Preface

This developer guide comes directly from the docs directory of the Codename One Git repository. The documentation is written in AsciiDoc, reviewed through pull requests, and published from the main branch to several targets.

How to contribute updates

To contribute updates, clone the repository, create a feature branch, and edit the AsciiDoc files in docs/developer-guide. Follow the steps in the CONTRIBUTING guidelines to open a GitHub pull request (PR) instead of using the deprecated community wiki. Continuous integration lints and builds each PR automatically. A maintainer then reviews the PR before merging it. After the merge, the content appears in the web manual at https://www.codenameone.com/manual/ and in the downloadable PDF at https://www.codenameone.com/files/developer-guide.pdf. From time to time, major revisions are collected for print-on-demand distribution.

This guide focuses on tutorial and conceptual material. The complete API reference is available in the Codename One Javadoc. The framework source code and this manual live side by side in Git, so documentation and code improvements follow the same contribution workflow.

Authors

This document includes content from contributors and community wiki edits. If you edit pages in the guide, add your name here in alphabetical order by surname:

Rights & Licensing

You may copy, redistribute, or print this document without prior permission from Codename One. You may not charge for the document itself, but charging for printing costs remains permitted.

If you print or reproduce sections and make changes, state that the result is a modified copy. Also link to the original source at https://www.codenameone.com/developer-guide/.

Conventions

This guide uses several notations for tips and further guidance.

When additional information breaks from the current tutorial flow, use a sidebar like this:

Sidebar

Dig deeper into details that don’t quite fit the current flow. Sidebars cover important detours. You can skip them while reading and return to them later.

Here are common conventions for highlighting notes:

This is an important note
This is a helpful tip
This is a general informational note. It may be interesting, but it isn’t crucial.
This is a warning. Pay attention to it.

This convention is used when referring to a button or widget to press in the UI. For example, press the button labeled Press Here.

Quotes appear as follows:

This is a quote

— By Author

Bold provides light emphasis for a specific word or two within a sentence.

1. Maven Project Workflow

Codename One uses Maven as the standard way to create, run, and maintain applications. This chapter consolidates the workflow guidance that used to live in the standalone Maven manual so the developer guide provides a single source of truth for building apps, updating projects, and managing add-ons.

1.1. Introduction

Codename One uses Maven as its primary build tool. This guide aims to be the definitive source of information for this project structure.

1.1.1. Conventions

The instructions throughout this chapter provide parallel guidance for the supported development environments. Each subsection heading clearly identifies the target tooling so you can follow the directions that match your workflow:

  • Command Line (CLI) – Focused on running Maven from a terminal. The commands use a Unix-style shell syntax; adapt the examples for Windows when necessary.

  • IntelliJ IDEA – Step-by-step directions for working inside IntelliJ.

  • NetBeans – Equivalent instructions tailored to NetBeans.

  • Eclipse – Maven-based guidance for Eclipse users.

When you encounter environment-specific sections later in the guide, simply follow the subsection corresponding to your preferred tools.

1.2. Getting Started

1.2.1. Creating a New Project

Codename One Initializr

The easiest way to create a new project is to use the Codename One initializr.

codenameone initializr screenshot

This tool will allow you to choose from a growing selection of project templates, and download a starter project that you can open in your preferred IDE (IntelliJ IDEA, NetBeans, etc..), or build directly on the command-line using Maven.

The following tutorials provide step-by-step instructions for getting started with bare-bones app templates. Those tutorials are a better starting place for Codename One development than this manual, as they are written in tutorial form.

Java Getting Started Tutorial:

Kotlin Getting Started Tutorial:

Generating a New Project from the Command-line
Bare-bones Java Project

If you prefer to generate your projects directly on the command-line, you can use the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” to generate the project directly on the command-line.

mvn archetype:generate \
  -DarchetypeGroupId=com.codenameone \
  -DarchetypeArtifactId=cn1app-archetype \
  -DarchetypeVersion=LATEST \
  -DgroupId=YOUR_GROUP_ID \
  -DartifactId=YOUR_ARTIFACT_ID \
  -Dversion=1.0-SNAPSHOT \
  -DmainName=YOUR_MAIN_NAME \
  -DinteractiveMode=false

This will generate a project in the current directory. The project’s directory will have the same name as the artifact ID you specified here. E.g. If your command had -DartifactId=myapp, then the project will be located in a newly created directory named "myapp".

If you haven’t used Maven archetypes before, this snippet may be confusing. See Introduction to Maven Archetypes to get up to speed.

This command uses the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” which has the following Maven coordinates:

<dependency>
  <groupId>com.codenameone</groupId>
  <artifactId>cn1app-archetype</artifactId>
  <version>LATEST</version>
  <type>maven-archetype</type>
</dependency>

This archetype generates a bare-bones Java project (the same one described in Getting Started with the Bare-bones Java App Template).

View the source of the the cn1app-archetype project here.

You can learn more about using the archetype in the appendix.

Project Templates

The bare-bones Kotlin App project template is an alternative starter project that uses Kotlin as the primary language instead of Java. it’s built on the cn1app-archetype at its core, but it includes some additional configuration settings and sources to modify the template. You can use such templates as starter projects by using the generate-app-project goal of the Codename One Maven plugin.

Here is an example which generates a project based on the bare-bones kotlin template:

mvn com.codenameone:codenameone-maven-plugin:{cn1-plugin-release-version}:generate-app-project \
  -DarchetypeGroupId=$archetypeGroupId \
  -DarchetypeArtifactId=$archetypeArtifactId \
  -DarchetypeVersion=$archetypeVersion \
  -DartifactId=$artifactId \
  -DgroupId=$groupId \
  -Dversion=$version \
  -DmainName=$mainName \
  -DinteractiveMode=false \
  -DsourceProject=/path/to/kotlin-example-app
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

Like the archetype:generate goal, this will create the project in a directory named after your specified artifact ID. E.g. If your command included -DartifactId=myapp, then the project would be in a newly-created directory named "myapp".

Some notes here:

  1. The com.codenameone:codenameone-maven-plugin:7.0.210:generate-app-project argument is the fully-qualified goal name for the generate-app-project. This is necessary since we aren’t running this goal in the context of any existing project. You should adjust the version number (7.0.210) to reflect the latest available Codename One version on Maven Central.

  2. The archetypeGroupId, archetypeArtifactId, and archetypeVersion parameters are the same as when using the archetype:generate goal, and they will (almost) always refer to the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)”.

  3. The groupId, artifactId, and version work the same as for the archetype:generate goal. that’s, that they specify the coordinates for your newly created project.

  4. The mainName specifies the Main class name for your app. This is the class name, and should not include the full package. E.g. "MyApp", not "com.example.MyApp"

  5. The sourceProject property is the path to the "template" project. In this case, you will assume that you’ve cloned the bare-bones kotlin project template repository at /path/to/kotlin-example-app.

A project template isn’t much different than a regular project. The template can be either a legacy Ant project, or a new Maven project. In fact, this goal is the same one you would use to migrate a legacy Ant project to use the new Maven project structure.

See Section 1.4, “Creating Project Templates” for instructions on building your own project templates.

1.2.2. Migrating an Existing Project

If you’ve an existing Codename One application project that uses the old Ant project structure, you can use the generate-app-project goal to migrate the project over to maven. This goal doesn’t make any changes to the Ant project. It creates a new Maven project and copies over all of the project sources and libraries, reorganized to fit the new project structure.

A minimal invocation of this goal would look like:

# Specify your the version of the codenameone-maven-plugin.
# Find the latest version at
# https://search.maven.org/search?q=a:codenameone-maven-plugin
CN1VERSION={cn1-plugin-release-version}
mvn com.codenameone:codenameone-maven-plugin:$CN1VERSION:generate-app-project \
  -DgroupId=YOUR_GROUP_ID \
  -DartifactId=YOUR_ARTIFACT_ID \
  -DsourceProject=/path/to/your/project \
  -Dcn1Version=$CN1VERSION
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

This will generate the new project in the current directory inside a folder named after the artifactId parameter.

After building the project, try running it to make sure that the migration worked. E.g. Assuming that your artifactId was myapp:

Command Line
cd myapp
./run.sh
On Windows it would be run.bat instead of run.sh.

If All goes well, your app should open in the Codename One simulator.

IntelliJ IDEA

Open the myapp folder in IntelliJ. Then press the "Run" intellij run icon button in the upper right of the toolbar.

If All goes well, your app should open in the Codename One simulator.

NetBeans
Before opening the project in NetBeans, be sure to copy the files in the tools/netbeans directory into the root directory. These are necessary for NetBeans to properly run, build, and debug the project.

Open the myapp folder as a project in NetBeans. Then press the "Run" netbeans run icon button on the toolbar.

If all goes well it should open in the Codename One simulator.

Eclipse IDE

Open Eclipse, and select "File" > "Import.."

eclipse file menu import

In the Import dialog, expand Maven, select Existing Maven Projects, and press Next.

eclipse import dialog

In the next panel, press the Browse button, and, in the file dialog, select the "myapp" directory, and press Next.

eclipse import browse dialog

The next panel should look similar to the one below. Make sure all of the projects are "checked", and press Finish.

eclipse import list projects dialog

Almost there, but not quite…​

Next you need to import the Eclipse launch configurations located inside the tools/eclipse directory.

Select File > Import…​ again, but this time, in the Import dialog, select Run/Debug > Launch Configurations and click Next.

eclipse import launch configurations dialog

In the next panel, press Browse…​ then select the tools/eclipse directory.

eclipse launch configurations file dialog

Then check the eclipse option, and press Finish

eclipse import launch configurations finish

The "Run" button menu should now include options for all of the major build targets. You can see them by pressing on the Run button in the toolbar:

eclipse run button dropdown

Select the MyApp - Run Simulator option from this menu.

If all goes well it should open in the Codename One simulator.

Example: Migrating Kitchen Sink App

Let us consider a concrete example, now. Download the KitchenSink Ant project from here and extract it.

The following is a bash script that uses curl to download this project as a zip file, and then converts it to a fully-functional Maven project.

CN1_VERSION={cn1-plugin-release-version}
curl -L https://github.com/codenameone/KitchenSink/archive/v1.0-cn7.0.11.zip > master.zip
unzip master.zip
rm master.zip
mvn com.codenameone:codenameone-maven-plugin:${CN1_VERSION}:generate-app-project \
  -DarchetypeGroupId=com.codename1 \
  -DarchetypeArtifactId=cn1app-archetype \
  -DarchetypeVersion=${CN1_VERSION} \
  -DartifactId=kitchensink \
  -DgroupId=com.example \
  -Dversion=1.0-SNAPSHOT \
  -DinteractiveMode=false \
  -DsourceProject=KitchenSink-1.0-cn7.0.11
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

This will generate the maven project in a directory named "kitchensink" in the current working directory because of the -DartifactId=kitchensink directory.

1.2.3. Adding Project Dependencies

For the easiest and recommended approach to adding dependencies to your project, skip to Section 1.2.3.5, “Managing Add-Ons in Control Center”.

One of the reasons to use Maven as the build tool is because it makes the management of project dependencies almost trivial. If the library you want to add is on Maven central, then you can copy and paste its <dependency> snippet into your pom.xml file and you’re good to go. Maven does the rest.

See Introducton to the Dependency Mechanism on the Maven website for a gentle, but comprehensive introduction to Maven dependencies.

With Codename One projects, there are a few caveats (see Section 1.2.3.4, “The Compliance Check”), and a few added nicities that make it easier to find and install add-on libraries in your project (see Section 1.2.3.5, “Managing Add-Ons in Control Center”).

Which pom.xml Do I add the <dependency> Snippet to?

Let us assume that you’ve a Maven <dependency> snippet that you’ve copied from Maven central, and it’s burning a hole in your clipboard while you’re trying to figure out where to paste it into your project. Codename One application projects, being multi-module projects, have more than one pom.xml file; One per module.

Question: Which pom.xml file do I paste my snippet into?

Answer: common/pom.xml (almost always).

The "common" module is where nearly all of your Codename One application resides. It houses your Java and Kotlin files, your CSS files, your GUI builder files, your Codename One configuration files (i.e. codenameone_settings.properties). Pretty much everything. The things you’d place in the other modules (e.g. Java SE, ios, etc…​) are your platform-specific native interface implementations; And in many applications you won’t need any of that.

Therefore, when adding dependencies into your app, you’ll almost always place them inside the pom.xml file for the "common" module.

You can add dependencies without needing to modify XML configuration files using the Control Center. See Section 1.2.3.5, “Managing Add-Ons in Control Center”.
When to use the "other" pom.xml Files

The instructions say that we almost always add dependencies in the common/pom.xml file. So what are the other modules' pom.xml files for, and when do we need to modify them, or add dependencies to them?

Here’s an overview:

%PROJECT_ROOT%/pom.xml

The root pom.xml file is the parent module of all of other modules. Anything you add here will be inherited by all of the modules. It can be helpful to use <dependencyManagement> and <pluginManagement> sections in this file to consolidate versions for dependencies and plugins project-wide. This is also a good place to add project meta-data like <developers>, <scm>.

Java SE/pom.xml

Any dependencies that are only required for native implementations on the Java SE platform can be added here. Dependencies added to this project aren’t subject to the compliance check.

Additionally, this module handles the build toolchain for the Java SE platform. This includes Mac and Windows Desktop builds, as well as Java SE desktop builds. If you want to customize the build workflow for any of these targets, you would do so by adding plugin executions in this pom.xml file.

android, ios, win, and javascript

These modules don’t really use Maven for their dependencies (Android may deserve a small asterisk here, but that’s complicated), so the primary thing you’d want to modify in these pom.xml files are the build toolchain for those targets. E.g. You might add plugin executions for your CI workflow on builds targeting these particular platforms.

Example: Adding Google Maps Dependency via Maven Central

Let us add the GoogleMaps library to our app as a maven dependency.

As described in the GoogleMaps cn1lib README, the dependency snippet is:

<dependency>
  <groupId>com.codenameone</groupId>
  <artifactId>googlemaps-lib</artifactId>
  <version>1.0.1</version>
  <type>pom</type>
</dependency>

You should, however, look on Maven central to see what the latest version number is, and substitute that version into the <version> tag of the snippet.

Copy and paste this snippet into the <dependencies> section of your common/pom.xml file. And save it.

The common/pom.xml file has a lot of existing configuration in it, and it may not be clear, on first glance, where the <dependencies> tag is located. A simple "find" for <dependencies> may deliver you a red herring also, since there are a few <profile> tags which also include <dependencies> sections.

The correct <dependencies> section, is located near the top of the file. You can identify it because it will include the following comment:

<!-- INJECT DEPENDENCIES -->

This is a special marker that’s used by some of the Codename One tooling to help it locate the optimal place to inject dependencies.

don’t REMOVE THIS COMMENT. Just add your dependency snippet somewhere before or after it.

Compatibility with Codename One

You can paste any Maven dependency snippet you like into your project, but libraries that haven’t been specifically developed for Codename One might not be compatible. See Appendix C, API. If you’re unsure whether a library is compatible, you could add the dependency and try to use it in your app. If it isn’t compatible, it will fail when you try to build the app, during the compliance check.

The easiest way to find compatible libraries is to use the extensions section of the Control Center. Libraries listed in this section have been build specifically for Codename One and are guaranteed to be compatible.

The Compliance Check

All application code in the common module of your Codename One project must be compatible with Codename One. This includes all dependencies. When you build your project, it will perform a compliance check to ensure that no code uses unsupported APIs. (See Appendix C, API).

If the compliance check fails (i.e. the app uses unsupported APIs), the build will fail. The error log should provide some clues as to where the offending code resides.

Managing Add-Ons in Control Center

As I mention throughout this guide, the best place to find and install add-ons for your project is in the Codename One Control Center (aka Codename One Preferences. aka Codename One Settings). See Appendix D, Codename One Settings.

From the dashboard, select "Advanced Settings" > "Extensions" in the navigation menu on the left as shown below:

Control center navigation menu

This will bring up a list of available Codename One extensions as shown below:

Control center extensions page

As an example, let’s install the "Google Maps" library.

Type in "Maps" into the search box, and it should narrow the options down to three libraries as shown below:

Control Center Extensions filtered on maps

The one in the middle "Codename One Google Native", is the Google maps lib that we want.

Press the "Download" button.

You should see a progress indicator while performs the installation.

How Control Center Handles Maven Dependencies

Many of the extensions listed in the control center are deployed as cn1lib bundles. Others are deployed on Maven central and could simply be installed by adding a snippet into the pom.xml file (as described in Section 1.2.3.2, “Example: Adding Google Maps Dependency via Maven Central”).

The control center UI shields you from the details of how it installs the extensions into your app. For extensions that are deployed on Maven central, it will simply add the Maven dependency for the library directly into your project’s common/pom.xml file. For extensions that are distributed as cn1lib bundles, it uses the install-cn1lib Maven goal to install it into your project.

You shouldn’t need to worry about this, as it happens seamlessly. If you’re curious, you can look at the <dependencies> section of your common/pom.xml file to see the added <dependency> tag after you install an extension.

Installing Legacy cn1libs

The recommended approach for installing add-ons to your project is to use the control center, or by adding the maven dependency to your common/pom.xml file. However, in some situations you may not be able to use those methods. E.g. If you’ve a legacy cnlib file that you need to use in your app, and it isn’t available on Maven central or the control center.

In cases like this you can use the install-cn1lib Maven goal to install it as follows:

mvn cn1:install-cn1lib -Dfile=/path/to/yourlibrary.cn1lib

1.3. Updating Codename One

Codename One releases new versions weekly on Maven central. it’s recommended that you stay up to date with the latest version as much as possible to ensure compatibility with the Codename One build server, which is always running the latest version.

You can use the update goal to update both the Codename One libraries, and the Codename One dependencies in your project.

e.g.

mvn cn:update

CLI

Alternatively you can use the run.sh/run.bat script to run this goal as follows:

./run.sh update
Use run.bat update instead on Windows

IntelliJ

Alternatively you can click on the "Configuration" menu, and select "Tools" > "Update Codename One" as shown here:

intellij update codenameone

Then press the Run button.

NetBeans

Alternatively you can right click on the project in the project inspector, and select "Run Maven" > "Update Codename One" as shown here:

netbeans update codenameone

Then press the Run button.

Manually Updating the pom.xml file

You can also update your Codename One dependencies manually by modifying the cn1.version and cn1.plugin.version properties defined in your project’s pom.xml file.

E.g. Open the pom.xml file, and look for the following:

<cn1.plugin.version>7.0.210</cn1.plugin.version>
<cn1.version>7.0.210</cn1.version>

Change these values to reflect the latest version of the codenameone-maven-plugin found here.

Updating the cn1.plugin.version and cn1.version properties manually will update the Maven dependencies for your project but it won’t update the other Codename One tools such as the GUI builder, and the Build Server Client, which are managed outside of Maven. You should use the Section B.20, “Update Codename One (update)” as described at the beginning of this section to perform a "full" update.

1.4. Creating Project Templates

A project template is a Codename One application project that can be used as a starting point for building a Codename One application. Codename One initializr uses project templates to generate starter projects for Codename One applications. You can also use the Section B.5, “Generate App Project (generate-app-project)” goal to generate starter projects from templates directly in Maven.

Any Codename One project can be converted into a project template.

1.4.1. Converting a Codename One Application Project into a Project template

If you’ve an existing maven Codename One application project, you can convert it into a project template by adding a file named generate-app-project.rpf in the root directory of the project.

The contents of this file should look like:

template.mainName=$YOUR_PROJECT_MAIN_NAME
template.packageName=$YOUR_PROJECT_PACKAGE_NAME

[dependencies]
====
... YOUR PROJECT MAVEN DEPENDENCIES ...
====

[parentDependencies]
====
... YOUR PARENT PROJECT MAVEN DEPENDENCIES ...
====

Where you make the following substitutions:

$YOUR_PROJECT_MAIN_NAME

This should be the value of the codename1.mainName property in the project’s codenameone_settings.properties file.

$YOUR_PROJECT_PACKAGE_NAME

This should be the value of the codename1.packageName property in the project’s codenameone_settings.properties file.

…​ YOUR PROJECT MAVEN DEPENDENCIES…​

Paste any maven dependencies that the project requires into this section. These will be injected into the <dependencies> section of the common/pom.xml file.

…​ YOUR PARENT PROJECT MAVEN DEPENDENCIES…​

Paste any maven dependencies that the parent project requires into this section. These will be injected into the <dependencies> section of the pom.xml file.

See Section B.5.4.2, “Sample generate-app-project.rpf file” for a more concrete example of the generate-app-project.rpf.

1.4.2. Test your Project Template

You can test your project template by using it as the sourceProject parameter for the generate-app-project goal. See Section B.5, “Generate App Project (generate-app-project)”.

1.4.3. Add Your Template to Codename One Intializr

If you’ve a project template that you want to share with the community, please file an issue in the Codename One issue tracker with a link to a Github Repository of your project template, and request to have it added Codename One initializr.

1.5. Codename One Libraries

A Codename One Library (cn1lib) is a module that can be distributed and added to Codename One applications to add functionality. It can be distributed as a self-contained bundle (a file with the.cn1lib extension), or deployed on Maven central to be included in application projects as a pom dependency.

A cn1lib may contain any of the following:

  1. Cross-platform Java classes.

  2. Native code that targets specific platforms.

  3. Build hints, which will affect how projects will be built that include this library. These can contain things like Gradle dependencies on Android, cocopods dependencies on iOS, and other hints to affect the build-server process.

  4. CSS files.

.cn1lib vs.jar

You may be wondering why the .cn1lib format is even necessary. Why not just distribute libraries as .jar files? The .cn1lib format offers several advantages over the plain .jar format:

  1. cn1libs can contain platform-specific native sources that make use of native APIs on the various platforms. E.g. they can contain Objective-C code which will be compiled on the build server when deploying on iOS.

  2. Codename One library projects perform a compliance check at the time that the library is compiled to ensure it only uses supported Codename One APIs. This provides a sort of "certification" that the library will be compatible with Codename One application projects.

  3. Codename One libraries can include CSS files and build hints which will be appended to the build hints of application projects when they are built.

All that said, you can still distribute libraries as plain old jars and include them in your Maven Codename One projects as jar dependencies. Codename One application projects will perform an additional compliance check to ensure that the jar is compatible, and the build will fail if it uses APIs that aren’t available in Codename One.

Codename One supports a subset of JavaSE8, as well as addition APIs for accessing device functionality and building beautiful user interfaces. See the Codename One javadocs for a definitive list of supported APIs.

1.5.1. Creating a Library Project

Use the cn1lib-archetype for generating a new Codename One library project as follows:

Command Line
mvn archetype:generate \
  -DarchetypeArtifactId=cn1lib-archetype \
  -DarchetypeGroupId=com.codenameone \
  -DarchetypeVersion=LATEST \
  -DgroupId=com.example.mylib \
  -DartifactId=mylib \
  -Dversion=1.0-SNAPSHOT \
  -DinteractiveMode=false
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

In the above snippet you would change the groupId, artifactId, and version properties to reflect your project settings.

You can run the archetype:generate goal with as many or few properties as you like, and it will prompt you to enter any properties that are required. E.g. You could enter:

mvn archetype:generate

And then follow the prompts. Or you could enter:

mvn archetype:generate -DarchetypeGroupId=com.codenameone \
  -DarchetypeArtifactId=cn1lib-archetype
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

And follow the prompts. This will, result in fewer prompts because you’ve already specified the archetype to use.

This will create a new project for you in the current directory, in a newly created directory named after the artifactId that you entered.

IntelliJ IDEA
  1. Select "File" > "New Project"…​

    intellij new project menu
  2. Select "Maven" in the left menu.

    intellij new project dialog maven
  3. Check the "Create from Archetype" checkbox. intellij create from archetype checkbox. This should allow you to choose from of archetypes that are already known to IntelliJ.

  4. If you don’t see an option for "com.codenameone:cn1lib-archetype", then IntelliJ doesn’t know about it yet. If, however you do see this option, you can skip to the next step. Press the "Add Archetype…​" button. This will display a dialog for you to enter the details of the archetype.

    intellij add archetype

    Fill in this dialog as shown in the above image. Specifically groupId="com.codenameone", artifactId="cn1lib-archetype", and version="LATEST"

    Then press "OK".

  5. Select the option that says "com.codenameone:cn1lib-archetype"

    intellij select cn1lib archetype

    Then press "Next"

  6. This will display a form where you can enter the details of your project such as its location (where you want to create the project folder), the name, the artifact ID, and the groupID. Fill in this form as you see fit.

    intellij new cn1lib project details form

    Then click "Next"

  7. The final form in this wizard summarizes the project details and gives you an opportunity to add additional properties to pass to the archetype:generate goal. In our case we don’t need to add any additional properties. If the information looks correct, you can press "Next".

    intellij new cn1lib project details summary

At this point you will be prompted to open the project.

NetBeans
  1. Select "File" > "New Project…​"

    netbeans new project menu
  2. In the "New Project" dialog, select "Java with Maven" in the left panel, and "Project from Archetype" in the right panel, as shown below.

    netbeans new project maven dialog

    Then press "Next"

  3. This will bring you to the "Maven Archetype" dialog as shown below:

    netbeans maven archetype cn1lib dialog

    Enter "com.codenameone" or "cn1lib-archetype" into the search field. Then select "cn1lib-archetype" in the "Known archetypes:" panel. This will prefill the Group ID, Artifact ID and Version fields for you. You may want to change Version to LATEST to ensure that it tries to use the latest available version of the archetype.

    Then click "Next"

  4. This will bring you to the "Name and Location" panel of the wizard.

    netbeans new project name and location

    Enter in the project name (which you’ll be forced to use as the artifact ID also), project location, groupId, version, and package. The "Package" is unimportant here as it isn’t used anywhere in the project.

    Once you’ve entered the information to your liking press the "Finish" button.

This will create a new libary project for you at the location you specified.

Eclipse IDE
  1. Select "File" > "New Project…​"

  2. In the New Project dialog, expand the Maven item, and select Maven Project

    eclipse new project wizard

    Then press "Next"

  3. The next panel will look like the below image. The default settings on this panel should be fine. Press Next

    eclipse new project wizard new maven project
  4. In the next panel, enter "cn1lib" in the Filter field. After a moment the cn1lib-archetype should appear in the area below as shown here:

    eclipse new maven project cn1lib

    Select that option, and press Next

  5. The next panel, allows you to enter your project details, such as group ID, and artifact ID. Your project information here and then press Finish.

    eclipse new maven project details

This will create a new libary project for you at the location you specified.

Project Structure

Let us take a look at the project that was created. it’s a multi-module Maven project with the following modules:

common

The module where you’ll add all of your cross-platform code and CSS, and build hint configuration. This module is in the "common" directory of the main project.

Java SE

The module where you can implement native interfaces for the Java SE platform. This module is in the "Java SE" directory of the main project.

ios

The module where you can implement native interfaces for the iOS platform. This module is in the "ios" directory of the main project.

android

The module where you can implement native interfaces for the Android platform. This module is in the "android" directory of the main project.

javascript

The module where you can implement native interfaces for the Javascript platform. This module is in the "javascript" directory of the main project.

lib

The library module which includes all of the other modules as dependencies, and can be used as a pom dependency in Codename One application projects that wish to use this library. This module is in the "lib" directory of the main project.

tests

An application project for writing unit tests against your library. This module is in the "tests" directory of the main project.

IntelliJ IDEA IDEA

The project inspector will look like:

intellij myfirstlib project inspector

This top-level view of the module structure may seem daunting. Most of your development will occur inside the "common" module. If we expand that module it will look more familiar to developers who have used the old Ant project structure:

intellij myfirstlibrary common project files

Your cross-platform Java source would go in the common/src/main/java directory. Your CSS files go in the common/src/main/css directory.

NetBeans

The project inspector will look like:

netbeans myfirstlibrary project inspector

This top-level view of the modules doesn’t provide a clear view of the project landscape, however, since 99% of your development will occur inside the common submodule. Let us open that "common" sub-module project as well and take a peek.

Right click on the "Common" sub-module, and select "Open Project" as shown below:

netbeans myfirstlibrary open common submodule

With the common subproject open, the project inspector will look like:

netbeans myfirstlibrary project inspector with common

In this screenshot I have expanded "Source Packages" and "Other Sources/css" to highlight where your Java source files and CSS source files will be located.

The project inspector hides a few important files, however, so here is a screenshot of the File inspector for the common project:

netbeans my first library file inspector common
Eclipse IDE IDE

The package explorer will look like:

eclipse cn1lib package explorer

In this screenshot, I have expanded the common/src/main/css and common/src/main/java directories as this is where most of your module source will go.

Command Line

If we do a file listing on the project directory, it shows the following:

Steves-Mac-Pro:MyFirstLibrary shannah$ find .
.
./tests
./tests/pom.xml
./tests/javase
./tests/javase/pom.xml
./tests/common
./tests/common/codenameone_settings.properties
./tests/common/pom.xml
./tests/common/nbactions.xml
./tests/common/src
./tests/common/src/test
./tests/common/src/test/java
./tests/common/src/test/java/com
./tests/common/src/test/java/com/example
./tests/common/src/test/java/com/example/myfirstlib
./tests/common/src/test/java/com/example/myfirstlib/MyFirstTest.java
./tests/common/src/main
./tests/common/src/main/css
./tests/common/src/main/css/theme.css
./tests/common/src/main/java
./tests/common/src/main/java/com
./tests/common/src/main/java/com/example
./tests/common/src/main/java/com/example/myfirstlib
./tests/common/src/main/java/com/example/myfirstlib/LibraryTests.java
./tests/cn1libs
./tests/.mvn
./tests/.mvn/jvm.config
./pom.xml
./javase
./javase/pom.xml
./javase/src
./javase/src/main
./javase/src/main/java
./javase/src/main/java/com
./javase/src/main/java/com/example
./javase/src/main/java/com/example/myfirstlib
./ios
./ios/pom.xml
./ios/src
./ios/src/main
./ios/src/main/objectivec
./common
./common/codenameone_library_required.properties
./common/pom.xml
./common/codenameone_library_appended.properties
./common/src
./common/src/test
./common/src/test/java
./common/src/test/java/com
./common/src/test/java/com/example
./common/src/test/java/com/example/myfirstlib
./common/src/test/java/com/example/myfirstlib/MyLibraryTest.java
./common/src/main
./common/src/main/css
./common/src/main/css/theme.css
./common/src/main/java
./common/src/main/java/com
./common/src/main/java/com/example
./common/src/main/java/com/example/myfirstlib
./common/src/main/java/com/example/myfirstlib/MyLibrary.java
./android
./android/pom.xml
./android/src
./android/src/main
./android/src/main/java
./android/src/main/java/com
./android/src/main/java/com/example
./android/src/main/java/com/example/myfirstlib
./lib
./lib/pom.xml
./MyFirstLibrary.iml
./javascript
./javascript/pom.xml
./javascript/src
./javascript/src/main
./javascript/src/main/javascript
./.idea
./.idea/encodings.xml
./.idea/jarRepositories.xml
./.idea/.gitignore
./.idea/workspace.xml
./.idea/misc.xml
./.idea/compiler.xml

This may seem daunting at first, but it’s important to realize that 99% of the time, you’ll be working in the "common" module - most of the other stuff is boilerplate.

Important Files

There are a few key files in this project that you’ll be using more than the others.

pom.xml

The maven configuration file of the root module is where you will set project-wide properties such as the cn1.version property, which specifies the version of the Codename One libraries that the module should be compiled against. Periodically, you’ll want to update the cn1.version property to point to the latest version.

When/if you decide to deploy your module to Maven central, you’ll need to add additional deployment-related settings in this file.

common/pom.xml

The maven configuration file for the "common" module, which will contain most of your cn1lib’s soure code, CSS files, and properties files. If your library depends on other libraries or jar files, you’ll usually be adding them as dependencies in this file, and not the root pom.xml file.

common/codenameone_library_appended.properties

This file is where you can specify properties that should be merged with the codenameone_settings.properties of application projects that include this library as a dependency. This is where you would add, for example, Gradle dependencies required for the Android builds, or cocoapods dependencies that are required for iOS builds.

common/codenameone_library_required.properties

This file allows you to specific build hints that must be present in application projects that include this library. If this libary requires a particular android build tools version, or a specific Java version, then those requirements should be specified in this file.

Important Directories

As mentioned previously, 99% of all of your development will likely occur inside the "common" module. The other modules are mostly for native implementations of Native interfaces.

common/src/main/java

This is where your cross-platform Java source files will be placed.

common/src/main/css

If your library uses CSS, this is where all CSS-related files will be placed.

common/src/main/resources

Other non-java resources that you want to have included in the classpath.

Building the Library
Command Line

To build the library, simply run the "install" goal on the root module as follows:

mvn install
IntelliJ IDEA IDEA

Press the "build" intellij build icon button on the toolbar.

NetBeans

Right click on the "root" module in the project explorer and select "Build".

netbeans right click build
You must build the root module and not one of the submodules.

Alternatively you could have selected the "root" module in the project explorer and pressed the "build" netbeans build button button on the toolbar.

Eclipse IDE IDE

Right click on the "root" module in the project explorer and select Run as > Maven Install

eclipse build cn1lib
If the build fails for any reason, check to make sure that your project is using the latest version of the Codename One plugin. You can do this by opening the pom.xml file, and changing the cn1.version and cn1.plugin.version properties to reference the latest version. Check for the latest version here.
Building the Legacy.cnlib File

When using the Maven build tool, we no longer require the.cn1lib file at all. Your library projects can be handled entirely via Maven’s dependency mechanism. The preferred way to distribute your libraries is on Maven central, and the preferred way to add a library to an application is via a Maven "pom" dependency.

That being said, you may still want to distribute your library as a.cn1lib file for the sake of users who are still using Ant as their build tool. For that reason, when you bulid a library project, the cn1lib is automatically built as well. After running a build, you can look in the common/target directory and find your.cn1lib file ready to be distributed.

Editing Java Code

In order to get acquainted with our project, let’s add a "Hello World" java class that we want to make available as part of our cn1lib.

Add a new class inside the "common/src/main/java" directory with package "com.example", and name "HelloWorld". Enter the following contents into the class:

package com.example;

public class HelloWorld {
    public static void helloWorld() {
        System.out.println("Hello world");
    }
}

Now build the library again. (See Section 1.5.1.6, “Building the Library”).

Using the Library in an Application Project

Now that you’ve built our library and added a Java class, let’s try adding it as a dependency in an application project. If you haven’t yet created an application project, do that now. See Section 1.2.1, “Creating a New Project” for instructions on creating a new application project.

Open the common/pom.xml file of your application project.

Make sure you’re editing the common/pom.xml file of the application project and not the library project.

This file may look a little hairy as there is a lot of configuration in there. You will be looking for the <dependencies> section.

The common/pom.xml file will have more than one <dependencies> tag, as it includes some profiles handling things like kotlin support. There will be one particular <dependencies> tag that includes a comment like

<!-- INJECT DEPENDENCIES -->

You should add your dependencies before this comment.

For the sake of this example, suppose our library was set up with the following coordinates:

groupId:

com.example

artifactId:

mylib

version:

1.0-SNAPSHOT

In this case we would add the following XML snippet to the <dependencies> section of our application’s common/pom.xml file:

<dependency>
    <groupId>com.example</groupId>
    <artifactId>mylib-lib</artifactId>
    <version>1.0-SNAPSHOT</version>
    <type>pom</type>
</dependency>
Notice that we appended "-lib" to the artifactId. This is because you’re including the "lib" module of our library project as the dependency, and not the root module. Also the <type>pom</type> is important as it indicates that this is a pom dependency - not a regular jar dependency.

Now let’s try it out. Try adding the following code to your application project’s main class (or anywhere in the application project, for that matter):

com.example.HelloWorld.helloWorld();

And build the project. The project should build OK, and if you run it, you should see that the helloWorld() method works as designed.

1.5.2. Distributing Your Library

The recommended way to distribute your library is on Maven central. That way users will be able to install your library by copying and pasting a familiar <dependency> snippet into their pom.xml file.

2. Introduction

Codename One is a Write Once Run Anywhere mobile development platform for Java/Kotlin developers. It fits naturally into modern Maven-capable IDEs such as IntelliJ IDEA, NetBeans, VS Code, and Eclipse, and you can also drive it entirely from the command line.

Codename One’s mission statement is:

Unify the complex and fragmented task of mobile device programming into a single set of tools, APIs and services. As a result create a more manageable approach to mobile application development without sacrificing the power/control given to developers.

This brings that old "Write Once Run Anywhere" (WORA) Java mantra to mobile devices without dumbing it down to the lowest common denominator.

The things that make Codename One stand out from other tools in this field are:

  • Write Once Run Anywhere support with no special hardware requirements and 100% code reuse

  • Compiles Java/Kotlin into native code for iOS, Android and even JavaScript/PWA

  • Open Source and Free with commercial backing/support

  • Easy to use with 100% portable Drag and Drop GUI builder

  • Full access to underlying native OS capabilities using the native OS programming language (for example: Objective-C) without compromising portability

  • Provides full control over every pixel on the screen

  • Lets you use native widgets (views) and mix them with Codename One components within the same hierarchy (heavyweight/lightweight mixing)

  • Supports seamless Continuous Integration out of the box

Codename One can trace its roots to the open source LWUIT project started at Sun Microsystem in 2007 by Chen Fishbein (co-founder of Codename One). It has been under constant development for over a decade.

2.1. Build Cloud

The build cloud approach to mobile development is one of the things that makes Codename One stand out. iOS native development requires a Mac with Xcode. Windows native development requires a Windows machine. To make matters worse, Apple, Google, and Microsoft change their tools regularly.

That makes it hard to keep up.

When you develop an app in Codename One, use the built-in simulator for running and debugging. When you want to build a native app, use the build cloud, where Macs build the native iOS apps and Windows machines build the native Windows apps. This works seamlessly and makes Codename One apps native because the native platform compiles them. For example, iOS builds use Macs running Xcode, the native Apple tool, to build the app.

Codename One doesn’t send source code to the build cloud, compiled bytecode!

2.1.1. Why Build Servers?

The build servers let you build native iOS apps without a Mac and native Windows apps without a Windows machine. They remove the need to install and update complex toolchains and simplify the process of building a native app to a right click.

Even though the build servers streamline delivery, Codename One also supports fully local builds. You can install the toolchain on your own hardware and follow the workflows in Chapter 1, Maven Project Workflow and [working-with-codename-one-sources] to compile, package, and test apps without leaving your desktop environment.

For example, because native iOS applications require a Mac with a recent version of Xcode, Codename One maintains such machines in the cloud. When developers send an iOS build, that Mac generates C source code using ParparVM, then compiles the C source code using Xcode and signs the resulting binary using Xcode. You can install the binary on your device or build a distribution binary for the App Store. Since C code is generated, your app is also future-proof against changes from Apple. You can also inject Objective-C native code into the app while keeping it 100% portable thanks to Codename One’s native interfaces capability.

Subscribers can receive the C source code back using the include-sources feature of Codename One and use those sources for benchmarking and debugging on devices.

The same is true for most other platforms. On Android and Java SE, Codename One runs the standard Java code, mostly unchanged.

Java Language Level Support

Historically, Java 8 syntax was supported through Retrolambda on the Codename One servers. It translated bytecode to Java 5 syntax using a server-based processor built on Retroweaver and custom code. This architecture was transparent to developers because the build servers abstract most of the painful differences between devices.

Today Codename One supports Java 25 level bytecode in ParparVM and Android supports Java 17 level bytecode natively. This lets Codename One support Java 17 seamlessly, and newer versions enable Java 25 level support through client side bytecode mutation.

2.1.2. How does Codename One Work?

Codename One uses a SaaS-based approach so the information in this appendix might (and probably will) change in the future to accommodate improved architectures. This appendix includes this information for reference, you don’t need to understand this in order to follow the content of the book…​

Since Android is already based on Java, Codename One is already native to Android and works with the Android VM (ART/Dalvik).

On iOS, Codename One built and open-sourced ParparVM, which is a conservative VM. ParparVM features a concurrent, non-blocking GC and is written entirely in Java/C. ParparVM is a transpiler that generates C source code matching the given Java bytecode. This means that an Xcode project is generated and compiled on the build servers. It’s as if you hand-coded a native app and is thus future-proof against changes that Apple introduces. For example, Apple migrated to 64-bit and later introduced bitcode support to iOS. ParparVM needed no modifications to comply with those changes.

Codename One translates the bytecode to C, which is faster than Swift/Objective-C. The port code that invokes iOS API’s is hand coded in Objective-C

Codename One previously offered a UWP (Universal Windows Platform) target based on iKVM. That target was discontinued in release 7.0.229 and is preserved as historical context in older documentation and blog posts.

JavaScript build targets use TeaVM to do the translation statically. TeaVM supports threading using JavaScript by breaking the app down in a rather elaborate way. To support the complex UI Codename One uses the HTML5 Canvas API which allows absolute flexibility for building applications.

For desktop builds Codename One uses javapackager, since both Macs and Windows machines are available in the cloud, the platform-specific nature of javapackager isn’t a problem.

Lightweight Architecture

What makes Codename One stand out is the approach it takes to UI: “lightweight architecture”.

Lightweight architecture is the “not so secrete sauce” to Codename One’s portability. Essentially it means all the components/widgets in Codename One are written in Java. Thus their behavior is consistent across all platforms and they are fully customizable from the developer code as they don’t rely on OS internal semantics. This allows developers to preview the application accurately in the simulators and GUI builders.

One of the big accomplishments in Codename One is its unique ability to embed “heavyweight” widgets into place among the “lightweights”. This is crucial for apps such as Uber where the cars and widgets on top are implemented as Codename One components yet below them you’ve the native map component.

Codename One achieves fast performance by drawing using the native gaming API’s of most platforms for example: OpenGL ES on iOS. The core technologies behind Codename One are all open source including most of the stuff developed by Codename One itself, for example: ParparVM but also the full library, platform ports, designer tool, device skins etc.

Lightweight Architecture Origin

Lightweight components date back to Smalltalk frameworks, this notion was popularized in the Java world by Swing. Swing was the main source of inspiration to Codename One’s predecessor LWUIT. Many frameworks took this approach over the years including JavaFX and most recently Ionic in the JavaScript world.

Why ParparVM

On iOS, Codename One uses ParparVM which translates Java bytecode to C code and boasts a non-blocking GC as well as 64 bit/bitcode support. This VM is fully open source in the Codename One git repository. In the past Codename One used XMLVM to generate native code similarly, but the XMLVM solution was too generic for the needs of Codename One. ParparVM boasts a unique architecture of translating code to C (similarly to XMLVM), because of that Codename One is the only solution of its kind that can guarantee future iOS compatibility since the officially supported iOS toolchain is always used instead of undocumented behaviors.

XMLVM could guarantee that as well, but it’s no longer maintained and lacked the API layer support

The key advantages of ParparVM over other approaches are:

  • Truly Native — since code is translated to C rather than directly to ARM or LLVM code, the app is "more native". It uses the official tools and approaches from Apple and can benefit from their advancements. For example: bitcode changes or profiling toolchain.

  • Smaller Class Library — ParparVM includes a small segment of the full JavaAPI’s resulting in final binaries that are smaller than the alternatives by orders of magnitude. This maps directly to performance and memory overhead.

  • Simple and Extensible — to work with ParparVM you need a basic understanding of C. Unlike other tools that require deep understanding of ARM assembly and LLVM bitcode. This is crucial for the fast-moving world of mobile development, as Apple changes things left and right, you need a more agile VM.

Historical Windows Ports

Codename One experimented with many Windows ports over the years, including the legacy Windows Phone target and a later UWP (Universal Windows Platform) target based on iKVM.

The UWP target was discontinued in release 7.0.229 and is no longer part of the supported build targets. Older references to it in historical material are retained for archival context.
JavaScript Port

The JavaScript port of Codename One is based on the work of the TeaVM project. The team behind TeaVM effectively built a JVM that translates Java bytecode into JavaScript source code while maintaining threading semantics with an imaginative approach.

The JavaScript port allows unmodified Codename One applications to run within a desktop or mobile browser. The port itself is based on the HTML5 Canvas API, which provides a pixel-perfect implementation of the Codename One API.

The JavaScript port is available for Enterprise grade subscribers of Codename One
Desktop and Android

The other ports of Codename One use the VMs available on the host machines and environments to execute the runtime. Historically, Retrolambda was used to provide Java 8 language features portably.

The Android port uses the native Android tools, including the Gradle build environment, in the latest versions.

The desktop port creates a standard Java SE application, which is packaged with the JRE and an installer.

The Desktop port is available to pro grade subscribers of Codename One

2.2. History

LWUIT App Screenshot
Figure 1. LWUIT App Screenshot circa 2007

Codename One was started by Chen Fishbein and Shai Almog who authored the Open Source LWUIT project at Sun Microsystems (circa 2007). The LWUIT project aimed to solve the fragmentation within J2ME/Blackberry devices by creating a higher standard of user interface than the common baseline at the time. LWUIT received critical acclaim and traction within many industries but was limited by the declining feature phone market. It was forked by many companies including Nokia. It was used as the base standard for DTV in Brazil. Another fork has brought a LWUIT into high end cars from Toyota and other companies. This fork later adapted Codename One as well.

In 2012 Shai and Chen formed Codename One as they left Oracle. The project has taken many of the basic concepts developed within the LWUIT project and adapted them to the smartphone world which is still experiencing similar issues to the device fragmentation of the old J2ME phones.

2.3. Core Concepts of Mobile Programming

Before you proceed, I would like to explain some universal core concepts of mobile programming that might not be intuitive. These are universal concepts that apply to mobile programming regardless of the tools you’re using.

You can skip this section if you feel you’re familiar enough with the core problems/issues in mobile app development.

2.3.1. Density

Density is also known as DPI (Dots Per Inch) or PPI (pixels or points per inch). Density is confusing, unintuitive and might collide with common sense. For example, an iPhone 7 plus has a resolution of 1080x1920 pixels and a PPI of 401 for a 5-inch screen. On the other hand, an iPad 4 has 1536x2048 pixels with a PPI of 264 on a 9.7 inch screen…​ Smaller devices can have higher resolutions!

As the following figure shows, if a Pixel 2 XL had pixels the size of an iPad, it would have been twice the size of that iPad. While in reality, it’s nearly half the height of the iPad!

Device Density vs Resolution
Figure 2. Device Density vs. Resolution

Differences in density can be extreme. A second generation iPad has 132 PPI, where modern phones have PPI that is over 600 dpi.

Low resolution images on high PPI devices will look either small or pixelated. High resolution images on low PPI devices will look huge, overscaled (artifacts) and will consume too much memory.

How the Same Image Looks in Different Devices
Figure 3. How the Same Image Looks in Different Devices

The exact same image will look different on each device, sometimes to a comical effect. One of the solutions for this problem is multi-images. All OS’s support the ability to define different images for various densities. I will discuss multi-images later in Chapter 2.

This also highlights the need for working with measurements other than pixels. Codename One supports millimeters (or dips) as a unit of measurement. This is highly convenient and is a better representation of size when dealing with mobile devices.

But there is a bigger conceptual issue involved. You need to build a UI that adapts to the wide differences in form factors. You might have fewer pixels on an iPad, but because of its physical size, you would expect the app to cram more information into that space so the app won’t feel like a blown-up phone application. There are many strategies to address that, but one of the first steps is in the layout managers.

I will discuss the layout managers in depth in Chapter 2, but the core concept is that they decide where a UI element is placed based on generic logic. That way, the user interface can adapt automatically to the huge variance in display size and density.

2.3.2. Touch Interface

The fact that mobile devices use a touch interface today isn’t news…​ But the implications of that aren’t immediately obvious to some developers.

UI elements need to be finger sized and heavily spaced. Otherwise, you risk the “fat finger” effect. That means spacing should be in millimeters and not in pixels due to device density.

Scrolling poses another challenge in touch-based interfaces. In desktop applications, it’s common to nest scrollable items. For example, in touch interfaces, the scrolling gesture doesn’t allow such a nuance. Furthermore, scrolling on both the horizontal and vertical axis (side scrolling) can be inconvenient in touch-based interfaces.

2.3.3. Device Fragmentation

Some developers single out this wide range of resolutions and densities as “device fragmentation”. While it does contribute to development complexity, for the most part, it isn’t a challenging problem to overcome.

Densities aren’t the cause of device fragmentation. Device fragmentation is caused by many OS versions with different behaviors. This is clear on Android and for the most part relates to the slow rollout of Android vendor versions compared to Google rollout. For example, 7 months after the Android 8 (Oreo) release in 2018, it was still available on 1.1% of the devices. The damning statistic is that 12% of the devices in mid 2018 run Android 4.4 Kitkat released in 2013!

This makes QA difficult as the disparity between these versions is pretty big. These numbers will be out of date by the time you read this, but the core problem remains. It’s hard to get all device manufacturers on the same page, so this problem will probably remain in the foreseeable future despite everything.

2.3.4. Performance

Besides the obvious need for performance and smooth animation within a mobile app, there are a couple of performance related issues that might not be intuitive to new developers: size and power.

App Size

Apps are installed and managed through stores. This poses some restrictions about what an app can do. But it also creates a huge opportunity. Stores manage automatic update and to some degree the marketing/monetization of the app.

A good mobile app is updated once a month and sometimes even once a week. Since the app downloads automatically from the store, this can be a huge benefit:

  • Existing users are reminded of the app and get new features instantly

  • New users notice the app featured on a “what’s new” list

If an app is big, it might not update over a cellular network connection. Google and Apple have restrictions on automatic updates over cellular networks to preserve battery life and data plans. A large app might negatively impact users perception of the app and trigger uninstalls for example, when a phone is low on available space.

Power Drain

Desktop developers rarely think about power usage within their apps. In mobile development, this is a crucial concept. Modern device OS’s have tools that highlight misbehaving applications, and this can lead to bad reviews.

Code that loops forever while waiting for input will block the CPU from sleeping and slowly drain the battery.

Worse. Mobile OS’s kill applications that drain the battery. If the app is draining the battery and is minimized, (for example, during an incoming call) the app could be killed. This will impact app performance and usability.

2.3.5. Sandbox and Permissions

Apps installed on the device are "sandboxed" to a specific area so they won’t harm the device or its functionality. The filesystem of mobile applications is restricted so one application can’t access the files of another application. Things that most developers take for granted on the desktop such as a "file picker" or accessing the image folder don’t work on devices!

This means that when your application works on a file, it belongs to your application. To share the file with a different application, you need to ask the operating system to do that for you.

Furthermore, some features require a "permission" prompt and in some cases require special flags in system files. Apps need to request permission to use sensitive capabilities, for example, Camera, Contacts etc.
Historically, Android developers declared required permissions for an app and the user was prompted with permissions during installation. Android 6 adopted the approach used by iOS of prompting the user for permission when accessing a feature.

This means that in runtime a user might revoke a permission. A good example in the case of an Uber app is the location permission. If a user revokes that permission, the app might lose its location.

2.4. Installing Codename One

Codename One requires either JDK 11 or JDK 8. Other JDK versions aren’t supported at this time.

Codename One projects are built with Maven. Typical Maven targets such as package, clean and install work out of the box, but the Codename One integrations that ship with each IDE provide dedicated Run and Build actions for a smoother workflow.

To create a new Codename One project visit https://start.codenameone.com/ and generate a starter project, or run the Codename One Application Project Archetype (cn1app-archetype) directly on the command line:

mvn archetype:generate \
  -DarchetypeGroupId=com.codenameone \
  -DarchetypeArtifactId=cn1app-archetype \
  -DarchetypeVersion=LATEST \
  -DgroupId=YOUR_GROUP_ID \
  -DartifactId=YOUR_ARTIFACT_ID \
  -Dversion=1.0-SNAPSHOT \
  -DmainName=YOUR_MAIN_NAME \
  -DinteractiveMode=false

This command generates a project in the current directory. The folder name matches the artifactId value. For example, specifying -DartifactId=myapp produces a project inside a new myapp directory.

Import the generated Maven project into your preferred IDE and use the Codename One Run in Simulator task from the IDE toolbar or Run/Debug buttons:

  • IntelliJ IDEA – use File > Open on the project directory, then choose the Codename One Run in Simulator action from the toolbar or standard Run/Debug controls.

  • NetBeans – use File > Open Project, select the generated Maven project, and rely on the Codename One toolbar actions to run and debug the simulator.

  • VS Code – install the Java and Codename One extensions, open the folder, and trigger the Run in Simulator task from the command palette or the Run/Debug buttons.

  • Eclipse – use File > Import > Existing Maven Projects, then use the Codename One launch shortcuts provided by the plugin for simulator and build tasks.

  • Command line – invoke Maven goals directly whenever you need to integrate with CI/CD pipelines or scripting.

For deeper coverage of the Maven goals, project structure, and automation tasks, continue with Chapter 1, Maven Project Workflow.

Arbitrary Maven dependencies probably won’t work for Codename One. Many dependencies assume a full JDK which Codename One can’t provide and they often assume functionality that might not be available for example: reflection, Spring, etc.
Legacy onboarding resources

Legacy Ant-based project instructions remain available for teams maintaining older codebases. New projects should follow the Maven workflows described in this guide.

2.4.1. Important Notes for New Projects

Before you get to the code there are few important things you need to understand about Codename One applications.

  • App Name - This is the name of the app and the main class, it’s important to get this right as it’s hard to change this value later

  • Package Name - it’s crucial you get this value right. Besides the difficulty of changing this after the fact, once an app is submitted to iTunes/Google Play with a specific package name this can’t be changed! See the sidebar "Picking a Package Name".

  • Theme - There are various types of built-in themes in Codename One, for simplicity recommend Native as it’s a clean slate starting point

Picking a Package Name

Apple, Google and Microsoft identify applications based on their package names. If you use a domain that you don’t own it’s possible that someone else will use that domain and collide with you. In fact some developers left the default com.mycompany domain in place all the way into production in some cases.

This can cause difficulties when submitting to Apple, Google or Microsoft. Submitting to one of them is no guarantee of success when submitting to another.

To come up with the right package name use a reverse domain notation. So if my website is goodstuff.co.uk my package name should start with uk.co.goodstuff. I highly recommend the following guidelines for package names:

  • Lower Case - some OS’s are case sensitive and handling a mistake in case is painful. The Java convention is lower case and I would recommend sticking to that although it isn’t a requirement

  • Avoid Dash and Underscore - You can’t use a dash character (-) for a package name in Java. Underscore (_) doesn’t work for iOS. If you want more than one word just use a deeper package e.g.: com.mydomain.deeper.meaningful.name

  • Obey Java Rules - A package name can’t start with a number so you can’t use com.mydomain.1sler. You should avoid using Java keywords like this, if etc.

  • Avoid Top Level - instead of using uk.co.goodstuff use uk.co.goodstuff.myapp. That would allow you to have more than one app on a domain

2.4.2. Runtime

Once Maven is set up you can run the HelloWorld application by selecting the Codename One Run in Simulator task from the IDE run menu. The Codename One simulator launches and you can use its menus to control and inspect details related to the device. You can rotate it, determine its location in the world, monitor networking calls etc.

With the Skins menu you can download device skins to see how your app will look on different devices.

Some skins are bigger than the screen size, uncheck the Scrollable flag in the Simulator menu to handle them more effectively

Use your IDE’s Debug button with the Run in Simulator task to launch the simulator under the debugger.

Simulator vs. Emulator

Codename One ships with a simulator similarly to the iOS toolchain which also has a simulator. Android ships with an emulator. Emulators go the extra mile. They create a virtual machine that’s compatible with the device CPU and then boot the full mobile OS within that environment. This provides an accurate runtime environment but is painfully slow.

Simulators rely on the fact that OS’s are similar and so they leave the low-level details in place and just map the API behavior. Since Codename One relies on Java it can start simulating on top of the virtual machine on the desktop. That provides several advantages including fast development cycles and full support for all the development tools/debuggers you can use on the desktop.

Emulators make sense for developers who want to build OS level services e.g. screensavers or low-level services. Standard applications are better served by simulators.

2.4.3. The Source Code Of The Hello World App

After clicking finish in the new project wizard you’ve a HelloWorld project with a few default settings. I will break the class down to small pieces and explain each piece starting with the enclosing class:

Listing 1. HelloWorld Class
public class HelloWorld { (1)
    private Form current; (2)
    private Resources theme; (3)

    // ... class methods ...
}
1This is the main class, it’s the entry point to the app, notice it doesn’t have a main method but rather callback which you will discuss soon
2Forms are the “top level” UI element in Codename One. Only one Form is shown at a time and everything you see on the screen is a child of that Form
3Every app has a theme, it determines how everything within the application looks for example: colors, fonts etc.

Next let’s discuss the first lifecycle method init(Object). I discuss the lifecycle in depth in the Application Lifecycle Sidebar.

Listing 2. HelloWorld init(Object)
public void init(Object context) { (1)
    updateNetworkThreadCount(2); (2)
    theme = UIManager.initFirstTheme("/theme"); (3)
    Toolbar.setGlobalToolbar(true); (4)
    Log.bindCrashProtection(true); (5)
    addNetworkErrorListener(err -> { (6)
        err.consume(); (7)
        if(err.getError() != null) { (8)
            Log.e(err.getError());
        }
        Log.sendLogAsync(); (9)
        Dialog.show("Connection Error", (10)
            "There was a networking error in the connection to " +
            err.getConnectionRequest().getUrl(), "OK", null);
    });
}
1init is the first of the four lifecycle methods. it’s responsible for initialization of variables and values
2By default Codename One has one thread that performs all the networking, you set the default to two which provides better performance
3The theme determines the appearance of the application. You will discuss this in the next chapter
4This enables the Toolbar API by default, it allows finer control over the title bar area
5Crash protection automatically sends device crash logs through the cloud
6In case of a network error the code in this block would run, you can customize it to handle networking errors effectively
7consume() swallows the event so it doesn’t trigger other alerts, it generally means “you got this”
8Not all errors include an exception, if you’ve an exception you can log it with this code
9This will email the log from the device to you if you’ve a pro subscription
10This shows an error dialog to the user, in production you might want to remove that code

init(Object) works as a constructor to some degree. Recommend avoiding the constructor for the main class and placing logic in the init method instead. This isn’t crucial but recommend it since the constructor might happen too early in the application lifecycle.

In a cold start init(Object) is invoked followed by the start() method. For example, start() can be invoked more than once if an app is minimized and restored, see the sidebar Application Lifecycle:

Listing 3. HelloWorld start()
public void start() {
    if(current != null){ (1)
        current.show(); (2)
        return;
    }
    Form hi = new Form("Hi World", BoxLayout.y()); (3)
    hi.add(new Label("Hi World")); (4)
    hi.show(); (5)
}
1If the app was minimized you usually don’t want to do much, show the last Form of the application
2current is a Form which is the top most visual element. You can have one Form showing and you enforce that by using the show() method
3You create a new simple Form instance. It has the title “Hello World” and arranges elements vertically (on the Y axis)
4You add another Label below the title, see figure [TitleAndLabelImage]. You will discuss component hierarchy later
5The show() method places the Form on the screen. Only one Form can be shown at a time
Title and Label in the UI
Figure 4. Title and Label in the UI

There are some complex ideas within this short snippet which I will address later in this chapter when talking about layout. The gist of it’s that you create and show a Form. Form is the top level UI element, it takes over the whole screen. You can add UI elements to that Form object, in this case the Label. You use the BoxLayout to arrange the elements within the Form from top to the bottom vertically.

Application Lifecycle

A few years ago Romain Guy (a senior Google Android engineer) was on stage at the Google IO conference. He asked for a show of hands of people who understand the Activity lifecycle (Activity is similar to a Codename One main class). He then proceeded to jokingly call the audience members who lifted their hands “liars” claiming that after all his years in Google he still doesn’t understand it…​

Lifecycle seems simple on the surface but hides a lot of nuance. Android’s lifecycle is ridiculously complex. Codename One tries to simplify this and also make it portable. Sometimes complexity leaks out and the nuances can be difficult to deal with.

Simply explained an application has three states:

  • Foreground - it’s running and in the foreground which means the user can physically interact with the app

  • Suspended - the app isn’t in the foreground, it’s either paused or has a background process running

  • Not Running - the app was never launched, was killed or crashed

The lifecycle is the process of transitioning between these 3 states and the callbacks invoked when such a transition occurs. The first time we launch the app we start from a “Cold Start” (Not Running State) but on subsequent launches the app is usually started from the "Warm Start" (Suspended State).

Codename One Application Lifecycle
Figure 5. Codename One Application Lifecycle

Codename One has four standard callback methods in the lifecycle API:

  • init(Object) - is invoked when the app is first launched from a Not Running state.

  • start() - is invoked for two separate cases. After start() is finished the app transitions to the Foreground state.

    • Following init(Object) in case of a cold start. Cold start refers to starting the app from a Not Running state.

    • When the app is restored from Suspended state. In this case init(Object) isn’t invoked

  • stop() - is invoked when the app is minimized e.g. when switching to a different app. After stop() is finished the app transitions to the Suspended state.

  • destroy() - is invoked when the app is destroyed e.g. killed by a user in the task manager. After destroy() is finished the app is no longer running hence it’s in the Not Running state.

destroy() is optional there is no guarantee that it will be invoked. It should be used only as a last resort

Now that you’ve a general sense of the lifecycle lets look at the last two lifecycle methods:

Listing 4. HelloWorld stop() and destroy()
public void stop() { (1)
    current = getCurrentForm(); (2)
    if(current instanceof Dialog) { (3)
        ((Dialog)current).dispose();
        current = getCurrentForm();
    }
}

public void destroy() { (4)
}
1stop() is invoked when the app is minimized or a different app is opened
2As the app is stopped you save the current Form so you can restore it back in start() if the app is restored
3Dialog is a bit of a special case restoring a Dialog might block the proper flow of application execution so you dispose them and then get the parent Form
4destroy() is a special case. Under normal circumstances you shouldn’t write code in destroy(). stop() should work for most cases

that’s it. Hopefully you’ve a general sense of the code. it’s time to run on the device.

2.4.4. Building and Deploying On Devices

Codename One Settings/Control Center
Figure 6. Codename One Control Center

You can use the Control Center to configure almost anything. Specifically, the application title, application version, application icon etc. are all found in the Codename One Settings maven target.

There are many options within this UI that control almost every aspect of the application from signing to basic settings.

Your device builds using the Codename One Cloud can also be found right here as well as subscription information.

Builds in Empty State
Figure 7. Device Builds in Logged out State
Signing/Certificates

All of the modern mobile platforms require signed applications but they all take radically different approaches when implementing it.

Signing is a process that marks your final application for the device with a special value. This value (signature) is a value that you can generate based on the content of the application and your certificate. Effectively it guarantees the app came from you. This blocks a 3rd party from signing their apps and posing as you to the App Store or to the user. it’s a crucial security layer.

A certificate is the tool you use for signing. Think of it as a mathematical rubber stamp that generates a different value each time. Unlike a rubber stamp a signature can’t be forged!

Signing on Android
Backup your Android certificate and save its password!
If you lose your Android certificate you won’t be able to update your app

Android uses a self signed certificate approach. You can generate a certificate by describing who you’re and picking a password!

Anyone can do that. For example, once a certificate is published it can’t be replaced…​

If this was not the case someone else could potentially push an “upgrade” to your app. Once an app is submitted with a certificate to Google Play this app can’t be updated with any other certificate.

With that in mind generating an Android certificate is trivial.

The following chart illustrates a process that’s identical on all IDE’s
android certificate generator
Figure 8. Process of Certificate Generation for Android
Your certificate will generate into the file Keychain.ks in your home directory
Make sure to back that up and the password as losing these can have dire consequences
Should I Use a Different Certificate for Each App?

In theory yes. In practice it’s a pain…​ Keeping multiple certificates and managing them is a pain so we often just use one.

The drawback of this approach occurs when you’re building an app for someone else or want to sell the app. Giving away your certificate is akin to giving away your house keys. So it makes sense to have separate certificates for each app.

Signing and Provisioning iOS

Code signing for iOS relies on Apple as the certificate authority. This is something that doesn’t exist on Android. iOS also requires provisioning as part of the certificate process and completely separates the process for development/release.

But first let’s start with the good news:

  • Losing an iOS certificate is no big deal - in fact you revoke them often with no impact on shipping apps

  • Codename One has a wizard that hides most of the pain related to iOS signing

In iOS Apple issues the certificates for your applications. That way the certificate is trusted by Apple and is assigned to your Apple iOS developer account. There is one important caveat: You need an iOS Developer Account and Apple charges a 99USD Annual fee for that.

The 99USD price and requirement have been around since the introduction of the iOS developer program for roughly 10 years at the time of this writing. It might change at some point though

Apple also requires a “provisioning profile” which is a special file bound to your certificate and app. This file describes some details about the app to the iOS installation process. One of the details it includes during development is the list of permitted devices.

The 4 files Required for iOS Signing and Provisioning
Figure 9. The Four Files Required for iOS Signing and Provisioning

You need 4 files for signing. Two certificates and two provisioning profiles:

  1. Production — The production certificate/provisioning pair is used for builds that are uploaded to iTunes

  2. Development — The development certificate/provisioning is used to install on your development devices

The certificate wizard automatically creates these 4 files and configures them for you.

Using the iOS Certificate Wizard Steps 1 and 2
Figure 10. Using the iOS Certificate Wizard Steps 1 and 2
Using the iOS Certificate Wizard Steps 3 and 4
Figure 11. Using the iOS Certificate Wizard Steps 3 and 4
Using the iOS Certificate Wizard Steps 5 and 6
Figure 12. Using the iOS Certificate Wizard Steps 5 and 6

If you’ve more than one project you should use the same iOS P12 certificate files in all the projects and regenerate the provisioning. In this situation the certificate wizard asks you if you want to revoke the existing certificate which you shouldn’t revoke in such a case. You can update the provisioning profile in Apple’s iOS developer website.

One important aspect of provisioning on iOS is the device list in the provisioning step. Apple allows you to install the app on 100 devices during development. This blocks developers from skipping the App Store altogether. it’s important you list the correct UDID for the device in the list otherwise install will fail.

There are many apps and tools that offer the UDID of the device, they aren’t necessarily reliable and might give a fake number!
Get the UDID of a Device
Figure 13. Get the UDID of a Device
You can right click the UDID and select copy to copy it

The simplest and most reliable process for getting a UDID is through iTunes. I have used other approaches in the past that worked but this approach is guaranteed.

Ad hoc provisioning allows 1000 beta testers for your application but it’s a more complex process that you won’t discuss here although it’s supported by Codename One
Build and Install

Before you continue with the build you should sign up at https://www.codenameone.com/build-server.html where you can soon follow the progress of your builds. You need a Codename One account in order to build for the device.

Now that you’ve certificates the process of device builds is literally a right click away for both OS’s. You can right click the project and select Codename OneSend iOS Debug Build or Codename OneSend Android Build.

Right click menu options for sending device builds
Figure 14. Right click menu options for sending device builds
The first time you send a build you will be prompted for the email and password you provided when signing up for Codename One

Once you send a build you should see the results in the build server page:

Build Results
Figure 15. Build Results
On iOS make sure you use Safari when installing, as 3rd party browsers might have issues

Once you go through those steps you should have the HelloWorld app running on your device. This process is non-trivial when starting so if you run into difficulties don’t despair and seek help at the discussion forum (https://www.codenameone.com/discussion-forum.html) or stack overflow (https://stackoverflow/tags/codenameone/). Once you go through signing and installation, it becomes easier.

You can also install the application either by emailing the install link to your account (using the e-mail Link button)

You can also download the binaries in order to upload them to the appstores.

2.5. Kotlin

Codename One started before Kotlin became public. Kotlin has since shown itself as an interesting option for developers especially within the Android community. With that in mind you decided to integrate support for Kotlin into Codename One.

To use Kotlin with Codename One you can create a kotlin directory next to the java directory under the common/src/main directory. Kotlin code that resides there can work as usual and interact with the Java code.

Please notice the following:

  • don’t use the project conversion tools or accept the warning that the project isn’t a Kotlin project. You do your own build process

  • Warnings and errors aren’t listed correctly and builds that claim to have errors might pass

2.5.1. Hello Kotlin

Due to the way Kotlin works you can create a regular Java project and convert sources to Kotlin. You can mix Java and Kotlin code without a problem and Codename One would "work".

The hello world Java source file looks like this (removed some comments and whitespace):

public class MyApplication {
    private Form current;
    private Resources theme;

    public void init(Object context) {
        theme = UIManager.initFirstTheme("/theme");
        Toolbar.setGlobalToolbar(true);
        Log.bindCrashProtection(true);
    }

    public void start() {
        if(current != null){
            current.show();
            return;
        }
        Form hi = new Form("Hi World", BoxLayout.y());
        hi.add(new Label("Hi World"));
        hi.show();
    }

    public void stop() {
        current = getCurrentForm();
        if(current instanceof Dialog) {
            ((Dialog)current).dispose();
            current = getCurrentForm();
        }
    }

    public void destroy() {
    }
}

When you select that file and select the menu option CodeConvert Java file to Kotlin File you should get this:

class MyApplication {
    private var current: Form? = null
    private var theme: Resources? = null

    fun init(context: Any) {
        theme = UIManager.initFirstTheme("/theme")
        Toolbar.setGlobalToolbar(true)
        Log.bindCrashProtection(true)
    }

    fun start() {
        if (current != null) {
            current!!.show()
            return
        }
        val hi = Form("Hi World", BoxLayout.y())
        hi.add(Label("Hi World"))
        hi.show()
    }

    fun stop() {
        current = getCurrentForm()
        if (current is Dialog) {
            (current as Dialog).dispose()
            current = getCurrentForm()
        }
    }

    fun destroy() {
    }
}

that’s pretty familiar. The problem is that there are two bugs in the automatic conversion…​ that’s the code for Kotlin behaves differently from standard Java.

The first problem is that Kotlin classes are final unless declared otherwise so you need to add the open keyword before the class declaration as such:

open class MyApplication

This is essential as the build server will fail with weird errors related to instanceof.

This applies to the main class of the project, other classes in Codename One can remain final

The second problem is that arguments are non-null by default. The init method might have a null argument. So this fails with an exception. The solution is to add a question mark to the end of the call: fun init(context: Any?).

So the full working sample is:

open class MyApplication {
    private var current: Form? = null
    private var theme: Resources? = null
    fun init(context: Any?) {
        theme = UIManager.initFirstTheme("/theme")
        Toolbar.setGlobalToolbar(true)
        Log.bindCrashProtection(true)
    }

    fun start() {
        if (current != null) {
            current!!.show()
            return
        }
        val hi = Form("Hi World", BoxLayout.y())
        hi.add(Label("Hi World"))
        hi.show()
    }

    fun stop() {
        current = getCurrentForm()
        if (current is Dialog) {
            (current as Dialog).dispose()
            current = getCurrentForm()
        }
    }

    fun destroy() {
    }
}

Once all of that’s in place Kotlin should work. This should be possible for additional JVM languages in the future.

3. Basics: themes, styles, components, and layouts

Start with a brief overview of the core ideas in Codename One. This chapter revisits them in more detail as it goes on.

3.1. Components

Every button, label, or other element on the screen in a Codename One application is a Component. This is a simplified version of the class hierarchy:

The Core Component Class Hierarchy
Figure 16. The Core Component Class Hierarchy

The Form is a special Component. it’s the root component shown to the user. Container is a Component type that can hold other components. That lets you create elaborate hierarchies by nesting Container instances.

Component UML
Figure 17. Component UML

A Codename One application is effectively a series of forms, but one Form can be visible at a time. The form contains everything on the screen. Under the hood, the Form has a few separate parts:

Structure of a Form
Figure 18. Structure of a Form
  • Content Pane - this is the body of the Form. When you add a Component to the Form, it goes into the content pane. The content pane scrolls vertically by default.

  • Title Area - you can’t add directly to this area. The title area is managed by the Toolbar class. Toolbar sits at the top of the form and handles the title design. The title area has two parts:

    • Title of the Form and its commands (the buttons on the right and left of the title)

    • Status Bar - on iOS, the top area leaves room for the notch, battery, clock, and similar indicators. Without that space, those elements would overlap the title.

Now that the structure is clear, open the Java file TodoApp.java in the project you created. You should see the lines that set up the UI in the start() method:

3.1.1. Layout Managers

A layout manager decides the size and location of components within a Container. Every Container has a layout manager. The default layout manager is FlowLayout.

To understand layouts, first understand a basic concept about Component: each component has a “preferred size”. that’s the size a component wants to occupy. For example, a Label uses the exact size needed to fit the label text, icon, and padding.

Understanding Preferred Size

The Component class contains many useful methods. One of the most important is calcPreferredSize(), which recalculates the size a component wants when something changes.

By default Codename One invokes the getPreferredSize() method rather than calcPreferredSize() directly.
getPreferredSize() invokes calcPreferredSize() and caches the value.

The preferred size depends on internal constraints such as font size, border sizes, and padding.

When a layout manager positions and sizes the component, it MIGHT take the preferred size into account. It can also ignore it entirely.

For example, FlowLayout always gives components their exact preferred size, while BorderLayout resizes the center component by default and the other components along one axis.

You can define a group of components to have the same preferred width or height by using the setSameWidth and setSameHeight methods, for example:

Listing 5. setSameWidth/Height
Component.setSameWidth(cmp1, cmp2, cmp3, cmp4);
Component.setSameHeight(cmp5, cmp6, cmp7);

Codename One has a setPreferredSize method that lets developers explicitly request a component size. However, that caused many problems. For example, preferred size should change with device orientation or similar operations. The API also encouraged accidental hardcoding of UI values such as forcing pixel sizes. As a result, the method was deprecated.

Use setSameWidth and setSameHeight when you need sizing alignment. Use setHidden when you need to hide a component. As a last resort, override calcPreferredSize.

A layout manager places a component based on its own logic and the preferred size, sometimes called the “natural size”. A FlowLayout walks the components in the order they were added and sizes them one after another. When it reaches the end of the row, it moves to the next row.

Use FlowLayout for simple things
FlowLayout is great for simple cases, but it has issues when components change size dynamically, such as a text field. In those cases, it can choose bad line breaks and take up too much space.
Layout Manager Primer Part I
Figure 19. Layout Manager Primer Part I
Layout Manager Primer Part II
Figure 20. Layout Manager Primer Part II

Scrolling doesn’t work well for all layout types because the positioning algorithm within a layout can break. Scrolling on the Y axis works well for BoxLayout Y, which is why it was picked for the TodoForm:

Table 1. Scrolling in Layout Managers
LayoutScrollable

Flow Layout

Possible on Y axis only

Border Layout

Scrolling is blocked

Box Layout Y

Scrollable only on the Y axis

Box Layout X

Scrollable only on the X axis

Grid Layout

Scrollable

LayeredLayout

Not scrollable (usually)

Nesting Scrollable Containers

Only one element can be scrollable within the hierarchy. Otherwise, if you drag your finger over the Form, Codename One can’t know which element you want to scroll. By default, the form’s content pane scrolls on the Y axis unless you disable it explicitly. Setting the layout to BorderLayout disables scrolling implicitly.

it’s fine to use non-scrollable layouts such as BorderLayout inside a scrollable container. In the TodoApp, for example, TodoItem uses BorderLayout inside a scrollable BoxLayout Form.

Layouts can be divided into two distinct groups:

  • Constraint Based - BorderLayout (and a few others such as GridBagLayout, MigLayout, and TableLayout)

  • Regular - All of the other layout managers

When you add a Component to a Container with a regular layout you do so with a simple add method:

Listing 6. Adding to a Regular Container
Container cnt = new Container(BoxLayout.y());
cnt.add(new Label("Just Added"));

This works great for regular layouts but might not for constraint based layouts. A constraint based layout accepts another argument. For example: BorderLayout needs a location for the Component:

Listing 7. Adding to a Regular Container
cnt.add(NORTH, new Label("Just Added"));

This line assumes you’ve an import static com.codename1.ui.CN.*; in the top of the file. In BorderLayout (which is a constraint based layout) placing an item in the NORTH places it in the top of the Container.

The CN class is a class that contains many static helper methods and functions. it’s specifically designed for static import in this way to help keep your code terse
Static Global Context

The CN class is a thin wrapper around features in Display, NetworkManager, Storage, FileSystemStorage etc. It also adds common methods and constants from several other classes so Codename One code feels more terse e.g. you can do:

import static com.codename1.ui.CN.*;
that’s optional, if you don’t like static imports you can just write CN. for every element

From that point on you can write code that looks like this:

callSerially(() -> runThisOnTheEDT());

Instead of:

Display.getInstance().callSerially(() -> runThisOnTheEDT());

The same applies for most network manager calls e.g.:

addToQueue(myConnectionRequest);

Instead of:

NetworkManager.getInstance().addToQueue(myConnectionRequest);

Some things were changed so we won’t have too many conflicts e.g. Log.p or Log.e would have been problematic so we now have:

log("my log message");
log(myException);

Instead of Display.getInstance().getCurrent() we now have getCurrentForm() since getCurrent() is too generic. For most methods you should just be able to remove the NetworkManager or Display access and it should "just work".

The motivation for this is three fold:

  • Terse code

  • Small performance gain

  • Cleaner API without some of the baggage in Display or NetworkManager

Some of our samples in this guide might rely on that static import being in place. This helps us keep the code terse and readable in the code listings.

Terse Syntax

Almost every layout allows you to add a component using many variants of the add method:

Listing 8. Versions of add
Container cnt = new Container(BoxLayout.y());
cnt.add(new Label("Just Added")); (1)
cnt.addAll(new Label("Adding Multiple"), (2)
    new Label("Second One"));

cnt.add(new Label("Chaining")). (3)
    add(new Label("Value"));
1Regular add
2addAll accepts many components and adds them in a batch
3add returns the parent Container instance so you can chain calls like that

In the race to make code “tighter” you can make this even shorter. Almost all layout managers have their own custom terse syntax style for example:

Listing 9. Terse Syntax
Container boxY = BoxLayout.encloseY(cmp1, cmp2); (1)
Container boxX = BoxLayout.encloseX(cmp3, cmp4);
Container flowCenter = FlowLayout. (2)
    encloseCenter(cmp5, cmp6);
1Most layouts have a version of enclose to encapsulate components within
2FlowLayout has variants that support aligning the components on various axis

To sum this up, you can use layout managers and nesting to create elaborate UI’s that implicitly adapt to different screen sizes and device orientation.

Flow Layout
Flow Layout
Figure 21. Flow Layout

Flow layout lets the components "flow" horizontally and break a line when reaching the edge of the container. it’s the default layout manager for containers. Because it’s so flexible it’s also problematic as it can result in incorrect preferred size values for the parent Container. This can create a reflow issue, as a result recommend using flow layout for trivial cases. Avoid it for things such as text input etc. As the size of the text input can vary in runtime.

Form hi = new Form("Flow Layout", new FlowLayout());
hi.add(new Label("First")).
    add(new Label("Second")).
    add(new Label("Third")).
    add(new Label("Fourth")).
    add(new Label("Fifth"));
hi.show();

Flow layout also supports terse syntax shorthand such as:

Container flowLayout = FlowLayout.encloseIn(
        new Label("First"),
        new Label("Second"),
        new Label("Third"),
        new Label("Fourth"),
        new Label("Fifth")));

Flow layout can be aligned to the left (the default), to the center, or to the right. It can also be vertically aligned to the top (the default), middle (center), or bottom.

Flow layout aligned to the center
Figure 22. Flow layout aligned to the center
Flow layout aligned to the right
Figure 23. Flow layout aligned to the right
Flow layout aligned to the center horizontally & the middle vertically
Figure 24. Flow layout aligned to the center horizontally & the middle vertically

Components within the flow layout get their natural preferred size by default and aren’t stretched in any axis.

The natural sizing behavior is often used to prevent other layout managers from stretching components. For example: if you’ve a border layout element in the south and you want it to keep its natural size instead of adding the element to the south directly you can wrap it using parent.add(BorderLayout.SOUTH, FlowLayout.encloseCenter(dontGrowThisComponent)).
Box Layout

BoxLayout places elements in a row (X_AXIS) or column (Y_AXIS) according to box orientation. Box is a simple and predictable layout that serves as the "workhorse" of component lists in Codename One.

You can create a box layout Y using something like this:

Form hi = new Form("Box Y Layout", new BoxLayout(BoxLayout.Y_AXIS));
hi.add(new Label("First")).
    add(new Label("Second")).
    add(new Label("Third")).
    add(new Label("Fourth")).
    add(new Label("Fifth"));

Which results in this

BoxLayout Y
Figure 25. BoxLayout Y

Box layout also supports a shorter terse notation which you use here to demonstrate the X axis box.

Container box = BoxLayout.encloseX(new Label("First"),
        new Label("Second"),
        new Label("Third"),
        new Label("Fourth"),
        new Label("Fifth")));
BoxLayout X
Figure 26. BoxLayout X

The box layout keeps the preferred size of its destination orientation and scales elements on the other axis. Specifically X_AXIS will keep the preferred width of the component while growing all the components vertically to match in size. Its Y_AXIS counterpart keeps the preferred height while growing the components horizontally.

This behavior is useful since it allows elements to align as they would all have the same size.

In some cases the growing behavior in the X axis is undesired, for these cases you can use the X_AXIS_NO_GROW variant.

BoxLayout X_AXIS_NO_GROW
Figure 27. BoxLayout X_AXIS_NO_GROW
FlowLayout vs. BoxLayout.X_AXIS
When applicable recommend BoxLayout over FlowLayout as it acts more consistently in all situations. Another advantage of BoxLayout is the fact that it grows and thus aligns nicely
Border Layout
Border Layout
Figure 28. Border Layout

Border layout is unique. BorderLayout is a constraint-based layout that can place up to five components in one of the five positions: NORTH, SOUTH, EAST, WEST or CENTER.

Form hi = new Form("Border Layout", new BorderLayout());
hi.add(BorderLayout.CENTER, new Label("Center")).
    add(BorderLayout.SOUTH, new Label("South")).
    add(BorderLayout.NORTH, new Label("North")).
    add(BorderLayout.EAST, new Label("East")).
    add(BorderLayout.WEST, new Label("West"));
hi.show();
The Constraints are Included in the CN class
You can use the static import of the CN class and then the syntax can be add(SOUTH, new Label("South"))

The layout always stretches the NORTH/SOUTH components on the X-axis to completely fill the container and the EAST/WEST components on the Y-axis. The center component is stretched to fill the remaining area by default. For example, the setCenterBehavior allows you to manipulate the behavior of the center component so it’s placed in the center without stretching.

For example:

Form hi = new Form("Border Layout", new BorderLayout());
((BorderLayout)hi.getLayout()).setCenterBehavior(BorderLayout.CENTER_BEHAVIOR_CENTER);
hi.add(BorderLayout.CENTER, new Label("Center")).
    add(BorderLayout.SOUTH, new Label("South")).
    add(BorderLayout.NORTH, new Label("North")).
    add(BorderLayout.EAST, new Label("East")).
    add(BorderLayout.WEST, new Label("West"));
hi.show();

Results in:

Border Layout with CENTER_BEHAVIOR_CENTER
Figure 29. Border Layout with CENTER_BEHAVIOR_CENTER
Scrolling is Disabled in Border Layout
Because of its scaling behavior scrolling a border layout makes no sense. Container implicitly blocks scrolling on a border layout, but it can scroll its parents/children

In the case of RTL the EAST and WEST values are implicitly reversed as shown in this image:

Border Layout in RTL mode
Figure 30. Border Layout in RTL mode
RTL and Bidi

RTL (Right To Left) or Bidi (bi-directional) are common terms used for languages such as Hebrew, Arabic etc. These languages are written from the right to left direction hence all the UI needs to be “reversed”. Bidi denotes the fact that while the language is written from right to left, the numbers are still written in the other direction hence two directions…​

Preferred Size Still Matters
The preferred size of the center component doesn’t matter in border layout but the preferred size of the sides is. For example: If you place an large component in the SOUTH it will take up the entire screen and won’t leave room for anything
Grid Layout

GridLayout accepts a predefined grid (rows/columns) and grants all components within it equal size based on the dimensions of the largest components.

The main use case for this layout is a grid of icons for example: like one would see in the iPhone home screen

If the number of rows * columns is smaller than the number of components added a new row is implicitly added to the grid. For example, if the number of components is smaller than available cells (won’t fill the last row) blank spaces will be left in place.

In this example you can see that a 2x2 grid is used to add 5 elements, this results in an additional row that’s implicitly added turning the grid to a 3x2 grid implicitly and leaving one blank cell.

Form hi = new Form("Grid Layout 2x2", new GridLayout(2, 2));
hi.add(new Label("First")).
    add(new Label("Second")).
    add(new Label("Third")).
    add(new Label("Fourth")).
    add(new Label("Fifth"));
Grid Layout 2x2
Figure 31. Grid Layout 2x2

When you use a 2x4 size ratio you would see elements getting cropped as you do here. The grid layout uses the grid size first and doesn’t pay too much attention to the preferred size of the components it holds.

Grid Layout 2x4
Figure 32. Grid Layout 2x4

Grid also has an autoFit attribute that can be used to automatically calculate the column count based on available space and preferred width. This is useful for working with UI’s where the device orientation might change.

There is also a terse syntax for working with a grid that has two versions, one that uses the "auto fit" option and another that accepts the number of columns. Here’s a sample of the terse syntax coupled with auto fit followed by screenshots of the same code in two orientations:

GridLayout.encloseIn(new Label("First"),
    new Label("Second"),
    new Label("Third"),
    new Label("Fourth"),
    new Label("Fifth")));
Grid Layout autofit portrait
Figure 33. Grid Layout autofit portrait
Grid Layout autofit landscape
Figure 34. Grid Layout autofit landscape

3.1.2. Table Layout

The TableLayout is a elaborate constraint based layout manager that can arrange elements in rows/columns while defining constraints to control complex behavior such as spanning, alignment/weight etc.

Note the Different Package for TableLayout
The TableLayout is in the com.codename1.ui.table package and not in the layouts package.
This is due to the fact that TableLayout was originally designed for the Table class.

Despite being constraint based the TableLayout isn’t strict about constraints and will implicitly add a constraint when one is missing. This is unlike the BorderLayout which will throw an exception in this case.

Unlike GridLayout TableLayout won’t implicitly add a row if the row/column count is incorrect
Form hi = new Form("Table Layout 2x2", new TableLayout(2, 2));
hi.add(new Label("First")).
    add(new Label("Second")).
    add(new Label("Third")).
    add(new Label("Fourth")).
    add(new Label("Fifth"));
hi.show();
2x2 TableLayout with 5 elements
Figure 35. 2x2 TableLayout with 5 elements, notice that the last element is missing

TableLayout supports the ability to grow the last column which can be enabled using the setGrowHorizontally method. You can also use a shortened terse syntax to construct a TableLayout however since the TableLayout is a constraint based layout you won’t be able to utilize its full power with this syntax.

The default usage of the encloseIn method below uses the setGrowHorizontally flag.

Container tl = TableLayout.encloseIn(2, new Label("First"),
                new Label("Second"),
                new Label("Third"),
                new Label("Fourth"),
                new Label("Fifth")));
TableLayout.encloseIn() with default behavior of growing the last column
Figure 36. TableLayout.encloseIn() with default behavior of growing the last column
The Full Potential

TableLayout is a beast, to truly appreciate it you need to use the constraint syntax which allows you to span, align and set width/height for the rows and columns.

TableLayout works with a Constraint instance that can communicate your intentions into the layout manager. Such constraints can include more than one attribute for example: span and height.

TableLayout constraints can’t be reused for more than one component

The constraint class supports the following attributes

Table 2. Constraint Properties

column

The column for the table cell. This defaults to -1 which will place the component in the next available cell

row

Similar to column, defaults to -1 as well

width

The column width in percentages, -1 will use the preferred size. -2 for width will take up the rest of the available space

height

Similar to width but doesn’t support the -2 value

spanHorizontal

The cells that should be occupied horizontally defaults to 1 and can’t exceed the column count - current offset.

spanVertical

Similar to spanHorizontal with the same limitations

horizontalAlign

The horizontal alignment of the content within the cell, defaults to the special case -1 value to take up all the cell space can be either -1, Component.LEFT, Component.RIGHT or Component.CENTER

verticalAlign

Similar to horizontalAlign can be one of -1, Component.TOP, Component.BOTTOM or Component.CENTER

You need to set width/height to one cell in a column/row

The table layout constraint sample tries to demonstrate some of the unique things you can do with constraints.

TableLayout tl = new TableLayout(2, 3); (1)
Form hi = new Form("Table Layout Cons", tl);
hi.setScrollable(false); (2)
hi.add(tl.createConstraint(). (3)
            widthPercentage(20),
                new Label("AAA")).

        add(tl.createConstraint(). (4)
            horizontalSpan(2).
            heightPercentage(80).
            verticalAlign(Component.CENTER).
            horizontalAlign(Component.CENTER),
                new Label("Span H")).

        add(new Label("BBB")).

        add(tl.createConstraint().
            widthPercentage(60).
            heightPercentage(20),
                new Label("CCC")).

        add(tl.createConstraint().
            widthPercentage(20),
                new Label("DDD"));
1You need the TableLayout instance to create constraints. A constraint must be created for every component and must be used with the same layout as the parent container
2To get the look in the screenshot you need to turn scrolling off so the height constraint doesn’t take up available height. Otherwise it will miscalculate available height due to scrolling. You can scroll a TableLayout but sizing will be different
3You create the constraint and instantly apply width to it. This is a shorthand syntax for the code block below
4You can chain constraint creation using a call like this so many constraints apply to a single cell. Notice that you don’t span and set width on the same axis (horizontal span + width), doing something like that would create confusing behavior

Here is the full code mentioned in item 3:

TableLayout.Constraint cn = tl.createConstraint();
cn.setWidthPercentage(20);
hi.add(cn, new Label("AAA")).
TableLayout constraints can be used to create elaborate UI’s
Figure 37. TableLayout constraints can be used to create elaborate UI’s
TextMode Layout

TextModeLayout is a unique layout manager. It acts like TableLayout on Android and like BoxLayout.Y_AXIS in other platforms. Internally it delegates to one of these two layout managers so in a sense it doesn’t have as much functionality of its own.

For example: this is a sample usage of TextModeLayout:

TextModeLayout tl = new TextModeLayout(3, 2);
Form f = new Form("Pixel Perfect", tl);
TextComponent title = new TextComponent().label("Title");
TextComponent price = new TextComponent().label("Price");
TextComponent location = new TextComponent().label("Location");
TextComponent description = new TextComponent().label("Description").multiline(true);

f.add(tl.createConstraint().horizontalSpan(2), title);
f.add(tl.createConstraint().widthPercentage(30), price);
f.add(tl.createConstraint().widthPercentage(70), location);
f.add(tl.createConstraint().horizontalSpan(2), description);
f.setEditOnShow(title.getField());
f.show();
TextModeLayout on iOS
Figure 38. TextModeLayout on iOS
TextModeLayout on Android with the same code
Figure 39. TextModeLayout on Android with the same code

As you can see from the code and samples above there is a lot going on under the hood. On Android you want a layout that’s similar to TableLayout so you can “pack” the entries. On iOS you want a box layout Y type of layout but you also want the labels/text to align properly…​

The TextModeLayout isn’t a layout as much as it’s a delegate. When running in the Android mode (which you refer to as the “on top” mode) the layout is almost an exact synonym of TableLayout and in fact delegates to an underlying TableLayout. In fact there is a public final table instance within the layout that you can refer to directly…​

There is one small difference between the TextModeLayout and the underlying TableLayout and that’s your choice to default to align entries to TOP with this mode.

Aligning to TOP is important for error handling for TextComponent in Android otherwise the entries “jump”

When working in the non-android environment you use a BoxLayout on the Y axis as the delegate. There is one thing you do here that’s different from a default box layout: grouping. Grouping allows the labels to align by setting them to the same width, internally it invokes Component.setSameWidth(). Since text components hide the labels there is a special group method there that can be used. For example, this is implicit with the TextModeLayout which is pretty cool.

TextModeLayout was created specifically for the TextComponent and InputComponent so check out the section about them in the components chapter.

3.1.3. Layered Layout

When used without constraints, the LayeredLayout places the components in order one on top of the other and sizes them all to the size of the largest component. This is useful when trying to create an overlay on top of an existing component. For example: an "x" button to allow removing the component.

The X on this button was placed there using the layered layout code below
Figure 40. The X on this button was placed there using the layered layout code below

The code to generate this UI is slightly complex and contains few relevant pieces. The truly relevant piece is this block:

hi.add(LayeredLayout.encloseIn(settingsLabel,
        FlowLayout.encloseRight(close)));

you’re doing three distinct things here:

  1. you’re adding a layered layout to the form

  2. you’re creating a layered layout and placing two components within. This would be the equivalent of creating a LayeredLayout Container and invoking add twice

  3. You use FlowLayout to position the X close button in the right position

When used without constraints, the layered layout sizes all components to the exact same size one on top of the other. It usually requires that you use another container within; in order to position the components correctly

This is the full source of the example for completeness:

Form hi = new Form("Layered Layout");
int w = Math.min(Display.getInstance().getDisplayWidth(), Display.getInstance().getDisplayHeight());
Button settingsLabel = new Button("");
Style settingsStyle = settingsLabel.getAllStyles();
settingsStyle.setFgColor(0xff);
settingsStyle.setBorder(null);
settingsStyle.setBgColor(0xff00);
settingsStyle.setBgTransparency(255);
settingsStyle.setFont(settingsLabel.getUnselectedStyle().getFont().derive(w / 3, Font.STYLE_PLAIN));
FontImage.setMaterialIcon(settingsLabel, FontImage.MATERIAL_SETTINGS);
Button close = new Button("");
close.setUIID("Container");
close.getAllStyles().setFgColor(0xff0000);
FontImage.setMaterialIcon(close, FontImage.MATERIAL_CLOSE);
hi.add(LayeredLayout.encloseIn(settingsLabel,
        FlowLayout.encloseRight(close)));

Forms have a built in layered layout that you can access through getLayeredPane(), this allows you to overlay elements on top of the content pane.

The layered pane is used internally by components such as InteractionDialog, AutoComplete etc.

Codename One also includes a GlassPane that resides on top of the layered pane. Its useful if you want to "draw" on top of elements but is harder to use than layered pane
Insets and Reference Components

As of Codename One 3.7, LayeredLayout supports insets for its children. This effectively allows you to position child components precisely where you want them, relative to their container or siblings. This functionality forms the under-pinnings of the GUI Builder’s Auto-Layout mode.

As an example, suppose you wanted to position a button in the lower right corner of its container. This can be achieved with LayeredLayout as follows:

Container cnt = new Container(new LayeredLayout());
Button btn = new Button("Submit");
LayeredLayout ll = (LayeredLayout)cnt.getLayout();
cnt.add(btn);
ll.setInsets(btn, "auto 0 0 auto");

The result is:

Button positioned in bottom right using insets

The thing new here is this line:

ll.setInsets(btn, "auto 0 0 auto");

This is called after btn has already been added to the container. It says that you want its insets to be "auto" on the top and left, and 0 on the right and bottom. This insets string follows the CSS notation of top right bottom left (that’s: start on top and go clockwise), and the values of each inset may be provided in pixels (px), millimetres (mm), percent (%), or the special "auto" value. Like CSS, you can also specify the insets using a 1, 2, or 3 values. For example:

  1. "1mm" - Sets 1mm insets on all sides.

  2. "1mm 2mm" - Sets 1mm insets on top and bottom; 2mm on left and right.

  3. "1mm 10% 2mm" - Sets 1mm on top, 10% on left and right, and 2mm on bottom.

  4. "1mm 2mm 1px 50%" - Sets 1mm on top, 2mm on right, 1px on bottom, and 50% on left.

auto Insets

The special "auto" inset indicates that it’s a flexible inset. If all insets are set to "auto", then the component will be centered both horizontally and vertically inside its "bounding box".

The "inset bounding box" is the containing box from which a component’s insets are measured. If the component’s insets aren’t linked to any other components, then its inset bounding box will be the inner bounds (that’s: taking padding into account) of the component’s parent container.

If one inset is fixed (that’s: defined in px, mm, or %), and the opposite inset is "auto", then the "auto" inset will simply allow the component to be its preferred size. So if you want to position a component to be centered vertically, and 5mm from the left edge, you could do:

ll.setInsets(btn, "auto auto auto 5mm");

Resulting in:

Button vertically centered 5mm from left edge
Figure 41. Button vertically centered 5mm from left edge

Move it to the right edge with:

ll.setInsets(btn, "auto 5mm auto auto");
% Insets

Percent (%) insets are calculated with respect to the inset bounding box. A 50% inset is measured as 50% of the length of the bounding box on the inset’s axis. For example: A 50% inset on top would be 50% of the height of the inset bounding box. A 50% inset on the right would be 50% of the width of the inset bounding box.

Insets, Margin, and Padding

A component’s position in a layered layout is determined as follows: (Assume that cmp is the component that you’re positioning, and cnt is the container (In pseudo-code):

x = cnt.paddingLeft + cmp.calculatedInsetLeft + cmp.marginLeft
y = cnt.paddingTop + cmp.calculatedInsetTop + cmp.marginTop
w = cnt.width - cnt.verticalScroll.width - cnt.paddingRight - cmp.calculatedInsetRight - cmp.marginRight - x
h = cnt.height - cnt.horizontalScroll.height - cnt.paddingBottom - cmp.calculatedInsetBottom - cmp.marginBottom - y
The calculatedInsetXXX values here will be the same as the corresponding provided inset if the inset has no reference component. If it does have a reference component, then the calculated inset will depend on the position of the reference component.

If no inset is specified, then it’s assumed to be 0. This ensures compatibility with designs that were created before layered layout supported insets.

Component References: Linking Components together

If all you need to do is position a component relative to its parent container’s bounds, then mere insets provide you with sufficient vocabulary to achieve this. But most UIs are more complex than this and require another concept: reference components. In many cases you will want to position a component relative to another child of the same container. This is also supported.

For example, suppose I want to place a text field in the center of the form (both horizontally and vertically), and have a button placed beside it to the right. Positioning the text field is trivial (setInset(textField, "auto")), but there is no inset that you can provide that would position the button to the right of the text field. To accomplish your goal, you need to set the text field as a reference component of the button’s left inset - so that the button’s left inset is "linked" to the text field. Here is the syntax:

Container cnt = new Container(new LayeredLayout());
LayeredLayout ll = (LayeredLayout)cnt.getLayout();
Button btn = new Button("Submit");
TextField tf = new TextField();
cnt.add(tf).add(btn);
ll.setInsets(tf, "auto")
  .setInsets(btn, "auto auto auto 0")
  .setReferenceComponentLeft(btn, tf, 1f);

This would result in:

Button’s left inset linked to text field
Figure 42. Button’s left inset linked to text field

The two active lines here are the last two:

  .setInsets(btn, "auto auto auto 0") (1)
  .setReferenceComponentLeft(btn, tf, 1f); (2)
1Sets the left inset on btn to 0.
2Links btn’s left inset to `tf so that it’s measured from the text field. The third parameter (1.0) is the reference position. This will generally either be 0 (meaning the reference point is the left edge of the text field), or 1 (meaning the reference point is the right edge of the text field). In this case you set a reference position of 1.0 because you want the button to be aligned to the text field’s right edge.
The reference position is defined as the distance, expressed as a fraction of the reference component’s length on the inset’s axis, between the reference component’s leading (outer) edge and the point from which the inset is measured. A reference position of 0 means that the inset is measured from the leading edge of the reference component. A value of 1.0 means that the inset is measured from the trailing edge of the reference component. A value of 0.5 means that the inset is measured from the center of the reference component. Etc…​ Any floating point value can be used, though the most common values are 0 and 1.

The definition above may make reference components and reference position seem more complex than it’s. Some examples:

  1. For a top inset:

    1. referencePosition == 0 ⇒ the inset is measured from the top edge of the reference component.

    2. referencePosition == 1 ⇒ the inset is measured from the bottom edge of the reference component.

  2. For a bottom inset:

    1. referencePosition == 0 ⇒ the inset is measured from the bottom edge of the reference component.

    2. referencePosition == 1 ⇒ the inset is measured from the top edge of the reference component.

  3. For a left inset:

    1. referencePosition == 0 ⇒ the inset is measured from the left edge of the reference component.

    2. referencePosition == 1 ⇒ the inset is measured from the right edge of the reference component.

  4. For a right inset:

    1. referencePosition == 0 ⇒ the inset is measured from the right edge of the reference component.

    2. referencePosition == 1 ⇒ the inset is measured from the left edge of the reference component.

Layers In Codename One

Codename One allows placing components one on top of the other and we commonly use layered layout to do that. The form class has a built-in Container that resides in a layer on top of the content pane of the form.

When you add an element to a form it implicitly goes into the content pane. However, you can use getLayeredPane() and add any Component there. Such a Component will appear above the content pane. Notice that this layer resides below the title area (on the Y axis) and won’t draw on top of that.

When Codename One introduced the layered pane it was instantly useful. However, its popularity caused conflicts. Two separate pieces of code using the layered pane could easily collide with one another. Codename One solved it with getLayeredPane(Class c, boolean top). This method allocates a layer for a specific class within the layered pane. This way if two different classes use this method instead of the getLayeredPane() method they won’t collide. Each will get its own container in a layered layout within the layered pane seamlessly. The top flag indicates whether we want the layer to be the top most or bottom most layer within the layered pane (assuming it wasn’t created already). This allows you to place a layer that can appear above or below the already installed layers.

We only make use of the layered pane in this book but there are two additional layers on top of it. The form layered pane is identical to the layered pane but spans the entire height of the Form (including the title area). As a result the form layered pane is slower as it needs to handle some special cases to support this functionality.

The glass pane is the top most layer, unlike the layered pane it’s purely a graphical layer. You can only draw on the glass pane with a Painter instance and a Graphics object. You can’t add components into that layer.

The Layered Pane
Figure 43. The Layered Pane

3.1.4. GridBag Layout

GridBagLayout was introduced to simplify the process of porting existing Swing/AWT code with a more familiar API. The API for this layout is problematic as it was designed for AWT/Swing where styles were unavailable. As a result it has its own insets API instead of using elements such as padding/margin.

Your recommendation is to use Table which is as powerful but has better Codename One integration.

To demonstrate GridBagLayout you ported http://docs.oracle.com/Java SE/tutorial/uiswing/layout/gridbag.html[the sample from the Java tutorial] to Codename One.

Button button;
hi.setLayout(new GridBagLayout());
GridBagConstraints c = new GridBagConstraints();
//natural height, maximum width
c.fill = GridBagConstraints.HORIZONTAL;
button = new Button("Button 1");
c.weightx = 0.5;
c.fill = GridBagConstraints.HORIZONTAL;
c.gridx = 0;
c.gridy = 0;
hi.addComponent(c, button);

button = new Button("Button 2");
c.fill = GridBagConstraints.HORIZONTAL;
c.weightx = 0.5;
c.gridx = 1;
c.gridy = 0;
hi.addComponent(c, button);

button = new Button("Button 3");
c.fill = GridBagConstraints.HORIZONTAL;
c.weightx = 0.5;
c.gridx = 2;
c.gridy = 0;
hi.addComponent(c, button);

button = new Button("Long-Named Button 4");
c.fill = GridBagConstraints.HORIZONTAL;
c.ipady = 40;      //make this component tall
c.weightx = 0.0;
c.gridwidth = 3;
c.gridx = 0;
c.gridy = 1;
hi.addComponent(c, button);

button = new Button("5");
c.fill = GridBagConstraints.HORIZONTAL;
c.ipady = 0;       //reset to default
c.weighty = 1.0;   //request any extra vertical space
c.anchor = GridBagConstraints.PAGE_END; //bottom of space
c.insets = new Insets(10,0,0,0);  //top padding
c.gridx = 1;       //aligned with button 2
c.gridwidth = 2;   //2 columns wide
c.gridy = 2;       //third row
hi.addComponent(c, button);

Notice that because of the way gridbag works you didn’t provide any terse syntax API for it although it should be possible.

GridbagLayout sample from the Java tutorial running on Codename One
Figure 44. GridbagLayout sample from the Java tutorial running on Codename One

3.1.5. Group Layout

GroupLayout is a layout that would be familiar to the users of the NetBeans GUI builder (Matisse). Its a layout manager that’s hard to use for manual coding but is powerful for some elaborate use cases. Although MiGLayout and LayeredLayout might be superior options.

It was originally added during the LWUIT days as part of an internal attempt to port Matisse to LWUIT. it’s still useful to this day as developers copy and paste Matisse code into Codename One and produce elaborate layouts with drag and drop.

Since the layout is based on an older version of GroupLayout some things need to be adapted in the code or you should use the special "compatibility" library for Matisse to get better interaction. You also recommend tweaking Matisse to use import statements instead of full package names, that way if you use Label changing the awt import to a Codename One import will make it use work for Codenmae One’s Label.

Unlike any other layout manager GroupLayout adds the components into the container instead of the standard API. This works nicely for GUI builder code but as you can see from this sample it doesn’t make the code readable:

Form hi = new Form("GroupLayout");

Label label1 = new Label();
Label label2 = new Label();
Label label3 = new Label();
Label label4 = new Label();
Label label5 = new Label();
Label label6 = new Label();
Label label7 = new Label();

label1.setText("label1");

label2.setText("label2");

label3.setText("label3");

label4.setText("label4");

label5.setText("label5");

label6.setText("label6");

label7.setText("label7");

GroupLayout layout = new GroupLayout(hi.getContentPane());
hi.setLayout(layout);
layout.setHorizontalGroup(
    layout.createParallelGroup(GroupLayout.LEADING)
    .add(layout.createSequentialGroup()
        .addContainerGap()
        .add(layout.createParallelGroup(GroupLayout.LEADING)
            .add(layout.createSequentialGroup()
                .add(label1, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
                .addPreferredGap(LayoutStyle.RELATED)
                .add(layout.createParallelGroup(GroupLayout.LEADING)
                    .add(label4, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
                    .add(label3, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
                    .add(label2, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)))
            .add(label5, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
            .add(layout.createSequentialGroup()
                .add(label6, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
                .addPreferredGap(LayoutStyle.RELATED)
                .add(label7, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)))
        .addContainerGap(296, Short.MAX_VALUE))
);
layout.setVerticalGroup(
    layout.createParallelGroup(GroupLayout.LEADING)
    .add(layout.createSequentialGroup()
        .addContainerGap()
        .add(layout.createParallelGroup(GroupLayout.TRAILING)
            .add(label2, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
            .add(label1, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE))
        .addPreferredGap(LayoutStyle.RELATED)
        .add(label3, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
        .addPreferredGap(LayoutStyle.RELATED)
        .add(label4, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
        .addPreferredGap(LayoutStyle.RELATED)
        .add(label5, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
        .addPreferredGap(LayoutStyle.RELATED)
        .add(layout.createParallelGroup(GroupLayout.LEADING)
            .add(label6, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE)
            .add(label7, GroupLayout.PREFERRED_SIZE, GroupLayout.DEFAULT_SIZE, GroupLayout.PREFERRED_SIZE))
        .addContainerGap(150, Short.MAX_VALUE))
);
GroupLayout Matisse generated UI running in Codename One
Figure 45. GroupLayout Matisse generated UI running in Codename One

If you’re porting newer Matisse code there are simple changes you can do:

  • Change addComponent to add

  • Change addGroup to add

  • Remove references to ComponentPlacement and reference LayoutStyle directly

3.1.6. Mig Layout

MigLayout is a popular cross platform layout manager that was ported to Codename One from Swing.

MiG is still considered experimental so proceed with caution!
The API was deprecated to serve as a warning of its experimental status.

The best reference for MiG would probably be its quick start guide (PDF link). As a reference you ported one of the samples from that PDF to Codename One:

Form hi = new Form("MigLayout", new MigLayout("fillx,insets 0"));

hi.add(new Label("First")).
    add("span 2 2", new Label("Second")).  // The component will span 2x2 cells.
    add("wrap", new Label("Third")).      // Wrap to next row
    add(new Label("Forth")).
    add("wrap", new Label("Fifth")).    // Note that it "jumps over" the occupied cells.
    add(new Label("Sixth")).
    add(new Label("Seventh"));
hi.show();
MiG layout sample ported to Codename One
Figure 46. MiG layout sample ported to Codename One

It should be reasonably easy to port MiG code but you should notice the following:

  • MiG handles a lot of the spacing/padding/margin issues that are missing in Swing/AWT. With Codename One styles you’ve the padding and margin which are probably a better way to do a lot of the things that MiG does

  • The add method in Codename One can be changed as shown in the sample above.

  • The constraint argument for Coedname One add calls appears before the Component instance.

3.2. Themes and Styles

Next you need to introduce you to 3 important terms in Codename One: Theme, Style and UIID.

Themes are similar conceptually to CSS, in fact they can be created with CSS syntax as you will discuss soon. The various Codename One ports ship with a native theme representing the appearance of the native OS UI elements. Every Codename One application has its own theme that derives the native theme and overrides behavior within it.

If the native theme has a button defined, you can override properties of that button in your theme. This allows you to customize the look while retaining some native appearances. This works by merging the themes to one big theme where your application theme overrides the definitions of the native theme. This is pretty similar to the cascading aspect of CSS if you’re familiar with that.

Themes consist of a set of UIID definitions. Every component in Codename One has a UIID associated with it. UIID stands for User Interface Identifier. This UIID connects the theme to a specific component. A UIID maps to CSS classes if you’re familiar with that concept. For example, Codename One doesn’t support the complex CSS selector syntax options as those can impact runtime performance.

For example: see this code where:

Listing 10. setUIID on TextField
nameText.setUIID("Label");

This is a text field component (user input field) but it will look like a Label.

Effectively you told the text field that it should use the UIID of Label when it’s drawing itself. it’s common to do tricks like that in Codename One. For example: button.setUIID("Label") would make a button appear like a label and allow you to track clicks on a “Label”.

The UIID’s translate the theme elements into a set of Style objects. These Style objects get their initial values from the theme but can be further manipulated after the fact. So if I want to make the text field’s foreground color red I could use this code:

Listing 11. setUIID on TextField
nameText.getAllStyles().setFgColor(0xff0000);

The color is in hexadecimal RRGGBB format so 0xff00 would be green and 0xff0000 would be red.

getAllStyles() returns a Style object but why do you need “all” styles?

Each component can have one of 4 states and each state has a Style object. This means you can have 4 style objects per Component:

  • Unselected — used when a component isn’t touched and doesn’t have focus. You can get that object with getUnselectedStyle().

  • Selected — used when a component is touched or if focus is drawn for non-touch devices. You can get that object with getSelectedStyle().

  • Pressed — used when a component is pressed. Notice it’s applicable to buttons and button subclasses usually. You can get that object with getPressedStyle().

  • Disabled — used when a component is disabled. You can get that object with getDisabledStyle().

The getAllStyles() method returns a special case Style object that lets you set the values of all 4 styles from one class so the code before would be equivalent to invoking all 4 setFgColor methods. For example, getAllStyles() works for setting properties not for getting them!

don’t use getStyle() for manipulation
getStyle() returns the current Style object which means it will behave inconsistently. The paint method uses getStyle() as it draws the current state of the Component but other code should avoid that method. Use the specific methods instead: getUnselectedStyle(), getSelectedStyle(), getPressedStyle(), getDisabledStyle() and getAllStyles()

As you can see, it’s a bit of a hassle to change styles from code which is why the theme is so appealing.

3.2.1. Theme

A theme allows you to define the styles externally through a set of UIID’s (User Interface ID’s). Themes can be authored directly in CSS and then compiled into the Codename One resource file, which keeps styling concerns separate from application logic.

The theme is stored in the theme.res file in the project.

You load the theme file using this line of code in the init(Object) method in the main class of the application:

Listing 12. Theme Loading Code
theme = UIManager.initFirstTheme("/theme");

In a CSS project this file is generated automatically from the stylesheet. Legacy applications that still edit the resource file by hand can continue to do so, but new projects should prefer the CSS workflow described below.

This code is shorthand for resource file loading and for the installation of theme. You could technically have more than one theme in a resource file at which point you could use initNamedTheme() instead. The resource file is a special file format that includes inside it many features:

  • Themes

  • Images

  • Localization Bundles

  • Data files

3.2.2. Working with CSS Themes

Modern Codename One projects ship with a src/main/css/theme.css file (or an equivalent stylesheet). Editing this file allows you to define UIIDs using standard CSS syntax together with Codename One–specific extensions such as cn1-derive for inheritance and the #Constants block for theme constants. Each time you build or run the project, the build tool compiles the CSS into the theme.res resource file automatically. Saving the CSS while the simulator is running will also trigger a refresh so you can iterate on styling quickly.

Because the CSS compiler produces the final resource file, you should treat the generated theme.res as an output artifact and keep your changes in the CSS source. Images referenced from CSS rules (for example: background images or multi-images) should be placed alongside the stylesheet so that they are picked up by the compiler. Additional details about the supported selectors and properties are covered in the dedicated CSS chapter later in this guide.

3.3. GUI Builder

The GUI builder allows you to arrange components visually within a UI using drag and drop, property sheets etc. With the GUI builder you can create elaborate, rich UI’s without writing the layout code.

Why two GUI Builders?

Codename One originally shipped with a GUI builder that generated a Statemachine class and stored its data directly inside the resource file. That legacy tool targeted very constrained devices and has since been deprecated. Modern projects should rely on the standalone GUI builder launched from the IDE, which is the focus of the remainder of this section. The current builder includes an auto layout mode (introduced in version 3.7) that lets you freely position and resize components on a canvas while using LayeredLayout behind the scenes.

3.3.1. Hello World

Creating a hello world app in the new GUI builder is actually pretty trivial, you need to start with a regular handcoded application. Not a GUI builder application as it refers to the old GUI builder!

This is the exact same hello world application you created before…​

Following are the instructions for creating a form and launching the GUI builder. While they are similar there are minor IDE differences. Usage of the GUI builder is identical in all IDE’s as the GUI builder is a separate application.

NetBeans

In NetBeans you need to follow these 4 steps:

Right click the package select New → Other
Figure 47. Right click the package select NewOther
In the Codename One section select the GUI builder form
Figure 48. In the Codename One section select the GUI builder form
Type in the name of the form and click finish
Figure 49. Type in the name of the form and click finish, you can change the type to be a Container or Dialog
Launch the GUI builder thru the right click menu on the newly created file
Figure 50. Launch the GUI builder thru the right click menu on the newly created file
IntelliJ/IDEA

In IntelliJ you need to follow these 3 steps:

Right click the package select New → Codename One Form (or Dialog/Container)
Figure 51. Right click the package select NewCodename One AutoLayout Form (or Dialog/Container)
Type in a name for the new form
Figure 52. Type in a name for the new form
Launch the GUI builder thru the right click menu on the newly created file
Figure 53. Launch the GUI builder thru the right click menu on the newly created file
Eclipse

In Eclipse you need to follow these 4 steps:

Right click the package select New → Other
Figure 54. Right click the package select NewOther
In the Codename One section select the GUI builder option
Figure 55. In the Codename One section select the GUI builder option
Type in the name of the form and click finish
Figure 56. Type in the name of the form and click finish, you can change the type to be a Container or Dialog
Launch the GUI builder thru the right click menu on the newly created file
Figure 57. Launch the GUI builder thru the right click menu on the newly created file
Basic Usage

Notice that the UI of the new GUIBuilder might change in various ways but the basic concepts should remain the same.

The GUI builder is controlled through it’s main toolbar, notice that your changes will be applied when you click the Save button on the right:

The features of the left toolbar
Figure 58. The features of the left toolbar
The features of the right toolbar
Figure 59. The features of the right toolbar

The main UI includes four important parts:

  • Main Form — This is where you place the components of the UI you’re building

  • Component Tree — This is a logical representation of the component hierarchy within the Main Form. it’s often easier to pick a component from the tree rather than the form itself

  • Property Inspector — When you select an element in the tree or form you can see its details here. You can then edit the various details of the component in this area

  • Palette — Components can be dragged from the palette to the Main Form and placed in the UI

The four parts of the GUI builder
Figure 60. The four parts of the GUI builder

You will start by selecting the Component Palette and dragging a button into the UI:

You can drag any component you want from the palette to the main UI
Figure 61. You can drag any component you want from the palette to the main UI

By default the auto-layout mode of the GUI builder uses layered layout to position components. Sides can be bound to a component or to the Form. You then use distance units to determine the binding behavior. The GUI builder tries to be "smart" and guesses your intention as you drag the components along.

When you select the component you placed you can edit the properties of that component:

Properties allow you to customize everything about a component
Figure 62. Properties allow you to customize everything about a component

There are five property sheets per component:

  • Basic Settings — These include the basic configuration for a component for example: name, icon, text etc.

  • Advanced Settings — These include features that aren’t as common such as icon gap, mask etc.

  • Events — By clicking a button in this tab a method will be added to the source file with a callback matching your component name. This will let you bind an event to a button, text field etc.

  • Layout — You can determine the layout of the parent Container here. For auto-layout this should stay as layered layout, however you can nest other layout types in here

  • Style Customization — This isn’t a theme, if you want to customize the style of a specific component you can do that through this UI. The theme works on a more global/reusable level and this is designed for a specific component

For things like setting the text on the component you can use a convenient "long click" on the component to edit the text in place as such:

Use the long click to edit the text "in place"
Figure 63. Use the long click to edit the text "in place"
Events
As of now, the events tab was completely disabled. See issue 3593 for more info.

When a component supports broadcasting events you can bind such events by selecting it, then selecting the events tab and clicking the button matching the event type

The events tab is listed below supported event types can be bound above
Figure 64. The events tab is listed below supported event types can be bound above

Once an event is bound the IDE will open to the event code for example:

public void onButton_1ActionEvent(com.codename1.ui.events.ActionEvent ev) {
}
Some IDE’s generate the project source code after you explicitly build the project so if your code needs to access variables etc. try building first

Within the code you can access all the GUI components you defined with the gui_ prefix for example: Button_1 from the UI is represented as:

private com.codename1.ui.Button gui_Button_1 = new com.codename1.ui.Button();
Underlying XML

Saving the project generates an XML file representing the UI into the res directory in the project, the GUI file is created in a matching hierarchy in the project under the res/guibuilder directory:

The java and GUI files in the hierarchy
Figure 65. The java and GUI files in the hierarchy
If you refactor (rename or move) the java file it’s connection with the GUI file will break. You need to move/rename both

You can edit the GUI file directly but changes won’t map into the GUI builder unless you reopen it. These files should be under version control as they are the main files that change. The GUI builder file for the button and label code looks like this:

<?xml version="1.0" encoding="UTF-8"?>

<component type="Form" layout="FlowLayout" flowLayoutFillRows="false" flowLayoutAlign="1"
flowLayoutValign="0"  title="My new title" name="MyForm">
  <component type="Button" text="Button" name="Button_1" actionEvent="true">
  </component>
  <component type="Label" text="Hi World" name="Label_1">
  </component>
</component>

This format is relatively simple and is roughly the same format used by the old GUI builder which makes the migration to the new GUI builder possible. This file triggers the following Java source file:

package com.mycompany.myapp;

/**
 * GUI builder created Form
 *
 * @author shai
 */
public class MyForm extends com.codename1.ui.Form {

    public MyForm() {
        this(com.codename1.ui.util.Resources.getGlobalResources());
    }

    public MyForm(com.codename1.ui.util.Resources resourceObjectInstance) {
        initGuiBuilderComponents(resourceObjectInstance);
    }

//-- DON'T EDIT BELOW THIS LINE!!!
    private com.codename1.ui.Label gui_Label_1 = new com.codename1.ui.Label();
    private com.codename1.ui.Button gui_Button_1 = new com.codename1.ui.Button();


// <editor-fold defaultstate="collapsed" desc="Generated Code">
    private void guiBuilderBindComponentListeners() {
        EventCallbackClass callback = new EventCallbackClass();
        gui_Button_1.addActionListener(callback);
    }

    class EventCallbackClass implements com.codename1.ui.events.ActionListener, com.codename1.ui.events.DataChangedListener {
        private com.codename1.ui.Component cmp;
        public EventCallbackClass(com.codename1.ui.Component cmp) {
            this.cmp = cmp;
        }

        public EventCallbackClass() {
        }

        public void actionPerformed(com.codename1.ui.events.ActionEvent ev) {
            com.codename1.ui.Component sourceComponent = ev.getComponent();
            if(sourceComponent.getParent().getLeadParent() != null) {
                sourceComponent = sourceComponent.getParent().getLeadParent();
            }

            if(sourceComponent == gui_Button_1) {
                onButton_1ActionEvent(ev);
            }
        }

        public void dataChanged(int type, int index) {
        }
    }
    private void initGuiBuilderComponents(com.codename1.ui.util.Resources resourceObjectInstance) {
        guiBuilderBindComponentListeners();
        setLayout(new com.codename1.ui.layouts.FlowLayout());
        setTitle("My new title");
        setName("MyForm");
        addComponent(gui_Label_1);
        addComponent(gui_Button_1);
        gui_Label_1.setText("Hi World");
        gui_Label_1.setName("Label_1");
        gui_Button_1.setText("Click Me");
        gui_Button_1.setName("Button_1");
    }// </editor-fold>

//-- DON'T EDIT ABOVE THIS LINE!!!
    public void onButton_1ActionEvent(com.codename1.ui.events.ActionEvent ev) {
    }

}
don’t touch the code within the don’t EDIT comments…​

The GUI builder uses the "magic comments" approach where code is generated into those areas to match the XML defined in the GUI builder. Various IDE’s generate that code at different times. Some will generate it when you run the app while others will generate it as you save the GUI in the builder.

You can write code freely within the class both by using the event mechanism, by writing code in the constructors or thru overriding functionality in the base class.

3.3.2. Auto-Layout Mode

As of version 3.7, new forms created with the GUI Builder will use auto-layout mode. In this mode you can move and resize your components exactly as you see fit. You aren’t constrained to the positions dictated by the form’s layout manager.

All forms designed in auto-layout mode use LayeredLayout
Auto-Layout Mode is built upon the inset support in LayeredLayout. Component positioning uses insets and reference components, not absolute positioning

As an example, let’s drag a button onto a blank form and see what happens. The button will be "selected" initially after adding it, so you’ll see its outline and resize handles for adjusting its size and position. You’ll also see four floating labels (above, below, to the left, and to the right) that show the corresponding side’s inset values and allow you to adjust them.

When a component is selected you can drag it to reposition it or use the resize handles to change its size. The floating inset labels update as you drag so you can fine tune spacing without leaving the canvas.

Press the mouse inside the bounds of the button and drag it around to reposition it. You will notice that the inset labels change to reflect the new inset values. If you drag the button close to the edge of the form, the corresponding inset value will change to millimetres. If you move farther away from the edge, it will change to percentage values.

The Inset Control

Let you take a closer look at the inset control (the inset controls are the black buttons that appear to the top, bottom, left, and right of the selected component).

Inset control
Figure 66. The inset control allows you to change the inset size and units, toggle it between fixed and flexible, and link it to another component.

Each control has three sections:

  1. The inset value drop-down menu. This shows the current value of the inset (for example: 0mm, 25%, auto, etc…​). If you click on this, it will open a menu that will allow you to change the units. If the inset is currently in millimetres, it will have options for pixels, and percent. If the inset is in percent, it will have options for pixels and millimetres. Etc.. It also includes a text field to enter a an inset value explicitly.

    Inset drop-down menu
  2. The "Link" Button Link button - If the inset is linked to a reference component, then this button will be highlighted "blue", and hovering over it will highlight the reference component in the UI so that you can clearly see which component it’s linked to. Clicking on this button will open a dialog that will allow you to "break" this link. You can drag this button over any component in the form to "link".

  3. The "Lock" Button" Inset fixed button - This button allows you to toggle the inset between "flexible" (that’s: auto) and "fixed" (that’s: millimetres or percent).

Auto Snap

Notice the "auto-snap" checkbox that appears in the top-right corner of the GUI builder window.

Auto-snap checkbox
Figure 67. Auto-snap checkbox

Auto-snap does exactly what it sounds like: It automatically snaps two components together when you drag them near each other. This is handy for linking components together without having to explicitly link them (using the "link" button). This feature is turned on by default. If auto-snap is turned off, you can still initiate a "snap" by holding down the ALT/Option key on your keyboard during the drag.

Smart Insets

Beside the "auto-snap" checkbox is another checkbox named "Smart Insets".

Smart insets checkbox
Figure 68. Smart insets checkbox

Smart Inset uses some heuristics during a drag to try to determine how the insets should be linked. Currently the heuristics are basic (it tries to link to the nearest neighbor component in most cases), but you will be working on improving this for future releases. This feature is turned off by default while it’s still being refined. The goal is to improve this to the point where it always makes the correct link choices - at which time you will be able to use the GUI builder without having any knowledge of insets or reference components.

The Widget Control Pad
Widget control pad
Figure 69. Widget control pad

When a component is selected, you should see a black floating panel appear in the lower right of the screen.

This is the widget control pad, and it provides an alternative view of the component’s links. It also provides a useful list of incoming links (that’s: components that "depend on" this component’s positioning). In some cases, you may want to disconnect incoming links so that you can drag the component without affecting the position of dependent components.

This control pad also includes game-pad-like controls (up, down, left, right), that allow you to "tab" the component to the next guide in that direction. Tab positions exist at component edges in the form. This is useful for aligning components with each other.

Keyboard Short-Cuts
  1. Arrow Keys - Use the up/down/left/right arrow keys to nudge the currently selected component a little bit at a time. This is a convenient way to move the component to a position that’s more precise than can easily be achieved with a mouse drag.

  2. Arrow Keys + SHIFT - Hold down the SHIFT key while pressing an arrow key and it will "tab" the component to the next tab marker. The form has implicit tab markers at the edge of each component on the form.

  3. ALT/Option Key + Click or Drag - Holding down the option/alt key while clicking or dragging a component will resulting in "snapping" behaviour even if auto-snap is turned off.

Sub-Containers

In some cases, you may need to add sub-containers to your form to aid in grouping your components together. You can drag a container onto your form using the "Container" palette item (under "Core Components"). The default layout the subcontainer will be LayeredLayout so that you’re able to position components within the sub-container with precision, like on the root container.

You can also change the layout of subcontainers to another classical layout manager (for example: grid layout, box layout, etc..) and drag components directly into it as you did with the old GUI builder. This is useful if parts of your form lend themselves. As an example, let’s drag a container onto the canvas that uses BoxLayout Y. (You can find this under the "Containers" section of the component palette).

Drag the button (that was previously on the form) over that container, and you should see a drop-zone become highlighted.

Dropping container on child container with box layout y
Figure 70. Dropping container on child container with box layout y

You can drop the button directly there. You can As you drag more components into the sub-container, you’ll see them automatically laid out vertically.

Box Layout Y dropping 2nd child
Figure 71. Box Layout Y dropping 2nd child
The Canvas Resize Tool

When designing a UI with the new GUI builder it’s ** important that you periodically test the form’s "resizing" behavior so that you know how it will behave on different devices. Components may appear to be positioned correctly when the canvas is one size, but become out of whack when the container is resized. After nearly every manipulation you perform, it’s good practice to drag the canvas resize tool (the button in the lower right corner of the GUI builder) smaller and bigger so you can see how the positions are changed. If things grow out of whack, you may need to toggle an inset between fixed and auto, or add a link between some of the components so that the resizing behavior matches your expectations.

4. Theme Basics

This chapter covers the creation of a simple hello-world style theme and its visual customization. It uses the Codename One Designer tool to demonstrate basic concepts in theme creation such as 9-piece borders, selectors, and style types. You should review this even if you end up using CSS.

4.1. Understanding Codename One Themes

Codename One themes are pluggable CSS-like elements that let developers determine or switch the look of the application at runtime. A theme can be installed through the UIManager class, and themes can be layered one on top of another. A theme can also be generated from CSS, and this guide covers that and the supported CSS syntax later.

By default, Codename One themes derive the native operating system themes, although this behavior is entirely optional.

A theme initializes the Style objects, which are then used by the components to render themselves or by the LookAndFeel and DefaultLookAndFeel classes to create the appearance of the application.

Codename One themes have some built-in defaults. For example, there are borders for buttons and padding, margin, and opacity for various components. These are “common sense” defaults that you can override within the theme.

Codename One themes are effectively a set of UIIDs mapped to a Style object. Codename One applications always have a theme. You can modify it to suit your needs, and you can add many themes within the main resource file.

You can also add many resource files to a project and work with them. In code, initialize a theme like this in your main class:

private Resources theme;

public void init(Object context) {
    theme = UIManager.initFirstTheme("/theme");
}

The initFirstTheme method is a helper method that hides some try/catch logic and some verbosity. It could be expressed as:

try {
    theme = Resources.openLayered("/theme");
    UIManager.getInstance().setThemeProps(theme.getTheme(theme.getThemeResourceNames()[0]));
} catch(IOException e){
    e.printStackTrace();
}

4.2. Customizing your theme

You can launch the designer tool by double clicking on the theme.res file found in typical Codename One applications. In the left side you can see the section picker and within it the Theme section.

The theme area in the designer
Figure 72. The theme area in the designer

When you select the theme you will see the theme default view.

Theme default view
Figure 73. Theme default view

There are many interesting things to notice here the preview section allows you to instantly see the changes you make to the theme data.

Theme preview section
Figure 74. Theme preview section

The theme state tabs and constant tabs allow you to pass between the various editing modes for the theme and also add theme constants.

As discussed earlier, you can pick the right style mode through the tabs.

You can use these tabs to add the various types of styles and theme constants
Figure 75. You can use these tabs to add the various types of styles and theme constants

The most important section is the style section. It allows you to add/edit/remove style UIID’s.

Notice the Default Style section, it allows you to customize global defaults for the styles. Use it with caution as changes here can have wide implications.

The theme selection area allows you to add
Figure 76. The theme selection area allows you to add, edit and delete entries. Notice the default style entry which is a unique special case

When you add an entry to the style you can type the desired UIID into the box at the top of the dialog. You can also pick a UIID from the combo box but that might not include all potential options.

You can use the Component Inspector tool in the simulator to locate a component and its UIID in a specific Form
When pressing the Add/Edit entry you can edit a specific style entry UIID
Figure 77. When pressing the Add/Edit entry you can edit a specific style entry UIID

When you add/edit an entry an important piece of the puzzle is the Derive check box that appears next to all of the UIID entries. All styles derive from the base style and usually from the native theme defaults, so when this flag is checked the defaults will be used.

When you uncheck that checkbox the fields below it become editable and you can override the default behavior. To restore the default recheck that flag.

A common oddity for developers is that when they press Add and don’t derive any entry nothing is actually added. The entries in the theme are essentially key/value pairs so when you don’t add anything there are no keys so the entry doesn’t show up

4.3. Customizing The Title

The title is a great target for customization since it includes a few interesting "complexities".

The Title is surrounded by a TitleArea container that encloses it, above the title you will also see the StatusBar UIID that prevents the status details from drawing on top of the title text.

Title Area UIID’s
Figure 78. Title Area UIID’s
The StatusBar UIID is a special case that’s there on iOS. In iOS the application needs to render the section under the status bar (which isn’t the case for other OS’s) and the StatusBar UIID was added so developers can ignore that behavior.

4.3.1. Background Priorities and Types

A slightly confusing aspects of styles in Codename One is the priorities of backgrounds. When you define a specific type of background it will override prior definitions, this even applies to inheritance.

For example: if the theme defined a border for the Button UIID (a common case) if you will try to define the background image or the background color of Button those will be ignored!

The solution is to derive the border and select the Empty border type

The order for UIID settings for background is as follows:

  1. Border - if the component has a border it can override everything. Image borders always override all background settings you might have.

  2. Image or gradient - an image or gradient background overrides background color/transparency settings.

  3. Background Color/Transparency - If transparency is larger than 0 then this takes effect.

4.3.2. The Background Behavior and Image

Lets start in the first page of the style entry, you will customize the background behavior for the Title UIID and demonstrate/explain some of the behaviors.

The pictures below demonstrate the different types of background image behaviors.

IMAGE_SCALED scales the image without preserving aspect ratio to fit the exact size of the component
Figure 79. IMAGE_SCALED scales the image without preserving aspect ratio to fit the exact size of the component
IMAGE_SCALED_FILL scales the image while preserving aspect ratio so it fills the entire space of the component
Figure 80. IMAGE_SCALED_FILL scales the image while preserving aspect ratio so it fills the entire space of the component
Aspect ratio is the ratio between the width and the height of the image. For example: if the image is 100x50 pixels and you want the width to be 200 pixels preserving the aspect ratio will require the height to also double to 200x100.
You highly recommend preserving the aspect ratio to keep images more "natural".
IMAGE_SCALED_FIT scales the image while preserving aspect ratio so it fits within the component
Figure 81. IMAGE_SCALED_FIT scales the image while preserving aspect ratio so it fits within the component
IMAGE_TILE_BOTH tiles the image on both axis of the component
Figure 82. IMAGE_TILE_BOTH tiles the image on both axis of the component
IMAGE_TILE_VERTICAL_ALIGN_LEFT tiles the image on the left side of the component
Figure 83. IMAGE_TILE_VERTICAL_ALIGN_LEFT tiles the image on the left side of the component
IMAGE_TILE_VERTICAL_ALIGN_CENTER tiles the image in the middle of the component
Figure 84. IMAGE_TILE_VERTICAL_ALIGN_CENTER tiles the image in the middle of the component
IMAGE_TILE_VERTICAL_ALIGN_RIGHT tiles the image on the right side of the component
Figure 85. IMAGE_TILE_VERTICAL_ALIGN_RIGHT tiles the image on the right side of the component
IMAGE_TILE_HORIZONTAL_ALIGN_TOP tiles the image on the top of the component
Figure 86. IMAGE_TILE_HORIZONTAL_ALIGN_TOP tiles the image on the top of the component
IMAGE_TILE_HORIZONTAL_ALIGN_CENTER tiles the image in the middle of the component
Figure 87. IMAGE_TILE_HORIZONTAL_ALIGN_CENTER tiles the image in the middle of the component
IMAGE_TILE_HORIZONTAL_ALIGN_BOTTOM tiles the image to the bottom of the component
Figure 88. IMAGE_TILE_HORIZONTAL_ALIGN_BOTTOM tiles the image to the bottom of the component
IMAGE_ALIGNED_TOP places the image centered at the top part of the component
Figure 89. IMAGE_ALIGNED_TOP places the image centered at the top part of the component
IMAGE_ALIGNED_BOTTOM places the image centered at the bottom part of the component
Figure 90. IMAGE_ALIGNED_BOTTOM places the image centered at the bottom part of the component
IMAGE_ALIGNED_LEFT places the image centered at the left part of the component
Figure 91. IMAGE_ALIGNED_LEFT places the image centered at the left part of the component
IMAGE_ALIGNED_RIGHT places the image centered at the right part of the component
Figure 92. IMAGE_ALIGNED_RIGHT places the image centered at the right part of the component
IMAGE_ALIGNED_TOP_LEFT places the image at the top left corner
Figure 93. IMAGE_ALIGNED_TOP_LEFT places the image at the top left corner
IMAGE_ALIGNED_TOP_RIGHT places the image at the top right corner
Figure 94. IMAGE_ALIGNED_TOP_RIGHT places the image at the top right corner
IMAGE_ALIGNED_BOTTOM_LEFT places the image at the bottom left corner
Figure 95. IMAGE_ALIGNED_BOTTOM_LEFT places the image at the bottom left corner
IMAGE_ALIGNED_BOTTOM_RIGHT places the image at the bottom right corner
Figure 96. IMAGE_ALIGNED_BOTTOM_RIGHT places the image at the bottom right corner
IMAGE_ALIGNED_CENTER places the image in the middle of the component
Figure 97. IMAGE_ALIGNED_CENTER places the image in the middle of the component

4.3.3. The Color Settings

The color settings are much simpler than the background behavior. As explained above the priority for color is at the bottom so if you’ve a border, image or gradient defined the background color settings will be ignored.

Add theme entry color settings
Figure 98. Add theme entry color settings

There are three color settings:

  • Foreground color is the RRGGBB color that sets the style foreground color normally used to draw the text of the component. You can use the color picker button on the side to pick a color

  • Background same as foreground determines the background color of the component

  • Transparency represents the opacity of the component background as a value between 0 (transparent) and 255 (opaque)

Setting the background will have no effect unless transparency is higher than 0. If you don’t explicitly define this it might have a different value based on the native theme

4.3.4. Alignment

Not all component types support alignment and even when they do they don’t support it for all elements. For example: a Label and its subclasses support alignment but will apply it to the text and not the icon.

Notice that Container doesn’t support alignment. You should use the layout manager to tune component positioning.

Alignment of the text within some component types
Figure 99. Alignment of the text within some component types
Aligning text components to anything other than the default alignment might be a problem if they are editable. The native editing capabilities might collide with the alignment behavior.
Bidi/RtL layout reverses the alignment value so left becomes right and visa versa

4.3.5. Padding and Margin

Padding and margin are concepts derived from the CSS box model. They are slightly different in Codename One, where the border spacing is part of the padding, but other than that they are pretty similar:

Padding and Margin
Figure 100. Padding and Margin/Box Model

In the diagram, you can see the component represented in yellow occupying its preferred size. The padding portion in gray effectively increases the components size. The margin is the space between components, it allows you to keep whitespace between many components. Margin is represented in red in the diagram.

The theme allows you to customize the padding/margin, and specify them for all 4 sides of a component. They can be specified in pixels, millimeters/dips, or screen percentage:

Padding tab
Figure 101. Padding tab
We recommend using millimeters for all spacing to make it look good for all device densities. Percentages make sense in extreme cases.

4.3.6. Borders

Borders are a big subject in their own right, the UI for their creation is also a bit confusing:

Border entry in the theme
Figure 102. Border entry in the theme

4.3.7. 9-Piece Image Border

A common border type is the 9-piece image border. To simplify creating this type of border, there is a special Image Border Wizard.

A 9-piece image border is a common convention in UI theming that divides a border into 9 pieces: 4 representing the corners, 4 representing the sides, and 1 representing the middle.

Android uses a common variation on the 9-piece border: 9-patch. The main difference between the 9-piece border and 9-patch is that 9-piece borders tile the sides/center whereas 9-patch scales them

9-piece image borders work better than background images for many use cases where the background needs to "grow/shrink" extensively and might need to change aspect ratio.

They don’t work well in cases where the image is asymmetric on both axis. For example: a radial gradient image. 9-piece images in general don’t work well with complex gradients.

The image border wizard simplifies the process of generating a 9-piece image border using a 3 stage process.

Stage 1: create or pick an image from an existing PNG file that you will convert to a 9-piece image
Figure 103. Stage 1: create or pick an image from an existing PNG file that you will convert to a 9-piece image
Use an image that’s designed for a high DPI device

For your convenience you can create a rudimentary image with the create image stage but for a professional looking application you would usually want to use a design by a professional designer.

Stage 2: Cutting the image and adapting it to the DPI’s
Figure 104. Stage 2: Cutting the image and adapting it to the DPI’s

The second stage is probably the hardest and most important one in this wizard!

You can change the values of the top/bottom/left/right spinners to move the position of the guide lines that indicate the various 9 pieces. The image shows the correct cut for this image type with special attention to the following:

  • The left/right position is high enough to fit in the rounded corners in their entirety. Notice that you didn’t leave 1 pixel as that performs badly, you want to leave as much space as possible!

  • The top and bottom lines have exactly one pixel between them. This is to avoid breaking the gradient. For example: if you set the lines further apart you will end up with this:

This is why it’s important to keep the lines close when a gradient is involved
Figure 105. This is why it’s important to keep the lines close when a gradient is involved, notice the tiling effect…​
When the lines are close together the gradient effect grows more effectively
Figure 106. When the lines are close together the gradient effect grows more effectively
  • The elements on the right hand side include the Generate Multi Image options. Here you can indicate the density of the source image you’re using (for example: if its for iPhone 5 class device pick High). You can then select in the checkboxes below the densities that should be generated automatically for you. This allows fine detail on the border to be maintained in the various high/low resolution devices.

You go into a lot of details about multi images in the advanced theming section.
Stage 3: Styles to which the border is applied
Figure 107. Stage 3: Styles to which the border is applied

The last page indicates the styles to which the wizard will apply the border. Under normal usage you don’t need to touch this as its properly filled out.

You can define the same border for many UIIDs from here though.

Border Minimum Size

A common oddity when using the image borders is the fact that even when padding is removed the component might take a larger size than the height of the text within it.

The reason for this is the border. Because of the way borders are implemented they can’t be drawn to be smaller than the sum of their corners. For example: the minimum height of a border would be the height of the bottom corner + the height of the top corner. The minimum width would be the width of the left + right corners.

This is coded into the common preferred size methods in Codename One and components generally don’t shrink below the size of the image border even if padding is 0.

Customizing The 9-Piece Border

Normally you can use the 9-piece border wizard but you can also customize the border by pressing the "…​" button on the border section in the theme.

Press this to customize borders
Figure 108. Press this to customize borders

The UI for the 9-piece border you created above looks like this.

9-piece border in edit mode
Figure 109. 9-piece border in edit mode

You can pick the image represented by every section in the border from the combo boxes. They are organized in the same way the border is with the 9-pieces placed in the same position they would occupy when the border is rendered.

Notice that the other elements in the UI are disabled when the image border type is selected.
3 Image Mode

The 9-piece border has a (rarely used) special case: 3 image mode. In this mode a developer can specify the top left corner, the top image and the center image to produce a 9 piece border. The corner and top piece are then rotated dynamically to produce a standard 9-piece border on the device.

This is useful for reducing application code size but isn’t used often as it requires a more symetric UI.

don’t confuse the 3-image mode for the 9-piece border with the horizontal/vertical image border below

4.3.8. Horizontal/Vertical Image Border

The 9-piece border is the workhorse of borders in Codename One, however there are some edge cases of UI elements that should grow on one axis and not on another. A perfect example of this is the iOS 6 style back button. If you tried to cut it into a 9-piece border the arrow effect would be broken.

Horizontal image border is commonly used for UI’s that can’t grow vertically for example: the iOS style back button
Figure 110. Horizontal image border is commonly used for UI’s that can’t grow vertically for example: the iOS 6 style back button

The horizontal and vertical image borders accept 3 images of their respective AXIS and build the border by placing one image on each side and tiling the center image between them. For example: A horizontal border will never grow vertically.

In RTL/Bidi [1] modes the borders flip automatically to show the reverse direction. An iOS style back button will point to the right in such languages.

4.3.9. Empty Border

Empty borders enforce the removal of a border. This is important if you would like to block a base style from having a border.

For example: Buttons have borders by default. If you would like to create a Button that’s strictly of solid color you could define the border to be empty and then use the solid color as you see fit.

There is a null border which is often confused with an empty border. You should use empty border and not null border

4.3.10. Round Border

Circles and completely round border sides are problematic for multi-resolutions. You need to draw them dynamically and can’t use image borders which can’t be tiled/cut to fit round designs (due to physical constraints of the round shape).

You designed the RoundBorder to enable two distinct types of borders:

  • Circular borders - for example: Android floating action

  • Rectangles with round (not rounded) sides

Round Border is a bit confusing since you already support a rounded border type. The rounded border type is a rectangle with rounded corners whereas the round border has completely round sides or appears as a circle.

To make matters worse the round border has a ridiculous number of features/configurations that would have made the already cluttered UI darn near impossible to navigate. To simplify this you split the UI into 3 tabs for standard borders, image borders and round border.

Round Border
Figure 111. Round Border

4.3.11. Rounded Rectangle Border

The RoundRectBorder was developed based on the RoundBorder and has similar features. It produces a rounded rectangle UI.

don’t confuse the Rounded Rectangle border with the deprecated Rounded border…​

it’s a pretty simple border type akin to the RoundBorder.

Rounded Rectangle Border
Figure 112. Rounded Rectangle Border

4.3.12. Bevel/Etched Borders

You generally recommend avoiding bevel/etched border types as they aren’t as efficient and look a bit dated in todays applications. You cover them here mostly for completeness.

Bevel border
Figure 113. Bevel border
Etched border
Figure 114. Etched border

4.3.13. Derive

Derive allows you to inherit the behavior of a UIID and extend it with some customization.

For example: Lets say you created a component that’s supposed to look like a title, you could do something like:

cmp.setUIID("Title");

But title might sometimes be aligned to the left (based on theme) and you always want your component to be center aligned. For example, you don’t want that to affect the actual titles in the app…​

To solve this you can define a MyTitle UIID and derive the Title UIID. Then customize that one attribute.

Derive title
Figure 115. Derive title
Issues With Derive

Style inheritance is a problematic topic in every tool that supports such behavior. Codename One styles start from a global default then have a system default applied and on top of that have the native OS default applied to them.

At that point a developer can define the style after all of the user settings are in place. Normally this works reasonably well, but there are some edge cases where inheriting a style can fail.

When you override an existing style such as Button and choose to derive from Button in a different selection mode or even a different component altogether such as Label you might trigger a recursion effect where a theme setting in the base theme depends on something in a base triggering an infinite loop.

To avoid this always inherit only from UIID’s you defined e.g. MyButton.

4.3.14. Fonts

Codename One currently supports 3 font types:

  • System fonts — these are simplistic built-in fonts. They work on all platforms and come in one of 3 sizes. For example, they are ubiquitous and work in every platform in all languages.

  • TTF files — you can place a TTF file in the src directory of the project and it will appear in the True Type combo box.

  • Native fonts — these aren’t supported on all platforms but generally they allow you to use a set of platform native good looking fonts. For example: on Android the devices Roboto font will be used and on iOS San Francisco or Helvetica Neue will be used. This is the recommended font type you suggest for most use cases!

If you use a TTF file MAKE SURE not to delete the file when there MIGHT be a reference to it. This can cause hard to track down issues!
Notice that a TTF file must have the ".ttf" extension, otherwise the build server won’t be able to recognize the file as a font and set it up accordingly (devices need fonts to be defined in specific ways). Once you do that, you can use the font from code or from the theme
Font Theme Entry
Figure 116. Font Theme Entry
System fonts are always defined even if you use a TTF or native font. If the native font/TTF is unavailable in a specific platform the system font will be used instead.

You can size native/TTF fonts either through pixels, millimeters or based on the size of the equivalent system fonts:

  1. System font size - the truetype font will have the same size as a small, medium or large system font. This allows the developer to size the font based on the device DPI

  2. Millimeter size - allows sizing the font in a more DPI aware size

  3. Pixels - useful for some unique cases, but highly problematic in multi-DPI scenarios

You should notice that font sizing is inconsistent between platforms recommend using millimeters for sizing

You can load a truetype font from code using:

if(Font.isTrueTypeFileSupported()) {
    Font myFont = Font.createTrueTypeFont(fontName, fontFileName);
    myFont = myFont.derive(sizeInPixels, Font.STYLE_PLAIN);
    // do something with the font
}

Notice that, in code, pixel sizes are supported, so it’s up to you to decide how to convert that. Recommend using millimeters with the convertToPixels method. You also need to derive the font with the proper size, unless you want a 0 sized font which isn’t useful.

The font name is the difficult bit, iOS requires the name of the font in order to load the font. This font name doesn’t always correlate to the file name making this task rather "tricky". The actual font name is sometimes viewable within a font viewer. It isn’t always intuitive, so be sure to test that on the device to make sure you got it right.

Due to licensing restrictions Codename One doesn’t bundle Apple’s iOS fonts. In the simulator with an iOS skin you try to use installed San Francisco/SF Pro (or Helvetica Neue) fonts when available on your machine; otherwise you fall back to bundled Roboto. You can obtain Apple’s font downloads and terms at https://developer.apple.com/fonts/

The code below demonstrates all the major fonts available in Codename One with the handlee ttf file posing as a standin for arbitrary TTF:

private Label createForFont(Font fnt, String s) {
  Label l = new Label(s);
  l.getUnselectedStyle().setFont(fnt);
  return l;
}

public void showForm() {
  GridLayout gr = new GridLayout(5);
  gr.setAutoFit(true);
  Form hi = new Form("Fonts", gr);

  int fontSize = Display.getInstance().convertToPixels(3);

  // requires Handlee-Regular.ttf in the src folder root!
  Font ttfFont = Font.createTrueTypeFont("Handlee", "Handlee-Regular.ttf").
                      derive(fontSize, Font.STYLE_PLAIN);

  Font smallPlainSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_PLAIN, Font.SIZE_SMALL);
  Font mediumPlainSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_PLAIN, Font.SIZE_MEDIUM);
  Font largePlainSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_PLAIN, Font.SIZE_LARGE);
  Font smallBoldSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_BOLD, Font.SIZE_SMALL);
  Font mediumBoldSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_BOLD, Font.SIZE_MEDIUM);
  Font largeBoldSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_BOLD, Font.SIZE_LARGE);
  Font smallItalicSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_ITALIC, Font.SIZE_SMALL);
  Font mediumItalicSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_ITALIC, Font.SIZE_MEDIUM);
  Font largeItalicSystemFont = Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_ITALIC, Font.SIZE_LARGE);

  Font smallPlainMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_PLAIN, Font.SIZE_SMALL);
  Font mediumPlainMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_PLAIN, Font.SIZE_MEDIUM);
  Font largePlainMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_PLAIN, Font.SIZE_LARGE);
  Font smallBoldMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_BOLD, Font.SIZE_SMALL);
  Font mediumBoldMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_BOLD, Font.SIZE_MEDIUM);
  Font largeBoldMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_BOLD, Font.SIZE_LARGE);
  Font smallItalicMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_ITALIC, Font.SIZE_SMALL);
  Font mediumItalicMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_ITALIC, Font.SIZE_MEDIUM);
  Font largeItalicMonospaceFont = Font.createSystemFont(Font.FACE_MONOSPACE, Font.STYLE_ITALIC, Font.SIZE_LARGE);

  Font smallPlainProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_PLAIN, Font.SIZE_SMALL);
  Font mediumPlainProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_PLAIN, Font.SIZE_MEDIUM);
  Font largePlainProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_PLAIN, Font.SIZE_LARGE);
  Font smallBoldProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_BOLD, Font.SIZE_SMALL);
  Font mediumBoldProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_BOLD, Font.SIZE_MEDIUM);
  Font largeBoldProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_BOLD, Font.SIZE_LARGE);
  Font smallItalicProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_ITALIC, Font.SIZE_SMALL);
  Font mediumItalicProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_ITALIC, Font.SIZE_MEDIUM);
  Font largeItalicProportionalFont = Font.createSystemFont(Font.FACE_PROPORTIONAL, Font.STYLE_ITALIC, Font.SIZE_LARGE);

  String[] nativeFontTypes = {
      "native:MainThin", "native:MainLight",
      "native:MainRegular", "native:MainBold",
      "native:MainBlack", "native:ItalicThin",
      "native:ItalicLight", "native:ItalicRegular",
      "native:ItalicBold", "native:ItalicBlack"};

  for(String s : nativeFontTypes) {
      Font tt  = Font.createTrueTypeFont(s, s).derive(fontSize, Font.STYLE_PLAIN);
      hi.add(createForFont(tt, s));
  }

  hi.add(createForFont(ttfFont, "Handlee TTF Font")).
          add(createForFont(smallPlainSystemFont, "smallPlainSystemFont")).
          add(createForFont(mediumPlainSystemFont, "mediumPlainSystemFont")).
          add(createForFont(largePlainSystemFont, "largePlainSystemFont")).
          add(createForFont(smallBoldSystemFont, "smallBoldSystemFont")).
          add(createForFont(mediumBoldSystemFont, "mediumBoldSystemFont")).
          add(createForFont(largeBoldSystemFont, "largeBoldSystemFont")).
          add(createForFont(smallPlainSystemFont, "smallItalicSystemFont")).
          add(createForFont(mediumItalicSystemFont, "mediumItalicSystemFont")).
          add(createForFont(largeItalicSystemFont, "largeItalicSystemFont")).

          add(createForFont(smallPlainMonospaceFont, "smallPlainMonospaceFont")).
          add(createForFont(mediumPlainMonospaceFont, "mediumPlainMonospaceFont")).
          add(createForFont(largePlainMonospaceFont, "largePlainMonospaceFont")).
          add(createForFont(smallBoldMonospaceFont, "smallBoldMonospaceFont")).
          add(createForFont(mediumBoldMonospaceFont, "mediumBoldMonospaceFont")).
          add(createForFont(largeBoldMonospaceFont, "largeBoldMonospaceFont")).
          add(createForFont(smallItalicMonospaceFont, "smallItalicMonospaceFont")).
          add(createForFont(mediumItalicMonospaceFont, "mediumItalicMonospaceFont")).
          add(createForFont(largeItalicMonospaceFont, "largeItalicMonospaceFont")).

          add(createForFont(smallPlainProportionalFont, "smallPlainProportionalFont")).
          add(createForFont(mediumPlainProportionalFont, "mediumPlainProportionalFont")).
          add(createForFont(largePlainProportionalFont, "largePlainProportionalFont")).
          add(createForFont(smallBoldProportionalFont, "smallBoldProportionalFont")).
          add(createForFont(mediumBoldProportionalFont, "mediumBoldProportionalFont")).
          add(createForFont(largeBoldProportionalFont, "largeBoldProportionalFont")).
          add(createForFont(smallItalicProportionalFont, "smallItalicProportionalFont")).
          add(createForFont(mediumItalicProportionalFont, "mediumItalicProportionalFont")).
          add(createForFont(largeItalicProportionalFont, "largeItalicProportionalFont"));

  hi.show();
}
The fonts running on the ipad simulator on a Mac
Figure 117. The fonts running on the ipad simulator on a Mac, notice that this will look different on a PC
The same demo running on a OnePlus One device with Android 5.1
Figure 118. The same demo running on a OnePlus One device with Android 5.1
Font Effects

You can define an effect to be applied to a specific font, specifically:

  • Underline

  • Strike thru

  • 3d text raised/lowered

  • 3d shadow north

The "3d" effects effectively draw the text twice, with a slight offset and two different colors to create a "3d" feel.

All of the effects are relatively simple and performant.

5. Advanced theming

Before getting into CSS, this section introduces a few advanced theme concepts. Those ideas also apply to CSS because CSS uses features such as theme constants.

5.1. Working with UIIDs

A UIID (User Interface Identifier) uniquely identifies a group of theme definitions for UI components. For example, a Button UIID can be linked to a component, and the theme can then define that component’s appearance.

A major advantage of UIIDs is the ability to change a component’s UIID. For example, to create a multiline label, use code like this:

TextArea t = new TextArea(); // ...
t.setUIID("Label");
t.setEditable(false);
Components such as SpanLabel use this approach internally.

UIIDs can be customized in the GUI builder and support per-component styling.

The component class name often matches the UIID, but the two remain separate entities.

5.2. Theme layering

Theme layering helps in two common cases:

  • A platform needs a slightly different theme.

  • A specific use case needs theme customization. For example, a user might select larger fonts.

Theme layering is straightforward and doesn’t require rebuilding the entire theme. A theme can be applied on top of another theme, similar to CSS cascading. To create a layer, add a new theme with the Add Theme button.

Remove the includeNativeBool constant from the new theme.

In the new theme, define the changes you need. For example, to use a larger default font, define that property for the relevant UIIDs and leave the other properties unchanged.

In a non-GUI-builder app, the theme loading code looks like this by default:

Resources theme = UIManager.initFirstTheme("/theme");

Update it to look like this:

Resources theme = UIManager.initNamedTheme("/theme", "Theme");
This example assumes that the main theme is named "Theme", not the layer theme that was added.

The original code relies on the theme being at position 0 in the theme name array. That might not always be true.

To add the theme layer, use:

UIManager.getInstance().addThemeProps(theme.getTheme("NameOfLayerTheme"));

The addThemeProps call places the secondary theme on top of the primary "Theme" and keeps the original UIIDs in "Theme" intact.

To apply theme changes to a running application, call Form’s `refreshTheme(). This updates the UI immediately and provides visual feedback for the theme changes.

5.3. Override resources in platform

When you adapt an application to different OS conventions, one common requirement is to use different icons. Sometimes you also need to change behavior based on device type, for example to use a different UI structure for a tablet.

Codename One lets you override a resource for a specific platform. You can redefine a resource for that platform and add platform-specific resources.

Override resources for specific platform
Figure 119. Override resources for specific platform

Overridden resources take precedence over embedded resources, which lets you change the look or even behavior for a specific platform or OS.

Overriding the theme is dangerous because a theme has external dependencies, such as image borders. The solution is to use theme layering and override the layer.

To override a resource, select the platform where the override applies.

Override for platform
Figure 120. Override for platform, allows you to override the checked resources and replace them with another resource

You can then click the green checkbox to mark that resource as specific to this platform. All resources added while that platform is selected apply to that platform. If you change your mind, delete the override in override mode and it will stop applying.

5.4. Theme constants

The Codename One Designer has a tab for creating constants. These constants can add global values and behavior hints to Codename One and its components. Constants are always strings. Some conventions let the UI adapt to input types. For example, a constant that ends with Bool is treated as a boolean value and displays as a checkbox. An Int suffix displays a numeric picker, and an Image suffix shows a combo box for picking an image.

The combo box in the designer for adding a theme constant is editable, so you can type any value you want.

To use a constant, call the appropriate UIManager methods:

  • getThemeConstant

  • isThemeConstant

  • getThemeImageConstant

Internally, Codename One has many built-in constants, and the list keeps growing. As features are added, the list is updated, but theme constants are inherently ad hoc and some may not appear here.

Table 3. Theme Constants
ConstantDescription/Argument

alwaysTensileBool

Enables tensile drag even when there is no scrolling in the container (only for scrollable containers)

backGestureThresholdInt

The threshold for the back gesture in the SwipeBackSupport class, defaults to 5

backUsesTitleBool

Indicates to the GUI builder that the back command should use the title of the previous form and not just the word "Back"

buttonRippleBool

true to activate the material design ripple effect on the buttons. This effect draws a growing circle from the point of touch onwards. This is false by default except for Android where it defaults to true. This is equivalent to setButtonRippleEffectDefault(bool) in the Button class

capsButtonTextBool

true to activate the caps text mode in the buttons. When activated setText on Button and all the constructors will invoke upcase() on all the strings effectively making the application buttons use uppercase exclusively. This is false by default except for Android where it defaults to true. it’s equivalent to Button.setCapsTextDefault(boolean) and can be tuned to an individual Component via Component.setRippleEffect(boolean)

capsButtonUiids

A list of the UIID’s that should be capitalized by default (in supported platforms) other than the Button and RaisedButton which are already capitalized. This list can be separated by spaces or commas e.g. capsButtonUiids=UpcaseButton,OtherCustomButton

defaultCommandImage

Image to give a command with no icon

dialogButtonCommandsBool

Place commands in the dialogs as buttons

dialogBlurRadiusInt

Sets the default Gaussian blur radius for the background of the dialogs. The default value is -1 indicating no blur

dialogPosition

Place the dialog in an arbitrary border layout position (e.g. North, South, Center, etc.)

centeredPopupBool

Popup of the combo box will appear in the center of the screen

changeTabOnFocusBool

Useful for feature phones, allows changing the tab when the focus changes immediately, without pressing a key

checkBoxCheckDisImage

CheckBox image to use instead of Codename One drawing it on its own

checkBoxCheckedImage

CheckBox image to use instead of Codename One drawing it on its own

checkBoxOppositeSideBool

Indicates the check box should be drawn on the opposite side to the text and not next to the text

checkBoxUncheckDisImage

CheckBox image to use instead of Codename One drawing it on its own

checkBoxUncheckedImage

CheckBox image to use instead of Codename One drawing it on its own

comboImage

Combo image to use instead of Codename One drawing it on its own

commandBehavior

Deprecated: don’t use this constant as it conflicts with the Toolbar. Indicates how commands should act, as a touch menu, native menu etc. Possible values: SoftKey, Touch, Bar, Title, Right, Native

ComponentGroupBool

Enables component group, which allows components to be logically grouped together, so the UIID’s of components would be modified based on their group placement. This allows for some unique styling effects where the first/last elements have different styles from the rest of the elements. it’s disabled by default, thus leaving its usage up to the designer

dialogTransitionIn

Default transition for dialog

dialogTransitionInImage

Default transition Image for dialog, causes a Timeline transition effect

dialogTransitionOut

Default transition for dialog

defaultCommandImage

An image to place on a command if none is defined, only applies to touch commands

defaultEmblemImage

The emblem painted on the side of the multibutton, by default this is an arrow on some platforms

emblemUiid

Overrides the UIID applied to emblem labels rendered by composite buttons such as MultiButton and SpanMultiButton.

iconUiid

Allows theming the icon component used by SpanLabel, SpanButton, MultiButton, and SpanMultiButton when they fetch icon styling via theme constants.

iosScrollMotionBool

Enables iOS-style scroll physics (nonlinear rubber-band during drag and critically-damped tensile snap-back). When unset it defaults to true on the iOS platform and false elsewhere. Set explicitly to override the platform default. See Section 5.4.1, “Scroll motion tuning”

imageviewerNavigationArrowsBool

Enables side navigation arrows by default for ImageViewer instances using the ImageViewer UIID (or a lowercased custom UIID prefix).

imageviewerThumbnailBarHeightMM

Sets the default thumbnail strip height (in millimeters) for ImageViewer navigation thumbnails.

imageviewerThumbnailsBool

Enables the bottom thumbnail strip by default for ImageViewer instances using the ImageViewer UIID (or a lowercased custom UIID prefix).

textUiid

Overrides the text component UIID for SpanLabel, SpanButton, MultiButton, and SpanMultiButton instances when provided as a theme constant.

useLargerTextScaleBool

When true, UIManager applies the larger text accessibility scale from Display.getLargerTextScale() when Display.isLargerTextEnabled() is enabled.

dialogTransitionOutImage

Default transition Image for dialog, causes a Timeline transition effect

DecayMotionScaleFactorInt

Velocity-to-distance multiplier for the exponential-decay scroll motion (see Section 5.4.1, “Scroll motion tuning”). Default is 950. Larger values make flicks travel farther for the same release velocity

disabledColor

Color to use when disabling entries by default

dlgButtonCommandUIID

The UIID used for dialog button commands

dlgCommandButtonSizeInt

Minimum size to give to command buttons in the dialog

dlgCommandGridBool

Places the dialog commands in a grid for uniform sizes

dlgInvisibleButtons

Includes an RRGGBB color for the line separating dialog buttons, as is the case with Android 4 and iOS 7 buttons in dialogs

dlgSlideDirection

Slide hints

dlgSlideInDirBool

Slide hints

dlgSlideOutDirBool

Slide hints

drawMapPointerBool

Indicates whether a pointer should appear in the center of the map component

fadeScrollBarBool

Boolean indicating if the scrollbar should fade when there is inactivity

setFadeScrollBarSpeed(int) (API)

Sets the per-frame opacity decrement for scrollbar fading (not milliseconds). Approximate fade duration is durationMs ~= (255 / speed) * (1000 / frameRate). At 60 FPS: speed 5 ~= 850ms, 3 ~= 1400ms, 2 ~= 2100ms, 1 ~= 4250ms

fadeScrollEdgeBool

Places a fade effect at the edges of the screen to indicate that it’s possible to scroll until we reach the edge (common on Android)

fadeScrollEdgeInt

Amount of pixels to fade out at the edge

firstCharRTLBool

Indicates to the GenericListCellRenderer that it should determine RTL status based on the first character in the sentence

noTextModeBool

Indicates that the on/off switch in iOS shouldn’t draw text on top of the switch, which is the case for iOS 7+ but not for prior versions

fixedSelectionInt

Number corresponding to the fixed selection constants in List

formTransitionIn

Default transition for form

formTransitionInImage

Default transition Image for form, causes a Timeline transition effect

formTransitionOut

Default transition for form

formTransitionOutImage

Default transition Image for form, causes a Timeline transition effect

globalToobarBool

Indicates that the Toolbar API should be on/off by default for all forms

hasRaisedButtonBool

Is true in platforms where the theme has the RaisedButton UIID defined. This is currently only true in the native Android theme to allow some material design guidelines

hideBackCommandBool

Hides the back command from the side menu when possible

hideEmptyTitleBool

Indicates that a title with no content should be hidden even if the border for the title occupies space

hideLeftSideMenuBool

Hides the side menu icon that appears on the left side of the UI

hideRightSideMenuBool

Hides the toolbar menu icon that appears on the right side of the title area

ignorListFocusBool

Hide the focus component of the list when the list doesn’t have focus

infiniteImage

The image used by the infinite progress component, the component will rotate it as needed

infiniteMaterialDesignSize

Size (in millimeters) of the generated material design spinner when InfiniteProgress runs in material mode. Defaults to 6.667mm

infiniteMaterialImageSize

Size (in millimeters) of the generated spinner image when no custom infiniteImage is provided. Defaults to 7mm

infiniteDefaultColor

Hex RGB color used for the auto-generated material spinner when infiniteImage isn’t supplied. Defaults to 777777

interactionDialogSpeedInt

Controls the duration in milliseconds that InteractionDialog uses when animating into and out of the layered pane (including the directional dispose helpers). Defaults to 400 if the constant isn’t defined.

includeNativeBool

True to derive from the platform native theme, false to create a blank theme that only uses the basic defaults

labelGap

Positive floating point value representing the default gap value between the label text and the icon in millimeters

listItemGapInt

Built-in item gap in the list, this defaults to 2, which predated padding/margin in Codename One

listLongPressBool

Indicates whether a list should handle long press events, defaults to true

mapTileLoadingImage

An image to preview while loading the MapComponent tile

mapTileLoadingText

The text of the tiles in the MapComponent during loading, defaults to "Loading…​"

mapZoomButtonsBool

Indicates whether buttons should be drawn on the map component

mediaBackImage

Media icon used by the media player class

mediaFwdImage

Media icon used by the media player class

mediaPauseImage

Media icon used by the media player class

mediaPlayImage

Media icon used by the media player class

menuButtonBottomBool

When set to true this flag aligns the menu button to the bottom portion of the title. Defaults to false

menuButtonTopBool

When set to true this flag aligns the menu button to the top portion of the title. Defaults to false

landscapeTitleUiidBool

When true the toolbar swaps to landscape-specific UIIDs (such as ToolbarLandscape/BackCommandLandscape) for layout and icon styling

menuHeightPercent

Allows positioning and sizing the menu

menuImage

The three dot menu image used in Android and the Toolbar to show additional command entries

menuImageSize

The size in millimeters (floating point value) of the generated side menu image, this is only used if you don’t supply a custom image. The default value is 4.5.

menuPrefSizeBool

Allows positioning and sizing the menu

menuSlideDirection

Defines menu entrance effect

menuSlideInDirBool

Defines menu entrance effect

menuSlideOutDirBool

Defines menu entrance effect

menuTransitionIn

Defines menu entrance effect

menuTransitionInImage

Defines menu entrance effect

menuTransitionOut

Defines menu exit effect

menuTransitionOutImage

Defines menu entrance effect

menuWidthPercent

Allows positioning and sizing the menu

iosStyleBackArrowBool

Renders the back command using the iOS-style chevron arrow (with a small icon gap) when the toolbar shows back text

minimizeOnBackBool

Indicates whether the form should minimize the entire application when the physical back button is pressed (if available) and no command is defined as the back command. Defaults to true

onOffIOSModeBool

Indicates whether the on/off switch should use the iOS or Android mode

otherPopupRendererBool

Indicates that a separate renderer UIID/instance should be used to the list within the combo box popup

PackTouchMenuBool

Enables preferred sized packing of the touch menu (true by default), when set to false this allows manually determining the touch menu size using percentages

paintsTitleBarBool

Indicates that the StatusBar UIID should be added to the top of the form to space down the title area, as is the case on iOS 7+ where the status bar is painted on top of the UI

rightSideMenuImage

Overrides the default icon used for the right-side toolbar menu button

rightSideMenuPressImage

Optional pressed-state icon for the right-side toolbar menu button

popupCancelBodyBool

Indicates that a cancel button should appear within the combo box popup

PopupDialogArrowBool

Indicates whether the popup dialog has an arrow, notice that this constant will change if you change UIID of the popup dialog

PopupDialogArrowBottomImage

Image of the popup dialog arrow, notice that this constant will change if you change UIID of the popup dialog

PopupDialogArrowTopImage

Image of the popup dialog arrow, notice that this constant will change if you change UIID of the popup dialog

PopupDialogArrowLeftImage

Image of the popup dialog arrow, notice that this constant will change if you change UIID of the popup dialog

PopupDialogArrowRightImage

Image of the popup dialog arrow, notice that this constant will change if you change UIID of the popup dialog

popupNoTitleAddPaddingInt

Adds padding to a popup when no title is present

popupTitleBool

Indicates that a title should appear within the combo box popup

pullToRefreshImage

The arrow image used to draw the pullToRefresh animation

pureTouchBool

Indicates the pure touch mode

radioOppositeSideBool

Indicates the radio button should be drawn on the opposite side to the text and not next to the text

radioSelectedDisImage

Radio button image

radioSelectedImage

Radio button image

radioUnselectedDisImage

Radio button image

radioUnselectedImage

Radio button image

radioSelectedDisFocusImage

Radio button image

radioSelectedFocusImage

Radio button image

radioUnselectedDisFocusImage

Radio button image

radioUnselectedFocusImage

Radio button image

releaseRadiusInt

Indicates the distance from the button with dragging, in which the button should be released, defaults to 0

rendererShowsNumbersBool

Indicates whether renderers should render the entry number

reverseSoftButtonsBool

Swaps the softbutton positions

rightSideMenuImage

Same as sideMenuImage only for the right side, optional and defaults to sideMenuImage

rightSideMenuPressImage

Same as sideMenuPressImage only for the right side, optional and defaults to sideMenuPressImage

rubberBandCoefficientInt

Resistance coefficient for the iOS-style rubber-band compression used while the finger drags past a scroll edge. Value is interpreted as hundredths, so 55 means 0.55 (the iOS reference value). Larger values let the content be pulled farther for the same finger travel; smaller values make the content feel stiffer. Only active when iosScrollMotionBool is true. See Section 5.4.1, “Scroll motion tuning”

ScrollMotion

Selects the post-release flick model. DECAY (default) uses exponential velocity decay controlled by ScrollMotionTimeConstantInt and DecayMotionScaleFactorInt. Any other value (e.g. FRICTION) falls back to the linear-friction model. See Section 5.4.1, “Scroll motion tuning”

ScrollMotionTimeConstantInt

Time constant in milliseconds for the exponential-decay flick model (active when ScrollMotion=DECAY). Default is 500. Smaller values stop the flick sooner

scrollVisibleBool

true/false default is platform dependent. Toggles whether the scroll bar is visible

showBackCommandOnTitleBool

Used by the Toolbar API to indicate whether the back button should appear on the title

shrinkPopupTitleBool

Indicates the title of the popup should be set to 0 if it’s missing

sideMenuAnimSpeedInt

The speed at which a sidemenu moves defaults to 300 milliseconds

sideMenuFoldedSwipeBool

Indicates the side menu could be opened via swiping

sideMenuImage

The image representing the side menu, three lines (Hamburger menu)

sideMenuPressImage

Optional pressed version of the sideMenuImage

sideMenuScrollVisibleBool

Indicates whether the scroll bar on the side menu should be visible or not, defaults to hidden

sideMenuShadowBool

Indicates whether the shadow for the side menu should be drawn

sideMenuShadowImage

The image used when drawing the shadow (a default is used if this isn’t supplied)

sideMenuSizeTabPortraitInt

The size of the side menu when expanded in a tablet in portrait mode

sideMenuSizePortraitInt

The size of the side menu when expanded in a phone in portrait mode

sideMenuSizeTabLandscapeInt

The size of the side menu when expanded in a tablet in landscape mode

sideMenuSizeLandscapeInt

The size of the side menu when expanded in a phone in landscape mode

sideMenuTensileDragBool

Enables/disables the tensile drag behavior within the opened side menu

sideSwipeActivationInt

Indicates the threshold in the side menu bar at which a swipe should trigger activation, defaults to 15 (percent)

sideSwipeSensitiveInt

Indicates the region of the screen that’s sensitive to side swipe in the side menu bar, defaults to 10 (percent)

sigButtonOKUIID

Defines the UIID applied to the confirmation button in the signature capture dialog (defaults to Button).

sigButtonResetUIID

Defines the UIID applied to the reset/clear button in the signature capture dialog (defaults to Button).

sigButtonCancelUIID

Defines the UIID applied to the cancel button in the signature capture dialog (defaults to Button).

slideDirection

Default slide transition settings

slideInDirBool

Default slide transition settings

slideOutDirBool

Default slide transition settings

sliderThumbImage

The thumb image that can appear on the sliders

snapGridBool

Snap to grid toggle

statusBarScrollsUpBool

Indicates that a tap on the status bar should scroll up the UI, only relevant in OS’s where paintsTitleBarBool is true

switchButtonPadInt

Indicates the padding in the on/off switch, defaults to 16

switchMaskImage

Indicates the mask image used in iOS mode to draw on top of the switch

switchOnImage

Indicates the on image used in iOS mode to draw the on/off switch

switchOffImage

Indicates the off image used in iOS mode to draw the on/off switch

TabEnableAutoImageBool

Indicates images should be filled by default for tabs

TabSelectedImage

Default selected image for tabs (if TabEnableAutoImageBool=true)

TabUnselectedImage

Default unselected image for tabs (if TabEnableAutoImageBool=true)

tabPlacementInt

The placement of the tabs in the Tabs component: TOP = 0, LEFT = 1, BOTTOM = 2, RIGHT = 3

tabsSlideSpeedInt

The time of the animation that occurs (in milliseconds) between between releasing a swiped tab and reaching the next tab. Currently defaults to 200

tabsFillRowsBool

Indicates if the tabs should fill the row using flow layout

tabsGridBool

Indicates whether tabs should use a grid layout thus forcing all tabs to have identical sizes

tabsOnTopBool

Indicates the tabs should be drawn on top of their content in a layered UI, this allows a tab to intrude into the content of the tabs

textCmpVAlignInt

The vertical alignment of the text component: TOP = 0, CENTER = 4, BOTTOM = 2

textComponentErrorColor

A hex RGB color which defaults to null in which case this has no effect. When defined this will change the color of the border and label to the given color to match the material design styling. This implements the red border underline in cases of error and the label text color change

textComponentOnTopBool

Toggles the on top mode which makes things look like they do on Android. This defaults to true on Android and false on other OS’s. This can also be manipulated via the onTopMode(boolean) method in InputComponent however the layout will only use the theme constant

textComponentAnimBool

toggles the animation mode which again can be manipulated by a method in InputComponent. If you want to keep the UI static without the floating hint effect set this to false. Notice this defaults to true only on Android

textComponentFieldUIID

sets the UIID of the text field to something other than TextField this is useful for platforms such as iOS where the look of the text field is different within the text component. This allows us to make the background of the text field transparent when it’s within the TextComponent and make it different from the regular text field

textFieldCursorColorInt

The color of the cursor as an integer (not hex)

tickerSpeedInt

The speed of label/button etc. (in milliseconds)

tintColor

The aarrggbb hex color to tint the screen when a dialog is shown

topMenuSizeTabPortraitInt

The size of the side menu when expanded and attached to the top in a tablet in portrait mode

topMenuSizePortraitInt

The size of the side menu when expanded and attached to the top in a phone in portrait mode

topMenuSizeTabLandscapeInt

The size of the side menu when expanded and attached to the top in a tablet in landscape mode

topMenuSizeLandscapeInt

The size of the side menu when expanded and attached to the top in a phone in landscape mode

touchCommandFillBool

Indicates how the touch menu should layout the commands within

touchCommandFlowBool

Indicates how the touch menu should layout the commands within

transitionSpeedInt

Indicates the default speed for transitions

treeFolderImage

Picture of a folder for the Tree class

treeFolderOpenImage

Picture of a folder expanded for the Tree class

treeNodeImage

Picture of a file node for the Tree class

tensileDragBool

Indicates that tensile drag should be enabled/disabled. This is usually set by platform themes

tensileSnapMinDurationInt

Minimum duration in milliseconds for the tensile snap-back animation when the finger is released past a scroll edge. Defaults to 400 when iosScrollMotionBool is true and 300 otherwise. The actual duration scales with the distance being snapped; this is only a floor

tensileSnapMotion

Motion curve used for the tensile snap-back. SPRING (the default when iosScrollMotionBool is true) applies a critically-damped spring envelope that settles softly. DECELERATION (the default elsewhere) applies the legacy quadratic ease-out. See Section 5.4.1, “Scroll motion tuning”

5.4.1. Scroll motion tuning

Scroll feel is controlled by three stages, each tunable via theme constants:

  1. While the finger is dragging past an edge — when iosScrollMotionBool is true, the over-edge distance is compressed by the iOS UIScrollView rubber-band function c * d * dim / (c * d + dim), where d is the raw finger displacement past the edge, dim is the viewport dimension, and c is rubberBandCoefficientInt / 100 (default 0.55). The result is that the content feels heavier the farther you pull it, asymptotically approaching dim. When iosScrollMotionBool is false, the legacy behavior is used: a linear 1:1 follow clamped to tensileLength.

  2. After the finger is lifted, while there is still velocity — the ScrollMotion constant selects the model. DECAY (default) uses exponential velocity decay with a time constant of ScrollMotionTimeConstantInt milliseconds and a distance scale of DecayMotionScaleFactorInt. Any other value (e.g. FRICTION) falls back to linear friction.

  3. When the scroll comes to rest past an edge — a tensile snap-back animates the content back to the edge. tensileSnapMotion picks the curve: SPRING is a critically-damped envelope (iOS-like soft settle) and DECELERATION is the legacy quadratic ease-out. The duration scales with distance but never falls below tensileSnapMinDurationInt milliseconds.

    iosScrollMotionBool is the single switch that flips stage 1 and the default of stage 3 to the iOS-matching behavior. It defaults to true on the iOS platform only. Every individual constant can still be overridden regardless of this switch, so you can, for example, enable the nonlinear rubber-band globally (iosScrollMotionBool=true) while keeping the legacy quadratic snap-back (tensileSnapMotion=DECELERATION).

Tuning suggestions
  • To make scrolling feel stiffer on iOS (less pull), reduce rubberBandCoefficientInt from 55 toward 35.

  • To make flicks stop sooner, reduce ScrollMotionTimeConstantInt (default 500) or DecayMotionScaleFactorInt (default 950).

  • To enable iOS-style physics on Android or desktop for consistency, set iosScrollMotionBool=true explicitly.

  • To disable iOS physics on the simulator while debugging, set iosScrollMotionBool=false in your development theme.

Dynamic Theme Swapping & Theme Constants

Once a theme constant is set by a theme, it isn’t removed on a refresh when replacing the theme.

E.g. if one would set the comboImage constant to a specific value in theme A and then switch to theme B, that doesn’t define the comboImage, the original theme A comboImage might remain!

The reason for this is simple: when extracting the constant values, components keep the values in cache locally and just don’t track the change in value. Furthermore, since the components allow manually setting values, it’s impractical for them to track whether a value was set by a constant or explicitly by the user.

The solution for this is to either manually reset undesired values before replacing a theme (e.g. for the case, above by calling the default look and feel method for setting the combo image with a null value), or defining a constant value to replace the existing value.

5.5. Native Theming

Codename One uses a theme constant called includeNativeBool, when that constant is set to true Codename One starts by loading the native theme first and then applying all the theme settings. This means your theme "derives" the style of the native theme first, similar to the cascading effect of CSS. Internally this is exactly what the theme layering section covered.

By avoiding this flag you can create themes that look EXACTLY the same on all platforms.

If you avoid the native theming you might be on your own. A few small device oddities such as the iOS status bar are abstracted by native theming. Without it you will need to do everything from scratch

You can simulate different OS platforms by using the native theme menu option

The native theme menu option
Figure 121. The native theme menu option

Developers can pick the platform of their liking and see how the theme will appear in that particular platform by selecting it and having the preview update on the fly.

5.6. Under the Hood of the Theme Engine

To truly understand a theme you need to understand what it’s. Internally a theme is a Hashtable key/value pair between UIID based keys and their respective values. For example: the key:

return "Button.fgColor=ffffff";

Will set the foreground color of the Button UIID to white.

When a Codename One Component is instantiated it requests a Style object from the UIManager class. The Style object is based on the settings within the theme and can be modified thru code or by using the theme.

You can replace the theme dynamically in runtime and refresh the styles assigned to the various components using the refreshTheme() method.

it’s a common mistake to invoke refreshTheme() without actually changing the theme. You see developers doing it when all they need is a repaint() or revalidate(). Since refreshTheme() is ** expensive recommend that you don’t use it unless you need to…​

A theme Hashtable key is comprised of:

[UIID.][type#]attribute

The UIID, corresponds to the component’s UIID for example: Button, CheckBox etc. it’s optional and may be omitted to address the global default style.

The type is omitted for the default unselected type, and may be one of sel (selected type), dis (disabled type) or press (pressed type). The attribute should be one of:

  • derive - the value for this attribute should be a string representing the base component.

  • bgColor - represents the background color for the component, if applicable, in a web hex string format RRGGBB for example: ff0000 for red.

  • fgColor - represents the foreground color, if applicable.

  • border - an instance of the border class, used to display the border for the component.

  • bgImage - an Image object used in the background of a component.

  • transparency - a String containing a number between 0-255 representing the alpha value for the background. This applies to the bgColor.

  • margin - the margin of the component as a String containing 4 comma separated numbers for top,bottom,left,right.

  • padding - the padding of the component, it has an identical format to the margin attribute.

  • font - A Font object instance.

  • alignment - an Integer object containing the LEFT/RIGHT/CENTER constant values defined in Component.

  • textDecoration - an Integer value containing one of the TEXT_DECORATION_* constant values defined in Style.

  • backgroundType - a Byte object containing one of the constants for the background type defined in Style under BACKGROUND_*.

  • backgroundGradient - contains an Object array containing 2 integers for the colors of the gradient. If the gradient is radial it contains 3 floating points defining the x, y & size of the gradient.

So to set the foreground color of a selected button to red, a theme will define a property like:

Button.sel#fgColor=ff0000

This information is mostly useful for understanding how things work within Codename One, but it can also be useful in runtime.

For example: to increase the size of all fonts in the application, you can do something like:

Hashtable h = new Hashtable();
h.put("font", largeFont);
UIManager.getInstance().addThemeProps(h);
Display.getInstance().getCurrent().refreshTheme();

5.7. Understanding Images and Multi-Images

This section provides a high-level overview of images. You dive deeper into the various types of images in the graphics section.

When working with a theme, you often use images for borders or backgrounds. You also use images within the GUI for various purposes and most such images will be extracted from the resource file.

Adding a standard JPEG/PNG image to the resource file is straight forward, and the resulting image can be viewed within the images section. For example, due to the wide difference between device types, an image that would be appropriate in size for an iPhone 3gs would not be appropriate in size for a Nexus device or an iPhone 4 (but perhaps, surprisingly, it will be right for iPad 1 and iPad 2).

The density of the devices varies significantly and Codename One tries to simplify the process by unifying everything into one set of values to indicate density. For simplicity’s sake, density is sometimes expressed in terms of pixels, however it’s mapped internally to actual screen measurements where possible.

A multi-image is an image that has many varieties for different densities, and thus looks sharp in all the densities. Since scaling on the device can’t interpolate the data (due to performance considerations), significant scaling on the device becomes impractical. For example, a multi-image will provide the "right" resolution image for the given device type.

From the programming perspective this is mostly seamless, a developer accesses one image and has no ability to access the images in the different resolutions. Within the designer, however, you can explicitly define images for many resolutions and perform high quality scaling so the "right" image is available.

You can use two basic methods to add a multi-image: quick add and standard add.

Both methods rely on understanding the source resolution of the image, for example: if you’ve an icon that you expect to be 128x128 pixels on iPhone 4, 102x102 on nexus one and 64x64 on iPhone 3gs. You can provide the source image as the 128 pixel image and perform a quick add option while picking the # High# density option.

This will indicate to the algorithm that your source image is designed for the " high" density and it will scale for the rest of the densities accordingly.

This relies on the common use case of asking your designer to design for one high end device (for example: iPhone X) then you can take the resources and add them as "HD" resources. They will automatically adapt to the lower resolutions

Alternatively, you can use the standard add multi-image dialog and set it like this:

Multi-image resolution dialog

Notice that you selected the square image option, essentially eliminating the height option. Setting values to 0 prevents the system from generating a multi-image entry for that resolution, which will mean a device in that category will fall on the closest alternative.

The percentage value will change the entire column, and it means the percentage of the screen. For example: You know the icon is 128 for the high resolution, you can move the percentage until you reach something close to 128 in the " High" row and the other rows will represent a size that should be pretty close in terms of physical size to the 128 figure.

At runtime, you can always find the host device’s approximate pixel density using the Display.getDeviceDensity() method. This will return one of:

Table 4. Densities

Constant

Density

Example Device

Display.DENSITY_VERY_LOW

~ 88 ppi

Display.DENSITY_LOW

~ 120 ppi

Android ldpi devices

Display.DENSITY_MEDIUM

~ 160 ppi

iPhone 3GS, iPad, Android mdpi devices

Display.DENSITY_HIGH

~ 240 ppi

Android hdpi devices

Display.DENSITY_VERY_HIGH

~ 320 ppi

iPhone 4, iPad Air 2, Android xhdpi devices

Display.DENSITY_HD

~ 540 ppi

iPhone 6+, Android xxhdpi devices

Display.DENSITY_560

~ 750 ppi

Android xxxhdpi devices

Density.DENSITY_2HD

~ 1000 ppi

Density.DENSITY_4K

~ 1250ppi

5.8. Use Millimeters for Padding/Margin and Font Sizes

When configuring your styles, you should almost never use "Pixels" as the unit for padding, margins, font size, and border thickness because the results will be inconsistent on different densities. Instead, you should use millimeters for all non-zero units of measurement.

As you now understand the complexities of DPI it should be clear why this is important.

5.8.1. Fractions of Millimeters

Sometimes millimeters don’t give you enough precision for what you want to do. Currently the designer allows you to specify integer values for most units. For example, you can achieve more precise results when working directly in Java. The Display.convertToPixels() method will allow you to convert millimeters (or DIPS) to pixels. It also takes an integer input, but you can use it to obtain a multiplier that you can then use to convert any millimeter value you want into pixels.

For example:

double pixelsPerMM = ((double) Display.getInstance().convertToPixels(10, true)) / 10.0;

And now you can set the padding on an element to 1.5mm. For example:

myButton.getAllStyles().setPaddingUnit(Style.UNIT_TYPE_PIXELS);
int pixels = (int) (1.5 * pixelsPerMM);
myButton.getAllStyles().setPadding(pixels, pixels, pixels, pixels);

5.9. Creating a Great Looking Side Menu

Side Menu final result
Figure 122. Side Menu final result

A side menu is a crucial piece of an elegant application. You will explain how one creates a simple side menu that’s elegant, portable and easy to build. This is a good "starting point" side menu from which you can build more elaborate designs.

To get this result you will start from a native theme and a bare bones application to keep things simple.

The code for the side menu is this:

Form hi = new Form("Hi World");

Toolbar tb = hi.getToolbar();
Image icon = theme.getImage("icon.png"); (1)
Container topBar = BorderLayout.east(new Label(icon));
topBar.add(BorderLayout.SOUTH, new Label("Cool App Tagline...", "SidemenuTagline")); (2)
topBar.setUIID("SideCommand");
tb.addComponentToSideMenu(topBar);

tb.addMaterialCommandToSideMenu("Home", FontImage.MATERIAL_HOME, e -> {}); (3)
tb.addMaterialCommandToSideMenu("Website", FontImage.MATERIAL_WEB, e -> {});
tb.addMaterialCommandToSideMenu("Settings", FontImage.MATERIAL_SETTINGS, e -> {});
tb.addMaterialCommandToSideMenu("About", FontImage.MATERIAL_INFO, e -> {});

hi.addComponent(new Label("Hi World"));
hi.show();
1This is the icon which was used in lieu of a logo it appears in the top right of the side menu
2This is the top bar containing the tagline and the icon it’s styled as if it’s a command but you can put anything here for example: an image etc.
3The commands are added as usual to the side menu with no styling or functionality, the entire look is determined by the theme

Next you will open the designer tool to style the UI

Open the side menu so you will get the right values in the combo box on add
Figure 123. Open the side menu so you will get the right values in the combo box on add

Now when you press Add the side menu entries will appear in the combo box (you can type them but this is more convenient). You will start with the SideNavigationPanel style:

The SideNavigationPanel has an opaque white background
Figure 124. The SideNavigationPanel has an opaque white background

The SideCommand style is a bit more elaborate, you start with a white foreground and an opaque bluish/purple color:

The SideCommand has a white foreground and opaque bluish background
Figure 125. The SideCommand has a white foreground and opaque bluish background

You will set padding to 3 millimeters which provides everything a good feel and spacing. This is important for finger touch sensitivity.

Padding is 3mm so it will feel spacious and touch friendly
Figure 126. Padding is 3mm so it will feel spacious and touch friendly

You will set margin to 0 except for the bottom one pixel which will leave a nice white line by showing off the background. This means the commands will have a space between them and the white style you gave to the SideNavigationPanel will appear thru that space.

Margin is 0 except for a thin line below each command
Figure 127. Margin is 0 except for a thin line below each command

Setting the border to empty is crucial!

The iOS version of the side command inherits a border style so you must "remove" it by defining a different border in this case an empty border. Since borders take precedence over color this would have prevented the color changes you made from appearing.

Border must be defined as Empty
Figure 128. Border must be defined as Empty

Next you need to pick a good looking font and make sure it’s large enough. You use millimeters size it correctly for all OS’s and override the derived text decoration which has a value in the iOS native theme so it can impact the final look.

Pick a good looking font for the side command
Figure 129. Pick a good looking font for the side command

Next you need to move to the selected tab and add a new side command entry that derives from the unselected version. You will pick a new color that’s slightly deeper and will make the selected style appear selected. You will also copy and paste this selected style to the pressed style.

Selected & Pressed SideCommand
Figure 130. Selected & Pressed SideCommand
Color for the Selected/Pressed SideCommand
Figure 131. Color for the Selected/Pressed SideCommand

The SidemenuTagline is a SideCommand style that was slightly adapted. You will remove the padding and margin because the whole section is wrapped in a side command and you don’t want double padding. You will leave 1mm padding at the top for a bit of spacing from the logo.

Padding of the SidemenuTagline
Figure 132. Padding of the SidemenuTagline

You will also update the font to a smaller size and italic styling so it will feel like a tagline.

Font for the SideMenuTagline is slightly smaller and italic
Figure 133. Font for the SideMenuTagline is slightly smaller and italic

The last change for the theme is for the StatusBarSideMenu UIID which is a spacing on the top of the sidemenu. This spacing is there for iOS devices which render the clock/battery/reception symbols on top of the app. You will set the padding to 0.

StatusBarSideMenu padding for the top of the side menu
Figure 134. StatusBarSideMenu padding for the top of the side menu

Finally, you will add the icon image (or a logo if you’ve it) into the theme as a multi image so you can use it within the side menu as a good looking logo. A relatively large icon image works as a 2HD multi-image but you can use many strategies to get a fitting image for this spot.

Rounded images work well here, you can round images dynamically using masking

These steps produce the UI above as a side menu, they might seem like a long set of steps but each step is pretty simple as you walk thru each one. This does show off the versatility and power of Codename One as a change to one step can create a radically different UI design.

5.10. Converting a PSD To A Theme

Codename One provides extensive support for designing beautiful user interfaces, but it isn’t necessarily obvious to new developers how to achieve their desired results. A common workflow for app design includes a PSD file with mock-ups of the UI, created by a professional designer.

PSD is the Adobe Photoshop file format, it’s the most common format for UI designs in the industry

For this tutorial you adapt a slick looking sign-up form found online and convert it to a Codename One component that can be used inside an application.

The process you followed was:

  1. Find the PSD design you want to use: this PSD file created by Adrian Chiran (you mirrored it here in case it goes offline):

    Sign Up form Design
    Figure 135. Sign Up form Design
  2. Re-create the general structure and layout of the design in a Codename One Form using nested components and layout managers. Here is a break-down of how you structured the component hierarchy in the Form:

    Component hierarchy and layouts
    Figure 136. Component hierarchy and layouts
  3. Extract the images you needed using Photoshop - this process is often referred to as "cutting"

  4. Extract the fonts, colors, and styles you needed to reproduce the design in Codename One

  5. Import images into the Codename one project, and define theme styles so that your components match the look of the original design

Here is a screenshot of the resulting component running inside the Codename One simulator:

Resulting app in the Codename One simulator
Figure 137. Resulting app in the Codename One simulator

5.10.1. Breaking Down the PSD

Open the PSD you’re interested in using Photoshop.

You might be missing fonts in your system so you can either install them or ignore that. Keep in mind that some fonts might not be redistributable with your application

In this PSD you want one of the screen designs so initially you want to remove everything that isn’t related so you can get your bearings more effectively:

  • Select the drag tool (the top left tool)

  • In the toolbar for the tool (top bar area) check the Auto Select mode

  • Select the Layer Mode for auto selection (in some cases group would actually be better so feel free to experiment)

  • Click on the portion in the PSD that you’re interested in

You should end up with something like this where a layer is selected in the layers window:

Selecting a layer from the region you’re interested in
Figure 138. Selecting a layer from the region you’re interested in

Scroll up the hierarchy a bit and uncheck/recheck the eye icon on the left until you locate the right element layer.

Find the right element layer you’re interested in
Figure 139. Selecting a layer from the region you’re interested in

Right click the layer and select Convert To Smart Object.

The right click menu will present different options when you click different areas of the layer, clicking on the left area of the layer works
In the right click menu option select "Convert To Smart Object"
Figure 140. In the right click menu option select "Convert To Smart Object"

Once the layer hierarchy is a smart object you can double click it which will open the sub hierarchy in a new tab and you now have the pieces of the image you care about.

Double clicking the smart object allows you to edit the form you need
Figure 141. Double clicking the smart object allows you to edit the form you need
Removing the Noise

The first thing you need to do is remove from the image all of the things that you don’t need. The status bar area on the top is redundant as if is a part of the phones UI. You can select it using the select tool and click the eye icon next to the layer to hide it.

Normally you’d want to have the back arrow but thanks to the material design icons that are a part of Codename One you don’t need that icon so you can hide that too.

You don’t need the "Sign Up" or "Done" strings in the title either but before removing them you’d like to know the font that’s used.

To discover that I can click them to select the layer then switch to the text tool:

The text tool allows you to inspect the font used
Figure 142. The text tool allows you to inspect the font used

Then I can double click the text area layer to find out the font in the top of the UI like this:

The Done toolbar entry uses SourceSansPro Regular
Figure 143. The Done toolbar entry uses SourceSansPro Regular
Notice that I don’t actually need to have the font installed in this case I don’t (hence the square brackets)

Also notice that the color of the font is accessible in that toolbar, by clicking the color element you get this dialog which shows the color value to be f73267, this is something you will use later

The color dialog lists the hex color at the bottom
Figure 144. The color dialog lists the hex color at the bottom, you can paste that directly to the designer tool

You can now hide both text layers so they won’t pose a problem later.

The Camera Button

The camera button includes an icon and the button background itself. You can use that as a single image and be done with it, but for the purpose of this tutorial I will take the harder route of separating this into a button background and a foreground image.

When you click on the camera icon you will notice that the camera icon is comprised of two separate layers: the camera and the "x" symbol above it. You can select both layers using ctrl-click (command click on the Mac) and convert both to a smart object together using the same method as before:

The camera smart object
Figure 145. The camera smart object

Since the image is used as an icon you want it to be completely square which isn’t the situation here!
This is important as a non-square image can trigger misalignment when dealing with icons and the background. So you need to use the ImageCanvas Size menu and set the values to be the same (the higher value of the two).

The canvas size dialog for the camera.png file
Figure 146. The canvas size dialog for the camera.png file

You can now use FileExport and save the first image resource you will need into a temporary directory. Make sure to save a PNG file to preserve quality and transparency!

Use FileExport and never use FileSave As. The latter can produce a huge size difference as it retains image meta-data

For convenience you will refer to the file as camera.png when you need it later.

The camera icon image
Figure 147. The camera icon image

You can follow the exact same procedure with the parent button layer (the white portion) which you can convert to a smart object and export camera-button.png.

The camera button image set to a gray background so it will be visible
Figure 148. The camera button image set to a gray background so it will be visible

Now you can hide both of these elements and proceed to get the background image for the title.

Here the "smart object trick" won’t work…​ There is an effects layer in place and the smart object will provide you with the real underlying image instead of the look you actually want. For example, solving this is trivial now that you hid all of the elements on top of the image!

You need to switch to the rectangular select tool:

The select tool and the clean image you want to select
Figure 149. The select tool and the clean image you want to select

Now drag the select tool to select the image don’t cross into the white pixels below the image. You can use the zoom value and set it to a high value to get the selection right.

When the selection is right click EditCopy Merged. Normally Copy would copy a specific layer but in this case you want to copy what you see on the screen!

Now click FileNew it should have the Presets set to Clipboard which means the newly created image is based on what you copied (that’s seriously great UX). Just accept that dialog and paste (Ctrl-V or Command-V).

You can now save the image, since it’s a background using JPEG is totally acceptable in this case. You named it background.jpg.

The background image
Figure 150. The background image

The last thing you need is the colors used in the UI. You can use the "eye drop" tool in a high zoom level to discover the colors of various elements for example: the text color is 4d606f and the separator color is f5f5f5:

The eye drop tool can be pointed at an area of the image to get the color in that region
Figure 151. The eye drop tool can be pointed at an area of the image to get the color in that region

5.10.2. The Code

While that was verbose it was relatively simple. You will create a simple barebones manual application with the native theme.

The reason for this is to avoid "noise", if you use a more elaborate theme it would have some existing settings. This can make the tutorial harder to follow
Simple bare bones app settings
Figure 152. Simple bare bones app settings

Once the project is created double click the theme.res file and within the designer select ImagesQuick Add Multi Images. Select the 3 images you created above: background.jpg, camera.png & camera-button.png. Leave the default setting on # High# and press OK.

Then save the resource file so you can use these images from code.

Here is the source code you used to work with the UI above there are comments within the code explaining some of the logic:

private Label createSeparator() {
    Label sep = new Label();
    sep.setUIID("Separator");
    // the separator line  is implemented in the theme using padding and background color, by default labels
    // are hidden when they have no content, this method disables that behavior
    sep.setShowEvenIfBlank(true);
    return sep;
}
if (current != null) {
    current.show();
    return;
}
// The toolbar uses the layered mode so it resides on top of the background image, the theme makes
// it transparent so we will see the image below it, we use border layout to place the background image on
// top and the "Get started" button in the south
Form psdTutorial = new Form("Signup", new BorderLayout());
Toolbar tb = new Toolbar(true);
psdTutorial.setToolbar(tb);

// we create 4mm material arrow images for the back button and the Get started button
Style iconStyle = psdTutorial.getUIManager().getComponentStyle("Title");
FontImage leftArrow = FontImage.createMaterial(FontImage.MATERIAL_ARROW_BACK, iconStyle, 4);
FontImage rightArrow = FontImage.createMaterial(FontImage.MATERIAL_ARROW_FORWARD, iconStyle, 4);

// we place the back and done commands in the toolbar, we need to change UIID of the "Done" command
// so we can color it in Red
tb.addCommandToLeftBar("", leftArrow, (e) -> Log.p("Back pressed"));
Command doneCommand = tb.addCommandToRightBar("Done", null, (e) -> Log.p("Done pressed"));
tb.findCommandComponent(doneCommand).setUIID("RedCommand");

// The camera button is comprised of 3 pieces. A label containing the image and the transparent button
// with the camera icon on top. This is all wrapped in the title container where the title background image
// is placed using the theme. We chose to use a Label rather than a background using the cameraLayer so
// the label will preserve the original size of the image without scaling it and take up the space it needs
Button cameraButton = new Button(theme.getImage("camera.png"));
Container cameraLayer = LayeredLayout.encloseIn(
        new Label(theme.getImage("camera-button.png")),
        cameraButton);
cameraButton.setUIID("CameraButton");
Container titleContainer = Container.encloseIn(
        new BorderLayout(BorderLayout.CENTER_BEHAVIOR_CENTER),
        cameraLayer, BorderLayout.CENTER);
titleContainer.setUIID("TitleContainer");

TextField firstName = new TextField("", "First Name");
TextField lastName = new TextField("", "Last Name");
TextField email = new TextField("", "Email Address", 20, TextField.EMAILADDR);
TextField password = new TextField("", "Choose a Password", 20, TextField.PASSWORD);
TextField phone = new TextField("", "Phone Number", 20, TextField.PHONENUMBER);
Label phonePrefix = new Label("+1");
phonePrefix.setUIID("TextField");

// The phone and full name have vertical separators, we use two table layouts to arrange them correctly
// so the vertical separator will be in the right place
TableLayout fullNameLayout = new TableLayout(1, 3);
Container fullName = new Container(fullNameLayout);
fullName.add(fullNameLayout.createConstraint().widthPercentage(49), firstName).
        add(fullNameLayout.createConstraint().widthPercentage(1), createSeparator()).
        add(fullNameLayout.createConstraint().widthPercentage(50), lastName);
Container fullPhone = TableLayout.encloseIn(3, phonePrefix, createSeparator(), phone);

// The button in the south portion needs the arrow icon to be on the right side so we place the text on the left
Button southButton = new Button("Get started", rightArrow);
southButton.setTextPosition(Component.LEFT);
southButton.setUIID("SouthButton");

// we add the components and the separators the center portion contains all of the elements in a box
// Y container which we allow to scroll. BorderLayout Containers implicitly disable scrolling
Container by = BoxLayout.encloseY(
        fullName,
        createSeparator(),
        email,
        createSeparator(),
        password,
        createSeparator(),
        fullPhone,
        createSeparator()
);
by.setScrollableY(true);
psdTutorial.add(BorderLayout.NORTH, titleContainer).
        add(BorderLayout.SOUTH, southButton).
        add(BorderLayout.CENTER, by);

psdTutorial.show();

5.10.3. Styling The UI

So the code above is most of the work but you still need to put everything together using the theme. This is what you’ve so far:

Before applying the changes to the theme this is what you’ve
Figure 153. Before applying the changes to the theme this is what you’ve
This is what you’re aiming at with no additional code changes
Figure 154. This is what you’re aiming at with no additional code changes

This looks like a major set of changes but it requires exactly 10 UIID definitions to get to this look!

Open the designer and select the theme. Press the Add button and type in TitleContainer. Uncheck derive for the background and select IMAGE_SCALED_FILL for the Type and the background.jpg image.

Define the padding as:

  • Left - 3 millimeter

  • Right - 3 millimeter

  • Top - 8 millimeter

  • Bottom - 2 millimeter

This will allow enough space for the title. Define margin as 0 on all sides. Then press OK.

Add the "Title" UIID. In the Color tab define the foreground as ffffff define transparency as 0 (fully transparent so you will see the TitleContainer). Define padding as 1 millimeter on all sides and margin as 0 on all sides.

In the Border tab press the …​ button and select [Empty].

In the Font tab select the True Type as native:MainThin. Select the True Type Size as millimeters and set the value to 3.5.

Press OK to save the changes.

Copy the Title UIID and paste it, change the name to "TitleCommand" and press OK to save the changes.

Copy the Title UIID again and paste it, change the name to "RedCommand". In the Color tab set the foreground color to f73267. In the Font tab set the True Type to native:MainLight and set the size to 3. Press OK to save the changes.

Add the "TitleArea" UIID. In the Color tab define transparency as 0 (fully transparent so you will see the TitleContainer). Define padding and margin as 0 on all sides.
In the Border tab press the …​ button and select [Empty]. Press OK to save the changes.

Add the "TextField" UIID. In the Color tab define transparency as 255 (fully opaque) and the background as ffffff (white). Define padding as 2 millimeter on all sides and margin as 0 on all sides.
In the Border tab press the …​ button and select [Empty]. In the Font tab set the True Type to native:MainLight and set the size to 2. Press OK to save the changes.

Copy the TextField UIID again and paste it, change the name to "TextHint". In the Color tab set the foreground color to 4d606f. Press OK to save the changes.

Add the "SouthButton" UIID. In the Color tab define transparency as 255 (fully opaque) and the background as f73267 (red) and the foreground as ffffff (white). Define Alignment as Center.

Define padding as:

  • Left - 1 millimeter

  • right - 1 millimeter

  • top - 2 millimeters

  • bottom - 2 millimeters

Define margin as 0 on all sides. In the Font tab set the True Type to native:MainThin and set the size to 3. Press OK to save the changes.

Add the "CameraButton" UIID. In the Color tab define transparency as 0 (fully transparent). Define Alignment as Center.
Define padding as:

  • Left - 1 millimeter

  • right - 1 millimeter

  • top - 3 millimeters

  • bottom - 1 millimeter

This helps spacing away from the title

Define margin as 1 millimeter on all sides. Press OK to save the changes.

You can now save the theme and the app should look like the final result!

Not Quite There Yet

There is one last piece that you would notice if you actually try to run this code. When pressing the buttons/text fields you would see their look change completely due to the different styles for focus/press behavior.

You can derive the regular styles from the selected/pressed styles but one of the simplest ways is to copy & paste the styles to the pressed/selected tabs. You can copy CameraButton, RedCommand, SouthButton & TextField to the selected state. Then copy CameraButton, RedCommand & SouthButton to the pressed state to get the complete app running!

6. Native Modern Themes

Codename One ships an iOS Modern (liquid-glass) theme and an Android Material 3 theme that you can opt your app into with a single build hint. Both are fully overridable - their colour palettes, type ramps, and state-specific styles are all reachable from your own theme.css and from runtime API.

The legacy iOS 7 (iOS) and Holo Light (Android) themes remain the default so existing apps see no behaviour change.

6.1. Selecting a theme

Three build hints control the platform native theme. None of them are required; with all three unset every app continues to load the legacy theme it always did.

HintValuesDescription

ios.themeMode

auto (default)
modern / liquid
ios7 / flat
legacy / iphone

auto and ios7 both load the iOS 7 flat theme. modern / liquid opts in to the modern theme generated from native-themes/ios-modern/theme.css. legacy / iphone loads the pre-iOS 7 theme. The automodern flip is planned for a future release.

cn1.androidTheme

hololight (default)
material / modern
legacy

hololight is Android Holo Light. material / modern opts in to the modern theme generated from native-themes/android-material/theme.css. legacy is the pre-Holo theme.

cn1.nativeTheme

modern / legacy / custom

Cross-platform shortcut that sets both ios.themeMode and cn1.androidTheme together. modern = liquid glass + Material 3, legacy = iOS 7 + Holo Light, custom disables the framework theme entirely so your own theme.css owns the base layer.

The legacy and.hololight=true hint still works and maps to cn1.androidTheme=hololight.

6.2. Light and dark mode

Both modern themes ship a dark variant via a @media (prefers-color-scheme: dark) block in their CSS. The CSS compiler rewrites each rule inside that block into a $Dark<UIID> style entry; UIManager picks them up whenever CN.isDarkMode() == true.

Display.getInstance().setDarkMode(Boolean) controls the active appearance:

  • null (the default) - follow the device. iOS reads UITraitCollection, Android reads Configuration.uiMode. When the user toggles light / dark in system settings the app reflects the change.

  • true / false - force the app into one mode regardless of system setting (useful for theme-preview screens or accessibility toggles).

6.3. Material 3 colour palette (Android)

The Android Material 3 theme is built around the Material Design 3 "baseline" palette. Each colour is referenced from one or more UIIDs; if you change a colour the change ripples to every UIID that inherits from it.

RoleLightDarkUsed by

primary

#6750a4

#d0bcff

Default Button fill, BackCommand / TitleCommand text, SelectedTab text colour.

on-primary

#ffffff

#381e72

Text printed on top of the primary fill.

primary-container

#eaddff

#4f378b

RaisedButton (the elevated tone), Button.pressed and MultiButton.pressed highlight, FloatingActionButton.

surface

#fef7ff

#141218

Form, ContentPane, Toolbar, TitleArea, List, Tabs, SideNavigationPanel. The "page" colour.

on-surface

#1d1b20

#e6e0e9

Body text on surfaces (Label, Title, MultiLine1).

surface-variant

#e7e0ec

#49454f

Track of the off-state Switch.

on-surface-variant

#49454f

#cac4d0

Secondary text (SecondaryLabel, MultiLine2, UnselectedTab text).

surface-container

#f3edf7

#211f26

TextField / TextArea filled background.

surface-container-highest

#e6e0e9

#211f26

Dialog, PopupContent. Sits one elevation step above surface so dialogs read as raised cards.

outline / outline-variant

#79747e / #cac4d0

#938f99 / #49454f

Separator, TertiaryLabel, disabled-text muting.

state-pressed

#d0bcff

#4f378b

All .pressed overrides on Button-family UIIDs.

state-disabled / on-disabled

#e0dce4 / #a5a0ab

#2b2930 / #5c5967

All .disabled overrides.

To rebrand the app, override the colour at the role level rather than touching every UIID. For example, to flip the primary container palette to teal:

#Constants {
    includeNativeBool: true;
    darkModeBool: true;
}

/* Touch the four UIIDs that paint with primary / primary-container.
   The role-as-rule pattern keeps brand changes localised. */
Button { background-color: #00796b; }
Button.pressed { background-color: #4db6ac; color: #00251a; }
RaisedButton { background-color: #b2dfdb; color: #00251a; }
RaisedButton.pressed { background-color: #80cbc4; }
SelectedTab { color: #00796b; }
BackCommand { color: #00796b; }
TitleCommand { color: #00796b; }

6.4. iOS modern colour palette

The iOS modern theme follows Apple’s system palette.

RoleLightDarkUsed by

accent

#007aff

#0a84ff

Button text, RaisedButton fill, SelectedTab text, BackCommand / TitleCommand, FloatingActionButton.

accent-pressed

#0064d1

#64b1ff

All .pressed accent overrides.

accent-disabled

#b3d4ff

#004a99

All .disabled accent overrides.

surface

#ffffff

#000000

Pure surface used by Toolbar, TitleArea, Title, List.

surface-grouped

#f2f2f7

#1c1c1e

Form / ContentPane (the iOS "grouped" form bg). Dialog / Tabs use this colour at reduced opacity for the liquid-glass look.

surface-tertiary

#e5e5ea

#2c2c2e

Button.pressed highlight, elevated dark Dialog surface.

text-primary

#000000

#ffffff

Label, MultiLine1, Title, primary body text.

text-secondary

#3c3c43

#ebebf5

SecondaryLabel, MultiLine2, unselected tabs.

text-tertiary / text-disabled

#8e8e93 / #c7c7cc

#8e8e93 / #48484a

TertiaryLabel, MultiLine3-4, disabled-state text.

separator

#c6c6c8

#38383a

Separator.

success

#34c759

#30d158

Switch.selected, OnOffSwitch.selected.

To layer a brand colour on top, override RaisedButton and accent-driven UIIDs the same way as Android above. The colour names match Apple’s UIColor.systemBlue etc. so you can mirror the SF Symbols semantics if you want.

6.5. Runtime palette override

Push a Hashtable of theme props through UIManager.addThemeProps to flip the palette live, without recompiling the theme:

Hashtable override = new Hashtable();
override.put("RaisedButton.bgColor", "d81b60");
override.put("RaisedButton.sel#bgColor", "b71c5c");
override.put("RaisedButton.press#bgColor", "ad1457");
override.put("BackCommand.fgColor", "d81b60");
UIManager.getInstance().addThemeProps(override);
Form.getCurrentForm().refreshTheme();

Common cases are demonstrated by the PaletteOverrideThemeScreenshotTest in the hellocodenameone test suite, which flips the primary accent to magenta at runtime and re-renders the same form.

6.6. Platform-specific UIIDs

A handful of UIIDs exist only because one platform draws them differently from the other. They are still safe to override; you just want to know which platform’s screen the override is going to land on.

iOS-only behaviour:

  • Toolbar, TitleArea, Title paint over the status-bar area. iOS reserves room above for the notch / status bar; in your capture this reads as a coloured strip at the very top of the Form. In production the device fills it with system content (signal, battery, time).

  • MultiButton is styled as an iOS Settings row (multi-line text ramp + chevron). Compare against Material 3’s denser list-item pattern.

Android-only behaviour:

  • Toolbar does not paint over the system status bar; the native Android status bar handles that.

  • Tabs use Material 3 top tabs (flat, underline-by-color). iOS modern renders Tabs as a bottom-anchored pill group via the tabPlacementInt constant - that constant is intentionally only set in the iOS theme so behaviour stays consistent on each platform.

6.7. Switching CheckBox / RadioButton glyphs

The default check / radio glyphs are Material icons drawn by DefaultLookAndFeel. The theme can swap them via four optional constants (Material codepoints):

ConstantDefaultNotes

@checkBoxCheckedIconInt

MATERIAL_CHECK_BOX (E834)

Override to e.g. MATERIAL_CHECK_CIRCLE (E86C / 59500) for an iOS-style filled circle. The iOS modern theme does this.

@checkBoxUncheckedIconInt

MATERIAL_CHECK_BOX_OUTLINE_BLANK (E835)

Match the empty version of whatever you chose above.

@radioCheckedIconInt

MATERIAL_RADIO_BUTTON_CHECKED (E837)

Filled circle with dot.

@radioUncheckedIconInt

MATERIAL_RADIO_BUTTON_UNCHECKED (E836)

Empty circle.

Set these in your #Constants { …​ } block; the icons rebuild on the next style refresh.

6.8. Component-specific tuning constants

ConstantEffect

@switchTrackScaleX, @switchTrackScaleY

Stretches the Switch track. Larger X = longer pill, larger Y = thicker. iOS uses 2.5 / 1.5; Material uses 3.0 / 0.9.

@switchThumbScaleY

Scales the Switch thumb relative to the track. iOS 1.4, Material 1.5.

@switchThumbPaddingInt, @switchThumbInsetMM

Pixels of breathing room between thumb and track.

@switchTrackOffOutlineWidthMM, @switchTrackOffOutlineColor

iOS draws a faint ring around the off-state track; Material does not.

@tabPlacementInt

Component.TOP (0), Component.BOTTOM (2), Component.LEFT (1), Component.RIGHT (3). Where the Tabs widget anchors its tab bar. Set in iOS modern theme to 2 for the iOS 26 bottom-bar look; unset on Android (Tabs at top).

@tabsFillRowsBool, @tabsGridBool

Distribute tabs evenly across the bar.

@darkModeBool

true enables $DarkUIID resolution when the app is in dark mode. Both modern themes set this; user themes that want dark mode also need to set it.

6.9. Customising in your own theme

Your app’s theme.css inherits from the installed native theme:

#Constants {
    includeNativeBool: true;
    darkModeBool: true;
}

/* Tweak only what's different. Everything you do not redeclare
   keeps coming from the native theme. */
RaisedButton { background-color: #d81b60; }
RaisedButton.pressed { background-color: #b71c5c; }
RaisedButton.disabled { background-color: #ffd6e2; color: #ffffff; }

@media (prefers-color-scheme: dark) {
    RaisedButton { background-color: #ff80ab; color: #4a0026; }
    RaisedButton.pressed { background-color: #f06292; }
}

The user’s CSS is layered on top of the native theme at app launch, so refresh / restart picks the override up.

6.10. Inheriting from a native UIID

cn1-derive lets a custom UIID start from one of the native theme’s UIIDs and refine it:

DangerButton {
    cn1-derive: RaisedButton;
    background-color: #d32f2f;
}
DangerButton.pressed {
    cn1-derive: RaisedButton;
    background-color: #b71c1c;
}

cn1-derive works best when the relationship is child refines parent. Avoid deriving across unrelated UIIDs (e.g. a TitleArea that derives from Toolbar) - inline the properties instead.

6.11. Translucency, glass effects, and the test harness

The iOS modern Dialog and Tabs use translucent surfaces (rgba with alpha < 1) so any backdrop reads through the widget. To exercise this in screenshot tests, the hellocodenameone fidelity tests opt-in to a diagonal-stripe textured backdrop on the form (useTexturedBackdrop() in DualAppearanceBaseTest). Translucent widgets show their see-through tint against the stripes; opaque widgets cover the stripes entirely.

A real backdrop blur (UIVisualEffectView on iOS, RenderEffect on Android) lands as a separate native primitive in a future release. The current rgba approximation is the closest the framework can do without that primitive.

7. CSS

In this chapter you will discuss theming with CSS in Codename One.

CSS Changes don’t Require a Recompile
You can change the CSS values while the simulator is running and the changes will reflect in the simulator within a few seconds

7.1. Activating CSS

Codename One applications always use the resource file. The CSS support compiles a file in CSS syntax to a Codename One resource file and adds it to the application. In runtime the CSS no longer exists and the file acts like a regular theme file.

To enable CSS support in Codename One you need to flip a switch in Codename One Settings.

The CSS Option in Codename One Settings
Figure 155. The CSS Option in Codename One Settings Part I
The CSS Option in Codename One Settings
Figure 156. The CSS Option in Codename One Settings Part II

Once enabled your theme.res file will regenerate from a CSS file that resides under the css directory. Changes you make to the CSS file will instantly update the simulator as you save. However, there are some limits to this live update so in some cases a simulator restart would be necessary.

7.2. Supported CSS Selectors

Since Codename One stylesheets are meant to be used with Codename One component hierarchies instead of XML/HTML documents, selectors work a little differently.

  1. All selectors (with some specific exceptions discussed below) are interpreted as UIIDs.

  2. Only 4 predefined CSS classes are supported:

    • .pressed — Targets the component when in "Pressed" state.

    • .selected — Targets the component when in "Selected" state.

    • .unselected — Targets the component when in "Unselected" state.

    • .disabled — Targets the component when in "Disabled" state.

      If no class is specified, then the selector targets "all" states of the given component.

The following are a few possible selectors you can include in your stylesheet.

  1. Button — Defines styles for the "Button" UIID.

  2. Button.pressed — Defines styles for the "Button" UIID’s "pressed" state.

  3. Button, TextField, Form — Defines styles for the "Button", "TextField", and "Form" UIIDs.

The following example creates a simple button with a border, and text aligned center. By default the button will have a transparent background, but when it’s pressed, it will have a gray background:

Button {
    text-align: center;
    border: 1pt solid gray;
    background-color: transparent;
}

Button.pressed {
    background-color: gray;
}

7.2.1. Inheriting properties using cn1-derive

The following example defines a custom Button style named "MyButton" that inherits all of the styles of Button but changes the background color to blue.

MyButton {
   cn1-derive: Button;
   background-color: blue;
}

7.3. Special Selectors

7.3.1. #Device

The #Device selector allows you to define which device resolutions this CSS file should target. Mutli-images generated from this style-sheet will be include variants for device resolutions in the range (min-resolution, max-resolution) as defined in this section. By default all resolutions are generated.

#Device {
    min-resolution: 120dpi;
    max-resolution: 480dpi;
    resolution: 480dpi;
}

7.3.2. #Constants

The #Constants selector allows you to specify theme constants.

e.g.

#Constants {
    PopupDialogArrowBool: false;
    calTitleDayStyleBool: true;
    calTransitionVertBool: false;
    calendarLeftImage: "calendar-arrow-left.png";
    calendarRightImage: "calendar-arrow-right.png";
    centeredPopupBool: false;
    checkBoxCheckDisFocusImage: "Check-Box_Normal.png";
    checkBoxCheckedFocusImage: "Check-Box_Press.png";
    checkBoxCheckedImage: "Check-Box_Press.png";
    checkBoxOppositeSideBool: true;
    checkBoxUncheckedFocusImage: "Check-Box_Normal.png";
    checkBoxUncheckedImage: "Check-Box_Normal.png";
    comboImage: "combo.png";
    commandBehavior: "Side";
    dialogTransitionIn: "fade";
    dialogTransitionOut: "fade";
    dlgButtonCommandUIID: "DialogButton";
    dlgCommandGridBool: true;
    dlgInvisibleButtons: #1a1a1a;
    formTransitionIn: "empty";
    formTransitionOut: "slide";
    includeNativeBool: true;
    menuImage: "of_menu.png";
    noTextModeBool: true;
    onOffIOSModeBool: true;
    otherPopupRendererBool: false;
    pureTouchBool: true;
    radioSelectedFocusImage: "Radio_btn_Press.png";
    radioSelectedImage: "Radio_btn_Press.png";
    radioUnselectedFocusImage: "Radio_btn_Normal.png";
    radioUnselectedImage: "Radio_btn_Normal.png";
    sideMenuImage: "menu.png";
    switchMaskImage: "switch-mask-3.png";
    switchOffImage: "switch-off-3.png";
    switchOnImage: "switch-on-3.png";
    tabPlacementInt: 0;
    backIconImage: "Back-icon.png";
    articleSourceIconImage: "Source-icon.png";
    articleDateIconImage: "Date-icon.png";
    articleArrowRightImage: "Arrow-right.png";
    articleShareIconImage: "Share-icon.png";
    articleBookmarkIconImage: "Bookmark-icon.png";
    articleTextIconImage: "Text-icon.png";
    articleCommentsIconImage: "Comments-icon.png";
    newsIconImage: "News-icon.png";
    channelsIconImage: "Channels-icon.png";
    bookmarksIconImage: "Bookmarks-icon.png";
    overviewIconImage: "Overview-icon.png";
    calendarIconImage: "Calendar-icon.png";
    timelineIconImage: "Timeline-icon.png";
    profileIconImage: "Profile-icon.png";
    widgetsIconImage: "Widgets-icon.png";
    settingsIconImage: "Settings-icon.png";
    SubmitIconImage: "Submit-icon.png";
    SubmitIconDarkImage: "SubmitButtonLight-icon.png";
    defaultFontSizeInt: 18;
    defaultDesktopFontSizeInt: 14;
    defaultSourceDPIInt: "0";

}

In the above example, the constants referring to an image name as a string requires that the image exists in one of the following locations:

  • res/<cssfilename>/<imageName>

  • ../res/<cssfilename>/<imageName>

  • ../../res/<cssfilename>/<imageName>

or that it has been defined as a background image in some selector in this CSS file.

7.3.3. Default

The Default selector is special in that it will set properties on the theme’s "default" element. The default element is a special UIID in Codename One from which all other UIIDs in the same theme are derived. This is a good place to set things like default fonts or background-colors.

7.4. Standard CSS Properties

  • padding (and variants)

  • margin (and variants)

  • border (and variants)

  • border-radius

  • background (Usage below)

  • background-color

  • background-repeat

  • background-image

  • border-image

  • border-image-slice

  • font (Usage is covered in the following font section)

  • font-family (Usage is covered in the following font section)

  • font-style (Usage is covered in the following font section)

  • font-size (Usage is covered in the following font section)

  • @font-face (Usage is covered in the following font section)

  • color

  • text-align

  • text-decoration(Usage below)

  • opacity

  • box-shadow

  • width ( used for generating background-images and borders)

  • height ( used for generating background-images and borders)

7.5. Custom Properties

cn1-source-dpi

Used to specify source DPI for multi-image generation of background images. Accepted values: 0 (Not multi-image), 120 (Low res), 160 (Medium Res), 320 (Very High Res), 480 (HD), Higher than 480 (2HD). If not specified, the default value will be the value of the defaultSourceDPIInt theme constant, if specified, or 480, if not specified.

cn1-background-type

Used to explicitly specify the background-type that should be used for the class.

cn1-9patch

Used to explicitly specify the slices used when generating 9-piece borders. Deprecated - Use border-image and border-image-slice for 9-piece borders.

cn1-derive

Used to specify that this UIID should derive from an existing UIID.

7.6. CSS Variables

As of CodenameOne 7.0, you can use variables in your CSS file via the var() CSS function. E.g.

var(--header-color, blue);

The var() function can be used inside property values. I.e. You can’t use it in property names or selectors.

Syntax:

var(<custom-property-name>, <declaration-value>?)

The <custom-property-name> must begin with two dashes (--).

The <declaration-value> is the fallback value that will be used if the variable hasn’t been defined in the CSS file. The fallback value may include commas.

Examples

Listing 13. Example defining and using a CSS variable
#Constants {
    --main-bg-color: red;
}

MyContainer {
    background-color: var(--main-bg-color);
}
Listing 14. Example using a fallback value
#Constants {
    --main-bg-color: red;
}

MyContainer {
    background-color: var(--main-bg-color, blue);
}

See the MDN docs for more details about the CSS variable spec.

7.7. CSS Properties

This section isn’t as comprehensive as it should be due to the breadth of CSS.

7.7.1. text-decoration

underline

Underlines text. E.g. text-decoration: underline;

overline

Overlines text. E.g. text-decoration: overline;

line-through

Strikes through text. E.g. text-decoration: line-through;

none

No text decoration. E.g. text-decoration: none;

cn1-3d

3D text. E.g. text-decoraton: cn1-3d; cn1-3d screenshot

cn1-3d-lowered

3D lowered text. E.g. text-decoration: cn1-3d-lowered; cn1-3d-lowered screenshot

cn1-3d-shadow-north

3D text with north shadow. E.g. text-decoration: cn1-3d-shadow-north; cn1-3d-shadow-north screenshot

For other CSS font settings see the Fonts section

7.7.2. border

This library supports the border property and most of its variants (e.g. border-width, border-style, and border-color. It will try to use native Codename One styles for generating borders if possible. If the border definition is too complex, it will fall-back to generating a 9-piece image border at compile-time. This has the effect of making the resulting resource file larger, but will produce good runtime performance, and a look that’s faithful to the provided CSS.

The algorithm used to determine whether to use a native border or to generate a 9-piece image, is complex, but the following guidelines may help you if you wish to design borders that can be rendered natively in CN1:

  • Non-pixel units border-width. (Except with the cn1-round-border and cn1-pill-border styles)

  • Using the border-radius directive.

  • Using box-shadow (Except when using cn1-round-border or cn1-pill-border styles)

  • Using a background gradient in combination with a border or any kind

  • Using a different border-width, border-style, or border-color for different sides of the border

  • Using a filter

You can open the resulting theme file in the designer and inspect it to see if an image was generated

Generating the image triggers slower CSS compilation and a larger binary so we generally recommend tuning the CSS so it avoids this fallback.

Round Borders

Rounded borders can be achieved in a few different ways. The easiest methods are:

  • The cn1-round-border style. This will render a circular round border in the background natively. I.e. this doesn’t require generation of an image border

  • The cn1-pill-border style. This will render a pill-shaped border in the background natively. This also doesn’t require generation of an image border

  • The border-radius property. This will round the corners of the border. If the style can be achieved using the RoundRectBorder in CodenameOne, then it will use that border. If not, this will cause the style to be generated as an image border

Examples using cn1-round-border

RoundBorder {
    border: 1px #3399ff  cn1-round-border;
    text-align:center;
    margin:2mm;
    padding:3mm;
}

RoundBorderFilled {
    background: cn1-round-border;
    background-color: #ccc;
    text-align:center;
    margin:2mm;
    padding:3mm;
}

Examples using cn1-pill-border

PillBorder {
    border: 1pt #3399ff cn1-pill-border;
    text-align:center;
}

PillBorderFilled {
    background: cn1-pill-border;
    background-color: #3399ff;
    color:white;
    text-align:center;
}

Examples using border-radius

RoundRectLabel {
    background-color: red;
    border-radius: 2mm;
}

cn1-pill-border and cn1-round-border don’t support the standard CSS box-shadow property. This is because the box-shadow property parameters don’t map nicely onto the shadow parameters for the Codename One RoundBorder class. To get shadows on the cn1-pill-border, you should use one or more of the following CSS properties:

  • cn1-box-shadow-spread — Accepts values in any scalar unit (e.g. px, mm, cm, etc…​). This maps directly to the border’s shadowSpread property.

  • cn1-box-shadow-h — Accepts values in real values or integers (not a scalar unit). This maps directly to the border’s shadowX property.

  • cn1-box-shadow-v — Accepts values in real values or integers (not a scalar unit). This maps directly to the border’s shadowY property.

  • cn1-box-shadow-blur — Scalar value. Maps to the border’s shadowBlur property.

  • cn1-box-shadow-color — The shadow color

  • cn1-box-shadow-inset — Set to inset to render an inner shadow instead of the default outer shadow spread.

Currently using the regular CSS box-shadow in conjunction with border-radius will cause a 9-piece border to be generated rather than mapping to the RoundRectBorder. If, however, you use the cn1-box-* properties for the shadow instead, it will use the RoundRectBorder — assuming that no other styles are specified that trigger an image border to be generated.

Codename One also exposes per-corner elliptical radius controls that map to the RoundBorder’s X/Y radii. You can set them directly with `cn1-border-top-left-radius-x / cn1-border-top-left-radius-y (and the equivalent top-right, bottom-left, and bottom-right pairs) to fine tune horizontal and vertical curvature independently. The CSS parser automatically populates these properties when you use standard border-radius syntax, including the longhand declarations and the border-radius: <x-radii> / <y-radii> shorthand.

EllipticalBorder {
    border-radius: 2mm 4mm 6mm 1mm / 1mm 3mm 5mm 7mm;
    cn1-box-shadow-spread: 1.5mm;
    cn1-box-shadow-inset: inset;
}

In the example above, the four horizontal radii (2mm 4mm 6mm 1mm) populate the cn1-border--radius-x properties clockwise from the top-left corner. The four values after the slash fill the matching cn1-border--radius-y entries. Setting cn1-box-shadow-inset: inset; converts the shadow into an inset glow that follows the same elliptical curvature.

7.7.3. background

The background property supports most standard CSS values for setting the background color, or background image.

9-piece Image borders always take precedence over background settings in Codename One. If your background directive seems to have no effect, it’s likely because the theme has specified a 9-piece image border for the UIID. You can disable the image border using a directive like border: none
Background Images

See Images

Gradients

Both the linear-gradient and radial-gradient CSS functions are fully supported by this library. If Codename One is capable of rendering the gradient natively then the theme resource file generated will include encoded parameters for the gradients. If the gradient isn’t supported by Codename One, then the module will fall back to an image background which it generates at compile-time. it’s generally preferable to try to stick to gradients that Codename One supports natively. This will result in a smaller theme resource file since it doesn’t need to generate any images for the gradient.

Natively Supported linear-gradient Syntax

In order for a linear gradient to be natively supported by Codename One, the following properties must be met:

  1. The gradient function has exactly two color stops, and these colors have the same opacity.

  2. The gradient is either perfectly horizontal or perfectly vertical. (e.g Direction can be 0deg, 90deg, 180deg, or 270deg.

Examples

MyContainer {
   background: linear-gradient(0deg, #ccc, #666);
}
Native linear gradient 0 degrees
Figure 157. Native linear gradient 0 degrees
MyContainer {
    background: linear-gradient(to top, #ccc, #666);
}
Native linear gradient to top
Figure 158. Native linear gradient to top
MyContainer {
    background: linear-gradient(90deg, #ccc, #666);
}
Native linear gradient 90deg
Figure 159. Native linear gradient 90deg
MyContainer {
    background: linear-gradient(to left, #ccc, #666);
}
Native linear gradient to left
Figure 160. Native linear gradient to left

Unsupported linear-gradient syntax

The following are some examples of linear gradients that aren’t supported natively by Codename One, and will result in a background image to be generated at compile-time:

MyComponent {
    background: linear-gradient(45deg, #eaeaea, #666666);
}
45deg gradient rendered at compile-time - uses background image
Figure 161. 45deg gradient rendered at compile-time — uses background image

The above example isn’t supported natively because the gradient direction is 45 degrees. Codename One supports 0, 90, 180, and 270 degrees natively. Therefore this would result in a background image being generated at compile-time with the appropriate gradient.

MyComponent {
    background: linear-gradient(90deg, rgba(255, 0, 0, 0.6), blue);
}
Linear gradient with different alpha
Figure 162. Linear gradient with different alpha

The above linear-gradient isn’t supported natively because the stop colors have different transparencies. The first color has an opacity of 0.5, and the second as an opacity of 1.0 (implicitly). Therefore, this would result in the gradient being generated as an image at compile-time.

Natively Supported radial-gradient Syntax

The following syntax is supported natively for radial gradients. Other syntaxes are also supported by the CSS library, but they will use compile-time image generation for the gradients rather than generating them at runtime.

background: radial-gradient(circle [closest-side] [at <position>], <color stop>, <color stop>)
  • <position> — The position using either offset keywords or percentages.

  • <color stop> — Either a color alone, or a color followed by a percentage. 0% indicates that color begins at center of the circle. 100% indicates that the color begins at the closest edge of the bounding box. Higher/lower values (>0%) will shift the color further or closer to circle’s center. If the first color stop is set to a non-zero value, the gradient can’t be rendered natively by Codename One, and an image of the gradient will instead be generated at compile-time.

More complex gradients are supported by this library, but they will be generated at compile-time. For more information about the radial-gradient CSS function see its MDN Wiki page.

Examples

MyContainer {
    background: radial-gradient(circle, gray, white);
}
Radial gradient 0 to 100
Figure 163. Radial gradient 0 to 100
MyContainer {
    background: radial-gradient(circle, gray, white 200%);
}
Radial gradient 0 to 200
Figure 164. Radial gradient 0 to 200
MyContainer {
    background: radial-gradient(circle at left, gray, white);
}
Radial gradient at left
Figure 165. Radial gradient at left
MyContainer {
    background: radial-gradient(circle at right, gray, white);
}
Radial gradient at right
Figure 166. Radial gradient at right

7.7.4. cn1-background-type

It also supports some special Codename One values, which are identifiers with a "cn1-" prefix. The following special values are available. They map to the standard Codename One values we discussed in the theming chapter:

  • cn1-image-scaled

  • cn1-image-scaled-fill

  • cn1-image-scaled-fit

  • cn1-image-tile-both

  • cn1-image-tile-valign-left

  • cn1-image-tile-valign-center

  • cn1-image-tile-valign-right

  • cn1-image-tile-halign-top

  • cn1-image-tile-halign-center

  • cn1-image-tile-halign-bottom

  • cn1-image-align-bottom

  • cn1-image-align-left

  • cn1-image-align-right

  • cn1-image-align-center

  • cn1-image-align-top-left

  • cn1-image-align-top-right

  • cn1-image-align-bottom-left

  • cn1-image-align-bottom-right

  • cn1-image-border

  • cn1-none

  • cn1-round-border

  • cn1-pill-border

7.8. Images

Images are supported as both "inputs" of the stylesheet, and as outputs to the compiled resource file. "Input" images are usually specified via the background-image property in a selector. "Output" images are always saved as multi-images inside the resource file.

7.8.1. Image DPI and Device Densities

In order to appropriately size the image, the CSS compiler needs to know what the source density of the image is. E.g. if an image is 160x160 pixels with a source density of 160dpi (i.e. medium density - or the same as an iPhone 3G), then the resulting multi-image will be sized at 160x160 for medium density devices and 320x320 on high density devices (e.g. iPhone 4S Retina) - which will result in the same perceived size to the user of 1x1 inch.

However if the image has a source density of 320dpi, then the resulting multi-image would be 80x80 pixels on medium density devices and 160x160 pixels on high density devices.

Some images have this density information embedded in the image itself so that the CSS processor will know how to resize the image properly. However, it’s usually better to explicitly document your intentions by including the cn1-source-dpi property as follows:

SomeStyle {
    background-image: url(images/my-image.png);
    cn1-source-dpi: 160;
}
cn1-source-dpi values are meant to fall into threshold ranges. Values less than or equal to 120, are interpreted as low density. 121 - 160 are medium density (iPhone 3GS). 161 - 320, high density (iPhone 4S). 321 - 480 == HD. 481 and higher == 2HD. In general, you should try to use images that are one of these DPIs exactly: 160, 320, or 480, then images will be scaled up or down to the other densities accordingly.

7.8.2. Multi-Images vs Regular Images

By default all images are imported as multi-images (unless you define the defaultSourceDPIInt theme constant). If you want to import an image as a "regular" image, you can simply set cn1-source-dpi to 0. E.g.

SomeStyle {
    background-image: url(images/my-image.png);
    cn1-source-dpi: 0;
}

You can change the default source DPI for the whole stylesheet by adding defaultSourceDPIInt: 0 to the theme constants. E.g.

#Constants {
  defaultSourceDPIInt: 0;
}

Most application templates in Codename One Initializr include this constant by default.

7.8.3. Multi-Images as Inputs

If you’ve already generated images in all of the appropriate sizes for all densities, you can provide them in the same file structure used by the Codename One XML resource files: The image path is a directory that contains images named after the density that they are intended to be used for. The possible names include:

  • verylow.png

  • low.png

  • medium.png

  • high.png

  • veryhigh.png

  • 560.png

  • hd.png

  • 2hd.png

  • 4k.png

E.g. Given the CSS directives:

MyStyle {
    background-image: url(images/mymultiimage.png);
}

The files would look like:

css/
 +--- mycssfile.css
 +--- images/
       +--- mymultiimage.png/
             +--- verylow.png
             +--- low.png
             +--- medium.png
              ... etc...
Multi-image inputs are supported for local URLs. You can’t use remote (e.g. http://) urls with multi-image inputs

7.8.4. Image Constants

Theme constants can be images. The convention is to suffix the constant name with "Image" so that it will be treated as an image. In addition to the standard url() notation for specifying a constant image, you can provide a simple string name of the image, and the CSS processor will try to find an image by that name specified as a background image for one of the styles. If it can’t find one, it will look inside a special directory named "res" (located in the same directory as the CSS stylesheet), inside which it will look for a directory named the same as the stylesheet, inside which it will look for a directory with the specified multi-image. This directory structure is the same as used for Codename One’s XML resources directory.

E.g. In the CSS file "mycssfile.css":

radioSelectedFocusImage: "Radio_btn_Press.png";

Will look for a directory located at res/mycssfile.css/Radio_btn_Press.png/ with the following images:

  • verylow.png

  • low.png

  • medium.png

  • high.png

  • veryhigh.png

  • 560.png

  • hd.png

  • 2hd.png

  • 4k.png

It will then create a multi-image from these images and include them in the resource file.

7.9. Image Recipes

7.9.1. Import Multiple Images In Single Selector

it’s quite useful to be able to embed images inside the resource file that’s generated from the CSS stylesheet so that you can access the images using the Resources.getImage() method in your app and set it as an icon on a button or label. In this case, it’s easier to simply create a dummy style that you don’t intend to use and include multiple images in the background-image property like so:

Images {
    background-image: url(images/NowLogo.png),
        url(images/Username-icon.png),
        url(images/Password-icon.png),
        url(images/Name-icon.png),
        url(images/Email-icon.png),
        url(images/SeaIce.png),
        url(images/Back-icon.png),
        url(images/Source-icon.png),
        url(images/Date-icon.png),
        url(images/Arrow-right.png),
        url(images/Share-icon.png),
        url(images/Text-icon.png),
        url(images/Comments-icon.png),
        url(images/RedPlanet.png),
        url(images/News-icon.png),
        url(images/Channels-icon.png),
        url(images/Bookmarks-icon.png),
        url(images/Overview-icon.png),
        url(images/Calendar-icon.png),
        url(images/Timeline-icon.png),
        url(images/Profile-icon.png),
        url(images/Widgets-icon.png),
        url(images/Settings-icon.png),
        url(images/Bookmark-icon.png);
}

Then in Java, I might do something like:

Resources theme = Resources.openLayered("/theme");

Label bookmark = new Label(theme.getImage("Bookmark-icon.png"));

7.9.2. Loading Images from URLs

You can also load images from remote URLs. E.g.

Images {
    background-image: url(http://solutions.weblite.ca/logo.png);
}

7.9.3. Generating 9-Piece Image Borders

css nine piece border

9-Piece image borders can be created using the image-border and image-border-slice properties.

E.g.

NinePiece {
	border-image:url('dashbg_landscape.png');
}

In the above example we omitted the border-image-slice property, so it defaults to "40%", which means that the image is sliced 40% from the top, 40% from the bottom, 40% from the left, and 40% from the right.

If you want more specific "slice" points, you can add the border-image-slice property. E.g.

NinePiece {
	border-image:url('dashbg_landscape.png');
	border-image-slice:10% 49%;  /*vertical horizontal*/
}

NinePiece2 {
	border-image:url('dashbg_landscape.png');
	border-image-slice:10% 49% 20%;  /*top horizontal bottom*/
}

NinePiece3 {
	border-image:url('dashbg_landscape.png');
	border-image-slice:10% 30% 40% 20%;  /*top right bottom left*/
}

NinePiece4 {
	border-image:url('dashbg_landscape.png');
	border-image-slice:10%;  /*all*/
}

7.9.4. Image Backgrounds

Component backgrounds in Codename One are a common source of confusion for newcomers because there are 3 different properties that can be used to define what a component’s background looks like, and they have priorities:

  1. Background Color - You can specify an RGB color to be used as the background for a component.

  2. Background Image - You can specify an image to be used as the background for a component. Codename One includes settings to define how the image is treated, e.g. scale/fill, tile, etc. If a background image is specified, it will override the background color setting - unless the image has transparent regions.

  3. Image Border - You can define a 9-piece image border which will effectively cover the entire background of the component. If an image border is specified, it will override the background image of the component.

A common scenario that I run into is trying to set the background color of a component and see no change when I preview my form because the style had an image background defined - which overrides my background color change.

The potential for confusion is mitigated somewhat, but still exists when using CSS. You can make your intentions explicit by adding the cn1-background-type property to your style. Possible values include:

  • cn1-image-scaled

  • cn1-image-scaled-fill

  • cn1-image-scaled-fit

  • cn1-image-tile-both

  • cn1-image-tile-valign-left

  • cn1-image-tile-valign-center

  • cn1-image-tile-valign-right

  • cn1-image-tile-halign-top

  • cn1-image-tile-halign-center

  • cn1-image-tile-halign-bottom

  • cn1-image-align-bottom

  • cn1-image-align-left

  • cn1-image-align-right

  • cn1-image-align-center

  • cn1-image-align-top-left

  • cn1-image-align-top-right

  • cn1-image-align-bottom-left

  • cn1-image-align-bottom-right

  • cn1-image-border

  • cn1-none

  • none

Example Setting Background Image to Scale Fill
MyContainer {
    background-image: url(myimage.png);
    cn1-background-type: cn1-image-scaled-fill;
}

7.10. Image Compression

CN1 resource files support both PNG and JPEG images, but PNG is the default. Multi-images that are generated by the CSS compiler will be PNG if they include alpha transparency, and JPEG otherwise. This is to try to reduce the file size as much as possible while not sacrificing quality.

7.11. Fonts

This library supports the font, font-size, font-family, font-style, font-weight, and text-decoration properties, as well at the @font-face CSS "at" rule for including TTF/OTF fonts.

7.11.1. font-family

By default, CN1’s native fonts are used. The appropriate native font is selected for the provided font-weight and font-style properties. You can also explicitly specify the native font you wish to use in the font-family property. E.g.

SideCommand {
    font-family:  "native:MainThin";
}

If you omit the font-family directive altogether, it will use native:MainRegular. The following native fonts are available:

  1. native:MainThin

  2. native:MainLight

  3. native:MainRegular

  4. native:MainBold

  5. native:MainBlack

  6. native:ItalicThin

  7. native:ItalicLight

  8. native:ItalicRegular

  9. native:ItalicBold

  10. native:ItalicBlack

Using TTF Fonts

If you want to use a font other than the built-in fonts, you’ll need to define the font using the @font-face rule. E.g.

@font-face {
    font-family: "Montserrat";
    src: url(res/Montserrat-Regular.ttf);
}

Then you’ll be able to reference the font using the specified font-family in any CSS element. E.g.

MyLabel {
    font-family: "Montserrat";
}

The @font-face directive’s src property will accept both local and remote URLs. E.g.

@font-face {
    font-family: "MyFont";
    src: url(http://example.com/path/to/myfont.ttf);
}

In this case, it will download the myfont.ttf file to the same directory as the CSS file. From then on it will use that locally downloaded version of the font so that it doesn’t have to make a network request for each build.

Fonts are automatically copied to the project’s "src" directory when the CSS file is compiled so that they will be distributed with the app and available at runtime.

Github URLs

Fonts hosted on GitHub are accessible using a special github: protocol to make it easier to reference such fonts. E.g. the following directive includes the "FontAwesome" font directly from Github

@font-face {
    font-family: "FontAwesome";
    src: url(github://FontAwesome/Font-Awesome/blob/master/fonts/fontawesome-webfont.ttf);
}
Apparently FontAwesome has removed its public repositories from Github so this URL no longer works.

7.11.2. font-size

it’s best practice to size your fonts using millimetres (rem) (or another "real-world" measurement unit such as inches (in), centimetres (cm), millimetres (mm). This will allow the font to be sized appropriate for all display densities. If you specify size in pixels (px), it will treat it the same as if you sized it in points (pt), where 1pt == 1/72 inches (one seventy-second of an inch).

If you size your font in percentage units (e.g. 150%) it will set the font size relative to the medium font size of the platform. This is different than the standard behaviour of a web browser, which would size it relative to the parent element’s font size.

font-size: 150% is the same as font-size: 1.5rem.

You can use system fonts, true type fonts, and native fonts in your CSS stylesheet. True Type fonts need to be defined in a @font-face directive before they can be referenced. True-type fonts and native fonts have the advantage that you can specify their sizes in generic terms (e.g. small, medium, large) and in more specific units such as millimeters (mm) or pixels (px).

Normalizing Default Font Size

When trying to make a design look "good" across multiple platforms it can be difficult to deal with the differing default font sizes on different platforms. You may spend hours tweaking your UI to look perfect on iPhone X, only to find out that the fonts are too small when viewed on an android device. you’ve now added theme constants to explicitly set the the default font size in "screen-independent-pixels".

Note In this case, 1 screen-independent-pixel is defined as 1/160th of an inch on a device, and 1/96th of an inch on desktop. These values correspond to Android’s definition on device, and Windows' definition on the desktop.

If you add the following to your stylesheet, it will set the default font size to 18 screen-independent pixels (or 18/160th of an inch), which corresponds to the Android native default "medium" font size.

#Constants {
 defaultFontSizeInt: 18;
}
I have found that a value of 18 here gives optimum results across devices.

On the desktop, you may find that 18 is too big. You can additionally define a default font size for for tablet and desktop using defaultDesktopFontSizeInt and defaultTabletFontSizeInt respectively. I have found that a defaultDesktopFontSizeInt gives results that closely match the Mac OS default font size.

#Constants {
 defaultFontSizeInt: 18;
 defaultDesktopFontSizeInt: 14;
}
How density is determined per platform

The conversion from "screen-independent pixels" or mm to physical pixels uses the device’s PPI. The two mobile ports compute it differently, which is worth keeping in mind when chasing per-platform sizing differences:

  • Android — uses density × 160 from DisplayMetrics, where density is the bucketed scale factor reported by Android (typically 1.0, 1.5, 2.0, 3.0, 3.5, 4.0). Because the buckets are coarse, a phone whose physical density falls between two buckets will report the lower one, so mm-based measurements may render slightly smaller than their nominal physical size.

  • iOS — uses an explicit per-device PPI lookup keyed on the screen’s pixel dimensions (e.g. 460ppi for iPhone 12 / 13 / 14 / 15 / 16, 458ppi for the Plus and Pro Max models, 326ppi for older 2× devices). This is exact for catalogued devices. Any iPhone whose resolution is not in the table falls through to a default fallback (now 460ppi, since Apple has held that density steady for every non-Plus iPhone since the iPhone 12).

Net result: the same defaultFontSizeInt: 18 may render at slightly different absolute physical sizes on an iPhone vs. an Android device of similar physical size — typically the iOS rendering is the larger of the two when both are at the platform’s default text size. If you need cross-platform pixel-perfect sizing, use platform overrides (@iOS-platform-font-size, etc., via media queries) rather than relying on the conversion math alone.

When a new iPhone model ships with a resolution that isn’t yet in the iOS PPI table, mm-based measurements will use the fallback 460ppi, which is correct to within a few percent for every modern iPhone. If you discover a model that should use a different value (for example a future Plus/Max device that returns to 458ppi), file an issue so the table can be updated.

7.11.3. text-decoration

See the text-decoration section in the "Supported Properties" page.

7.11.4. Some Sample CSS Directives

@font-face {
    font-family: "Montserrat";
    src: url(res/Montserrat-Regular.ttf);
}

@font-face {
    font-family: "Montserrat-Bold";
    src: url(res/Montserrat-Bold.ttf);
}

@font-face {
    font-family: "FontAwesome";
    src: url(github://FontAwesome/Font-Awesome/blob/master/fonts/fontawesome-webfont.ttf);
}

PlainText0p5mm {
    font-size: 0.5mm;
}

PlainText1mm {
    font-size: 1mm;
}

PlainText2mm {
    font-size: 2mm;
}

PlainText5mm {
    font-size: 5mm;
}

PlainText10mm {
    font-size: 10mm;
}

PlainText50mm {
    font-size: 50mm;
}

PlainTextSmall {
    font-size: small;
}

PlainTextMedium {
    font-size: medium;
}

PlainTextLarge {
    font-size: large;
}

PlainText3pt {
    font-size: 3pt;
}

PlainText6pt {
    font-size: 6pt;
}

PlainText12pt {
    font-size: 12pt;
}

PlainText20pt {
    font-size: 20pt;
}

PlainText36pt {
    font-size: 36pt;
}

BoldText {
    font-weight: bold;
}

BoldText1mm {
    font-weight: bold;
    font-size: 1mm;
}

BoldText2mm {
    font-weight: bold;
    font-size: 2mm;
}

BoldText3mm {
    font-weight: bold;
    font-size: 3mm;
}

BoldText5mm {
    font-weight: bold;
    font-size: 5mm;
}

ItalicText {
    font-style: italic;
}

ItalicText3mm {
    font-style: italic;
    font-size: 3mm;
}

ItalicBoldText {
    font-style: italic;
    font-weight: bold;
}

PlainTextUnderline {
    text-decoration: underline;
}

BoldTextUnderline {
    text-decoration: underline;
    font-weight: bold;
}

ItalicTextUnderline {
    text-decoration: underline;
    font-style: italic;
}

PlainText3d {
    text-decoration: cn1-3d;
    color:white;
    background-color: #3399ff
}

BoldText3d {
    text-decoration: cn1-3d;
    font-weight: bold;
    color:white;
    background-color: #3399ff;
}

ItalicText3d {
    text-decoration: cn1-3d;
    font-style: italic;
    color:white;
    background-color: #3399ff;
}

PlainText3dLowered {
    text-decoration: cn1-3d-lowered;
    color:black;
    background-color: #3399ff;
}

BoldText3dLowered {
    text-decoration: cn1-3d-lowered;
    font-weight: bold;
    color:black;
    background-color: #3399ff;
}

ItalicText3dLowered {
    text-decoration: cn1-3d-lowered;
    font-style: italic;
    color:black;
    background-color: #3399ff;
}

PlainText3dShadow {
    text-decoration: cn1-3d-shadow-north;
    color:white;
    background-color: #3399ff;
}

BoldText3dShadow {
    text-decoration: cn1-3d-shadow-north;
    font-weight: bold;
    color:white;
    background-color: #3399ff;
}

ItalicText3dShadow {
    text-decoration: cn1-3d-shadow-north;
    font-style: italic;
    color:white;
    background-color: #3399ff;
}


MainThin {

    font-size: 200%;
    background: radial-gradient(circle at top left, yellow, blue 100%);
}

MainRegular0001 {
    font-family: "native:MainRegular";
    /*background: cn1-pill-border;
    background-color: red;*/
    color: blue;
    border: 1px cn1-pill-border blue;
    /*box-shadow: 1mm 1mm 0 2mm rgba(0,0,0,1.0);*/
    padding: 2mm;
}

MainRegular0001.pressed {
    font-family: "native:MainRegular";
    background: cn1-pill-border blue;
    /*background-color: red;*/
    color: white;
    border: 1px solid white;
    /*box-shadow: 1mm 1mm 0 2mm rgba(0,0,0,1.0);*/
    padding: 2mm;
}

Heading {
    font-size: 4mm;
    font-family: "Montserrat-Bold";
    color: black;
    padding: 2mm;
    text-align: center;
}

XMLVIewIcon {
    font-family: "FontAwesome";
}

7.12. Media Queries

You can use media queries to target styles to specific platforms, devices, and device densities. Currently the following media queries are supported:

  1. platform-xxx - Target a specific platform. E.g. platform-and, platform-ios, platform-mac, platform-win.

  2. density-xxx - Target a specific device density. E.g. density—​low, density-low, density-medium, density-high, density—​high, density-hd, density-2hd, and density-560.

  3. device-xxx - Target a specific device type. E.g. device-desktop, device-tablet, device-phone.

In addition to the Codename One specific media tokens above, the CSS compilers also recognize standard dark-mode media queries using prefers-color-scheme: dark. Rules inside these blocks are compiled into $Dark UIIDs automatically (e.g. Button becomes $DarkButton, Button.selected becomes $DarkButton.selected).

Listing 15. Example: Dark-mode overrides with standard CSS media query syntax
Button {
    color: #222222;
}

@media (prefers-color-scheme: dark) {
    Button {
        color: #f0f0f0;
        background-color: #000000;
    }

    Button.selected {
        color: #ff0000;
    }
}
Listing 16. Example: Different font colors on Android and iOS. On Android, labels will appear green. On iOS, they will appear red. On all other platforms, they will appear black.
Label {
    color: black;
}

@media platform-and {
    Label {
        color: green;
    }
}

@media platform-ios {
    Label {
        color: red;
    }
}
Listing 17. Example: Different font colors based on device density. On lower densities, labels will be green. On higher densities, labels will be red.
Label {
    color: black;
}

@media density-very-low, density-low, density-medium, density-high {
    Label {
        color: green;
    }
}

@media density-very-high, density-h2, density-2hd, density-560 {
    Label {
        color: red;
    }
}
Listing 18. Example: Different label colors based on device type.
Label {
    color: black;
}

@media device-desktop {
    Label {
        color: green;
    }
}

@media device-tablet, device-phone {
    Label {
        color: red;
    }
}
When deploying your app using the Javascript port, it will use a platform name derived from the "UserAgent" string in the browser, rather than the result of Display.getPlatformName(), which is used for other ports. When running on Android, then, the platform will be "and". When running on iOS, the platform will be "ios". Etc…​

7.12.1. Compound Media Queries

You can combine multiple media queries together, separated by a comma. Queries of the same type are "OR"ed together. Queries of different types are "AND"ed together. For example if you’ve a media query that specifies two different device densities (e.g. density-low and density-high) the query will match both devices with low density and high density. However, if the query specifies a device density and a platform (e.g. density-low and platform-and), then it will match a device if it matches the platform and the density.

Listing 19. Example: Targeting styles to Android devices with high density
@media platform-and, density-high {
    ....
}
Listing 20. Example: Targeting styles to iOS devices with high or low density
@media platform-ios, density-high, density-low {
    ....
}
Listing 21. Example: Targeting Mac Desktop.
@media device-desktop, platform-mac {
    ....
}

7.12.2. Order or Precedence

The order of precendence when applying styles differs slightly from the way styles would be applied in standard CSS. The order of precendence is as follows:

  1. Styles defined inside @media blocks will always take precendence over styles defined outside of @media blocks.

  2. @media blocks with more query matches will take precendence over blocks with fewer query matches. E.g. A media block matching density, platform, and device will take precendence over a block that only matches the density and platform.

  3. If the same style is defined in two media blocks which contain the same number of query matches, then the order precedence is platform, device, density in decreasing order. I.e. the block that matches on platform will take precedence over the block that matches on density.

  4. If the same style is defined in two media blocks with identical query matches, then the order of precedence is undefined.

7.12.3. Font Scaling Constants

In some cases you may find that fonts are coming out too large or too small across the board on certain types of devices. You can use standard media queries to customize font sizes, but you can also use font-scaling constants to scale font sizes for the entires stylesheet based on platform, device, and/or density. In some cases you may find this approach easier.

For example, consider the following simple stylesheet that defines a font size of 2mm on labels:

Label {
 font-size: 3mm;
}

During testing, perhaps you find that, on desktop, the fonts are a little bit too small. In this case, you can apply a font-scale constant that only applies to the desktop.

#Constants {
 device-desktop-font-scale: "1.5";
}

Label {
 font-size: 3mm;
}

Now, on most devices the Label style will have 3mm fonts. But on desktop, it will have 4.5mm fonts.

The above would be roughly equivalent to:

Label {
 font-size: 3mm;
}

@media device-desktop {
 Label {
 font-size: 4.5mm;
 }
}
Listing 22. Example: Font-scaling based on device, platform, and density
#Constants {
 device-phone-font-scale: "1.5";
 device-tablet-font-scale: "1.2";
 device-desktop-font-scale: "1.4";
 platform-ios-font-scale: "0.9";
 density-low-font-scale: "1.2";
 platform-ios-density-low-font-scale: "1.3";
}
All matching font-scale constants will be applied to the styles. If you define 3 font-scale constants that all match the current runtime environment, they will all be applied. E.g. If there are 3 matching font-scale constants with "2.0", "3.0", and "4.0", then fonts will be scaled by 2*3*4=24!

8. The components of Codename One

This chapter covers the components of Codename One. It doesn’t cover every component, but it goes deeper than the Javadocs.

8.1. Container

The Codename One container is a base class for many high-level components. A container can hold other components.

Every component has a parent container. That parent can be null when the component isn’t inside another container or when it’s a top-level container. A container can have many children.

Component-Container relationship expressed as UML
Figure 167. Component-Container relationship expressed as UML

Components are arranged in containers with layout managers. A layout manager decides how to arrange components inside the container.

You can read more about layout managers in the basics section.

8.1.1. Composite Components

Codename One components share a generic inheritance hierarchy. For example, Button derives from Label and thus receives all its abilities.

Some components are composites and derive from the Container class. For example, the MultiButton is a composite button that derives from Container but behaves like a Button. Most of the time this feels seamless, but a few details matter.

  • don’t use the Container-derived methods on such a composite component (for example, add and remove).

  • You can’t cast it to the type it relates to. For example, you can’t cast MultiButton to Button.

  • Events can be more nuanced. For example, if you rely on ActionEvent.getSource() or ActionEvent.getComponent(), they may not behave as expected. For a MultiButton, they return the underlying Button. To work around that, use ActionEvent.getActualComponent().

Lead Component

Codename One includes a feature for creating composite components called "lead components". It lets components like MultiButton act like a single component while still containing multiple components.

Lead components work by assigning one component as the "leader". That leader determines the style state for every component in the hierarchy. If a Container is led by a Button, the button determines whether the selected or pressed state applies to the entire hierarchy.

This means a single Component can contain multiple nested UIID`s. For example, `MultiButton has UIID`s such as `MultiLine1, which you can customize with APIs such as setUIIDLine1.

The lead component also handles events from a single source. Clicking another component in the hierarchy sends the event to the leading Button, which can make action events behave unexpectedly. that’s why getActualComponent() exists.

You can learn more about lead components in here.

8.2. Form

Form is the top-level container in Codename One. Form derives from Container and is the element the app shows. Only one form can be visible at any given time. You can get the currently visible Form with the code:

Form currentForm = Display.getInstance().getCurrent();

A form is a container with a title, a content area, and an optional menu or menu-bar area. When you call methods such as add or remove on a form, you’re invoking something that maps to this:

myForm.getContentPane().add(...);

Form is effectively a Container with a border layout. The north section holds the title area, the south section holds the optional menu bar, and the center stretches as the content pane. Place all components in the content pane.

Form layout graphic
Figure 168. Form layout graphic

You can see that every Form has space allocated for the title area. If you don’t set the title, it won’t show up, but it will still be there. The same isn’t always true for the menu bar, which can vary significantly. Effectively, the section that matters is the content pane, so the form tries to do the right thing by pretending to be the content pane. For example, this isn’t always seamless, and sometimes code needs to invoke getContentPane() in order to work directly with the container.

A good example for such a case is layout animations. Animating the form might not produce the right results. When in doubt, it’s easier to use getContentPane() instead of working with the Form directly.

As you can see from the graphic, Form has two layers that reside on top of the content pane/title. The first is the layered pane, which allows you to place "always on top" components. The layered pane is added implicitly when you invoke getLayeredPane().

You still need to place components using layout managers in order to get them to appear in the right place when using the layered pane.

8.2.1. Safe Areas

Modern phones frequently include display cut-outs, rounded corners, or persistent gesture/navigation indicators that overlap the physical screen edges. These intrusions are no longer limited to iOS—many recent Android devices behave the same way—so Codename One provides a "safe area" API to ensure your UI remains visible regardless of the device. The safe area is the portion of the display that’s guaranteed to be unobstructed.

Tabs with safe-area padding enabled
Figure 169. Tabs with safe-area padding enabled
Tabs without safe-area padding
Figure 170. Tabs without safe-area padding
Automatic Safe-Area Handling

Form calculates the safe region automatically, and core UI components that anchor themselves to the screen edges apply that information without additional work:

  • Toolbar and the status bar placeholder respect the top safe margins so that titles and action buttons remain legible around notches.

  • Tabs, Sheet, and FloatingActionButton instances mark their internal containers as safe areas so navigation controls are padded above gesture/navigation bars.

  • UI fragment templates can opt-in to safe areas declaratively using the safeArea flag, ensuring generated components stay within the padded region.

This means that many applications will work on devices such as the iPhone X/14 family or Android devices with edge-to-edge displays. You need to intervene when you use custom containers that you position flush against a screen edge or when you perform your own painting.

Marking Your Own Containers as Safe

If you create a container that should always stay clear of the unsafe portions of the screen (for example, a bottom navigation bar, an on-screen joystick, or a floating tool palette), enable safe-area padding explicitly:

Form form = new Form(new BorderLayout());

Container bottomBar = new Container(BoxLayout.x());
bottomBar.setSafeArea(true);
bottomBar.addAll(new Button("Home"), new Button("Search"), new Button("Profile"));

form.add(BorderLayout.SOUTH, bottomBar);
form.show();

Safe-area padding is applied when the container does not have a scrollable parent. For scrollable content, you can assume the user can scroll the component into view instead.

Most layouts never need to know where the safe area begins, but if you draw manually (for example, inside paint() or on the glass pane) you can query it directly:

Form form = Display.getInstance().getCurrent();
Rectangle safe = form.getSafeArea();

Graphics g = ...; // e.g. inside paint()
g.setClip(safe.getX(), safe.getY(), safe.getWidth(), safe.getHeight());
// Custom drawing code that should avoid the notch/gesture areas

The rectangle returned by Form#getSafeArea() is updated automatically whenever the OS reports a change (rotation, multitasking gestures, showing or hiding the system navigation area, and so on). In unusual situations where you adjust the safe-area root yourself (for example, when animating a container in from off-screen) you can force a recalculation by calling Form#setSafeAreaChanged().

Safe-Area Roots and Advanced Layouts

Safe-area padding is calculated relative to a "safe-area root". Forms are roots by default, but you can mark any container as a root using Container#setSafeAreaRoot(true) when you need precise control, for example, when preparing a side menu that starts off-screen and slides in:

Container drawer = new Container(BoxLayout.y());
drawer.setSafeAreaRoot(true); // Ensure safe margins apply before the drawer is visible
drawer.setSafeArea(true);

Marking the drawer as both a root and a safe area prevents a jump the moment it becomes visible, because the safe padding is already applied while it’s off-screen.

Remember that safe areas apply across platforms. Always verify your screens on actual devices (or in the Codename One simulator with a device skin that exposes cut-outs) to make sure critical UI elements remain inside the padded region.

The second layer is the glass pane which allows you to draw arbitrary things on top of everything. The order in the image is indeed accurate:

  1. ContentPane is lowest

  2. LayeredPane is second

  3. GlassPane is painted last

it’s important to notice that a layered pane is on top of the ContentPane and doesn’t stretch to the title. A GlassPane usually stretches all the way but with a "lightweight" title area, for example, the Toolbar API.

The GlassPane allows developers to overlay UI on top of existing UI and paint as they see fit. This is useful for things that provide notification but don’t want to intrude with application functionality.

In earlier versions of Codename One (pre-3.6), LayeredPane & GlassPane didn’t work with "native" peer components such as media, browser, native maps etc, because peer components were always rendered "in front" of the Codename One UI canvas. For example, current versions now allow for proper layering of peer components and light-weight components so that LayeredPane and GlassPane can be used seamlessly with peer components.

8.3. Dialog

A Dialog is a special kind of Form that can occupy a portion of the screen. It also has the additional functionality of the modal show method.

When showing a dialog you’ve two basic options: modeless and modal:

  • Modal dialogs (the default) block the current EDT thread until the dialog is dismissed. To understand how they do it, read about invokeAndBlock.
    Modal dialogs are an extremely useful way to prompt the user since the code can assume the user responded in the next line of execution. This promotes a linear and intuitive way of writing code.

  • Modeless dialogs return immediately, so a call to show such a dialog can’t assume anything in the next line of execution. This is useful for features such as progress indicators where you aren’t waiting for user input.

For example: a modal dialog can be expressed as such:

if(Dialog.show("Click Yes Or No", "Select one", "Yes", "No")) {
    // user clicked yes
} else {
    // user clicked no
}

Notice that during the show call above the execution of the next line was "paused" until you got a response from the user and once the response was returned you could proceed directly.

All usage of Dialog must be within the Event Dispatch Thread (the default thread of Codename One). This is especially true for modal dialogs. The Dialog class knows how to "block the EDT" without blocking it.

To learn more about invokeAndBlock which is the workhorse behind the modal dialog functionality check out the EDT section.

The Dialog class contains many static helper methods to quickly show user notifications, but also allows a developer to create a Dialog instance, add information to its content pane and show the dialog.

Dialogs contain a ContentPane like Form.

When showing a dialog in this way, you can either ask Codename One to position the dialog in a specific location based on the BorderLayout concept of locations, or position it by spacing it in pixels from the four edges of the screen.

For example: you could do something like this to show a simple modal Dialog:

Dialog d = new Dialog("Title");
d.setLayout(new BorderLayout());
d.add(BorderLayout.CENTER, new SpanLabel("Dialog Body", "DialogBody"));
d.showPacked(BorderLayout.SOUTH, true);
Custom Dialog in the south position
Figure 171. Custom modal Dialog in the south position
You can turn the code above to a modless Dialog by flipping the boolean true argument to false.

You can position a Dialog absolutely by determining the space from the edges for example: with this code you can occupy the bottom portion of the screen:

Dialog d = new Dialog("Title");
d.setLayout(new BorderLayout());
d.add(BorderLayout.CENTER, new SpanLabel("Dialog Body", "DialogBody"));
d.show(hi.getHeight() / 2, 0, 0, 0);
Custom Dialog positioned absolutely
Figure 172. Custom Dialog positioned absolutely
hi is the name of the parent Form in the sample above.

8.3.1. Styling Dialogs

it’s important to style a Dialog using getDialogStyle() or setDialogUIID methods rather than styling the dialog object directly.

The reason for this is that the Dialog is a Form that takes up the whole screen. The Form that’s visible behind the Dialog is rendered as a screenshot. So customizing the actual UIID of the Dialog won’t produce the desired results.

8.3.2. Tint and Blurring

By default a Dialog uses a platform specific tint color when it’s showing for example: notice the background in the image below is tinted:

Form hi = new Form("Tint Dialog", new BoxLayout(BoxLayout.Y_AXIS));
Button showDialog = new Button("Tint");
showDialog.addActionListener((e) -> Dialog.show("Tint", "Is On....", "OK", null));
hi.add(showDialog);
hi.show();
Dialog with tinted background
Figure 173. Dialog with tinted background

The tint color can be manipulated on the parent form, you can set it to any AARRGGBB value to set any color using the setTintColor method. Notice that this is invoked on the parent form and not on the Dialog!

This is an AARRGGBB value and not an RRGGBB value! This means that 0 will be transparent.

You can also manipulate this default value globally using the theme constant tintColor. The sample below tints the background in green:

Form hi = new Form("Tint Dialog", new BoxLayout(BoxLayout.Y_AXIS));
hi.setTintColor(0x7700ff00);
Button showDialog = new Button("Tint");
showDialog.addActionListener((e) -> Dialog.show("Tint", "Is On....", "OK", null));
hi.add(showDialog);
hi.show();
Dialog with green tinted background
Figure 174. Dialog with green tinted background

You can apply Gaussian blur to the background of a dialog to highlight the foreground further and produce a attractive effect. You can use the setDefaultBlurBackgroundRadius to apply this globally, you can use the theme constant dialogBlurRadiusInt to do the same or you can do this on a per Dialog basis using setBlurBackgroundRadius.

Not all device types support blur you can test if your device supports it using Display.getInstnace().isGaussianBlurSupported(). If blur isn’t supported the blur setting will be ignored.
Form hi = new Form("Blur Dialog", new BoxLayout(BoxLayout.Y_AXIS));
Dialog.setDefaultBlurBackgroundRadius(8);
Button showDialog = new Button("Blur");
showDialog.addActionListener((e) -> Dialog.show("Blur", "Is On....", "OK", null));
hi.add(showDialog);
hi.show();
The blur effect coupled with the OS default tint
Figure 175. The blur effect coupled with the OS default tint

It might be a bit hard to notice the blur effect with the tinting so here is the same code with tinting disabled:

hi.setTintColor(0);
The blur effect is more pronounced when the tint is disabled
Figure 176. The blur effect is more pronounced when the tint is disabled

8.3.3. Popup Dialog

A popup dialog is a common mobile paradigm showing a Dialog that points at a specific component. it’s a standard Dialog that’s shown in a unique way:

Dialog d = new Dialog("Title");
d.setLayout(new BorderLayout());
d.add(BorderLayout.CENTER, new SpanLabel("Dialog Body", "DialogBody"));
d.showPopupDialog(showDialog);
Popup Dialog
Figure 177. Popup Dialog

The popup dialog accepts a Component or Rectangle to point at and handles the rest.

Styling The Arrow Of The Popup Dialog

When Codename One was young you needed a popup arrow implementation but your low-level graphics API was pretty basic. As a workaround you created a version of the 9-piece image border that supported pointing arrows at a component.

Today Codename One supports pointing an arrow from the RoundRectBorder class. This is implicit for the PopupDialog UI. This allows for better customization of the border (color etc.) and it looks better on newer displays. It also works on all OSs. Right now the iOS theme has the old image border approach.

This will change with a future update where all OS’s will align and iOS will use the lightweight popup too
You can make all OS’s act the same way by overriding the PopupDialog UIID and defining its style to RoundRectBorder

The new RoundRectBorder support works by setting the track component property on border. When that’s done the border implicitly points to the right location.

If you still need deeper customization of the arrow you can still use the old 9-piece border functionality illustrated below.

Legacy 9-Piece Border Arrow

One of the harder aspects of a popup dialog is the construction of the theme elements required for arrow styling. To get that sort of behavior you will need a custom image border and 4 arrows pointing in each direction that will be overlaid with the border.

The sizes of the arrow images should be similarly proportioned and fit within the image borders whitespace. The block image of the dialog should have empty pixels in the sides to reserve space for the arrow. For example: if the arrows are all 32x32 pixels then the PopupDialog image should have 32 pixels of transparent pixels around it.

You will need to define the following theme constants for the arrow to work:

PopupDialogArrowBool=true
PopupDialogArrowTopImage=arrow up image
PopupDialogArrowBottomImage=arrow down image
PopupDialogArrowLeftImage=arrow left image
PopupDialogArrowRightImage=arrow right image

Then style the PopupDialog UIID with the image for the Dialog itself.

8.4. InteractionDialog

Dialogs in Codename One can be modal or modeless, the former blocks the calling thread and the latter doesn’t. For example, there is another definition to those terms: A modal dialog blocks access to the rest of the UI while a modeless dialog "floats" on top of the UI.

In that sense, all dialogs in Codename One are modal; they block the parent form since they are effectively forms that show the "parent" in their background. InteractionDialog has an API that’s similar to the Dialog API but, unlike dialog, it never blocks anything. Neither the calling thread nor the UI.

InteractionDialog isn’t a Dialog since it doesn’t share the same inheritance hierarchy. For example, it acts and "feels" like a Dialog despite the fact that it’s a Container in the LayeredPane.

InteractionDialog is a container that’s positioned within the layered pane. Notice that because of that design, you can have one such dialog at the moment and, if you add something else to the layered pane, you might run into trouble.

Using the interaction dialog is pretty trivial and similar to dialog:

InteractionDialog dlg = new InteractionDialog("Hello");
dlg.setLayout(new BorderLayout());
dlg.add(BorderLayout.CENTER, new Label("Hello Dialog"));
Button close = new Button("Close");
close.addActionListener((ee) -> dlg.dispose());
dlg.addComponent(BorderLayout.SOUTH, close);
Dimension pre = dlg.getContentPane().getPreferredSize();
dlg.show(0, 0, Display.getInstance().getDisplayWidth() - (pre.getWidth() + pre.getWidth() / 6), 0);
Interaction Dialog
Figure 178. Interaction Dialog

This will show the dialog on the right hand side of the screen, which is pretty useful for a floating in place dialog.

The InteractionDialog can be shown at absolute or popup locations. This is inherent to its use case which is "non-blocking". When using this component you need to be aware of its location.

To make popup behaviour feel natural on touch devices you can call setDisposeWhenPointerOutOfBounds(true) so the dialog auto-dismisses as soon as the user taps outside the title or content area. Internally the dialog listens for pointer pressed/released events and will call dispose() for you when the interaction happens beyond its bounds, so you no longer need to wire that logic manually.

By default the dialog is placed on the form’s layered pane, but you can switch between the global layered pane and form-specific layered pane using setFormMode(boolean). Setting form mode to true keeps the dialog coupled with the showing form even when the global layered pane is used elsewhere in your app.

Finally, recent updates added animation toggles so you can fine-tune presentation. setAnimateShow(boolean) turns the show/dispose animations on or off, while setRepositionAnimation(boolean) enables a "grow/shrink" reposition effect during those animations when you want a more dynamic transition.

8.5. Label

Label represents a text, icon or both. Label is also the base class of Button which in turn is the base class for RadioButton & CheckBox. Thus the functionality of the Label class extends to all of these components.

Label text can be positioned in one of 4 locations as such:

Label left = new Label("Left", icon);
left.setTextPosition(Component.LEFT);
Label right = new Label("Right", icon);
right.setTextPosition(Component.RIGHT);
Label bottom = new Label("Bottom", icon);
bottom.setTextPosition(Component.BOTTOM);
Label top = new Label("Top", icon);
top.setTextPosition(Component.TOP);
hi.add(left).add(right).add(bottom).add(top);
Label positions
Figure 179. Label positions

Label allows a single line of text, line breaking is a expensive operation on mobile devices [2] and so the Label class doesn’t support it.

SpanLabel supports many lines with a single label, notice that it does carry a performance penalty for this functionality.

Labels support tickering and the ability to end with "…​" if there isn’t enough space to render the label. Developers can determine the placement of the label relatively to its icon in a few powerful ways.

8.5.1. Label Gap

The gap between the label text & the icon defaults to 2 pixels due to legacy settings. The setGap method of Label accepts a gap size in pixels.

Two pixels is low for most cases & it’s hard to customize for each Label.

You can use the theme constant labelGap which is a floating point value you can specify in millimeters that will allow you to determine the default gap for a label. You can also customize this manually using the method Label.setDefaultGap(int) which determines the default gap in pixels.

8.5.2. Autosizing Labels

One of the common requests you received over the years is a way to let text "fit" into the allocated space so the font will match almost exactly the width available. In some designs this is important but it’s also tricky. Measuring the width of a String is a surprisingly expensive operation on some OS’s. Unfortunately, there is no other way other than trial & error to find the "best size".

Still despite the fact that something is "slow" you might still want to use it for some cases, this isn’t something you should use in a renderer, infinite scroll etc. and recommend minimizing the usage of this feature as much as possible.

This feature is applicable to Label and its subclasses (for example: Button), with components such as TextArea (for example: SpanButton) the choice between shrinking and line break would require some complex logic.

To activate this feature use setAutoSizeMode(true) for example:

Form hi = new Form("AutoSize", BoxLayout.y());

Label a = new Label("Short Text");
a.setAutoSizeMode(true);
Label b = new Label("Much Longer Text than the previous line...");
b.setAutoSizeMode(true);
Label c = new Label("MUCH MUCH MUCH Much Longer Text than the previous line by a pretty big margin...");
c.setAutoSizeMode(true);

Label a1 = new Button("Short Text");
a1.setAutoSizeMode(true);
Label b1 = new Button("Much Longer Text than the previous line...");
b1.setAutoSizeMode(true);
Label c1 = new Button("MUCH MUCH MUCH Much Longer Text than the previous line by a pretty big margin...");
c1.setAutoSizeMode(true);
hi.addAll(a, b, c, a1, b1, c1);

hi.show();
Automatically sizes the fonts of the buttons/labels based on text and available space
Figure 180. Automatically sizes the fonts of the buttons/labels based on text and available space

8.6. TextField and TextArea

The TextField class derives from the TextArea class, and both are used for text input in Codename One.

TextArea defaults to multi-line input and TextField defaults to single line input but both can be used in both cases. The main differences between TextField and TextArea are:

  • Blinking cursor is rendered on TextField

  • DataChangeListener is available in TextField. This is crucial for character by character input event tracking

  • Done listener is available in the TextField

  • Different UIID

The semantic difference between TextField & TextArea dates back to the ancestor of Codename One: LWUIT. Feature phones don’t have "proper" in-place editing capabilities & thus TextField was introduced to allow such input.

Because it lacks the blinking cursor capability TextArea is often used as a multi-line label and is used internally in SpanLabel, SpanButton etc.

A common use case is to have an important text component in edit mode immediately as you enter a Form. Codename One forms support this exact use case thru the Form.setEditOnShow(TextArea) method.

TextField & TextArea support constraints for various types of input such as NUMERIC, EMAIL, URL, etc. Those usually affect the virtual keyboard used, but might not limit input in some platforms. For example: on iOS even with NUMERIC constraint you would still be able to input characters.

If you need to prevent specific types of input check out the validation section.

The following sample shows off simple text field usage:

TableLayout tl;
int spanButton = 2;
if(Display.getInstance().isTablet()) {
    tl = new TableLayout(7, 2);
} else {
    tl = new TableLayout(14, 1);
    spanButton = 1;
}
tl.setGrowHorizontally(true);
hi.setLayout(tl);

TextField firstName = new TextField("", "First Name", 20, TextArea.ANY);
TextField surname = new TextField("", "Surname", 20, TextArea.ANY);
TextField email = new TextField("", "E-Mail", 20, TextArea.EMAILADDR);
TextField url = new TextField("", "URL", 20, TextArea.URL);
TextField phone = new TextField("", "Phone", 20, TextArea.PHONENUMBER);

TextField num1 = new TextField("", "1234", 4, TextArea.NUMERIC);
TextField num2 = new TextField("", "1234", 4, TextArea.NUMERIC);
TextField num3 = new TextField("", "1234", 4, TextArea.NUMERIC);
TextField num4 = new TextField("", "1234", 4, TextArea.NUMERIC);

Button submit = new Button("Submit");
TableLayout.Constraint cn = tl.createConstraint();
cn.setHorizontalSpan(spanButton);
cn.setHorizontalAlign(Component.RIGHT);
hi.add("First Name").add(firstName).
        add("Surname").add(surname).
        add("E-Mail").add(email).
        add("URL").add(url).
        add("Phone").add(phone).
        add("Credit Card").
                add(GridLayout.encloseIn(4, num1, num2, num3, num4)).
        add(cn, submit);
Simple text component sample
Figure 181. Simple text component sample
The Toolbar section contains a elaborate TextField search sample with DataChangeListener and rather unique styling.

8.6.1. Masking

A common use case when working with text components is the ability to "mask" input for example: in the credit card number above you would want 4 digits for each text field and don’t want the user to tap Next 3 times.

Masking allows you to accept partial input in one field and implicitly move to the next, this can be used to all types of complex input thanks to the text component API. E.g with the code above you can mask the credit card input so the cursor jumps to the next field implicitly using this code:

automoveToNext(num1, num2);
automoveToNext(num2, num3);
automoveToNext(num3, num4);

Then implement the method automoveToNext as:

private void automoveToNext(final TextField current, final TextField next) {
    current.addDataChangedListener((type, index) -> {
        if(current.getText().length() == 5) {
            current.stopEditing();
            current.setText(val.substring(0, 4));
            next.setText(val.substring(4));
            next.startEditingAsync();
        }
    });
}

Notice you can invoke stopEditing(Runnable) where you receive a callback as editing is stopped.

8.6.2. The Virtual Keyboard

A common misconception for developers is assuming the virtual keyboard represents "keys". For example: developers often override the "keyEvent" callbacks which are invoked for physical keyboard typing and expect those to occur with a virtual keyboard.

This isn’t the case since a virtual keyboard is a different beast. With a virtual keyboard characters typed might produce a completely different output due to autocorrect. Some keyboards don’t even have "keys" in the traditional sense or don’t type them in the traditional sense (for example: swiping).

The constraint property for the TextField/TextArea is crucial for a virtual keyboard.
When working with a virtual keyboard it’s important that the parent Container for the TextField/TextArea is scrollable. Otherwise the component won’t be reachable or the UI might be distorted when the keyboard appears.
Action Button Client Property

By default, the virtual keyboard on Android has a "Done" button, you can customize it to be a search icon, a send icon, or a go icon using a hint such as this:

searchTextField.putClientProperty("searchField", Boolean.TRUE);
sendTextField.putClientProperty("sendButton", Boolean.TRUE);
goTextField.putClientProperty("goButton", Boolean.TRUE);

This will adapt the icon for the action on the keys.

Next and Done on iOS

You try to hide a lot of the platform differences in Codename One, input is ** different between OS’s. A common reliance is the ability to send the "Done" event when the user presses the Done button. Unfortunately this button doesn’t always exist for example: if there is an Enter button (due to multiline input) or if there is a Next button in that place.

To make the behavior more uniform you slightly customized the iOS keyboard as such:

Next virtual keyboard with toolbar
Figure 182. Next virtual keyboard with toolbar
Done virtual keyboard without toolbar
Figure 183. Done virtual keyboard without toolbar
This works with 3rd party keyboards too…​

For example, this behavior might not be desired so to block that you can do:

tf.putClientProperty("iosHideToolbar", Boolean.TRUE);

This will hide the toolbar for that given field.

You can customize the color of the Done button in the toolbar by setting the ios.doneButtonColor display property. For example: To change the color to red, you could do Display.getInstance().setProperty("ios.doneButtonColor", String.valueOf(0xff0000)). @since 5.0

8.6.3. Clearable Text Field

iOS has a convention where an X can be placed after the text field to clear it. Some Android apps have it but there is no native support for that as of this writing.

You can wrap a TextField with a clearable wrapper to get this effect on all platforms. For example: replace this:

cnt.add(myTextField);

With this:

cnt.add(ClearableTextField.wrap(myTextField));

You can also specify the size of the clear icon if you wish. This is technically a Container with the text field style and a button to clear the text at the edge.

8.7. TextComponent

When building input forms you sometimes want to adapt to the native OS behavior and create a UI that’s a bit more distinct to the native OS. TextField and TextArea are low-level, you can create an Android style UI with such components but it might look out of place in iOS.

For example: this is how most of you would expect the UI to look on iOS and Android respectively:

TextModeLayout on iOS
Figure 184. Text Input on iOS
TextModeLayout on Android with the same code
Figure 185. Text Input on Android

Doing this with text fields is possible but would require code that looks a bit different and jumps through hoops. TextComponent allows this exact UI without forcing developers to write OS specific code:

TextModeLayout tl = new TextModeLayout(3, 2);
Form f = new Form("Pixel Perfect", tl);
TextComponent title = new TextComponent().label("Title");
TextComponent price = new TextComponent().label("Price");
TextComponent location = new TextComponent().label("Location");
TextComponent description = new TextComponent().label("Description").multiline(true);

f.add(tl.createConstraint().horizontalSpan(2), title);
f.add(tl.createConstraint().widthPercentage(30), price);
f.add(tl.createConstraint().widthPercentage(70), location);
f.add(tl.createConstraint().horizontalSpan(2), description);
f.setEditOnShow(title.getField());
f.show();
This code uses the TextModeLayout which is discussed in the layouts section

The text component uses a builder approach to set various values for example:

TextComponent t = new TextComponent().
    text("This appears in the text field").
    hint("This is the hint").
    label("This is the label").
    multiline(true);

The code is pretty self-explanatory and more convenient than typical setters/getters. It automatically handles the floating hint style of animation when running on Android.

8.7.1. Error Handling

The validator class supports text component and it should "work". But the cool thing is that it uses the material design convention for error handling!

So if you add to the sample above a Validator:

Validator val = new Validator();
val.addConstraint(title, new LengthConstraint(2));
val.addConstraint(price, new NumericConstraint(true));

You would see something that looks like this on Android:

Error handling when the text is blank
Figure 186. Error handling when the text is blank
Error handling when there is some input (notice red title label)
Figure 187. Error handling when there is some input (notice red title label)
On iOS the situation hasn’t changed much yet
Figure 188. On iOS the situation hasn’t changed much yet

The underlying system is the errorMessage method which you can chain like the other methods on TextComponent as such:

TextComponent tc = new TextComponent().
    label("Input Required").
    errorMessage("Input is essential in this field");

8.7.2. InputComponent and PickerComponent

To keep the code common and generic you use the InputComponent abstract base class and derive the other classes from that. PickerComponent is currently the other option.

A picker can work with your existing sample using code like this:

TextModeLayout tl = new TextModeLayout(3, 2);
Form f = new Form("Pixel Perfect", tl);
TextComponent title = new TextComponent().label("Title");
TextComponent price = new TextComponent().label("Price");
TextComponent location = new TextComponent().label("Location");
PickerComponent date = PickerComponent.createDate(new Date()).label("Date");
TextComponent description = new TextComponent().label("Description").multiline(true);
Validator val = new Validator();
val.addConstraint(title, new LengthConstraint(2));
val.addConstraint(price, new NumericConstraint(true));
f.add(tl.createConstraint().widthPercentage(60), title);
f.add(tl.createConstraint().widthPercentage(40), date);
f.add(location);
f.add(price);
f.add(tl.createConstraint().horizontalSpan(2), description);
f.setEditOnShow(title.getField());
f.show();

This produces the following which looks pretty standard:

Picker component taking place in iOS
Figure 189. Picker component taking place in iOS
And in Android
Figure 190. And in Android

The one tiny thing you should notice with the PickerComponent is that you don’t construct the picker component using new PickerComponent(). Instead you use create methods such as PickerComponent.createDate(new Date()). The reason for that’s that you’ve many types of pickers and it wouldn’t make sense to have one constructor.

8.7.3. Underlying Theme Constants and UIID’s

These varying looks are implemented through a combination of layouts, theme constants and UIID’s. The most important UIID’s are: TextComponent, FloatingHint & TextHint.

There are many theme constants related that can manipulate some pieces of this functionality:

  • textComponentErrorColor a hex RGB color which defaults to null in which case this has no effect. When defined this will change the color of the border and label to the given color to match the material design styling. This implements the red border underline in cases of error and the label text color change

  • textComponentErrorLineBorderBool toggles the material-style underline that appears on validation errors. Set it to false if you prefer to supply a different border when errors are shown

  • textComponentOnTopBool toggles the on top mode which makes things look like they do on Android. This defaults to true on Android and false on other OS’s. This can also be manipulated through the onTopMode(boolean) method in InputComponent however the layout will use the theme constant

  • textComponentAnimBool toggles the animation mode which again can be manipulated by a method in InputComponent. If you want to keep the UI static without the floating hint effect set this to false. Notice this defaults to true on Android

  • textComponentFieldUIID sets the UIID of the text field to something other than TextField this is useful for platforms such as iOS where the look of the text field is different within the text component. This allows you to make the background of the text field transparent when it’s within the TextComponent and make it different from the regular text field

  • inputComponentErrorMultilineBool makes error labels multi-line by default so longer validation messages can wrap instead of being clipped

8.8. Button

Button is a subclass of Label and as a result it inherits all of its functionality, specifically icon placement, tickering, etc.

Button adds to the mix some additional states such as a pressed UIID state and pressed icon.

There are additional icon states in Button such as rollover and disabled icon.

Button also exposes some functionality for subclasses specifically the setToggle method call which has no meaning when invoked on a Button but has a lot of implications for CheckBox & RadioButton.

Button event handling can be performed through an ActionListener or through a Command.

Changes in a Command won’t be reflected into the Button after the command was set to the Button.

Here is a trivial hello world style Button:

Form hi = new Form("Button");
Button b = new Button("My Button");
hi.add(b);
b.addActionListener((e) -> Log.p("Clicked"));
Simple button in the iOS styling
Figure 191. Simple button in the iOS styling, notice iOS doesn’t have borders on buttons…​

Such a button can be styled to look like a link using code like this or simply by making these settings in the theme and using code such as btn.setUIID("Hyperlink").

Form hi = new Form("Button");
Button b = new Button("Link Button");
b.getAllStyles().setBorder(Border.createEmpty());
b.getAllStyles().setTextDecoration(Style.TEXT_DECORATION_UNDERLINE);
hi.add(b);
b.addActionListener((e) -> Log.p("Clicked"));
Button styled to look like a link
Figure 192. Button styled to look like a link

8.8.1. Uppercase Buttons

Buttons on Android’s material design UI use upper case styling which isn’t the case for iOS. To solve this you’ve the method setCapsText(boolean) in Button which has the corresponding isCapsText, isCapsTextDefault & setCapsTextDefault(boolean). This is pretty core to Codename One so to prevent this from impacting everything unless you explicitly invoke setCapsText(boolean) the default value of true will apply when the UIID is Button, RaisedButton or for the built-in Dialog buttons.

You also have a theme constant: capsButtonTextBool. This constant controls caps text behavior from the theme and is set to true in the Android native theme.

8.8.2. Raised Button

Raised button is a style of button that’s available on Android and used to highlight an important action within a form. To confirm with the material design UI guidelines you might want to leverage a raised button UI element on Android but use a regular button everywhere else.

First you need to know whether a raised button exists in the theme. So on Android this will return true but on other OS’s it will return false. A potential future update might make another platform true based on UI guidelines in other OS’s.

For this purpose you’ve got the theme constant hasRaisedButtonBool which will return true on Android but will be false elsewhere. You can use it like this:

if(UIManager.getInstance().isThemeConstant("hasRaisedButtonBool", false)) {
    // that means we can use a raised button
}

To enable this you’ve the RaisedButton UIID that derives from Button and will act like it except for the places where hasRaisedButtonBool is true in which case it will look like this:

Raised and flat button in simulator
Figure 193. Raised and flat button in simulator

Notice that you can easily customize the colors of these buttons now since the border respects user colors…​

In this case I set the background color to purple and the foreground to white:

Purple raised button
Figure 194. Purple raised button
Form f = new Form("Pixel Perfect", BoxLayout.y());
Button b = new Button("Raised Button", "RaisedButton");
Button r = new Button("Flat Button");
f.add(b);
f.add(r);
f.show();

8.8.3. Ripple Effect

The ripple effect in material design highlights the location of the finger and grows as a circle to occupy the full area of the component as the user presses the button.

you’ve the ability to perform a ripple effect by darkening the touched area and growing that in a quick animation.

Ripple effect can be applied to any component but you currently have it turned on for buttons on Android which also applies to things like title commands, side menu elements etc. This might not apply at this moment to lead components like multi-buttons but that might change in the future.

Component has a property to enable the ripple effect setRippleEffect(boolean) and the corresponding isRippleEffect(). You can turn it on or off individually in the component level. For example, Button has static setButtonRippleEffectDefault(boolean) and isButtonRippleEffectDefault(). These allow you to define the default behavior for all the buttons and that can be configured through the theme constant buttonRippleBool which is currently on by default on the native Android theme.

8.9. CheckBox/RadioButton

CheckBox & RadioButton are subclasses of button that allow for either a toggle state or exclusive selection state.

Both CheckBox & RadioButton have a selected state that allows you to determine their selection.

RadioButton doesn’t allow you to "deselect" it, the way to "deselect" a RadioButton is by selecting another RadioButton.

The CheckBox can be added to a Container like any other Component but the RadioButton must be associated with a ButtonGroup otherwise if you’ve more than one set of RadioButton’s in the form you might have an issue.

Notice in the sample below that you associate all the radio buttons with a group but don’t do anything with the group as the radio buttons keep the reference internally. You also show the opposite side functionality and icon behavior:

CheckBox cb1 = new CheckBox("CheckBox No Icon");
cb1.setSelected(true);
CheckBox cb2 = new CheckBox("CheckBox With Icon", icon);
CheckBox cb3 = new CheckBox("CheckBox Opposite True", icon);
CheckBox cb4 = new CheckBox("CheckBox Opposite False", icon);
cb3.setOppositeSide(true);
cb4.setOppositeSide(false);
RadioButton rb1 = new RadioButton("Radio 1");
RadioButton rb2 = new RadioButton("Radio 2");
RadioButton rb3 = new RadioButton("Radio 3", icon);
new ButtonGroup(rb1, rb2, rb3);
rb2.setSelected(true);
hi.add(cb1).add(cb2).add(cb3).add(cb4).add(rb1).add(rb2).add(rb3);
RadioButton & CheckBox usage
Figure 195. RadioButton & CheckBox usage

Both of these components can be displayed as toggle buttons (see the toggle button section below), or use the default check mark/filled circle appearance based on the type/OS.

8.9.1. Toggle Button

A toggle button is a button that’s pressed and stays pressed. When a toggle button is pressed again it’s released from the pressed state. Hence the button has a selected state to indicate if it’s pressed or not exactly like the CheckBox/RadioButton components in Codename One.

To turn any CheckBox or RadioButton to a toggle button use the setToggle(true) method. Alternatively you can use the static createToggle method on both CheckBox and RadioButton to create a toggle button directly.

Invoking setToggle(true) implicitly converts the UIID to ToggleButton unless it was changed by the user from its original default value.

You can easily convert the sample above to use toggle buttons as such:

CheckBox cb1 = CheckBox.createToggle("CheckBox No Icon");
cb1.setSelected(true);
CheckBox cb2 = CheckBox.createToggle("CheckBox With Icon", icon);
CheckBox cb3 = CheckBox.createToggle("CheckBox Opposite True", icon);
CheckBox cb4 = CheckBox.createToggle("CheckBox Opposite False", icon);
cb3.setOppositeSide(true);
cb4.setOppositeSide(false);
ButtonGroup bg = new ButtonGroup();
RadioButton rb1 = RadioButton.createToggle("Radio 1", bg);
RadioButton rb2 = RadioButton.createToggle("Radio 2", bg);
RadioButton rb3 = RadioButton.createToggle("Radio 3", icon, bg);
rb2.setSelected(true);
hi.add(cb1).add(cb2).add(cb3).add(cb4).add(rb1).add(rb2).add(rb3);
Toggle button converted sample
Figure 196. Toggle button converted sample

that’s half the story though, to get the full effect of some cool toggle button UI’s you can use a ComponentGroup. This allows you to create a button bar effect with the toggle buttons.

For example: lets enclose the CheckBox components in a vertical ComponentGroup and the RadioButton’s in a horizontal group. You can do this by changing the last line of the code above as such:

hi.add(ComponentGroup.enclose(cb1, cb2, cb3, cb4)).
        add(ComponentGroup.encloseHorizontal(rb1, rb2, rb3));
Toggle button converted sample wrapped in ComponentGroup
Figure 197. Toggle button converted sample wrapped in ComponentGroup

8.10. ComponentGroup

ComponentGroup is a special container that can be either horizontal or vertical (BoxLayout X_AXIS or Y_AXIS respectively).

ComponentGroup "restyles" the elements within the group to have a UIID that allows you to create a "round border" effect that groups elements together.

The following code adds 4 component groups to a Container to demonstrate the various UIID changes:

hi.add("Three Labels").
        add(ComponentGroup.enclose(new Label("GroupElementFirst UIID"), new Label("GroupElement UIID"), new Label("GroupElementLast UIID"))).
        add("One Label").
        add(ComponentGroup.enclose(new Label("GroupElementOnly UIID"))).
        add("Three Buttons").
        add(ComponentGroup.enclose(new Button("ButtonGroupFirst UIID"), new Button("ButtonGroup UIID"), new Button("ButtonGroupLast UIID"))).
        add("One Button").
        add(ComponentGroup.enclose(new Button("ButtonGroupOnly UIID")));
ComponentGroup adapts the UIID’s of the components added so you can style them
Figure 198. ComponentGroup adapts the UIID’s of the components added so you can style them

Notice the following about the code above and the resulting image:

  • Buttons have a different UIID than other element types. Their styling is slightly different in such UI’s so you need to pay attention to that.

  • When an element is placed alone within a ComponentGroup its a special case UIID.

By default, ComponentGroup does nothing. You need to explicitly activate it in the theme by setting a theme property to true. Specifically you need to set ComponentGroupBool to true for ComponentGroup to do something otherwise its a box layout container! The ComponentGroupBool flag is true by default in the iOS native theme.

When ComponentGroupBool is set to true, the component group will modify the styles of all components placed within it to match the element UIID given to it (GroupElement by default) with special caveats to the first/last/ elements. For example:

  1. If I have one element within a component group it will have the UIID: GroupElementOnly

  2. If I have two elements within a component group they will have the UIID’s GroupElementFirst, GroupElementLast

  3. If I have three elements within a component group they will have the UIID’s GroupElementFirst, GroupElement, GroupElementLast

  4. If I have four elements within a component group they will have the UIID’s GroupElementFirst, GroupElement, GroupElement, GroupElementLast

This allows you to define special styles for the edges.

You can customize the UIID set by the component group by calling setElementUIID in the component group for example: setElementUIID("ToggleButton") for three elements result in the following UIID’s:

ToggleButtonFirst, ToggleButton, ToggleButtonLast

8.11. MultiButton

MultiButton is a composite component (lead component) that acts like a versatile Button. It supports up to 4 lines of text (it doesn’t automatically wrap the text), an emblem (usually navigational arrow, or check box) and an icon.

MultiButton can be used as a button, a CheckBox or a RadioButton for creating rich UI’s.

The MultiButton was inspired by the aesthetics of the UITableView iOS component.

A common source of confusion in the MultiButton is the difference between the icon and the emblem, since both may have an icon image associated with them. The icon is an image representing the entry while the emblem is an optional visual representation of the action that will be undertaken when the element is pressed. Both may be used simultaneously or individually of one another.

MultiButton twoLinesNoIcon = new MultiButton("MultiButton");
twoLinesNoIcon.setTextLine2("Line 2");
MultiButton oneLineIconEmblem = new MultiButton("Icon + Emblem");
oneLineIconEmblem.setIcon(icon);
oneLineIconEmblem.setEmblem(emblem);
MultiButton twoLinesIconEmblem = new MultiButton("Icon + Emblem");
twoLinesIconEmblem.setIcon(icon);
twoLinesIconEmblem.setEmblem(emblem);
twoLinesIconEmblem.setTextLine2("Line 2");

MultiButton twoLinesIconEmblemHorizontal = new MultiButton("Icon + Emblem");
twoLinesIconEmblemHorizontal.setIcon(icon);
twoLinesIconEmblemHorizontal.setEmblem(emblem);
twoLinesIconEmblemHorizontal.setTextLine2("Line 2 Horizontal");
twoLinesIconEmblemHorizontal.setHorizontalLayout(true);

MultiButton twoLinesIconCheckBox = new MultiButton("CheckBox");
twoLinesIconCheckBox.setIcon(icon);
twoLinesIconCheckBox.setCheckBox(true);
twoLinesIconCheckBox.setTextLine2("Line 2");

MultiButton fourLinesIcon = new MultiButton("With Icon");
fourLinesIcon.setIcon(icon);
fourLinesIcon.setTextLine2("Line 2");
fourLinesIcon.setTextLine3("Line 3");
fourLinesIcon.setTextLine4("Line 4");

hi.add(oneLineIconEmblem).
        add(twoLinesNoIcon).
        add(twoLinesIconEmblem).
        add(twoLinesIconEmblemHorizontal).
        add(twoLinesIconCheckBox).
        add(fourLinesIcon);
Multiple usage scenarios for the MultiButton
Figure 199. Multiple usage scenarios for the MultiButton

8.11.1. Styling The MultiButton

Since the MultiButton is a composite component setting its UIID will impact the top level UI.

To customize everything you need to customize the UIID’s for MultiLine1, MultiLine2, MultiLine3, MultiLine4 & Emblem.

You can customize the individual UIID’s thru the API directly using the setIconUIID, setUIIDLine1, setUIIDLine2, setUIIDLine3, setUIIDLine4 & setEmblemUIID.

Recent versions also include a badge overlay that can be rendered in the corner of the main icon. Use setBadgeText() to display a value (for example a notification count) and setBadgeUIID() if you need a custom UIID instead of the default Badge styling. When you need to inspect or adjust the badge style programmatically, getBadgeStyleComponent() returns the component whose styles are applied to the badge so you can tweak padding, colors or borders before showing the MultiButton.

8.12. SpanButton

SpanButton is a composite component (lead component) that looks/acts like a Button but can break lines rather than crop them when the text is long.

Unlike the MultiButton it uses the TextArea internally to break lines seamlessly. The SpanButton is far simpler than the MultiButton and as a result isn’t as configurable.

SpanButton sb = new SpanButton("SpanButton is a composite component (lead component) that looks/acts like a Button but can break lines rather than crop them when the text is very long.");
sb.setIcon(icon);
hi.add(sb);
The SpanButton Component
Figure 200. The SpanButton Component
SpanButton is slower than both Button and MultiButton. Recommend using it when there is a genuine need for its functionality.

8.13. SpanLabel

SpanLabel is a composite component (lead component) that looks/acts like a Label but can break lines rather than crop them when the text is long.

SpanLabel uses the TextArea internally to break lines seamlessly and so doesn’t provide all the elaborate configuration options of Label.

One of the features of label that moved into SpanLabel to some extent is the ability to position the icon. For example, unlike a Label the icon position is determined by the layout manager of the composite so setIconPosition accepts a BorderLayout constraint.

SpanLabel d = new SpanLabel("Default SpanLabel that can seamlessly line break when the text is really long.");
d.setIcon(icon);
SpanLabel l = new SpanLabel("NORTH Positioned Icon SpanLabel that can seamlessly line break when the text is really long.");
l.setIcon(icon);
l.setIconPosition(BorderLayout.NORTH);
SpanLabel r = new SpanLabel("SOUTH Positioned Icon SpanLabel that can seamlessly line break when the text is really long.");
r.setIcon(icon);
r.setIconPosition(BorderLayout.SOUTH);
SpanLabel c = new SpanLabel("EAST Positioned Icon SpanLabel that can seamlessly line break when the text is really long.");
c.setIcon(icon);
c.setIconPosition(BorderLayout.EAST);
hi.add(d).add(l).add(r).add(c);
The SpanLabel Component
Figure 201. The SpanLabel Component
SpanLabel is significantly slower than Label. Recommend using it when there is a genuine need for its functionality.

8.14. OnOffSwitch

The OnOffSwitch allows you to write an application where the user can swipe a switch between two states (on/off). This is a common UI paradigm in Android and iOS, although it’s implemented in a radically different way in both platforms.

This is a rather elaborate component because of its unique design on iOS, but you you’re able to accommodate most of the small behaviors of the component into your version, and it seamlessly adapts between the Android style and the iOS style.

The image below was generated based on the default use of the OnOffSwitch:

OnOffSwitch onOff = new OnOffSwitch();
hi.add(onOff);
The OnOffSwitch component as it appears on/off on iOS (top) and on Android (bottom)
Figure 202. The OnOffSwitch component as it appears on/off on iOS (top) and on Android (bottom)

As you can understand the difference between the way iOS and Android render this component has triggered two different implementations within a single component. The Android implementation uses standard buttons and is the default for non-iOS platforms.

You can force the Android or iOS mode by using the theme constant onOffIOSModeBool.

8.14.1. Validation

Validation is an inherent part of text input, and the Validator class allows that. You can enable validation thru the Validator class to add constraints for a specific component. it’s also possible to define components that would be enabled/disabled based on validation state and the way in which validation errors are rendered (change the components UIID, paint an emblem on top, etc.). A Constraint is an interface that represents validation requirements. You can define a constraint in Java or use some of the built-in constraints such as LengthConstraint, RegexConstraint, etc.

This sample below continues from the place where the TextField sample above stopped by adding validation to that code.

Validator v = new Validator();
v.addConstraint(firstName, new LengthConstraint(2)).
        addConstraint(surname, new LengthConstraint(2)).
        addConstraint(url, RegexConstraint.validURL()).
        addConstraint(email, RegexConstraint.validEmail()).
        addConstraint(phone, new RegexConstraint(phoneRegex, "Must be valid phone number")).
        addConstraint(num1, new LengthConstraint(4)).
        addConstraint(num2, new LengthConstraint(4)).
        addConstraint(num3, new LengthConstraint(4)).
        addConstraint(num4, new LengthConstraint(4));

v.addSubmitButtons(submit);
Validation and Regular Expressions
Figure 203. Validation & Regular Expressions

8.15. InfiniteProgress

The InfiniteProgress indicator spins an image infinitely to indicate that a background process is still working.

This style of animation is often nicknamed "washing machine" as it spins endlessly.

InfiniteProgress can be used in one of two ways either by embedding the component into the UI thru something like this:

myContainer.add(new InfiniteProgress());

InfiniteProgress can also appear over the entire screen, thus blocking all input. This tints the background while the infinite progress rotates:

Dialog ip = new InfiniteProgress().showInifiniteBlocking();

// do some long operation here using invokeAndBlock or do something in a separate thread and callback later
// when you are done just call

ip.dispose();
Infinite progress
Figure 204. Infinite progress

The image used in the InfiniteProgress animation is defined by the native theme. You can override that definition either by defining the theme constant infiniteImage or by invoking the setAnimation method.

Despite the name of the method setAnimation expects a static image that will be rotated internally. don’t use an animated image.

8.16. InfiniteScrollAdapter and InfiniteContainer

InfiniteScrollAdapter & InfiniteContainer allow you to create a scrolling effect that "never" ends with the typical Container/Component paradigm.

The motivation behind these classes is simple, say you’ve a lot of data to fetch from storage or from the internet. You can fetch the data in batches and show progress indication while you do this.

Infinite scroll fetches the next batch of data dynamically as you reach the end of the Container. InfiniteScrollAdapter & InfiniteContainer represent two similar ways to accomplish that task relatively easily.

Let start by exploring how you can achieve this UI that fetches data from a webservice:

InfiniteScrollAdapter demo code fetching property cross data
Figure 205. InfiniteScrollAdapter demo code fetching property cross data

The first step is creating the webservice call, you won’t go into too much detail here as webservices & IO are discussed later in the guide:

int pageNumber = 1;
java.util.List<Map<String, Object>> fetchPropertyData(String text) {
    try {
        ConnectionRequest r = new ConnectionRequest();
        r.setPost(false);
        r.setUrl("http://api.nestoria.co.uk/api");
        r.addArgument("pretty", "0");
        r.addArgument("action", "search_listings");
        r.addArgument("encoding", "json");
        r.addArgument("listing_type", "buy");
        r.addArgument("page", "" + pageNumber);
        pageNumber++;
        r.addArgument("country", "uk");
        r.addArgument("place_name", text);
        NetworkManager.getInstance().addToQueueAndWait(r);
        Map<String,Object> result = new JSONParser().parseJSON(new InputStreamReader(new ByteArrayInputStream(r.getResponseData()), "UTF-8"));
        Map<String, Object> response = (Map<String, Object>)result.get("response");
        return (java.util.List<Map<String, Object>>)response.get("listings");
    } catch(Exception err) {
        Log.e(err);
        return null;
    }
}
The demo code here doesn’t do any error handling! This is a bad practice and it’s taken here to keep the code short and readable. Proper error handling is used in the Property Cross demo.

The fetchPropertyData is a simplistic tool that fetches the next page of listings for the nestoria webservice. Notice that this method is synchronous and will block the calling thread (legally) until the network operation completes.

Now that you’ve a webservice lets proceed to create the UI. Check out the code annotations below:

Form hi = new Form("InfiniteScrollAdapter", new BoxLayout(BoxLayout.Y_AXIS));

Style s = UIManager.getInstance().getComponentStyle("MultiLine1");
FontImage p = FontImage.createMaterial(FontImage.MATERIAL_PORTRAIT, s);
EncodedImage placeholder = EncodedImage.createFromImage(p.scaled(p.getWidth() * 3, p.getHeight() * 3), false); (1)

InfiniteScrollAdapter.createInfiniteScroll(hi.getContentPane(), () -> { (2)
    java.util.List<Map<String, Object>> data = fetchPropertyData("Leeds"); (3)
    MultiButton[] cmps = new MultiButton[data.size()];
    for(int iter = 0 ; iter < cmps.length ; iter++) {
        Map<String, Object> currentListing = data.get(iter);
        if(currentListing == null) { (4)
            InfiniteScrollAdapter.addMoreComponents(hi.getContentPane(), new Component[0], false);
            return;
        }
        String thumb_url = (String)currentListing.get("thumb_url");
        String guid = (String)currentListing.get("guid");
        String summary = (String)currentListing.get("summary");
        cmps[iter] = new MultiButton(summary);
        cmps[iter].setIcon(URLImage.createToStorage(placeholder, guid, thumb_url));
    }
    InfiniteScrollAdapter.addMoreComponents(hi.getContentPane(), cmps, true); (5)
}, true); (6)
1Placeholder is essential for the URLImage class which you will discuss at a different place.
2The InfiniteScrollAdapter accepts a runnable which is invoked every time you reach the edge of the scrolling. You used a closure instead of the typical run() method override.
3This is a blocking call, after the method completes you will have all the data you need. Notice that this method doesn’t block the EDT illegally.
4If there is no more data you call the addMoreComponents method with a false argument. This indicates that there is no additional data to fetch.
5Here you add the actual components to the end of the form. Notice that you must not invoke the add/remove method of Container. Those might conflict with the work of the InfiniteScrollAdapter.
6You pass true to indicate that the data isn’t "prefilled" so the method should be invoked immediately when the Form is first shown
don’t violate the EDT in the callback. it’s invoked on the event dispatch thread and it’s crucial

8.16.1. The InfiniteContainer

InfiniteContainer was introduced to simplify and remove some of the boilerplate of the InfiniteScrollAdapter. It takes a more traditional approach of inheriting the Container class to provide its functionality.

Unlike the InfiniteScrollAdapter the InfiniteContainer accepts an index and amount to fetch. This is useful for tracking your position but also important since the InfiniteContainer also implements Pull To Refresh as part of its functionality.

Converting the code above to an InfiniteContainer is pretty simple you moved all the code into the callback fetchComponents method and returned the array of Component’s as a response.

Unlike the InfiniteScrollAdapter you can’t use the ContentPane directly so you’ve to use a BorderLayout and place the InfiniteContainer there:

Form hi = new Form("InfiniteContainer", new BorderLayout());

Style s = UIManager.getInstance().getComponentStyle("MultiLine1");
FontImage p = FontImage.createMaterial(FontImage.MATERIAL_PORTRAIT, s);
EncodedImage placeholder = EncodedImage.createFromImage(p.scaled(p.getWidth() * 3, p.getHeight() * 3), false);

InfiniteContainer ic = new InfiniteContainer() {
    @Override
    public Component[] fetchComponents(int index, int amount) {
        java.util.List<Map<String, Object>> data = fetchPropertyData("Leeds");
        MultiButton[] cmps = new MultiButton[data.size()];
        for(int iter = 0 ; iter < cmps.length ; iter++) {
            Map<String, Object> currentListing = data.get(iter);
            if(currentListing == null) {
                return null;
            }
            String thumb_url = (String)currentListing.get("thumb_url");
            String guid = (String)currentListing.get("guid");
            String summary = (String)currentListing.get("summary");
            cmps[iter] = new MultiButton(summary);
            cmps[iter].setIcon(URLImage.createToStorage(placeholder, guid, thumb_url));
        }
        return cmps;
    }
};
hi.add(BorderLayout.CENTER, ic);

8.17. List, MultiList, Renderers & Models

8.17.1. InfiniteContainer/InfiniteScrollAdapter vs. List/ContainerList

Your recommendation is to always go with Container, InfiniteContainer or InfiniteScrollAdapter.

Recommend avoiding List or its subclasses/related classes specifically ContainerList & MultiList.

Recommend replacing ComboBox with Picker but that’s a completely different discussion.

A Container with ~5000 nested containers within it can perform on par with a List and probably exceed its performance when used correctly.

Larger sets of data are rarely manageable on phones or tablets so the benefits for lists are dubious.

In terms of API you found that even experienced developers experienced a great deal of pain when wrangling the Swing styled lists and their stateless approach.

Since animation, swiping and other capabilities that are so common in mobile are so hard to accomplish with lists you see no actual reason to use them.

8.17.2. Why isn’t List Deprecated?

You deprecated ContainerList which performs badly and has some inherent complexity issues. List has some unique use cases and is still used all over Codename One.

MultiList is a reasonable version of List that’s far easier to use without most of the pains related to renderer configuration.

There are cases where using List or MultiList is justified, they are rarer than usual hence your recommendation.

8.17.3. MVC In Lists

A Codename One List doesn’t contain components, but rather arbitrary data; this seems odd at first but makes sense. If you want a list to contain components, use a Container.

The advantage of using a List in this way is that you can display it in many ways (for example: fixed focus positions, horizontally, etc.), and that you can have more than a million entries without performance overhead. You can also do some pretty nifty things, like filtering the list on the fly or fetching it dynamically from the Internet as the user scrolls down the list. To achieve these things the list uses two interfaces: ListModel and ListCellRenderer. List model represents the data; its responsibility is to return the arbitrary object within the list at a given offset. Its second responsibility is to notify the list when the data changes, so the list can refresh.

Think of the model as an array of objects that can notify you when it changes.

The list renderer is like a rubber stamp that knows how to draw an object from the model, it’s called many times per entry in an animated list and must be fast. Unlike standard Codename One components, it’s used to draw the entry in the model and is immediately discarded, hence it has no memory overhead, but if it takes too long to process a model value it can be a big bottleneck!

Think of the render as a translation layer that takes the "data" from the model and translates it to a visual representation.

This is all generic, but a bit too much for most, doing a list "properly" requires some understanding. The main source of confusion for developers is the stateless nature of the list and the transfer of state to the model (for example: a checkbox list needs to listen to action events on the list and update the model, in order for the renderer to display that state). Once you understand that it’s easy.

8.17.4. Understanding MVC

Let you recap, what is MVC:

  • Model - Represents the data for the component (list), the model can tell you exactly how many items are in it and which item resides at a given offset within the model. This differs from a simple Vector (or array), since all access to the model is controlled (the interface is simpler), and unlike a Vector/Array, the model can notify you of changes that occur within it.

  • View - The view draws the content of the model. it’s a "dumb" layer that has no notion of what is displayed and knows how to draw. It tracks changes in the model (the model sends events) and redraws itself when it changes.

  • Controller - The controller accepts user input and performs changes to the model, which in turn cause the view to refresh.

Image by RegisFrey - Own work Public Domain https://commons.wikimedia.org/w/index.php?curid=10298177
Figure 206. Typical MVC Diagram [3]

Codename One’s List component uses the MVC paradigm in its implementation. List itself is the Controller (with a bit of the View mixed in). The ListCellRenderer interface is the rest of the View and the ListModel is (you guessed it by now) the Model.

When the list is painted, it iterates over the visible elements in the model and asks the model for the data, it then draws them using the renderer. Notice that because of this both the model and the renderer must be REALLY fast and that’s hard.

Why is this useful?

Since the model is a lightweight interface, it can be implemented by you and replaced in runtime if so desired, this allows many use cases:

  1. A list can contain thousands of entries but load the portion visible to the user. Since the model will be queried for the elements that are visible to the user, it won’t need to load the large data set into memory until the user starts scrolling down (at which point other elements may be offloaded from memory).

  2. A list can cache efficiently. For example: a list can mirror data from the server into local RAM without actually downloading all the data. Data can also be mirrored from storage for better performance and discarded for better memory utilization.

  3. The is no need for state copying. Since renderers allow you to display any object type, the list model interface can be implemented by the application’s data structures (for example: persistence/network engine), which would return internal application data structures saving you the need of copying application state into a list specific data structure. Note that this advantage applies with a custom renderer which is pretty difficult to get right.

  4. Using the proxy pattern you can layer logic such as filtering, sorting, caching, etc. on top of existing models without changing the model source code.

  5. You can reuse generic models for many views, for example: a model that fetches data from the server can be initialized with different arguments, to fetch different data for different views. View objects in different Forms can display the same model instance in different view instances, thus they would update automatically when you change one global model.

Most of these use cases work best for lists that grow to a larger size, or represent complex data, which is what the list object is designed to do.

8.17.5. Important - Lists & Layout Managers

Usually when working with lists, you want the list to handle the scrolling (otherwise it will perform badly). This means you should place the list in a non-scrollable container (no parent can be scrollable), notice that the content pane is scrollable by default, so you should disable that.

it’s also recommended to place the list in the CENTER location of a BorderLayout to produce the most effective results. for example:

form.setScrollable(false);
form.setLayout(new BorderLayout());
form.add(BorderLayout.CENTER, myList);

8.17.6. MultiList & DefaultListModel

So after this long start lets show the first sample of creating a list using the MultiList.

The MultiList is a preconfigured list that contains a ready made renderer with defaults that make sense for the most common use cases. It still retains most of the power available to the List component but reduces the complexity of one of the hardest things to grasp for most developers: rendering.

The full power of the ListModel is still available and allows you to create a million entry list with a few lines of code. For example the objects that the model returns should always be in the form of Map objects and not an arbitrary object like the standard List allows.

Here is a simple example of a MultiList containing a highly popular subject matter:

Form hi = new Form("MultiList", new BorderLayout());

ArrayList<Map<String, Object>> data = new ArrayList<>();

data.add(createListEntry("A Game of Thrones", "1996"));
data.add(createListEntry("A Clash Of Kings", "1998"));
data.add(createListEntry("A Storm Of Swords", "2000"));
data.add(createListEntry("A Feast For Crows", "2005"));
data.add(createListEntry("A Dance With Dragons", "2011"));
data.add(createListEntry("The Winds of Winter", "2016 (please, please, please)"));
data.add(createListEntry("A Dream of Spring", "Ugh"));

DefaultListModel<Map<String, Object>> model = new DefaultListModel<>(data);
MultiList ml = new MultiList(model);
hi.add(BorderLayout.CENTER, ml);
Basic usage of the MultiList and DefaultListModel
Figure 207. Basic usage of the MultiList & DefaultListModel]

createListEntry is relatively trivial:

private Map<String, Object> createListEntry(String name, String date) {
    Map<String, Object> entry = new HashMap<>();
    entry.put("Line1", name);
    entry.put("Line2", date);
    return entry;
}

There is one major piece missing here and that’s the cover images for the books. A simple approach would be to place the image objects into the entries using the "icon" property as such:

private Map<String, Object> createListEntry(String name, String date, Image cover) {
    Map<String, Object> entry = new HashMap<>();
    entry.put("Line1", name);
    entry.put("Line2", date);
    entry.put("icon", cover);
    return entry;
}
With cover images in place
Figure 208. With cover images in place
Since the MultiList uses the GenericListCellRenderer internally you can use URLImage to dynamically fetch the data. This is discussed in the graphics section of this guide.
Going Further With the ListModel

Lets assume that GRRM was prolific and wrote 1 million books. The default list model won’t make much sense in that case but you would still be able to render everything in a list model.

You will fake it a bit but notice that 1M components won’t be created even if you somehow scroll all the way down…​

The ListModel interface can be implemented by anyone in this case you did a stupid simple implementation:

class GRMMModel implements ListModel<Map<String,Object>> {
    @Override
    public Map<String, Object> getItemAt(int index) {
        int idx = index % 7;
        switch(idx) {
            case 0:
                return createListEntry("A Game of Thrones " + index, "1996");
            case 1:
                return createListEntry("A Clash Of Kings " + index, "1998");
            case 2:
                return createListEntry("A Storm Of Swords " + index, "2000");
            case 3:
                return createListEntry("A Feast For Crows " + index, "2005");
            case 4:
                return createListEntry("A Dance With Dragons " + index, "2011");
            case 5:
                return createListEntry("The Winds of Winter " + index, "2016 (please, please, please)");
            default:
                return createListEntry("A Dream of Spring " + index, "Ugh");
        }
    }

    @Override
    public int getSize() {
        return 1000000;
    }

    @Override
    public int getSelectedIndex() {
        return 0;
    }

    @Override
    public void setSelectedIndex(int index) {
    }

    @Override
    public void addDataChangedListener(DataChangedListener l) {
    }

    @Override
    public void removeDataChangedListener(DataChangedListener l) {
    }

    @Override
    public void addSelectionListener(SelectionListener l) {
    }

    @Override
    public void removeSelectionListener(SelectionListener l) {
    }

    @Override
    public void addItem(Map<String, Object> item) {
    }

    @Override
    public void removeItem(int index) {
    }
}

You can now replace the existing model by removing all the model related logic and changing the constructor call as such:

MultiList ml = new MultiList(new GRMMModel());
It took ages to scroll this far…​ This goes to a million…​
Figure 209. It took ages to scroll this far…​ This goes to a million…​

8.17.7. List Cell Renderer

The Renderer is a simple interface with 2 methods:

public interface ListCellRenderer {
   //This method is called by the List for each item, when the List paints itself.
   public Component getListCellRendererComponent(List list, Object value, int index, boolean isSelected);

   //This method returns the List animated focus which is animated when list selection changes
   public Component getListFocusComponent(List list);
}

The most simple/naive implementation may choose to implement the renderer as follows:

public Component getListCellRendererComponent(List list, Object value, int index, boolean isSelected){
     return new Label(value.toString());
}

public Component getListFocusComponent(List list){
     return null;
}

This will compile and work, but won’t give you much, notice that you won’t see the List selection move on the List, this is because the renderer returns a Label with the same style regardless if it’s selected or not.

Now Let you try to make it a bit more useful.

public Component getListCellRendererComponent(List list, Object value, int index, boolean isSelected){
      Label l = new Label(value.toString());
if (isSelected) {
             l.setFocus(true);
             l.getAllStyles().setBgTransparency(100);
         } else {
             l.setFocus(false);
             l.getAllStyles().setBgTransparency(0);
        }
        return l;
}   public Component getListFocusComponent(List list){
      return null;
}

In this renderer you set the Label.setFocus(true) if it’s selected, calling to this method doesn’t give the focus to the Label, it simply renders the label as selected.

Then you invoke Label.getAllStyles().setBgTransparency(100) to give the selection semi transparency, and 0 for full transparency if not selected.

that’s still not efficient because you create a new Label each time the method is invoked.

To make the code tighter, keep a reference to the Component or extend it as DefaultListCellRenderer does.

class MyRenderer extends Label implements ListCellRenderer {
    public Component getListCellRendererComponent(List list, Object value, int index, boolean isSelected){
        setText(value.toString());
        if (isSelected) {
            setFocus(true);
            getAllStyles().setBgTransparency(100);
        } else {
            setFocus(false);
            getAllStyles().setBgTransparency(0);
        }
        return this;
        }
    }
}

Now Let you’ve a look at a more advanced Renderer.

class ContactsRenderer extends Container implements ListCellRenderer {

 private Label name = new Label("");
 private Label email = new Label("");
 private Label pic = new Label("");

 private Label focus = new Label("");

 public ContactsRenderer() {
     setLayout(new BorderLayout());
     addComponent(BorderLayout.WEST, pic);
     Container cnt = new Container(new BoxLayout(BoxLayout.Y_AXIS));
     name.getAllStyles().setBgTransparency(0);
     name.getAllStyles().setFont(Font.createSystemFont(Font.FACE_SYSTEM, Font.STYLE_BOLD, Font.SIZE_MEDIUM));
     email.getAllStyles().setBgTransparency(0);
     cnt.addComponent(name);
     cnt.addComponent(email);
     addComponent(BorderLayout.CENTER, cnt);

     focus.getStyle().setBgTransparency(100);
 }

 public Component getListCellRendererComponent(List list, Object value, int index, boolean isSelected) {

     Contact person = (Contact) value;
     name.setText(person.getName());
     email.setText(person.getEmail());
     pic.setIcon(person.getPic());
     return this;
 }

 public Component getListFocusComponent(List list) {
     return focus;
 }
}

In this renderer you want to render a Contact object to the Screen, you build the Component in the constructor and in the getListCellRendererComponent you simply update the Labels' texts according to the Contact object.

Notice that in this renderer you return a focus Label with semi transparency, as mentioned before, the focus component can be modified within this method.

For example, I can modify the focus Component to have an icon.

focus.getAllStyles().setBgTransparency(100);
try {
    focus.setIcon(Image.createImage("/duke.png"));
    focus.setAlignment(Component.RIGHT);
} catch (IOException ex) {
    ex.printStackTrace();
}

8.17.8. Generic List Cell Renderer

As part of the GUI builder work, you needed a way to customize rendering for a List, but the renderer/model approach seemed impossible to adapt to a GUI builder (it seems the Swing GUI builders had a similar issue). Your solution was to introduce the GenericListCellRenderer, which while introducing limitations and implementation requirements still manages to make life easier, both in the GUI builder and outside of it.

GenericListCellRenderer is a renderer designed to be as simple to use as a Component-Container hierarchy, you effectively crammed most of the common renderer use cases into one class. To enable that, you need to know the content of the objects within the model, so the GenericListCellRenderer assumes the model contains Map objects. Since Maps can contain arbitrary data the list model is still generic and allows storing application specific data. Furthermore a Map can still be derived and extended to provide domain specific business logic.

The GenericListCellRenderer accepts two container instances (more later on why at least two, and not one), which it maps to individual Map entries within the model, by finding the appropriate components within the given container hierarchy. Components are mapped to the Map entries based on the name property of the component (getName/setName) and the key/value within the Map, for example:

For a model that contains a Map entry like this:

"Foo": "Bar"
"X": "Y"
"Not": "Applicable"
"Number": Integer(1)

A renderer will loop over the component hierarchy in the container, searching for components whose name matches Foo, X, Not, and Number, and assigning the appropriate value to them.

You can also use image objects as values, and they will be assigned to labels as expected. For example, you can’t assign both an image and a text to a single label, since the key will be taken. That isn’t a big problem, since two labels can be used easily in such a renderer.

To make matters even more attractive the renderer seamlessly supports list tickering when appropriate, and if a CheckBox appears within the renderer, it will toggle a boolean flag within the Map seamlessly.

One issue that crops up with this approach is that, if a value is missing from the Map, it’s treated as empty and the component is reset.

This can pose an issue if you hardcode an image or text within the renderer and you don’t want them replaced (for example: an arrow graphic on a Label within the renderer). The solution for this is to name the component with Fixed in the end of the name, for example: HardcodedIconFixed.

Naming a component within the renderer with $number will automatically set it as a counter component for the offset of the component within the list.

Styling the GenericListCellRenderer is slightly different, the renderer uses the UIID of the Container passed to the generic list cell renderer, and the background focus uses that same UIID with the word "Focus" appended to it.

Note that the generic list cell renderer will grant focus to the child components of the selected entry if they are focusable, thus changing the style of said entries. For example: a Container might have a child Label that has one style when the parent container is unselected and another when it’s selected (focused), this can be easily achieved by defining the label as focusable. Notice that the component will never receive direct focus, since it’s still part of a renderer.

Last but not least, the generic list cell renderer accepts two or four instances of a Container, rather than the obvious choice of accepting one instance. This allows the renderer to treat the selected entry differently, which is especially important to tickering, although it’s also useful for the fisheye effect [4]. Since it might not be practical to seamlessly clone the Container for the renderer’s needs, Codename One expects the developer to provide two separate instances, they can be identical in all respects, but they must be separate instances for tickering to work. The renderer also allows for a fisheye effect, where the selected entry is actually different from the unselected entry in its structure, it also allows for a pinstripe effect, where odd/even rows have different styles (this is accomplished by providing 4 instances of the containers selected/unselected for odd/even).

The best way to learn about the generic list cell renderer and the Map model is by playing with them in the old GUI builder. Notice they can be used in code without any dependency on the GUI builder and can be useful at that.

Here is a simple example of a list with checkboxes that gets updated automatically:

com.codename1.ui.List list = new com.codename1.ui.List(createGenericListCellRendererModelData());
list.setRenderer(new GenericListCellRenderer(createGenericRendererContainer(), createGenericRendererContainer()));


private Container createGenericRendererContainer() {
    Label name = new Label();
    name.setFocusable(true);
    name.setName("Name");
    Label surname = new Label();
    surname.setFocusable(true);
    surname.setName("Surname");
    CheckBox selected = new CheckBox();
    selected.setName("Selected");
    selected.setFocusable(true);
    Container c = BorderLayout.center(name).
            add(BorderLayout.SOUTH, surname).
            add(BorderLayout.WEST, selected);
    c.setUIID("ListRenderer");
    return c;
}

private Object[] createGenericListCellRendererModelData() {
    Map<String,Object>[] data = new HashMap[5];
    data[0] = new HashMap<>();
    data[0].put("Name", "Shai");
    data[0].put("Surname", "Almog");
    data[0].put("Selected", Boolean.TRUE);
    data[1] = new HashMap<>();
    data[1].put("Name", "Chen");
    data[1].put("Surname", "Fishbein");
    data[1].put("Selected", Boolean.TRUE);
    data[2] = new HashMap<>();
    data[2].put("Name", "Ofir");
    data[2].put("Surname", "Leitner");
    data[3] = new HashMap<>();
    data[3].put("Name", "Yaniv");
    data[3].put("Surname", "Vakarat");
    data[4] = new HashMap<>();
    data[4].put("Name", "Meirav");
    data[4].put("Surname", "Nachmanovitch");
    return data;
}
GenericListCellRenderer demo code
Figure 210. GenericListCellRenderer demo code
Custom UIID Of Entry in GenenricListCellRenderer/MultiList

With MultiList/GenenricListCellRenderer one of the common issues is making a UI where a specific component within the list renderer has a different UIID style based on data. For example: this can be helpful to mark a label within the list as red, for instance, in the case of a list of monetary transactions.

This can be achieved with a custom renderer, but that’s a pretty difficult task.
GenericListCellRenderer (MultiList uses GenericListCellRenderer internally) has another option.

Normally, to build the model for a renderer of this type, you use something like:

map.put("componentName", "Component Value");

What if you want componentName to be red? Just use:

map.put("componentName_uiid", "red");

This will apply the UIID "red" to the component, which you can then style in the theme. Notice that once you start doing this, you need to define this entry for all entries, for example:

map.put("componentName_uiid", "blue");

Otherwise the component will stay red for the next entry (since the renderer acts like a rubber stamp).

Rendering Prototype

Because of the rendering architecture of a List its pretty hard to calculate the right preferred size for such a component. The default behavior includes querying a few entries from the model then constructing their renderers to get a "sample" of the preferred size value.

As you might guess this triggers a performance penalty that’s paid with every reflow of the UI. The solution is to use setRenderingPrototype.

setRenderingPrototype accepts a "fake" value that represents a reasonably large amount of data and it will be used to calculate the preferred size. For example: for a multiList that should render 2 lines of text with 20 characters and a 5mm square icon I can do something like this:

Map<String, Object> proto = new HashMap<>();
map.put("Line1", "WWWWWWWWWWWWWWWWWWWW");
map.put("Line2", "WWWWWWWWWWWWWWWWWWWW");
int mm5 = Display.getInstance().convertToPixels(5, true);
map.put("icon", Image.create(mm5, mm5));
myMultiList.setRenderingPrototype(map);

8.17.9. ComboBox

The ComboBox is a specialization of List that displays a single selected entry. When clicking that entry a popup is presented allowing the user to pick an entry from the full list of entries.

The ComboBox UI paradigm isn’t as common on OS’s such as iOS where there is no native equivalent to it. Recommend using either the Picker class or the AutoCompleteTextField.

ComboBox is notoriously hard to style properly as it relies on a complex dynamic of popup renderer and instantly visible renderer. The UIID for the ComboBox is ComboBox however if you set it to something else all the other UIID’s will also change their prefix. For example: the ComboBoxPopup UIID will become MyNewUIIDPopup.

The combo box defines the following UIID’s by default:

  • ComboBox

  • ComboBoxItem

  • ComboBoxFocus

  • PopupContentPane

  • PopupItem

  • PopupFocus

The ComboBox also defines theme constants that allow some native themes to manipulate its behavior for example:

  • popupTitleBool - shows the "label for" value as the title of the popup dialog

  • popupCancelBodyBool - Adds a cancel button into the popup dialog

  • centeredPopupBool - shows the popup dialog in the center of the screen instead of under the popup

  • otherPopupRendererBool - Uses a different list cell render for the popup than the one used for the ComboBox itself. When this is false PopupItem & PopupFocus become irrelevant. Notice that the Android native theme defines this to true.

Since a ComboBox is a List you can use everything you learned about a List to build a ComboBox including models, GenericListCellRenderer etc.

For example: the demo below uses the GRRM demo data from above to build a ComboBox:

Form hi = new Form("ComboBox", new BoxLayout(BoxLayout.Y_AXIS));
ComboBox<Map<String, Object>> combo = new ComboBox<> (
        createListEntry("A Game of Thrones", "1996"),
        createListEntry("A Clash Of Kings", "1998"),
        createListEntry("A Storm Of Swords", "2000"),
        createListEntry("A Feast For Crows", "2005"),
        createListEntry("A Dance With Dragons", "2011"),
        createListEntry("The Winds of Winter", "2016 (please, please, please)"),
        createListEntry("A Dream of Spring", "Ugh"));

combo.setRenderer(new GenericListCellRenderer<>(new MultiButton(), new MultiButton()));
GRRM ComboBox
Figure 211. GRRM ComboBox

8.18. Slider

A Slider is an empty component that can be filled horizontally or vertically to allow indicating progress, setting volume etc. It can be editable to allow the user to determine its value or none editable to relay that information to the user. It can have a thumb on top to show its current position.

Slider
Figure 212. Slider

The interesting part about the slider is that it has two separate style UIID’s, Slider & SliderFull. The Slider UIID is always painted and SliderFull is rendered on top based on the amount the Slider should be filled.

Slider is highly customizable for example: a slider can be used to replicate a 5 star rating widget as such. Notice that this slider will work when its given its preferred size otherwise additional stars will appear. that’s why you place it within a FlowLayout:

Form hi = new Form("Star Slider", new BoxLayout(BoxLayout.Y_AXIS));
hi.add(FlowLayout.encloseCenter(createStarRankSlider()));
hi.show();

The slider itself is initialized in the code below. Notice that you can achieve almost the same result using a theme by setting the Slider & SliderFull UIID’s (both in selected & unselected states).

In fact doing this in the theme might be superior as you could use one image that contains 5 stars already and that way you won’t need the preferred size hack below:

private void initStarRankStyle(Style s, Image star) {
    s.setBackgroundType(Style.BACKGROUND_IMAGE_TILE_BOTH);
    s.setBorder(Border.createEmpty());
    s.setBgImage(star);
    s.setBgTransparency(0);
}

private Slider createStarRankSlider() {
    Slider starRank = new Slider();
    starRank.setEditable(true);
    starRank.setMinValue(0);
    starRank.setMaxValue(10);
    Font fnt = Font.createTrueTypeFont("native:MainLight", "native:MainLight").
            derive(Display.getInstance().convertToPixels(5, true), Font.STYLE_PLAIN);
    Style s = new Style(0xffff33, 0, fnt, (byte)0);
    Image fullStar = FontImage.createMaterial(FontImage.MATERIAL_STAR, s).toImage();
    s.setOpacity(100);
    s.setFgColor(0);
    Image emptyStar = FontImage.createMaterial(FontImage.MATERIAL_STAR, s).toImage();
    initStarRankStyle(starRank.getSliderEmptySelectedStyle(), emptyStar);
    initStarRankStyle(starRank.getSliderEmptyUnselectedStyle(), emptyStar);
    initStarRankStyle(starRank.getSliderFullSelectedStyle(), fullStar);
    initStarRankStyle(starRank.getSliderFullUnselectedStyle(), fullStar);
    starRank.setPreferredSize(new Dimension(fullStar.getWidth() * 5, fullStar.getHeight()));
    return starRank;
}
private void showStarPickingForm() {
  Form hi = new Form("Star Slider", new BoxLayout(BoxLayout.Y_AXIS));
  hi.add(FlowLayout.encloseCenter(createStarRankSlider()));
  hi.show();
}
Star Slider set to 5 (its between 0 - 10)
Figure 213. Star Slider set to 5 (its between 0 - 10)
This slider goes all the way to 0 stars which is less common. You can use a Label to represent the first star and have the slider work between 0 - 8 values to provide 4 additional stars.

8.19. Table

Table is a composite component (but it isn’t a lead component), this means it’s a subclass of Container. it’s effectively built from many components.

Table is heavily based on the TableLayout class. it’s important to be familiar with that layout manager when working with Table.

Here is a trivial sample of using the standard table component:

Form hi = new Form("Table", new BorderLayout());
TableModel model = new DefaultTableModel(new String[] {"Col 1", "Col 2", "Col 3"}, new Object[][] {
    {"Row 1", "Row A", "Row X"},
    {"Row 2", "Row B", "Row Y"},
    {"Row 3", "Row C", "Row Z"},
    {"Row 4", "Row D", "Row K"},
    }) {
        public boolean isCellEditable(int row, int col) {
            return col != 0;
        }
    };
Table table = new Table(model);
hi.add(BorderLayout.CENTER, table);
hi.show();
Simple Table usage
Figure 214. Simple Table usage
In the sample above the title area and first column aren’t editable. The other two columns are editable.

The more "interesting" capabilities of the Table class can be utilized through the TableLayout. You can use the layout constraints (also exposed in the table class) to create spanning and elaborate UI’s.

For example:

Form hi = new Form("Table", new BorderLayout());
TableModel model = new DefaultTableModel(new String[] {"Col 1", "Col 2", "Col 3"}, new Object[][] {
    {"Row 1", "Row A", "Row X"},
    {"Row 2", "Row B can now stretch", null},
    {"Row 3", "Row C", "Row Z"},
    {"Row 4", "Row D", "Row K"},
    }) {
        public boolean isCellEditable(int row, int col) {
            return col != 0;
        }
    };
Table table = new Table(model) {
    @Override
    protected TableLayout.Constraint createCellConstraint(Object value, int row, int column) {
        TableLayout.Constraint con =  super.createCellConstraint(value, row, column);
        if(row == 1 && column == 1) {
            con.setHorizontalSpan(2);
        }
        con.setWidthPercentage(33);
        return con;
    }
};
hi.add(BorderLayout.CENTER, table);
Table with spanning and fixed widths to 33%
Figure 215. Table with spanning & fixed widths to 33%

In order to customize the table cell behavior you can derive the Table to create a "renderer like" widget, however unlike the list this component is "kept" and used as is. This means you can bind listeners to this component and work with it as you would with any other component in Codename One.

So lets fix the example above to include far more capabilities:

Table table = new Table(model) {
    @Override
    protected Component createCell(Object value, int row, int column, boolean editable) { (1)
        Component cell;
        if(row == 1 && column == 1) {  (2)
            Picker p = new Picker();
            p.setType(Display.PICKER_TYPE_STRINGS);
            p.setStrings("Row B can now stretch", "This is a good value", "So Is This", "Better than text field");
            p.setSelectedString((String)value);  (3)
            p.setUIID("TableCell");
            p.addActionListener((e) -> getModel().setValueAt(row, column, p.getSelectedString()));  (4)
            cell = p;
        } else {
            cell = super.createCell(value, row, column, editable);
        }
        if(row > -1 && row % 2 == 0) {  (5)
            // pinstripe effect
            cell.getAllStyles().setBgColor(0xeeeeee);
            cell.getAllStyles().setBgTransparency(255);
        }
        return cell;
    }

    @Override
    protected TableLayout.Constraint createCellConstraint(Object value, int row, int column) {
        TableLayout.Constraint con =  super.createCellConstraint(value, row, column);
        if(row == 1 && column == 1) {
            con.setHorizontalSpan(2);
        }
        con.setWidthPercentage(33);
        return con;
    }
};
1The createCell method is invoked once per component but is similar conceptually to the List renderer. Notice that it doesn’t return a "rubber stamp" though, it returns a full component.
2You apply the picker to one cell for simplicities sake.
3You need to set the value of the component manually, this is crucial since the Table doesn’t "see" this.
4You need to track the event and update the model in this case as the Table isn’t aware of the data change.
5You set the "pinstripe" effect by coloring even rows. Notice that unlike renderers you need to apply the coloring once as the Components are stateful.
Table with customize cells using the pinstripe effect
Figure 216. Table with customize cells using the pinstripe effect
Picker table cell during edit
Figure 217. Picker table cell during edit

To line wrap table cells you can override the createCell method and return a TextArea instead of a TextField since the TextArea defaults to the multi-line behavior this should work seamlessly. For example:

Form hi = new Form("Table", new BorderLayout());
TableModel model = new DefaultTableModel(new String[] {"Col 1", "Col 2", "Col 3"}, new Object[][] {
    {"Row 1", "Row A", "Row X"},
    {"Row 2", "Row B can now stretch very long line that should span multiple rows as much as possible", "Row Y"},
    {"Row 3", "Row C", "Row Z"},
    {"Row 4", "Row D", "Row K"},
    }) {
        public boolean isCellEditable(int row, int col) {
            return col != 0;
        }
    };
Table table = new Table(model) {
    @Override
    protected Component createCell(Object value, int row, int column, boolean editable) {
        TextArea ta = new TextArea((String)value);
        ta.setUIID("TableCell");
        return ta;
    }

    @Override
    protected TableLayout.Constraint createCellConstraint(Object value, int row, int column) {
        TableLayout.Constraint con =  super.createCellConstraint(value, row, column);
        con.setWidthPercentage(33);
        return con;
    }
};
hi.add(BorderLayout.CENTER, table);
hi.show();
Notice that you don’t need to do anything else as binding to the TextArea is built-in to the Table.
You must set the column width constraint when you want multi-line to work. Otherwise the preferred size of the column might be too wide and the remaining columns might not have space left.
Multiline table cell in portrait mode
Figure 218. Multiline table cell in portrait mode
Multiline table cell in landscape mode. Notice the cell row count adapts seamlessly
Figure 219. Multiline table cell in landscape mode. Notice the cell row count adapts seamlessly

8.19.1. Sorting Tables

Sorting tables by clicking the titles is something that should generally work out of the box by using an API like setSortSupported(true).

Form hi = new Form("Table", new BorderLayout());
TableModel model = new DefaultTableModel(new String[] {"Col 1", "Col 2", "Col 3"}, new Object[][] {
    {"Row 1", "Row A", 1},
    {"Row 2", "Row B", 4},
    {"Row 3", "Row C", 7.5},
    {"Row 4", "Row D", 2.24},
    });
Table table = new Table(model);
table.setSortSupported(true);
hi.add(BorderLayout.CENTER, table);
hi.add(NORTH, new Button("Button"));
hi.show();

Notice this works with numbers, Strings and might work with dates but you can generally support any object type by overriding the method protected Comparator createColumnSortComparator(int column) which should return a comparator for your custom object type in the column.

8.20. Tree

Tree allows displaying hierarchical data such as folders and files in a collapsible/expandable UI. Like the Table it’s a composite component (but it isn’t a lead component). Like the Table it works in consort with a model to construct its user interface on the fly but doesn’t use a stateless renderer (as List does).

The data of the Tree arrives from a model model for example: this:

class StringArrayTreeModel implements TreeModel {
    String[][] arr = new String[][] {
            {"Colors", "Letters", "Numbers"},
            {"Red", "Green", "Blue"},
            {"A", "B", "C"},
            {"1", "2", "3"}
        };

    public Vector getChildren(Object parent) {
        if(parent == null) {
            Vector v = new Vector();
            for(int iter = 0 ; iter < arr[0].length ; iter++) {
                v.addElement(arr[0][iter]);
            }
            return v;
        }
        Vector v = new Vector();
        for(int iter = 0 ; iter < arr[0].length ; iter++) {
            if(parent == arr[0][iter]) {
                if(arr.length > iter + 1 && arr[iter + 1] != null) {
                    for(int i = 0 ; i < arr[iter + 1].length ; i++) {
                        v.addElement(arr[iter + 1][i]);
                    }
                }
            }
        }
        return v;
    }

    public boolean isLeaf(Object node) {
        Vector v = getChildren(node);
        return v == null || v.size() == 0;
    }
}

Tree dt = new Tree(new StringArrayTreeModel());

Will result in this:

Tree
Figure 220. Tree
Since Tree is hierarchy based you can’t have a simple model like you’ve for the Table as deep hierarchy is harder to represent with arrays.

A more practical "real world" example would be working with XML data. You can use something like this to show an XML Tree:

Form hi = new Form("XML Tree", new BorderLayout());
InputStream is = Display.getInstance().getResourceAsStream(getClass(), "/build.xml");
try(Reader r = new InputStreamReader(is, "UTF-8");) {
    Element e = new XMLParser().parse(r);
    Tree xmlTree = new Tree(new XMLTreeModel(e)) {
        @Override
        protected String childToDisplayLabel(Object child) {
            if(child instanceof Element) {
                return ((Element)child).getTagName();
            }
            return child.toString();
        }
    };
    hi.add(BorderLayout.CENTER, xmlTree);
} catch(IOException err) {
    Log.e(err);
}
The try(Stream) syntax is a try with resources clogic that implicitly closes the stream.
XML Tree
Figure 221. XML Tree

The model for the XML hierarchy is implemented as such:

class XMLTreeModel implements TreeModel {
    private Element root;
    public XMLTreeModel(Element e) {
        root = e;
    }

    public Vector getChildren(Object parent) {
        if(parent == null) {
            Vector c = new Vector();
            c.addElement(root);
            return c;
        }
        Vector result = new Vector();
        Element e = (Element)parent;
        for(int iter = 0 ; iter < e.getNumChildren() ; iter++) {
            result.addElement(e.getChildAt(iter));
        }
        return result;
    }

    public boolean isLeaf(Object node) {
        Element e = (Element)node;
        return e.getNumChildren() == 0;
    }
}

8.21. ShareButton

ShareButton is a button you can add into the UI to let a user share an image or block of text.

The ShareButton uses a set of predefined share options on the simulator. On Android & iOS the ShareButton is mapped to the OS native sharing functionality and can share the image/text with the services configured on the device (for example: Twitter, Facebook etc.).

Sharing text is trivial but to share an image you need to save it to the FileSystemStorage. Notice that saving to Storage won’t work!

In the sample code below you take a screenshot which is saved to FileSystemStorage for sharing:

Form hi = new Form("ShareButton");
ShareButton sb = new ShareButton();
sb.setText("Share Screenshot");
hi.add(sb);

Image screenshot = Image.createImage(hi.getWidth(), hi.getHeight());
hi.revalidate();
hi.setVisible(true);
hi.paintComponent(screenshot.getGraphics(), true);

String imageFile = FileSystemStorage.getInstance().getAppHomePath() + "screenshot.png";
try(OutputStream os = FileSystemStorage.getInstance().openOutputStream(imageFile);) {
    ImageIO.getImageIO().save(screenshot, os, ImageIO.FORMAT_PNG, 1);
} catch(IOException err) {
    Log.e(err);
}
sb.setImageToShare(imageFile, "image/png");
The share button running on the simulator
Figure 222. The share button running on the simulator
ShareButton behaves differently on the device…​
The share button running on the Android device and screenshot sent into twitter
Figure 223. The share button running on the Android device and screenshot sent into twitter
The ShareButton features some share service classes to allow plugging in additional share services. For example, this functionality is relevant to devices where native sharing isn’t supported. So this code isn’t used on iOS/Android…​

8.22. Tabs

The Tabs Container arranges components into groups within "tabbed" containers. Tabs is a container type that allows leafing through its children using labeled toggle buttons. The tabs can be placed in many different ways (top, bottom, left or right) with the default being determined by the platform. This class also allows swiping between components to leaf between said tabs (for this purpose the tabs themselves can also be hidden).

Since Tabs are a Container its a common mistake to try and add a Tab using the add method. That method won’t work since a Tab can have both an Image and text String associated with it.

Form hi = new Form("Tabs", new BorderLayout());

Tabs t = new Tabs();
Style s = UIManager.getInstance().getComponentStyle("Tab");
FontImage icon1 = FontImage.createMaterial(FontImage.MATERIAL_QUESTION_ANSWER, s);

Container container1 = BoxLayout.encloseY(new Label("Label1"), new Label("Label2"));
t.addTab("Tab1", icon1, container1);
t.addTab("Tab2", new SpanLabel("Some text directly in the tab"));

hi.add(BorderLayout.CENTER, t);
Simple usage of Tabs
Figure 224. Simple usage of Tabs

A common usage for Tabs is the the swipe to proceed effect which is common in iOS applications. In the code below you use RadioButton and LayeredLayout with hidden tabs to produce that effect:

Form hi = new Form("Swipe Tabs", new LayeredLayout());
Tabs t = new Tabs();
t.hideTabs();

Style s = UIManager.getInstance().getComponentStyle("Button");
FontImage radioEmptyImage = FontImage.createMaterial(FontImage.MATERIAL_RADIO_BUTTON_UNCHECKED, s);
FontImage radioFullImage = FontImage.createMaterial(FontImage.MATERIAL_RADIO_BUTTON_CHECKED, s);
((DefaultLookAndFeel)UIManager.getInstance().getLookAndFeel()).setRadioButtonImages(radioFullImage, radioEmptyImage, radioFullImage, radioEmptyImage);

Container container1 = BoxLayout.encloseY(new Label("Swipe the tab to see more"),
        new Label("You can put anything here"));
t.addTab("Tab1", container1);
t.addTab("Tab2", new SpanLabel("Some text directly in the tab"));

RadioButton firstTab = new RadioButton("");
RadioButton secondTab = new RadioButton("");
firstTab.setUIID("Container");
secondTab.setUIID("Container");
new ButtonGroup(firstTab, secondTab);
firstTab.setSelected(true);
Container tabsFlow = FlowLayout.encloseCenter(firstTab, secondTab);

hi.add(t);
hi.add(BorderLayout.south(tabsFlow));

t.addSelectionListener((i1, i2) -> {
    switch(i2) {
        case 0:
            if(!firstTab.isSelected()) {
                firstTab.setSelected(true);
            }
            break;
        case 1:
            if(!secondTab.isSelected()) {
                secondTab.setSelected(true);
            }
            break;
     }
});
Swipeable Tabs with an iOS carousel effect page 1
Figure 225. Swipeable Tabs with an iOS carousel effect page 1
Swipeable Tabs with an iOS carousel effect page 2
Figure 226. Swipeable Tabs with an iOS carousel effect page 2
Notice that you used setRadioButtonImages to explicitly set the radio button images to the look you want for the carousel.

8.23. MediaManager & MediaPlayer

MediaPlayer is a peer component, understanding this is crucial if your application depends on such a component. You can learn about peer components and their issues here.

The MediaPlayer allows you to control video playback. To use the MediaPlayer you need to first load the Media object from the MediaManager.

The MediaManager is the core class responsible for media interaction in Codename One.

You should also check out the Capture class for things that aren’t covered by the MediaManager.

In the demo code below you use the gallery functionality to pick a video from the device’s video gallery.

final Form hi = new Form("MediaPlayer", new BorderLayout());
hi.setToolbar(new Toolbar());
Style s = UIManager.getInstance().getComponentStyle("Title");
FontImage icon = FontImage.createMaterial(FontImage.MATERIAL_VIDEO_LIBRARY, s);
hi.getToolbar().addCommandToRightBar("", icon, (evt) -> {
    Display.getInstance().openGallery((e) -> {
        if(e != null && e.getSource() != null) {
            String file = (String)e.getSource();
            try {
                Media video = MediaManager.createMedia(file, true);
                hi.removeAll();
                hi.add(BorderLayout.CENTER, new MediaPlayer(video));
                hi.revalidate();
            } catch(IOException err) {
                Log.e(err);
            }
        }
    }, Display.GALLERY_VIDEO);
});
hi.show();
Video playback running on the simulator
Figure 227. Video playback running on the simulator
Video playback running on an Android device. Notice the native playback controls that appear when the video is tapped
Figure 228. Video playback running on an Android device. Notice the native playback controls that appear when the video is tapped
Video playback in the simulator will work with JavaFX enabled. This is the default for Java 8 or newer so recommend using that.

8.24. ImageViewer

The ImageViewer allows you to inspect, zoom and pan into an image. It also allows swiping between images if you’ve a set of images (using an image list model).

The ImageViewer is a complex rich component designed for user interaction. If you want to display an image use Label if you want the image to scale seamlessly use ScaleImageLabel.

You can use the ImageViewer as a tool to view a single image which allows you to zoom in/out to that image as such:

Form hi = new Form("ImageViewer", new BorderLayout());
ImageViewer iv = new ImageViewer(duke);
hi.add(BorderLayout.CENTER, iv);
You can simulate pinch to zoom on the simulator by dragging the right button away from the top left corner to zoom in and towards the top left corner to zoom out. On Mac touchpads you can drag two fingers to achieve that.
ImageViewer as the demo loads with the image from the default icon
Figure 229. ImageViewer as the demo loads with the image from the default icon
ImageViewer zoomed in
Figure 230. ImageViewer zoomed in

You can work with a list of images to produce a swiping effect for the image viewer where you can swipe from one image to the next and also zoom in/out on a specific image:

Form hi = new Form("ImageViewer", new BorderLayout());

Image red = Image.createImage(100, 100, 0xffff0000);
Image green = Image.createImage(100, 100, 0xff00ff00);
Image blue = Image.createImage(100, 100, 0xff0000ff);
Image gray = Image.createImage(100, 100, 0xffcccccc);

ImageViewer iv = new ImageViewer(red);
iv.setImageList(new DefaultListModel<>(red, green, blue, gray));
hi.add(BorderLayout.CENTER, iv);
An ImageViewer with many elements is indistinguishable from a single ImageViewer with the exception of swipe
Figure 231. An ImageViewer with many elements is indistinguishable from a single ImageViewer with the exception of swipe

Notice that you use a ListModel to allow swiping between images.

From Codename One 9.0, ImageViewer also supports optional side arrows (material font icons) and an optional thumbnail strip for direct image navigation:

ImageViewer iv = new ImageViewer(red);
iv.setImageList(new DefaultListModel<>(red, green, blue, gray));
iv.setNavigationArrowsVisible(true);
iv.setThumbnailsVisible(true);
iv.setThumbnailBarHeight(6f); // Optional, defaults to 6mm

When arrows are enabled, tapping near the left/right edge will move to the previous/next image. When thumbnails are enabled, tapping a thumbnail jumps directly to that image.

All three options can be configured with theme constants (using the ImageViewer UIID prefix):

  • imageviewerNavigationArrowsBool=true|false

  • imageviewerThumbnailsBool=true|false

  • imageviewerThumbnailBarHeightMM=<floating point millimeters>

EncodedImage’s aren’t always fully loaded and so when you swipe if the images are large you might see delays!

You can dynamically download images directly into the ImageViewer with a custom list model like this:

Form hi = new Form("ImageViewer", new BorderLayout());
final EncodedImage placeholder = EncodedImage.createFromImage(
        FontImage.createMaterial(FontImage.MATERIAL_SYNC, s).
                scaled(300, 300), false);

class ImageList implements ListModel<Image> {
    private int selection;
    private String[] imageURLs = {
        "http://awoiaf.westeros.org/images/thumb/9/93/AGameOfThrones.jpg/300px-AGameOfThrones.jpg",
        "http://awoiaf.westeros.org/images/thumb/3/39/AClashOfKings.jpg/300px-AClashOfKings.jpg",
        "http://awoiaf.westeros.org/images/thumb/2/24/AStormOfSwords.jpg/300px-AStormOfSwords.jpg",
        "http://awoiaf.westeros.org/images/thumb/a/a3/AFeastForCrows.jpg/300px-AFeastForCrows.jpg",
        "http://awoiaf.westeros.org/images/7/79/ADanceWithDragons.jpg"
    };
    private Image[] images;
    private EventDispatcher listeners = new EventDispatcher();

    public ImageList() {
        this.images = new EncodedImage[imageURLs.length];
    }

    public Image getItemAt(final int index) {
        if(images[index] == null) {
            images[index] = placeholder;
            Util.downloadUrlToStorageInBackground(imageURLs[index], "list" + index, (e) -> {
                    try {
                        images[index] = EncodedImage.create(Storage.getInstance().createInputStream("list" + index));
                        listeners.fireDataChangeEvent(index, DataChangedListener.CHANGED);
                    } catch(IOException err) {
                        err.printStackTrace();
                    }
            });
        }
        return images[index];
    }

    public int getSize() {
        return imageURLs.length;
    }

    public int getSelectedIndex() {
        return selection;
    }

    public void setSelectedIndex(int index) {
        selection = index;
    }

    public void addDataChangedListener(DataChangedListener l) {
        listeners.addListener(l);
    }

    public void removeDataChangedListener(DataChangedListener l) {
        listeners.removeListener(l);
    }

    public void addSelectionListener(SelectionListener l) {
    }

    public void removeSelectionListener(SelectionListener l) {
    }

    public void addItem(Image item) {
    }

    public void removeItem(int index) {
    }
};

ImageList imodel = new ImageList();

ImageViewer iv = new ImageViewer(imodel.getItemAt(0));
iv.setImageList(imodel);
hi.add(BorderLayout.CENTER, iv);
Dynamically fetching an image URL from the internet
Figure 232. Dynamically fetching an image URL from the internet [5]

This fetches the images in the URL asynchronously and fires a data change event when the data arrives to automatically refresh the ImageViewer when that happens.

8.25. ScaleImageLabel & ScaleImageButton

ScaleImageLabel & ScaleImageButton allow you to position an image that will grow/shrink to fit available space. In that sense they differ from Label & Button which keeps the image at the same size.

The default UIID of ScaleImageLabel is “Label”, however the default UIID of ScaleImageButton is “ScaleImageButton”. The reasoning for the difference is that the “Button” UIID includes a border and a lot of legacy.

You can use ScaleImageLabel/ScaleImageButton interchangeably. The major difference between these components is the buttons ability to handle click events/focus.

Here is a simple example that also shows the difference between the scale to fill and scale to fit modes:

TableLayout tl = new TableLayout(2, 2);
Form hi = new Form("ScaleImageButton/Label", tl);
Style s = UIManager.getInstance().getComponentStyle("Button");
Image icon = FontImage.createMaterial(FontImage.MATERIAL_WARNING, s);
ScaleImageLabel fillLabel = new ScaleImageLabel(icon);
fillLabel.setBackgroundType(Style.BACKGROUND_IMAGE_SCALED_FILL);
ScaleImageButton fillButton = new ScaleImageButton(icon);
fillButton.setBackgroundType(Style.BACKGROUND_IMAGE_SCALED_FILL);
hi.add(tl.createConstraint().widthPercentage(20), new ScaleImageButton(icon)).
        add(tl.createConstraint().widthPercentage(80), new ScaleImageLabel(icon)).
        add(fillLabel).
        add(fillButton);
hi.show();
ScaleImageLabel/Button the top row includes scale to fit versions (the default) whereas the bottom row includes the scale to fill versions
Figure 233. ScaleImageLabel/Button, the top row includes scale to fit versions (the default) whereas the bottom row includes the scale to fill versions
When styling these components keep in mind that changing attributes such as background behavior might cause an issue with their functionality or might not work.

8.26. Toolbar

The Toolbar API provides deep customization of the title bar area with more flexibility for example: placing a TextField for search or buttons in arbitrary title area positions. The Toolbar API replicates some of the native functionality available on Android/iOS and integrates with features such as the side menu to provide fine grained control over the title area behavior.

The Toolbar needs to be installed into the Form in order for it to work. You can setup the Toolbar in one of these three ways:

  1. form.setToolbar(new Toolbar()); - allows you to activate the Toolbar to a specific Form and not for the entire application

  2. Toolbar.setGlobalToolbar(true); - enables the Toolbar for all the forms in the app

  3. Theme constant globalToobarBool - this is equivalent to Toolbar.setGlobalToolbar(true);

The basic functionality of the Toolbar includes the ability to add a command to the following 4 places:

  • Left side of the title - addCommandToLeftBar

  • Right side of the title - addCommandToRightBar

  • Side menu bar (the drawer that opens when you click the icon on the top left or swipe the screen from left to right) - addCommandToSideMenu

  • Overflow menu (the menu that opens when you tap the 3 vertical dots in the top right corner) - addCommandToOverflowMenu

The code below provides a brief overview of these options:

Toolbar.setGlobalToolbar(true);

Form hi = new Form("Toolbar", new BoxLayout(BoxLayout.Y_AXIS));
hi.getToolbar().addCommandToLeftBar("Left", icon, (e) -> Log.p("Clicked"));
hi.getToolbar().addCommandToRightBar("Right", icon, (e) -> Log.p("Clicked"));
hi.getToolbar().addCommandToOverflowMenu("Overflow", icon, (e) -> Log.p("Clicked"));
hi.getToolbar().addCommandToSideMenu("Sidemenu", icon, (e) -> Log.p("Clicked"));
hi.show();
The Toolbar
Figure 234. The Toolbar
The default sidemenu of the Toolbar
Figure 235. The default sidemenu of the Toolbar
The overflow menu of the Toolbar
Figure 236. The overflow menu of the Toolbar

Normally you can set a title with a String but if you would want the component to be a text field or a multi line label you can use setTitleComponent(Component) which allows you to install any component into the title area.

The code below demonstrates searching using custom code however the Toolbar also has built-in support for search covered in the next section

The customization of the title area allows for some pretty powerful UI effects for example: the code below allows searching dynamically within a set of entries and uses some neat tricks:

Toolbar.setGlobalToolbar(true);
Style s = UIManager.getInstance().getComponentStyle("Title");

Form hi = new Form("Toolbar", new BoxLayout(BoxLayout.Y_AXIS));
TextField searchField = new TextField("", "Toolbar Search"); (1)
searchField.getHintLabel().setUIID("Title");
searchField.setUIID("Title");
searchField.getAllStyles().setAlignment(Component.LEFT);
hi.getToolbar().setTitleComponent(searchField);
FontImage searchIcon = FontImage.createMaterial(FontImage.MATERIAL_SEARCH, s);
searchField.addDataChangeListener((i1, i2) -> { (2)
    String t = searchField.getText();
    if(t.length() < 1) {
        for(Component cmp : hi.getContentPane()) {
            cmp.setHidden(false);
            cmp.setVisible(true);
        }
    } else {
        t = t.toLowerCase();
        for(Component cmp : hi.getContentPane()) {
            String val = null;
            if(cmp instanceof Label) {
                val = ((Label)cmp).getText();
            } else {
                if(cmp instanceof TextArea) {
                    val = ((TextArea)cmp).getText();
                } else {
                    val = (String)cmp.getPropertyValue("text");
                }
            }
            boolean show = val != null && val.toLowerCase().indexOf(t) > -1;
            cmp.setHidden(!show); (3)
            cmp.setVisible(show);
        }
    }
    hi.getContentPane().animateLayout(250);
});
hi.getToolbar().addCommandToRightBar("", searchIcon, (e) -> {
    searchField.startEditingAsync(); (4)
});

hi.add("A Game of Thrones").
        add("A Clash Of Kings").
        add("A Storm Of Swords").
        add("A Feast For Crows").
        add("A Dance With Dragons").
        add("The Winds of Winter").
        add("A Dream of Spring");
hi.show();
1You use a TextField the whole time and style it to make it (and its hint) look like a regular title. An alternative way is to replace the title component dynamically.
2You use the DataChangeListener to update the search results as you type them.
3Hidden & Visible use the opposite flag values to say similar things (for example: when hidden is set to false you would want to set visible to true).
Visible indicates whether a component can be seen. It will still occupy the physical space on the screen even when it isn’t visible. Hidden will remove the space occupied by the component from the screen, but some code might still try to paint it. Normally, visible is redundant but you use it with hidden for good measure.
4The search button is totally unnecessary here. You can click the TextField!
For example, that isn’t intuitive to most users so you added the button to start editing.
Search field within the toolbar
Figure 237. Search field within the toolbar
Search field after typing a couple of letters
Figure 238. Search field after typing a couple of letters

8.26.1. Search Mode

While you can implement search manually using the built-in search offers a simpler and more uniform UI.

built-in toolbar search functionality
Figure 239. built-in toolbar search functionality

You can customize the appearance of the search bar by using the UIID’s: ToolbarSearch, TextFieldSearch & TextHintSearch.

In the sample below you fetch all the contacts from the device and enable search thru them, notice it expects and image called duke.png which is the default Codename One icon renamed and placed in the src folder:

Image duke = null;
try {
    duke = Image.createImage("/duke.png");
} catch(IOException err) {
    Log.e(err);
}
int fiveMM = Display.getInstance().convertToPixels(5);
final Image finalDuke = duke.scaledWidth(fiveMM);
Toolbar.setGlobalToolbar(true);
Form hi = new Form("Search", BoxLayout.y());
hi.add(new InfiniteProgress());
Display.getInstance().scheduleBackgroundTask(()-> {
    // this will take a while...
    Contact[] cnts = Display.getInstance().getAllContacts(true, true, true, true, false, false);
    Display.getInstance().callSerially(() -> {
        hi.removeAll();
        for(Contact c : cnts) {
            MultiButton m = new MultiButton();
            m.setTextLine1(c.getDisplayName());
            m.setTextLine2(c.getPrimaryPhoneNumber());
            Image pic = c.getPhoto();
            if(pic != null) {
                m.setIcon(fill(pic, finalDuke.getWidth(), finalDuke.getHeight()));
            } else {
                m.setIcon(finalDuke);
            }
            hi.add(m);
        }
        hi.revalidate();
    });
});

hi.getToolbar().addSearchCommand(e -> {
    String text = (String)e.getSource();
    if(text == null || text.length() == 0) {
        // clear search
        for(Component cmp : hi.getContentPane()) {
            cmp.setHidden(false);
            cmp.setVisible(true);
        }
        hi.getContentPane().animateLayout(150);
    } else {
        text = text.toLowerCase();
        for(Component cmp : hi.getContentPane()) {
            MultiButton mb = (MultiButton)cmp;
            String line1 = mb.getTextLine1();
            String line2 = mb.getTextLine2();
            boolean show = line1 != null && line1.toLowerCase().indexOf(text) > -1 ||
                    line2 != null && line2.toLowerCase().indexOf(text) > -1;
            mb.setHidden(!show);
            mb.setVisible(show);
        }
        hi.getContentPane().animateLayout(150);
    }
}, 4);

hi.show();

8.26.2. South Component

A common feature in side menu bar is the ability to add a component to the "south" part of the side menu.

Notice that this feature works with the on-top and permanent versions of the side menu and not with the legacy versions:

toolbar.setComponentToSideMenuSouth(myComponent);

This places the component below the side menu bar. Notice that this component controls its entire UIID & is separate from the SideNavigationPanel UIID so if you set that component you might want to place it within a container that has the SideNavigationPanel UIID so it will blend with the rest of the UI.

8.26.3. Title Animations

Modern UI’s often animate the title upon scrolling to balance the highly functional smaller title advantage with the gorgeous large image based title. This is pretty easy to do with the Toolbar API thru the Title animation API.

The code below shows off an attractive title based on a book by GRRM on top of text [6] that’s scrollable. As the text is scrolled the title fades out.

Toolbar.setGlobalToolbar(true);

Form hi = new Form("Toolbar", new BoxLayout(BoxLayout.Y_AXIS));
EncodedImage placeholder = EncodedImage.createFromImage(Image.createImage(hi.getWidth(), hi.getWidth() / 5, 0xffff0000), true);
URLImage background = URLImage.createToStorage(placeholder, "400px-AGameOfThrones.jpg",
        "http://awoiaf.westeros.org/images/thumb/9/93/AGameOfThrones.jpg/400px-AGameOfThrones.jpg");
background.fetch();
Style stitle = hi.getToolbar().getTitleComponent().getUnselectedStyle();
stitle.setBgImage(background);
stitle.setBackgroundType(Style.BACKGROUND_IMAGE_SCALED_FILL);
stitle.setPaddingUnit(Style.UNIT_TYPE_DIPS, Style.UNIT_TYPE_DIPS, Style.UNIT_TYPE_DIPS, Style.UNIT_TYPE_DIPS);
stitle.setPaddingTop(15);
SpanButton credit = new SpanButton("This excerpt is from A Wiki Of Ice And Fire. Please check it out by clicking here!");
credit.addActionListener((e) -> Display.getInstance().execute("http://awoiaf.westeros.org/index.php/A_Game_of_Thrones"));
hi.add(new SpanLabel("A Game of Thrones is the first of seven planned novels in A Song of Ice and Fire, an epic fantasy series by American author George R. R. Martin. It was first published on 6 August 1996. The novel was nominated for the 1998 Nebula Award and the 1997 World Fantasy Award,[1] and won the 1997 Locus Award.[2] The novella Blood of the Dragon, comprising the Daenerys Targaryen chapters from the novel, won the 1997 Hugo Award for Best Novella. ")).
        add(new Label("Plot introduction", "Heading")).
        add(new SpanLabel("A Game of Thrones is set in the Seven Kingdoms of Westeros, a land reminiscent of Medieval Europe. In Westeros the seasons last for years, sometimes decades, at a time.\n\n" +
            "Fifteen years prior to the novel, the Seven Kingdoms were torn apart by a civil war, known alternately as \"Robert's Rebellion\" and the \"War of the Usurper.\" Prince Rhaegar Targaryen kidnapped Lyanna Stark, arousing the ire of her family and of her betrothed, Lord Robert Baratheon (the war's titular rebel). The Mad King, Aerys II Targaryen, had Lyanna's father and eldest brother executed when they demanded her safe return. Her second brother, Eddard, joined his boyhood friend Robert Baratheon and Jon Arryn, with whom they had been fostered as children, in declaring war against the ruling Targaryen dynasty, securing the allegiances of House Tully and House Arryn through a network of dynastic marriages (Lord Eddard to Catelyn Tully and Lord Arryn to Lysa Tully). The powerful House Tyrell continued to support the King, but House Lannister and House Martell both stalled due to insults against their houses by the Targaryens. The civil war climaxed with the Battle of the Trident, when Prince Rhaegar was killed in battle by Robert Baratheon. The Lannisters finally agreed to support King Aerys, but then brutally... ")).
        add(credit);

ComponentAnimation title = hi.getToolbar().getTitleComponent().createStyleAnimation("Title", 200);
hi.getAnimationManager().onTitleScrollAnimation(title);
hi.show();
The Toolbar starts with the large URLImage fetched from the web
Figure 240. The Toolbar starts with the large URLImage fetched from the web
As you scroll down the image fades and the title shrinks in size returning to the default UIID look
Figure 241. As you scroll down the image fades and the title shrinks in size returning to the default UIID look
As scrolling continues the title reaches standard size
Figure 242. As scrolling continues the title reaches standard size

Almost all of the code above creates the "look" of the application. The key piece of code above is this:

ComponentAnimation title = hi.getToolbar().getTitleComponent().createStyleAnimation("Title", 200);
hi.getAnimationManager().onTitleScrollAnimation(title);

In the first line you create a style animation that will translate the style from the current settings to the destination UIID (the first argument) within 200 pixels of scrolling. You then bind this animation to the title scrolling animation event.

8.27. BrowserComponent & WebBrowser

BrowserComponent is a peer component, understanding this is crucial if your application depends on such a component. You can learn about peer components and their issues here.

The WebBrowser component shows the native device web browser when supported by the device and the HTMLComponent when the web browser isn’t supported on the given device. If you intend to target smartphones you should use the BrowserComponent directly instead of the WebBrowser.

The BrowserComponent can point at an arbitrary URL to load it:

Form hi = new Form("Browser", new BorderLayout());
BrowserComponent browser = new BrowserComponent();
browser.setURL("https://www.codenameone.com/");
hi.add(BorderLayout.CENTER, browser);
Browser Component showing the Codename One website on the simulator
Figure 243. Browser Component showing the Codename One website on the simulator
The scrollbars appear in the simulator, device versions of the browser component act differently and support touch scrolling.
A BrowserComponent should be in the center of a BorderLayout. Otherwise its preferred size might be zero before the HTML finishes loading/layout in the native layer and layout might be incorrect as a result.

You can use WebBrowser and BrowserComponent interchangeably for most basic usage. For example, if you need access to JavaScript or native browser functionality then there is no use in going thru the WebBrowser abstraction.

The BrowserComponent has full support for executing local web pages from within the jar. The basic support uses the jar:/// URL as such:

BrowserComponent wb = new BrowserComponent();
wb.setURL("jar:///Page.html");
On Android a native indicator might show up when the web page is loading. This can be disabled using the Display.getInstance().setProperty("WebLoadingHidden", "true"); call. You need to invoke this once.

8.27.1. BrowserComponent Hierarchy

When Codename One packages applications into native apps it hides a lot of details to make the process simpler. One of the things hidden is the fact that you aren’t dealing with a JAR anymore, so getResource/getResourceAsStream are problematic…​ Both of these API’s support hierarchies and a concept of package relativity both of which might not be supported on all OS’s.

Codename One has its own getResourceAsSteam in the Display class and that works fine, but it requires that all files be in the src root directory.

that’s why recommend that you place files inside res files. A resource file allows you to add arbitrary data files and you can have as many resource files as you need.

For web developers this isn’t enough since hierarchies are used often to represent the various dependencies, this means that many links & references are relative. To work with such hierarchies place all of your resources in a hierarchy under the html package in the project source directory (src/html). The build server will tar the entire content of that package and add an html.tar file into the native package. This tar is seamlessly extracted on the device when you actually need the resources and with new application versions (not on every launch). So assuming the resources are under the html root package they can be displayed with code like this:

try {
    browserComponent.setURLHierarchy("/htmlFile.html");
} catch(IOException err) {
    ...
}

Notice that the path is relative to the html directory and starts with / but inside the HTML files you should use relative (not absolute) paths.

Also notice that an IOException can be thrown due to the process of untarring. Its unlikely to happen but is entirely possible.

8.27.2. NavigationCallback

At the core of the BrowserComponent you’ve the BrowserNavigationCallback. It might not seem like the most important interface within the browser but it’s the "glue" that allows the JavaScript code to communicate back into the Java layer.

You can bind a BrowserNavigationCallback by invoking setBrowserNavigationCallback on the BrowserComponent. At that point with every navigation within the browser the callback will get invoked.

The shouldNavigate method from the BrowserNavigationCallback is invoked in a native thread and NOT ON THE EDT!
it’s crucial that this method returns immediately and that it won’t do any changes on the UI.

The shouldNavigate indicates to the native code whether navigation should proceed or not. For example: if a user clicks a specific link you might choose to do something in the Java code so you can return false and block the navigation. You can invoke callSerially to do the actual task in the Java side.

Form hi = new Form("BrowserComponent", new BorderLayout());
BrowserComponent bc = new BrowserComponent();
bc.setPage( "<html lang=\"en\">\n" +
            "    <head>\n" +
            "        <meta charset=\"utf-8\">\n" +
            "        <script>\n" +
            "          function  fnc(message) {\n" +
            "         document.write(message);\n" +
            "            };\n" +
            "        </script>\n" +
            "    </head>\n" +
            "    <body >\n" +
            "        <p><a href=\"http://click\">Demo</a></p>\n" +
            "    </body>\n" +
            "</html>", null);
hi.add(BorderLayout.CENTER, bc);
bc.setBrowserNavigationCallback((url) -> {
    if(url.startsWith("http://click")) {
        Display.getInstance().callSerially(() -> bc.execute("fnc('<p>You clicked!</p>')"));
        return false;
    }
    return true;
});
Before the link is clicked for the "shouldNavigate" call
Figure 244. Before the link is clicked for the "shouldNavigate" call
After the link is clicked for the "shouldNavigate" call
Figure 245. After the link is clicked for the "shouldNavigate" call
The JavaScript Bridge is implemented on top of the BrowserNavigationCallback.

8.27.3. JavaScript

The JavaScript bridge is sometimes confused with the JavaScript Port. The JavaScript bridge allows you to communicate with JavaScript from Java (and visa versa). The JavaScript port allows you to compile the Codename One application into a JavaScript application that runs in a standard web browser without code changes (think GWT without source changes and with thread support).+ You discuss the JavaScript port further later in the guide.

Codename One 4.0 introduced a new API for interacting with Javascript in Codename One. This API is part of the BrowserComponent class, and effectively replaces the com.codename1.javascript package, which is now deprecated.

So what was wrong with the old API?

The old API provided a synchronous wrapper around an inherently asynchronous process, and made extensive use of invokeAndBlock() underneath the covers. This resulted in a nice API with high-level abstractions that played nicely with a synchronous programming model, but it came with a price-tag in terms of performance, complexity, and predictability. Let’s take a simple example, getting a reference to the "window" object:

JSObject window = ctx.get("window");

This code looks harmless enough, but this is actually expensive. It issues a command to the BrowserComponent, and uses invokeAndBlock() to wait for the command to go through and send back a response. invokeAndBlock() is a magical tool that allows you to "block" without blocking the EDT, but it has its costs, and shouldn’t be overused. Most of the Codename One APIs that use invokeAndBlock() indicate this in their name. For example: Component.animateLayoutAndWait(). This provides you the expectation that this call could take some time, and helps to alert you to the underlying cost.

The problem with the ctx.get("window") call is that it looks the same as a call to Map.get(key). There’s no indication that this call is expensive and could take time. One call like this probably isn’t a big deal, but it doesn’t take long before you’ve dozens or even hundreds of calls like this littered throughout your codebase, and they can be hard to pick out.

The New API

The new API fully embraces the asynchronous nature of Javascript. It uses callbacks instead of return values, and provides convenience wrappers with the appropriate "AndWait()" naming convention to allow for synchronous usage. Let’s look at a simple example:

In all of the sample code below, you can assume that variables named bc represent an instance of BrowserComponent.
bc.execute(
    "callback.onSuccess(3+4)",
    res -> Log.p("The result was "+res.getInt())
);

This code should output "The result was 7" to the console. it’s fully asynchronous, so you can include this code anywhere without worrying about it "bogging down" your code. The full signature of this form of the execute() method is:

public void execute(String js, SuccessCallback<JSRef> callback)

The first parameter is a javascript expression. This javascript MUST call either callback.onSuccess(result) or callback.onError(message, errCode) at some point in order for your callback to be called.

The second parameter is your callback that’s executed from the javascript side, when callback.onSuccess(res) is called. The callback takes a single parameter of type JSRef which is a generic wrapper around a javascript variable. JSRef has accessors to retrieve the value as some of the primitive types. For example: getBoolean(), getDouble(), getInt(), toString(), and it provides some introspection through the getType() method.

it’s worth noting that the callback method can take a single parameter. If you need to pass many parameters, you may consider including them in a single string which you parse in your callback.
Synchronous Wrappers

As mentioned before, the new API also provides an executeAndWait() wrapper for execute() that will work synchronously. It, as its name suggests, uses invokeAndBlock under the hood so as not to block the EDT while it’s waiting.

For example:

JSRef res = bc.executeAndWait("callback.onSuccess(3+4)");
Log.p("The result was "+res.Int());

Prints "The result was 7".

When using the andWait() variant, it’s extremely important that your Javascript calls your callback method at some point - otherwise it will block indefinitely. You provide variants of executeAndWait() that include a timeout in case you want to hedge against this possibility.
Multi-use Callbacks

The callbacks you pass to execute() and executeAndWait() are single-use callbacks. You can’t, for example, store the callback variable on the javascript side for later use (for example: to respond to a button click event). If you need a "multi-use" callback, you should use the addJSCallback() method instead. Its usage looks identical to execute(), the difference is that the callback will life on after its first use. For example: Consider the following code:

bc.execute(
    "$('#somebutton').click(function(){callback.onSuccess('Button was clicked')})",
    res -> Log.p(res.toString())
);

The above example, assumes that jQuery is loaded in the webpage that you’re interacting with, and you’re adding a click handler to a button with ID "somebutton". The click handler calls your callback.

If you run this example, the first time the button is clicked, you’ll see "Button was clicked" printed to the console as expected. For example, the 2nd time, you’ll get an exception. This is because the callback passed to execute() is single-use.

You need to modify this code to use the addJSCallback() method as follows:

bc.addJSCallback(
    "$('#somebutton').click(function(){callback.onSuccess('Button was clicked')})",
    res -> Log.p(res.toString())
);

Now it will work no matter how many times the button is clicked.

Passing Parameters to Javascript

In many cases, the javascript expressions that you execute will include parameters from your java code. Properly escaping these parameters is tricky at worst, and annoying at best. For example: If you’re passing a string, you need to make sure that it escapes quotes and new lines properly or it will cause the javascript to have a syntax error. Luckily you provide variants of execute() and addJSCallback() that allow you to pass your parameters and have them automatically escaped.

For example, suppose you want to pass a string with text to set in a textarea within the webpage. You can do something like:

bc.execute(
    "jQuery('#bio').text(${0}); jQuery('#age').text(${1})",
    new Object[]{
       "A multi-line\n string with \"quotes\"",
       27
    }
);

The gist is that you embed placeholders in the javascript expression that are replaced by the corresponding entry in an array of parameters. The ${0} placeholder is replaced by the first item in the parameters array, the ${1} placeholder is replaced by the 2nd, and so on.

Proxy Objects

The new API also includes a JSProxy class that encapsulates a Javascript object simplify the getting and setting of properties on Javascript objects - and the calling of their methods. It provides essentially three core methods, along with many variants of each to allow for async or synchronous usages, parameters, and timeouts.

For example: You might want to create a proxy for the window.location object so that you can access its properties more easily from Java.

JSProxy location = bc.createJSProxy("window.location");

Then you can retrieve its properties using the get() method:

location.get("href", res -> Log.p("location.href="+res));

Or synchronously:

JSRef href = location.getAndWait("href");
Log.p("location.href="+href);

You can also set its properties:

location.set("href", "http://www.google.com");

And call its methods:

location.call("replace", new Object[]{"http://www.google.com"},
    res -> Log.p("Return value was "+res)
);
Legacy JSObject Support

This section describes the now deprecated JSObject approach. it’s here for reference by developers working with older code. You suggest using the new API when starting a new project.

BrowserComponent can communicate with the HTML code using JavaScript calls. For example: you can create HTML like this:

Form hi = new Form("BrowserComponent", new BorderLayout());
BrowserComponent bc = new BrowserComponent();
bc.setPage( "<html lang=\"en\">\n" +
            "    <head>\n" +
            "        <meta charset=\"utf-8\">\n" +
            "        <script>\n" +
            "          function  fnc(message) {\n" +
            "         document.write(message);\n" +
            "            };\n" +
            "        </script>\n" +
            "    </head>\n" +
            "    <body >\n" +
            "        <p>Demo</p>\n" +
            "    </body>\n" +
            "</html>", null);
TextField tf = new TextField();
hi.add(BorderLayout.CENTER, bc).
        add(BorderLayout.SOUTH, tf);
bc.addWebEventListener("onLoad", (e) ->  bc.execute("fnc('<p>Hello World</p>')"));
tf.addActionListener((e) -> bc.execute("fnc('<p>" + tf.getText() +"</p>')"));
hi.show();
JavaScript code was invoked to append text into the browser image above
Figure 246. JavaScript code was invoked to append text into the browser image above
Notice that opening an alert in an embedded native browser might not work

You use the execute method above to execute custom JavaScript code. You also have an executeAndReturnString method that allows you to receive a response value from the JavaScript side.

Coupled with shouldNavigate you can effectively do everything which is exactly what the JavaScript Bridge tries to do.

The JavaScript Bridge

While it’s possible to build everything on top of execute and shouldNavigate, both of these methods have their limits. that’s why you introduced the javascript package, it allows you to communicate with JavaScript using intuitive code/syntax.

The JavascriptContext class lays the foundation by enabling you to call JavaScript code directly from Java. It provides automatic type conversion between Java and JavaScript types as follows:

Table 5. Java to JavaScript
Java TypeJavascript Type

String

String

Double/Integer/Float/Long

Number

Boolean

Boolean

JSObject

Object

null

null

Other

Not Allowed

Table 6. JavaScript to Java
Javascript TypeJava Type

String

String

Number

Double

Boolean

Boolean

Object

JSObject

Function

JSObject

Array

JSObject

null

null

undefined

null

This conversion table is more verbose than necessary, since JavaScript functions and arrays are, in fact Objects themselves, so those rows are redundant. All JavaScript objects are converted to JSObject.

You can access JavaScript variables easily from the context by using code like this:

Form hi = new Form("BrowserComponent", new BorderLayout());
BrowserComponent bc = new BrowserComponent();
bc.setPage( "<html lang=\"en\">\n" +
            "    <head>\n" +
            "        <meta charset=\"utf-8\">\n" +
            "    </head>\n" +
            "    <body >\n" +
            "        <p>This will appear twice...</p>\n" +
            "    </body>\n" +
            "</html>", null);
hi.add(BorderLayout.CENTER, bc);
bc.addWebEventListener("onLoad", (e) -> {
    // Create a Javascript context for this BrowserComponent
    JavascriptContext ctx = new JavascriptContext(bc);

    String pageContent = (String)ctx.get("document.body.innerHTML");
    hi.add(BorderLayout.SOUTH, pageContent);
    hi.revalidate();
});
hi.show();
The contents was copied from the DOM and placed in the south position of the form
Figure 247. The contents was copied from the DOM and placed in the south position of the form

Notice that when you work with numeric values or anything related to the types mentioned above your code must be aware of the typing. For example: in this case the type is Double and not String:

Double outerWidth = (Double)ctx.get("window.outerWidth");

You can also query the context for objects and modify their value for example:

Form hi = new Form("BrowserComponent", new BorderLayout());
BrowserComponent bc = new BrowserComponent();
bc.setPage( "<html lang=\"en\">\n" +
            "    <head>\n" +
            "        <meta charset=\"utf-8\">\n" +
            "    </head>\n" +
            "    <body >\n" +
            "        <p>Please Wait...</p>\n" +
            "    </body>\n" +
            "</html>", null);
hi.add(BorderLayout.CENTER, bc);
bc.addWebEventListener("onLoad", (e) -> {
    // Create a Javascript context for this BrowserComponent
    JavascriptContext ctx = new JavascriptContext(bc);

    JSObject jo = (JSObject)ctx.get("window");
    jo.set("location", "https://www.codenameone.com/");
});

This code effectively navigates to the Codename One home page by fetching the DOM’s window object and setting its location property to https://www.codenameone.com/.

8.27.4. Cordova/PhoneGap Integration

PhoneGap was one of the first web app packager tools in the market. it’s a tool that’s effectively a browser component within a native wrapper coupled with native access API’s. Cordova is the open source extension of this popular project.

Codename One supports embedding PhoneGap/Cordova applications directly into Codename One applications. This is relatively easy to do with the BrowserComponent and JavaScript integration. The main aspect that this integration requires is support for Cordova plugins & its JavaScript API’s.

The effort to integrate Cordova/PhoneGap support into Codename One is handled within an open source github project here. The chief benefits of picking Codename One rather than using Cordova directly are:

  • Build Cloud

  • Better Native Code Support

  • Better Protection Of IP

  • IDE Integration Java - JavaScript - HTML

  • Easy, doesn’t Require A Mac, Automates Certificates/Signing

  • Migration To Java

This is discussed further in the original announcement.

8.28. AutoCompleteTextField

The AutoCompleteTextField allows you to write text into a text field and select a completion entry from the list in a similar way to a search engine.

This is easy to incorporate into your code, replace your usage of TextField with AutoCompleteTextField and define the data that the autocomplete should work from. There is a default implementation that accepts a String array or a ListModel for completion strings, this can work well for a "small" set of thousands (or tens of thousands) of entries.

For example: This is a trivial use case that can work well for smaller sample sizes:

Form hi = new Form("Auto Complete", new BoxLayout(BoxLayout.Y_AXIS));
AutoCompleteTextField ac = new AutoCompleteTextField("Short", "Shock", "Sholder", "Shrek");
ac.setMinimumElementsShownInPopup(5);
hi.add(ac);
Autocomplete Text Field
Figure 248. Autocomplete Text Field

For example, if you wish to query a database or a web service you will need to derive the class and perform more advanced filtering by overriding the filter method:

public void showForm() {
  final DefaultListModel<String> options = new DefaultListModel<>();
  AutoCompleteTextField ac = new AutoCompleteTextField(options) {
      @Override
      protected boolean filter(String text) {
          if(text.length() == 0) {
              return false;
          }
          String[] l = searchLocations(text);
          if(l == null || l.length == 0) {
              return false;
          }

          options.removeAll();
          for(String s : l) {
              options.addItem(s);
          }
          return true;
      }

  };
  ac.setMinimumElementsShownInPopup(5);
  hi.add(ac);
  hi.add(new SpanLabel("This demo requires a valid google API key to be set below "
           + "you can get this key for the webservice (not the native key) by following the instructions here: "
           + "https://developers.google.com/places/web-service/get-api-key"));
  hi.add(apiKey);
  hi.getToolbar().addCommandToRightBar("Get Key", null, e -> Display.getInstance().execute("https://developers.google.com/places/web-service/get-api-key"));
  hi.show();
}

TextField apiKey = new TextField();

String[] searchLocations(String text) {
    try {
        if(text.length() > 0) {
            ConnectionRequest r = new ConnectionRequest();
            r.setPost(false);
            r.setUrl("https://maps.googleapis.com/maps/api/place/autocomplete/json");
            r.addArgument("key", apiKey.getText());
            r.addArgument("input", text);
            NetworkManager.getInstance().addToQueueAndWait(r);
            Map<String,Object> result = new JSONParser().parseJSON(new InputStreamReader(new ByteArrayInputStream(r.getResponseData()), "UTF-8"));
            String[] res = Result.fromContent(result).getAsStringArray("//description");
            return res;
        }
    } catch(Exception err) {
        Log.e(err);
    }
    return null;
}
Autocomplete Text Field with a webservice
Figure 249. Autocomplete Text Field with a webservice

8.28.1. Using Images In AutoCompleteTextField

One question I got a few times is "How do you customize the results of the auto complete field"?

This sounds difficult to most people as you can work with Strings so how do you represent additional data or format the date correctly?

The answer is actually pretty simple, you still need to work with Strings because auto-complete is first and foremost a text field. For example, that doesn’t preclude your custom renderer from fetching data that might be placed in a different location and associated with the result.

The following source code presents an auto-complete text field with images in the completion popup and two lines for every entry:

final String[] characters = { "Tyrion Lannister", "Jaime Lannister", "Cersei Lannister", "Daenerys Targaryen",
    "Jon Snow", "Petyr Baelish", "Jorah Mormont", "Sansa Stark", "Arya Stark", "Theon Greyjoy"
    // snipped the rest for clarity
};

Form current = new Form("AutoComplete", BoxLayout.y());

AutoCompleteTextField ac = new AutoCompleteTextField(characters);

final int size = Display.getInstance().convertToPixels(7);
final EncodedImage placeholder = EncodedImage.createFromImage(Image.createImage(size, size, 0xffcccccc), true);

final String[] actors = { "Peter Dinklage", "Nikolaj Coster-Waldau", "Lena Headey"}; (1)
final Image[] pictures = {
    URLImage.createToStorage(placeholder, "tyrion","http://i.lv3.hbo.com/assets/images/series/game-of-thrones/character/s5/tyrion-lannister-512x512.jpg"),
    URLImage.createToStorage(placeholder, "jaime","http://i.lv3.hbo.com/assets/images/series/game-of-thrones/character/s5/jamie-lannister-512x512.jpg"),
    URLImage.createToStorage(placeholder, "cersei","http://i.lv3.hbo.com/assets/images/series/game-of-thrones/character/s5/cersei-lannister-512x512.jpg")
};

ac.setCompletionRenderer(new ListCellRenderer() {
    private final Label focus = new Label(); (2)
    private final Label line1 = new Label(characters[0]);
    private final Label line2 = new Label(actors[0]);
    private final Label icon = new Label(pictures[0]);
    private final Container selection = BorderLayout.center(
            BoxLayout.encloseY(line1, line2)).add(BorderLayout.EAST, icon);

    @Override
    public Component getListCellRendererComponent(com.codename1.ui.List list, Object value, int index, boolean isSelected) {
        for(int iter = 0 ; iter < characters.length ; iter++) {
            if(characters[iter].equals(value)) {
                line1.setText(characters[iter]);
                if(actors.length > iter) {
                    line2.setText(actors[iter]);
                    icon.setIcon(pictures[iter]);
                } else {
                    line2.setText(""); (3)
                    icon.setIcon(placeholder);
                }
                break;
            }
        }
        return selection;
    }

    @Override
    public Component getListFocusComponent(com.codename1.ui.List list) {
        return focus;
    }
});
current.add(ac);

current.show();
1you’ve duplicate arrays that are partial for clarity. This is a separate list of data element but you can fetch the additional data from anywhere
2You create the renderer UI instantly in the fields with the helper methods for wrapping elements which is pretty cool & terse
3In a renderer it’s important to always set the value especially if you don’t have a value in place
Auto complete with images
Figure 250. Auto complete with images

8.29. Picker

Picker occupies the limbo between native widget and lightweight widget. Picker is more like TextField/TextArea in the sense that it’s a Codename One widget that calls the native code during editing.

The reasoning for this is the highly native UX and functionality related to this widget type which should be obvious from the screenshots below.

At this time there are 4 types of pickers:

  • Time

  • Date & Time

  • Date

  • Strings

If a platform doesn’t support native pickers an internal fallback implementation is used. This is the implementation you always use in the simulator so assume different behavior when building for the device.

While Android supports Date, Time native pickers it doesn’t support the Date & Time native picker UX and will fallback in that case.

The sample below includes al picker types:

Form hi = new Form("Picker", new BoxLayout(BoxLayout.Y_AXIS));
Picker datePicker = new Picker();
datePicker.setType(Display.PICKER_TYPE_DATE);
Picker dateTimePicker = new Picker();
dateTimePicker.setType(Display.PICKER_TYPE_DATE_AND_TIME);
Picker timePicker = new Picker();
timePicker.setType(Display.PICKER_TYPE_TIME);
Picker stringPicker = new Picker();
stringPicker.setType(Display.PICKER_TYPE_STRINGS);
Picker durationPicker = new Picker();
durationPicker.setType(Display.PICKER_TYPE_DURATION);
Picker minuteDurationPicker = new Picker();
minuteDurationPicker.setType(Display.PICKER_TYPE_DURATION_MINUTES);
Picker hourDurationPicker = new Picker();
hourDurationPicker.setType(Display.PICKER_TYPE_DURATION_HOURS);

datePicker.setDate(new Date());
dateTimePicker.setDate(new Date());
timePicker.setTime(10 * 60); // 10:00AM = Minutes since midnight
stringPicker.setStrings("A Game of Thrones", "A Clash Of Kings", "A Storm Of Swords", "A Feast For Crows",
        "A Dance With Dragons", "The Winds of Winter", "A Dream of Spring");
stringPicker.setSelectedString("A Game of Thrones");

hi.add(datePicker).add(dateTimePicker).add(timePicker)
  .add(stringPicker).add(durationPicker)
  .add(minuteDurationPicker).add(hourDurationPicker);
hi.show();
The various picker components
Figure 251. The various picker components
The date & time picker on the simulator
Figure 252. The date & time picker on the simulator
The date picker component on the Android device
Figure 253. The date picker component on the Android device
Date and time picker on Android. Notice it didn’t use a built-in widget since there is none
Figure 254. Date & time picker on Android. Notice it didn’t use a built-in widget since there is none
String picker on the native Android device
Figure 255. String picker on the native Android device
Time picker on the Android device
Figure 256. Time picker on the Android device
Duration picker on Android device
Figure 257. Duration picker on Android device
Hours Duration picker on Android device
Figure 258. Hours Duration picker on Android device
Minutes Duration picker on Android device
Figure 259. Minutes Duration picker on Android device

The text displayed by the picker on selection is generated automatically by the updateValue() method. You can override it to display a custom formatted value and call setText(String) with the correct display string.

A common use case is to format date values based on a specific appearance and Picker has built-in support for a custom display formatter. Just use the setFormatter(SimpleDateFormat) method and set the appearance for the field.

When using lightweight picker mode (setUseLightweightPopup(true)), you can add custom quick-action buttons to the popup. This is useful for actions like setting the date to "Today" or "+7 Days" without scrolling the wheels manually.

Picker picker = new Picker();
picker.setType(Display.PICKER_TYPE_DATE);
picker.setUseLightweightPopup(true);
picker.setDate(new Date());

picker.addLightweightPopupButton("Today", () -> picker.setDate(new Date()));

picker.addLightweightPopupButton("+7 Days", () -> {
    Calendar cal = Calendar.getInstance();
    cal.add(Calendar.DAY_OF_MONTH, 7);
    picker.setDate(cal.getTime());
}, Picker.LightweightPopupButtonPlacement.BELOW_SPINNER);

Button placement options are:

  • Picker.LightweightPopupButtonPlacement.BETWEEN_CANCEL_AND_DONE (default)

  • Picker.LightweightPopupButtonPlacement.ABOVE_SPINNER

  • Picker.LightweightPopupButtonPlacement.BELOW_SPINNER

8.30. SwipeableContainer

The SwipeableContainer allows you to place a component such as a MultiButton on top of additional "options" that can be exposed by swiping the component to the side.

This swipe gesture is commonly used in touch interfaces to expose features such as delete, edit etc. it’s trivial to use this component by determining the components placed on top and bottom (the revealed component).

SwipeableContainer swip = new SwipeableContainer(bottom, top);

You can combine some of the demos above including the Slider stars demo to rank GRRM’s books in an interactive way:

Form hi = new Form("Swipe", new BoxLayout(BoxLayout.Y_AXIS));
hi.add(createRankWidget("A Game of Thrones", "1996")).
    add(createRankWidget("A Clash Of Kings", "1998")).
    add(createRankWidget("A Storm Of Swords", "2000")).
    add(createRankWidget("A Feast For Crows", "2005")).
    add(createRankWidget("A Dance With Dragons", "2011")).
    add(createRankWidget("The Winds of Winter", "TBD")).
    add(createRankWidget("A Dream of Spring", "TBD"));
hi.show();

public SwipeableContainer createRankWidget(String title, String year) {
    MultiButton button = new MultiButton(title);
    button.setTextLine2(year);
    return new SwipeableContainer(FlowLayout.encloseCenterMiddle(createStarRankSlider()),
            button);
}
SwipableContainer showing a common use case of ranking on swipe
Figure 260. SwipableContainer showing a common use case of ranking on swipe

8.31. EmbeddedContainer

EmbeddedContainer solves a problem that exists within the GUI builder and the class makes no sense outside of the context of the GUI builder. The necessity for EmbeddedContainer came about due to iPhone inspired designs that relied on tabs (iPhone style tabs at the bottom of the screen) where different features of the application are within a different tab.

This didn’t mesh well with the GUI builder navigation logic and so you needed to rethink some of it. You wanted to reuse GUI as much as possible while still enjoying the advantage of navigation being completely managed for me.

Android does this with Activities and the iPhone itself has a view controller, both approaches are problematic for Codename One. The problem is that you’ve what is effectively two incompatible hierarchies to mix and match.

The Component/Container hierarchy is powerful enough to represent such a UI but you needed a "marker" to indicate to the UIBuilder where a "root" component exists so navigation occurs within the given "root". Here EmbeddedContainer comes into play, its a simple container that can contain another GUI from the GUI builder. Nothing else. So you can place it in any form of UI and effectively have the UI change appropriately and navigation would default to "sensible values".

Navigation replaces the content of the embedded container; it finds the embedded container based on the component that broadcast the event. If you want to navigate manually use the showContainer() method which accepts a component, you can give any component that’s under the EmbeddedContainer you want to replace and Codename One will be smart enough to replace that component.

The nice part about using the EmbeddedContainer is that the resulting UI can be easily refactored to provide a more traditional form based UI without duplicating effort and can be easily adapted to a more tablet oriented UI (with a side bar) again without much effort.

8.32. MapComponent

The MapComponent uses a somewhat outdated tiling API which isn’t as rich as modern native maps. Recommend using the GoogleMap’s Native cn1lib to integrate native mapping functionality into the Codename One app.

The MapComponent uses the OpenStreetMap webservice by default to display a navigatable map.

The code was contributed by Roman Kamyk and was originally used for a LWUIT application.

Map Component
Figure 261. Map Component

The screenshot above was produced using the following code:

Form map = new Form("Map");
map.setLayout(new BorderLayout());
map.setScrollable(false);
final MapComponent mc = new MapComponent();

try {
   //get the current location from the Location API
   Location loc = LocationManager.getLocationManager().getCurrentLocation();

  Coord lastLocation = new Coord(loc.getLatitude(), loc.getLongtitude());
   Image i = Image.createImage("/blue_pin.png");
   PointsLayer pl = new PointsLayer();
   pl.setPointIcon(i);
   PointLayer p = new PointLayer(lastLocation, "You Are Here", i);
   p.setDisplayName(true);
   pl.addPoint(p);
   mc.addLayer(pl);
} catch (IOException ex) {
   ex.printStackTrace();
}
mc.zoomToLayers();

map.addComponent(BorderLayout.CENTER, mc);
map.addCommand(new BackCommand());
map.setBackCommand(new BackCommand());
map.show();

The example below shows how to integrate the MapComponent with the Google Location API. make sure to obtain your secret api key from the Google Location data API at: https://developers.google.com/maps/documentation/places/

MapComponent with Google Location API
Figure 262. MapComponent with Google Location API
          final Form map = new Form("Map");
           map.setLayout(new BorderLayout());
           map.setScrollable(false);
           final MapComponent mc = new MapComponent();
           Location loc = LocationManager.getLocationManager().getCurrentLocation();
           //use the code from above to show you on the map
           putMeOnMap(mc);
           map.addComponent(BorderLayout.CENTER, mc);
           map.addCommand(new BackCommand());
           map.setBackCommand(new BackCommand());

           ConnectionRequest req = new ConnectionRequest() {

               protected void readResponse(InputStream input) throws IOException {
                   JSONParser p = new JSONParser();
                   Hashtable h = p.parse(new InputStreamReader(input));
                   // "status" : "REQUEST_DENIED"
                   String response = (String)h.get("status");
                   if(response.equals("REQUEST_DENIED")){
                       System.out.println("make sure to obtain a key from "
                               + "https://developers.google.com/maps/documentation/places/");
                       progress.dispose();
                       Dialog.show("Info", "make sure to obtain an application key from "
                               + "google places api's"
                               , "Ok", null);
                       return;
                   }

                   final Vector v = (Vector) h.get("results");

                   Image im = Image.createImage("/red_pin.png");
                   PointsLayer pl = new PointsLayer();
                   pl.setPointIcon(im);
                   pl.addActionListener(new ActionListener() {

                       public void actionPerformed(ActionEvent evt) {
                           PointLayer p = (PointLayer) evt.getSource();
                           System.out.println("pressed " + p);

                           Dialog.show("Details", "" + p.getName(), "Ok", null);
                       }
                   });

                   for (int i = 0; i < v.size(); i++) {
                       Hashtable entry = (Hashtable) v.elementAt(i);
                       Hashtable geo = (Hashtable) entry.get("geometry");
                       Hashtable loc = (Hashtable) geo.get("location");
                       Double lat = (Double) loc.get("lat");
                       Double lng = (Double) loc.get("lng");
                       PointLayer point = new PointLayer(new Coord(lat.doubleValue(), lng.doubleValue()),
                               (String) entry.get("name"), null);
                       pl.addPoint(point);
                   }
                   progress.dispose();

                   mc.addLayer(pl);
                   map.show();
                   mc.zoomToLayers();

               }
           };
           req.setUrl("https://maps.googleapis.com/maps/api/place/search/json");
           req.setPost(false);
           req.addArgument("location", "" + loc.getLatitude() + "," + loc.getLongtitude());
           req.addArgument("radius", "500");
           req.addArgument("types", "food");
           req.addArgument("sensor", "false");

           //get your own key from https://developers.google.com/maps/documentation/places/
           //and replace it here.
           String key = "yourAPIKey";

           req.addArgument("key", key);

           NetworkManager.getInstance().addToQueue(req);
       }
       catch (IOException ex) {
           ex.printStackTrace();
       }
   }

8.33. Chart Component

The charts package enables Codename One developers to add charts and visualizations to their apps without having to include external libraries or embedding web views. You also wanted to harness the new features in the graphics pipeline to maximize performance.

8.33.1. Device Support

Since the charts package makes use of 2D transformations and shapes, it requires some of the graphics features that aren’t yet available on all platforms. Currently the following platforms are supported:

  1. Simulator

  2. Android

  3. iOS

8.33.2. Features

  1. Built-in support for many common types of charts including bar charts, line charts, stacked charts, scatter charts, pie charts and more.

  2. Pinch Zoom - The ChartComponent class includes optional pinch zoom support.

  3. Panning Support - The ChartComponent class includes optional support for panning.

8.33.3. Chart Types

The com.codename1.charts package includes models and renderers for many different types of charts. it’s also extensible so that you can add your own chart types if required. The following screen shots demonstrate a small sampling of the types of charts that can be created.

Line Charts
Figure 263. Line Charts
Cubic Line Charts
Figure 264. Cubic Line Charts
Bar Charts
Figure 265. Bar Charts
Stacked Bar Charts
Figure 266. Stacked Bar Charts
Range Bar Charts
Figure 267. Range Bar Charts
Pie Charts
Figure 268. Pie Charts
Doughnut Charts
Figure 269. Doughnut Charts
Scatter Charts
Figure 270. Scatter Charts
Dial Charts
Figure 271. Dial Charts
Combined Charts
Figure 272. Combined Charts
Bubble Charts
Figure 273. Bubble Charts
Time Charts
Figure 274. Time Charts
The above screenshots were taken from the ChartsDemo app. You can start playing with this app by checking it out from your git repository.

8.33.4. How to Create A Chart

Adding a chart to your app involves four steps:

  1. Build the model. You can construct a model (aka data set) for the chart using one of the existing model classes in the com.codename1.charts.models package. Essentially, this is where you add the data that you want to display.

  2. Set up a renderer. You can create a renderer for your chart using one of the existing renderer classes in the com.codename1.charts.renderers package. The renderer allows you to specify how the chart should look. For example: the colors, fonts, styles, to use.

  3. Create the Chart View. Use one of the existing view classes in the com.codename1.charts.views package.

  4. Create a ChartComponent. In order to add your chart to the UI, you need to wrap it in a ChartComponent object.

You can check out the ChartsDemo app for specific examples, but here is a high-level view of some code that creates a Pie Chart.

/**
 * Creates a renderer for the specified colors.
 */
private DefaultRenderer buildCategoryRenderer(int[] colors) {
    DefaultRenderer renderer = new DefaultRenderer();
    renderer.setLabelsTextSize(15);
    renderer.setLegendTextSize(15);
    renderer.setMargins(new int[]{20, 30, 15, 0});
    for (int color : colors) {
        SimpleSeriesRenderer r = new SimpleSeriesRenderer();
        r.setColor(color);
        renderer.addSeriesRenderer(r);
    }
    return renderer;
}

/**
 * Builds a category series using the provided values.
 *
 * @param titles the series titles
 * @param values the values
 * @return the category series
 */
protected CategorySeries buildCategoryDataset(String title, double[] values) {
    CategorySeries series = new CategorySeries(title);
    int k = 0;
    for (double value : values) {
        series.add("Project " + ++k, value);
    }

    return series;
}

public Form createPieChartForm() {

    // Generate the values
    double[] values = new double[]{12, 14, 11, 10, 19};

    // Set up the renderer
    int[] colors = new int[]{ColorUtil.BLUE, ColorUtil.GREEN, ColorUtil.MAGENTA, ColorUtil.YELLOW, ColorUtil.CYAN};
    DefaultRenderer renderer = buildCategoryRenderer(colors);
    renderer.setZoomButtonsVisible(true);
    renderer.setZoomEnabled(true);
    renderer.setChartTitleTextSize(20);
    renderer.setDisplayValues(true);
    renderer.setShowLabels(true);
    SimpleSeriesRenderer r = renderer.getSeriesRendererAt(0);
    r.setGradientEnabled(true);
    r.setGradientStart(0, ColorUtil.BLUE);
    r.setGradientStop(0, ColorUtil.GREEN);
    r.setHighlighted(true);

    // Create the chart ... pass the values and renderer to the chart object.
    PieChart chart = new PieChart(buildCategoryDataset("Project budget", values), renderer);

    // Wrap the chart in a Component so we can add it to a form
    ChartComponent c = new ChartComponent(chart);

    // Create a form and show it.
    Form f = new Form("Budget");
    f.setLayout(new BorderLayout());
    f.addComponent(BorderLayout.CENTER, c);
    return f;

}

8.34. Calendar

The Calendar class allows you to display a traditional calendar picker and optionally highlight days in various ways.

You normally recommend developers use the Picker UI rather than use the calendar to pick a date. It looks better on the devices.

Simple usage of the Calendar class looks something like this:

Form hi = new Form("Calendar", new BorderLayout());
Calendar cld = new Calendar();
cld.addActionListener((e) -> Log.p("You picked: " + new Date(cld.getSelectedDay())));
hi.add(BorderLayout.CENTER, cld);
The Calendar component
Figure 275. The Calendar component

8.35. ToastBar

The ToastBar class allows you to display none-obtrusive status messages to the user at the bottom of the screen. This is useful for such things as informing the user of a long-running task (like downloading a file in the background), or popping up an error message that doesn’t require a response from the user.

Simple usage of the ToastBar class looks something like this:

Status status = ToastBar.getInstance().createStatus();
status.setMessage("Downloading your file...");
status.show();

//  ... Later on when download completes
status.clear();
ToastBar with message
Figure 276. ToastBar with message

You can show a progress indicator in the ToastBar like this:

Status status = ToastBar.getInstance().createStatus();
status.setMessage("Hello world");
status.setShowProgressIndicator(true);
status.show();
Status Message with Progress Bar
Figure 277. Status Message with Progress Bar

You can automatically clear a status message/progress after a timeout using the setExpires method as such:

Status status = ToastBar.getInstance().createStatus();
status.setMessage("Hello world");
status.setExpires(3000);  // only show the status for 3 seconds, then have it automatically clear
status.show();

You can also delay the showing of the status message using showDelayed as such:

Status status = ToastBar.getInstance().createStatus();
status.setMessage("Hello world");
status.showDelayed(300); // Wait 300 ms to show the status

// ... Some time later, clear the status... this may be before it shows at all
status.clear();
ToastBar with a multiline message
Figure 278. ToastBar with a multiline message

8.35.1. Actions In ToastBar

Probably the best usage example for actions in toast is in the gmail style undo. If you aren’t a gmail user then the gmail app essentially never prompts for confirmation!

It does whatever you ask and pops a "toast message" with an option to undo. So if you clicked by mistake you’ve 3-4 seconds to take that back.

This simple example shows you how you can undo any addition to the UI in a similar way to gmail:

Form hi = new Form("Undo", BoxLayout.y());
Button add = new Button("Add");

add.addActionListener(e -> {
    Label l = new Label("Added this");
    hi.add(l);
    hi.revalidate();
    ToastBar.showMessage("Added, click here to undo...", FontImage.MATERIAL_UNDO,
            ee -> {
                l.remove();
                hi.revalidate();
            });
});
hi.add(add);
hi.show();

8.36. SignatureComponent

The SignatureComponent provides a widget that allows users to draw their signature in the app.

Simple usage of the SignatureComponent class looks like:

Form hi = new Form("Signature Component");
hi.setLayout(new BoxLayout(BoxLayout.Y_AXIS));
hi.add("Enter Your Name:");
hi.add(new TextField());
hi.add("Signature:");
SignatureComponent sig = new SignatureComponent();
sig.addActionListener((evt)-> {
    System.out.println("The signature was changed");
    Image img = sig.getSignatureImage();
    // Now we can do whatever we want with the image of this signature.
});
hi.addComponent(sig);
hi.show();
The Signature Component
Figure 279. The signature Component

8.37. Accordion

The Accordion displays collapsible content panels.

Simple usage of the Accordion class looks like:

Form f = new Form("Accordion", new BoxLayout(BoxLayout.Y_AXIS));
f.setScrollableY(true);
Accordion accr = new Accordion();
accr.addContent("Item1", new SpanLabel("The quick brown fox jumps over the lazy dog\n"
        + "The quick brown fox jumps over the lazy dog"));
accr.addContent("Item2", new SpanLabel("The quick brown fox jumps over the lazy dog\n"
        + "The quick brown fox jumps over the lazy dog\n "
        + "The quick brown fox jumps over the lazy dog\n "
        + "The quick brown fox jumps over the lazy dog\n "
        + ""));

accr.addContent("Item3", BoxLayout.encloseY(new Label("Label"), new TextField(), new Button("Button"), new CheckBox("CheckBox")));

f.add(accr);
f.show();
The Accordion Component
Figure 280. The Accordion Component

8.38. Floating Hint

FloatingHint wraps a text component with a special container that can animate the hint label into a title label when the text component is edited or has content within it.

Form hi = new Form("Floating Hint", BoxLayout.y());
TextField first = new TextField("", "First Field");
TextField second = new TextField("", "Second Field");
hi.add(new FloatingHint(first)).
        add(new FloatingHint(second)).
        add(new Button("Go"));
hi.show();
The FloatingHint component with one component that contains text and another that doesn’t
Figure 281. The FloatingHint component with one component that contains text and another that doesn’t

8.39. Floating Button

The material design floating action button is a powerful tool for promoting an action within your application.

FloatingActionButton is a round button that resides on top of the UI typically in the bottom right hand side.
It has a drop shadow to distinguish it from the UI underneath and it can hide two or more additional actions under the surface. For example: you can create a simple single click button such as this:

FloatingActionButton fab = FloatingActionButton.createFAB(FontImage.MATERIAL_ADD);
fab.addActionListener(e -> ToastBar.showErrorMessage("Not implemented yet..."));
fab.bindFabToContainer(form.getContentPane());

Which will place a + sign button that will perform the action. Alternatively you can create a nested action where a click on the button will produce a submenu for users to pick from for example:

FloatingActionButton fab = FloatingActionButton.createFAB(FontImage.MATERIAL_ADD);
fab.createSubFAB(FontImage.MATERIAL_PEOPLE, "");
fab.createSubFAB(FontImage.MATERIAL_IMPORT_CONTACTS, "");
fab.bindFabToContainer(form.getContentPane());
FloatingActionButton with submenu expanded
Figure 282. FloatingActionButton with submenu expanded

Those familiar with this widget know that there are many nuances to this UI that you might implement/expose in the future. At the moment you chose to keep the API simple and minimal for the common use cases and refine it based on feedback.

8.39.1. Using Floating Button as a Badge

Floating buttons can also be used to badge an arbitrary component in the style popularized by iOS/Mac OS. A badge appears at the top right corner and includes special numeric details such as "unread count"..

The code below adds a simple badge to an icon button:

Form hi = new Form("Badge");

Button chat = new Button("");
FontImage.setMaterialIcon(chat, FontImage.MATERIAL_CHAT, 7);

FloatingActionButton badge = FloatingActionButton.createBadge("33");
hi.add(badge.bindFabToContainer(chat, Component.RIGHT, Component.TOP));

TextField changeBadgeValue = new TextField("33");
changeBadgeValue.addDataChangedListener((i, ii) -> {
    badge.setText(changeBadgeValue.getText());
    badge.getParent().revalidate();
});
hi.add(changeBadgeValue);

hi.show();

The code above results in this, notice you can type into the text field to change the badge value:

Badge floating button in action
Figure 283. Badge floating button in action

8.40. SplitPane

The split pane component is a bit desktop specific but works reasonably well on devices. To get the image below you changed SalesDemo.java in the kitchen sink by changing this:

private Container encloseInMaximizableGrid(Component cmp1, Component cmp2) {
    GridLayout gl = new GridLayout(2, 1);
    Container grid = new Container(gl);
    gl.setHideZeroSized(true);

    grid.add(encloseInMaximize(grid, cmp1)).
            add(encloseInMaximize(grid, cmp2));
    return grid;
}

To:

private Container encloseInMaximizableGrid(Component cmp1, Component cmp2) {
    return new SplitPane(SplitPane.VERTICAL_SPLIT, cmp1, cmp2, "25%", "50%", "75%");
}
Split Pane in the Kitchen Sink Demo
Figure 284. Split Pane in the Kitchen Sink Demo

This is mostly self-explanatory but "mostly". you’ve 5 arguments the first 3 make sense:

  • Split orientation

  • Components to split

The last 3 arguments seem weird but they also make sense once you understand them, they are:

  • The minimum position of the split - 1/4 of available space

  • The default position of the split - middle of the screen

  • The maximum position of the split - 3/4 of available space

The units don’t have to be percentages they can be mm (millimeters) or px (pixels).

9. Animations

There are many ways to animate and liven the data within a Codename One application, layout animations are probably chief among them. But first you need to understand some basics such as layout reflows.

9.1. Layout Reflow

Layout in tools such as HTML is implicit, when you add something into the UI it’s automatically placed correctly. Other tools such as Codename One use explicit layout, that means you’ve to explicitly request the UI to layout itself after making changes!

Like many such rules exceptions occur. E.g. if the device is rotated or window size changes a layout will occur automatically.

When adding a component to a UI that’s already visible, the component won’t show by default.

When adding a component to a form which isn’t shown on the screen, there is no need to tell the UI to repaint or reflow. This happens implicitly.

The chief advantage of explicit layout is performance.

E.g. imagine adding 100 components to a form. If the form was laid out automatically, layout would have happened 100 times instead of once when adding was finished. In fact layout reflows are often considered the #1 performance issue for HTML/JavaScript applications.

Smart layout reflow logic can alleviate some of the pains of the automatic layout reflows however since the process is implicit it’s almost impossible to optimize complex usages across browsers/devices. A major JavaScript performance tip is to use absolute positioning which is akin to not using layouts at all!

that’s why, when you add components to a form that’s already showing, you should invoke revalidate() or animate the layout appropriately. This also enables the layout animation behavior explained below.

9.2. Layout Animations

To understand animations you need to understand a couple of things about Codename One components. When we add a component to a container, it’s generally added but not positioned anywhere. A novice might notice the setX/setY/setWidth/setHeight methods on a component and try to position it absolutely.

This won’t work since these methods are meant for the layout manager, which is implicitly invoked when a form is shown (internally in Codename One). The layout manager uses these methods to position/size the components based on the hints given to it.

If you add components to a form that’s currently showing, it’s your responsibility to invoke revalidate/layoutContainer to arrange the newly added components (see Layout Reflows).

animateLayout() method is a fancy form of revalidate that animates the components into their laid out position. After changing the layout & invoking this method the components move to their new sizes/positions seamlessly. Form exposes convenience wrappers such as animateLayout*() that simply forward to the underlying content pane, so you can usually call the methods directly on the form unless you specifically need to animate a nested container.

This sort of behavior creates a special case where setting the size/position makes sense. When we set the size/position in the demo code here you’re positioning the components at the animation start position above the frame.

Form hi = new Form("Layout Animations", new BoxLayout(BoxLayout.Y_AXIS));
Button fall = new Button("Fall"); (1)
fall.addActionListener((e) -> {
    for (int iter = 0; iter < 10; iter++) {
        Label b = new Label("Label " + iter);
        b.setWidth(fall.getWidth());
        b.setHeight(fall.getHeight());
        b.setY(-fall.getHeight());
        hi.add(b);
    }
    hi.animateLayout(20000); (2)
});
hi.add(fall);

There are a couple of things that you should notice about this example:

1We used a button to do the animation rather than doing it on show. Since show() implicitly lays out the components it wouldn’t have worked correctly.
2We used hi.animateLayout(20000);, which delegates to the Form content pane. If you need to animate a specific container (e.g. a nested layout), call animateLayout() on that container instead.

This results in:

Frame 1 Frame 2 Frame 3 Frame 4 Frame 5 Frame 6 Frame 7

9.2.1. Unlayout Animations

While layout animations are powerful effects for adding elements into the UI and drawing attention to them. The inverse of removing an element from the UI is often more important. E.g. when we delete or remove an element we want to animate it out.

Layout animations don’t do that since they will try to bring the animated item into place. What we want is the exact opposite of a layout animation and that’s the "unlayout animation". Container.animateUnlayout(int, int, Runnable) and the Form.animateUnlayout*() helpers let you trigger this transition either asynchronously (with a completion callback) or synchronously via the AndWait variants.

The "unlayout animation" takes a valid laid out state and shifts the components to an invalid state that we defined in advance. E.g. you can fix the example above to flip the "fall" button into a "rise" button when the buttons come into place and this will allow the buttons to float back up to where they came from in the exact reverse order.

An unlayout animation always leaves the container in an invalidated state.
Form hi = new Form("Layout Animations", new BoxLayout(BoxLayout.Y_AXIS));
Button fall = new Button("Fall");
fall.addActionListener((e) -> {
    if (hi.getContentPane().getComponentCount() == 1) {
        fall.setText("Rise");
        for (int iter = 0; iter < 10; iter++) {
            Label b = new Label("Label " + iter);
            b.setWidth(fall.getWidth());
            b.setHeight(fall.getHeight());
            b.setY(-fall.getHeight());
            hi.add(b);
        }
        hi.animateLayout(20000);
    } else {
        fall.setText("Fall");
        for (int iter = 1; iter < hi.getContentPane().getComponentCount(); iter++) { (1)
            Component c = hi.getContentPane().getComponentAt(iter);
            c.setY(-fall.getHeight()); (2)
        }
        hi.animateUnlayoutAndWait(20000, 255); (3)
        hi.removeAll(); (4)
        hi.add(fall);
        hi.revalidate();
    }
});
hi.add(fall);

You will notice some similarities with the unlayout animation but the differences represent the exact opposite of the layout animation:

1We loop over existing components (not newly created ones)
2We set the desired end position not the desired starting position
3We used the animateUnlayoutAndWait(…​) variant to block until completion; animateUnlayout(duration, opacity, callback) provides the non-blocking alternative when you want to continue immediately and run code from a callback instead.
4After the animation completes you need to actually remove the elements since the UI is now in an invalid position with elements outside of the screen but still physically there!

9.2.2. Hiding & Visibility

A common trick for animating Components in Codename One is to set their preferred size to 0 and then invoke animateLayout() thus triggering an animation to hide said Component. There are several issues with this trick but one of the biggest ones is the fact that setPreferredSize has been deprecated for quite a while.

Instead of using that trick you can use setHidden/isHidden who effectively encapsulate this functionality and a bit more.

One of the issues setHidden tries to solve is the fact that preferred size doesn’t include the margin in the total and thus a component might still occupy space despite being hidden. When you request the margin adjustment the current margins are cached, the component is given zero margins while hidden, and those cached values are restored when it’s shown again—without resetting the UIID or other style state.

This functionality might be undesirable which is why there is a version of the setHidden method that accepts a boolean flag indicating whether the margin cache should be manipulated. You can effectively hide/show a component without deprecated code using something like this:

Button toHide = new Button("Will Be Hidden");
Button hide = new Button("Hide It");
hide.addActionListener((e) -> {
    hide.setEnabled(false);
    boolean t = !toHide.isHidden();
    toHide.setHidden(t);
    toHide.getParent().animateLayoutAndWait(200);
    toHide.setVisible(!t);
    hide.setEnabled(true);
});
Notice that the code above uses setVisible(), which shouldn’t be confused with setHidden. setVisible() toggles the visibility of the component it would still occupy the same amount of space

9.2.3. Synchronicity In Animations

Most animations have two or three variants:

  • Standard animation e.g. animateLayout(int) or the non-blocking animateUnlayout(int, int, Runnable)

  • And wait variant e.g. animateLayoutAndWait(int) / animateUnlayoutAndWait(int, int)

  • Callback variant e.g. animateLayoutFade(int, int, Runnable)

The standard animation is invoked when we don’t care about the completion of the animation. You can do this for a standard animation.

Unlayout animations always leave the container in an invalid state, so even the standard helper expects you to tidy up either in the callback or immediately after the animation finishes.

The AndWait variant blocks the calling thread until the animation completes. This is useful for sequencing animations one after the other e.g this code from the kitchen sink demo:

arrangeForInterlace(effects);
effects.animateUnlayoutAndWait(800, 20);
effects.animateLayoutFade(800, 20);

First the UI goes thru an "unlayout" animation, once that completes the layout itself is performed.

The AndWait calls needs to be invoked on the Event Dispatch Thread despite being "blocking". This is a common convention in Codename One powered by a unique capability of Codename One: invokeAndBlock.
You can learn more about invokeAndBlock in the EDT section.

The callback variant is similar to the invokeAndBlock variant but uses a more conventional callback semantic which is more familiar to some developers. It accepts a Runnable callback that will be invoked after the fact. E.g. you can change the unlayout call from before to use the callback semantics as such:

hi.animateUnlayout(20000, 255, () -> {
    hi.removeAll();
    hi.add(fall);
    hi.revalidate();
});
Animation Fade and Hierarchy

There are several additional variations on the standard animate methods. Several methods accept a numeric fade argument. This is useful to fade out an element in an "unlayout" operation or fade in a regular animation.

The value for the fade argument is a number between 0 and 255 where 0 represents full transparency and 255 represents full opacity.

Some animate layout methods are hierarchy based. They work like the regular animateLayout methods but recurse into the entire Container hierarchy. These methods work well when you’ve components in a nested hierarchy that need to animate into place. This is demonstrated in the opening sequence of the kitchen sink demo:

for(int iter = 0 ; iter < demoComponents.size() ; iter++) {
    Component cmp = (Component)demoComponents.elementAt(iter);
    if(iter < componentsPerRow) {
        cmp.setX(-cmp.getWidth());
    } else {
        if(iter < componentsPerRow * 2) {
            cmp.setX(dw);
        } else {
            cmp.setX(-cmp.getWidth());
        }
    }
}
boxContainer.setShouldCalcPreferredSize(true);
boxContainer.animateHierarchyFade(3000, 30);

The demoComponents Vector contains components from separate containers and this code would not work with a simple animate layout.

We normally recommend avoiding the hierarchy version. Its slower but more importantly, it’s flaky. Since the size/position of the Container might be affected by the layout the animation could get clipped and skip. These are hard issues to debug.

9.2.4. Sequencing Animations Via AnimationManager

All the animations go thru a per-form queue: the AnimationManager. This effectively prevents two animations from mutating the UI in parallel so we won’t have collisions between two conflicting sides. Things get more interesting when we try to do something like this:

cnt.add(myButton);
int componentCount = cnt.getComponentCount();
cnt.animateLayout(300);
cnt.removeComponent(myButton);
if(componentCount == cnt.getComponentCount()) {
    // this will happen...
}

The reason this happens is that the second remove gets postponed to the end of the animation so it won’t break the animation. This works for remove and add operations on a Container as well as other animations.

The simple yet problematic fix would be:

cnt.add(myButton);
int componentCount = cnt.getComponentCount();
cnt.animateLayoutAndWait(300);
cnt.removeComponent(myButton);
if(componentCount == cnt.getComponentCount()) {
    // this probably won't happen...
}

So why that might still fail?

Events come in constantly during the run of the EDT [7], so an event might come in that might trigger an animation in your code. Even if you’re on the EDT keep in mind that you don’t actually block it and an event might come in.

In those cases an animation might start and you might be unaware of that animation and it might still be in action when you expect remove to work.

Animation Manager to the Rescue

AnimationManager has built-in support to fix this exact issue.

You can flush the animation queue and run synchronously after all the animations finished and before new ones come in by using something like this:

cnt.add(myButton);
int componentCount = cnt.getComponentCount();
cnt.animateLayout(300);
cnt.getAnimationManager().flushAnimation(() -> {
    cnt.removeComponent(myButton);
    if(componentCount == cnt.getComponentCount()) {
        // this shouldn't happen...
    }
});

9.3. low-level Animations

The Codename One event dispatch thread has a special animation "pulse" allowing an animation to update its state and draw itself. Code can make use of this pulse to implement repetitive polling tasks that have little to do with drawing.

This is helpful since the callback will always occur on the event dispatch thread.

Every component in Codename One contains an animate() method that returns a boolean value, you can also implement the Animation interface in an arbitrary component to implement your own animation. In order to receive animation events you need to register yourself within the parent form, it’s the responsibility of the parent for to call animate().

If the animate method returns true then the animation will be painted (the paint method of the Animation interface would be invoked).

it’s important to deregister animations when they aren’t needed to conserve battery life.

If you derive from a component, which has its own animation logic you might damage its animation behavior by deregistering it, so tread gently with the low-level API’s.

E.g. you can add additional animation logic using code like this:

myForm.registerAnimated(this);
private int spinValue;
@Override
public boolean animate() {
   if(userStatusPending) {
       spinValue++;
       super.animate();
       return true;
   }
   return super.animate();
}

9.3.1. Why Not Just Write Code In Paint?

Animations are comprised of two parts, the logic (deciding the position etc) and the painting. The paint method should be dedicated to painting, not to the actual moving of the components.

The separation of concerns allows us to avoid redundant painting e.g. if animate didn’t trigger a change return false to avoid the overhead related to animations.

We discuss low-level animations in more details within the animation section of the clock demo.

9.4. Transitions

Transitions allow us to replace one component with another, most typically forms or dialogs are replaced with a transition however a transition can be applied to replace any arbitrary component.

Developers can implement their own custom transition and install it to components by deriving the Transition class, although most commonly the built in CommonTransitions class is used for almost everything.

You can define transitions for forms/dialogs/menus globally either via the theme constants or via the LookAndFeel class. Alternatively you can install a transition on top-level components via setter methods.

In/Out Transitions

When defining a transition we define the entering transition and the exiting transition. For most cases only one of those is necessary and we default to the exiting (out transition) as a convention.

So for almost all cases the method setFormTransitonIn should go unused. That API exists for some elaborate custom transitions that might need to have a special effect both when transitioning in and out of a specific form. However, most of these effects are easier to achieve with layout animations (e.g. components dropping into place etc.).

In the case of Dialog the transition in shows its appearance and the transition out shows its disposal. So in that case both transitions make a lot of sense.

Back/Forward Transitions

Transitions have a direction and can all be played either in incoming or outgoing direction. A transition can be flipped (played in reverse) when use an RTL language [8] or when we simply traverse backwards in the form navigation hierarchy.

Normally Form.show() displays the next Form with an incoming transition based on the current RTL mode. If use Form.showBack() it will play the transition in reverse.

When working with high-level animations you can select Slow Motion option in the simulator to slow down animations and inspect their details

Themes define the default transitions used when showing a form, these differ based on the OS. In most platforms the default is Slide whereas in iOS the default is SlideFade which slides the content pane and title while fading in/out the content of the title area.

SlideFade is problematic without a title area. If you’ve a Form that lacks a title area we would recommend to disable SlideFade at least for that Form.

Check out the full set of theme constants in the Theme Constants Section.

9.4.1. Replace

To apply a transition to a component you can use the Container.replace() method as such:

Form hi = new Form("Replace", new BoxLayout(BoxLayout.Y_AXIS));
Button replace = new Button("Replace Pending");
Label replaceDestiny = new Label("Destination Replace");
hi.add(replace);
replace.addActionListener((e) -> {
    replace.getParent().replaceAndWait(replace, replaceDestiny, CommonTransitions.createCover(CommonTransitions.SLIDE_VERTICAL, true, 800));
    replaceDestiny.getParent().replaceAndWait(replaceDestiny, replace, CommonTransitions.createUncover(CommonTransitions.SLIDE_VERTICAL, true, 800));
});
Replace even works when you’ve a layout constraint in place e.g. replacing a component in a border layout will do the "right thing". However, some layouts such as TableLayout might be tricky in such cases so recommend wrapping a potentially replaceable Component in a border layout and replacing the content.

Container.replace() can also be used with a null transition at which point it replaces instantly with no transition.

9.4.2. Slide Transitions

The slide transitions are used to move the Form/Component in a sliding motion to the side or up/down. There are 4 basic types of slide transitions:

  1. Slide - the most commonly used transition

  2. Fast Slide - historically this provided better performance for old device types. it’s no longer recommended for newer devices

  3. Slide Fade - the iOS default where the title area features a fade transition

  4. Cover/Uncover - a type of slide transition where the source or destination form slides while the other remains static in place

The code below demonstrates the usage of all the main transitions:

    Toolbar.setGlobalToolbar(true);
    Form hi = new Form("Transitions", new BoxLayout(BoxLayout.Y_AXIS));
    Style bg = hi.getContentPane().getUnselectedStyle();
    bg.setBgTransparency(255);
    bg.setBgColor(0xff0000);
    Button showTransition = new Button("Show");
    Picker pick = new Picker();
    pick.setStrings("Slide", "SlideFade", "Cover", "Uncover", "Fade", "Flip");
    pick.setSelectedString("Slide");
    TextField duration = new TextField("10000", "Duration", 6, TextArea.NUMERIC);
    CheckBox horizontal = CheckBox.createToggle("Horizontal");
    pick.addActionListener((e) -> {
        String s = pick.getSelectedString().toLowerCase();
        horizontal.setEnabled(s.equals("slide") || s.indexOf("cover") > -1);
    });
    horizontal.setSelected(true);
    hi.add(showTransition).
        add(pick).
        add(duration).
        add(horizontal);

    Form dest = new Form("Destination");
    bg = dest.getContentPane().getUnselectedStyle();
    bg.setBgTransparency(255);
    bg.setBgColor(0xff);
    dest.setBackCommand(
            dest.getToolbar().addCommandToLeftBar("Back", null, (e) -> hi.showBack()));

    showTransition.addActionListener((e) -> {
        int h = CommonTransitions.SLIDE_HORIZONTAL;
        if(!horizontal.isSelected()) {
            h = CommonTransitions.SLIDE_VERTICAL;
        }
        switch(pick.getSelectedString()) {
            case "Slide":
                hi.setTransitionOutAnimator(CommonTransitions.createSlide(h, true, duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(CommonTransitions.createSlide(h, true, duration.getAsInt(3000)));
                break;
            case "SlideFade":
                hi.setTransitionOutAnimator(CommonTransitions.createSlideFadeTitle(true, duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(CommonTransitions.createSlideFadeTitle(true, duration.getAsInt(3000)));
                break;
            case "Cover":
                hi.setTransitionOutAnimator(CommonTransitions.createCover(h, true, duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(CommonTransitions.createCover(h, true, duration.getAsInt(3000)));
                break;
            case "Uncover":
                hi.setTransitionOutAnimator(CommonTransitions.createUncover(h, true, duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(CommonTransitions.createUncover(h, true, duration.getAsInt(3000)));
                break;
            case "Fade":
                hi.setTransitionOutAnimator(CommonTransitions.createFade(duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(CommonTransitions.createFade(duration.getAsInt(3000)));
                break;
            case "Flip":
                hi.setTransitionOutAnimator(new FlipTransition(-1, duration.getAsInt(3000)));
                dest.setTransitionOutAnimator(new FlipTransition(-1, duration.getAsInt(3000)));
                break;
        }
        dest.show();
    });
    hi.show();
The slide transition moves both incoming and outgoing forms together
Figure 285. The slide transition moves both incoming and outgoing forms together
The slide transition can be applied vertically as well
Figure 286. The slide transition can be applied vertically as well
Slide fade fades in the destination title while sliding the content pane its the default on iOS
Figure 287. Slide fade fades in the destination title while sliding the content pane it’s the default on iOS
SlideFade is problematic without a title area. If you’ve a Form that lacks a title area we would recommend to disable SlideFade at least for that Form.
With cover transitions the source form stays in place as it’s covered by the destination. This transition can be played both horizontally and vertically
Figure 288. With cover transitions the source form stays in place as it’s covered by the destination. This transition can be played both horizontally and vertically
Uncover is the inverse of cover. The destination form stays in place while the departing form moves away
Figure 289. Uncover is the inverse of cover. The destination form stays in place while the departing form moves away

9.4.3. Fade and Flip Transitions

The fade transition is pretty trivial and accepts a time value since it has no directional context.

Fade transition is probably the simplest one around
Figure 290. Fade transition is probably the simplest one around

The FlipTransition is also pretty simple but unlike the others it isn’t a part of the CommonTransitions. It has its own FlipTransition class.

This transition looks different on devices as it uses native perspective transforms available there
Fade transition is probably the simplest one around
Figure 291. Fade transition is probably the simplest one around

9.4.4. Bubble Transition

BubbleTransiton morphs a component into another component using a circular growth motion.

The BubbleTransition accepts the component that will grow into the bubble effect as one of its arguments. it’s generally designed for Dialog transitions although it could work for more creative use cases:

The code below manipulates styles and look. This is done to make the code more "self contained". Real world code should probably use the theme
    Form hi = new Form("Bubble");
    Button showBubble = new Button("+");
    showBubble.setName("BubbleButton");
    Style buttonStyle = showBubble.getAllStyles();
    buttonStyle.setBorder(Border.createEmpty());
    buttonStyle.setFgColor(0xffffff);
    buttonStyle.setBgPainter((g, rect) -> {
        g.setColor(0xff);
        int actualWidth = rect.getWidth();
        int actualHeight = rect.getHeight();
        int xPos, yPos;
        int size;
        if(actualWidth > actualHeight) {
            yPos = rect.getY();
            xPos = rect.getX() + (actualWidth - actualHeight) / 2;
            size = actualHeight;
        } else {
            yPos = rect.getY() + (actualHeight - actualWidth) / 2;
            xPos = rect.getX();
            size = actualWidth;
        }
        g.setAntiAliased(true);
        g.fillArc(xPos, yPos, size, size, 0, 360);
    });
    hi.add(showBubble);
    hi.setTintColor(0);
    showBubble.addActionListener((e) -> {
        Dialog dlg = new Dialog("Bubbled");
        dlg.setLayout(new BorderLayout());
        SpanLabel sl = new SpanLabel("This dialog should appear with a bubble transition from the button", "DialogBody");
        sl.getTextUnselectedStyle().setFgColor(0xffffff);
        dlg.add(BorderLayout.CENTER, sl);
        dlg.setTransitionInAnimator(new BubbleTransition(500, "BubbleButton"));
        dlg.setTransitionOutAnimator(new BubbleTransition(500, "BubbleButton"));
        dlg.setDisposeWhenPointerOutOfBounds(true);
        dlg.getTitleStyle().setFgColor(0xffffff);

        Style dlgStyle = dlg.getDialogStyle();
        dlgStyle.setBorder(Border.createEmpty());
        dlgStyle.setBgColor(0xff);
        dlgStyle.setBgTransparency(0xff);
        dlg.showPacked(BorderLayout.NORTH, true);
    });

    hi.show();
Bubble transition converting a circular button to a Dialog
Figure 292. Bubble transition converting a circular button to a Dialog

9.4.5. Morph Transitions

Android’s material design has a morphing effect where an element from the previous form (activity) animates into a different component on a new activity. Codename One has a morph effect in the Container class but it doesn’t work as a transition between forms and doesn’t allow for multiple separate components to transition at once.

Morph Transition
Figure 293. Morph Transition

To support this behavior you’ve the MorphTransition class that provides this same effect coupled with a fade to the rest of the UI (see Figure 293, “Morph Transition”).

Since the transition is created before the form exists you can’t reference explicit components within the form when creating the morph transition (in order to indicate which component becomes which) so you need to refer to them by name. This means you need to use setName(String) on the components in the source/destination forms so the transition will be able to find them.

Form demoForm = new Form(currentDemo.getDisplayName());
demoForm.setScrollable(false);
demoForm.setLayout(new BorderLayout());
Label demoLabel = new Label(currentDemo.getDisplayName());
demoLabel.setIcon(currentDemo.getDemoIcon());
demoLabel.setName("DemoLabel");
demoForm.addComponent(BorderLayout.NORTH, demoLabel);
demoForm.addComponent(BorderLayout.CENTER, wrapInShelves(n));
// ...
demoForm.setBackCommand(backCommand);
demoForm.setTransitionOutAnimator(
    MorphTransition.create(3000).morph(
        currentDemo.getDisplayName(),
        "DemoLabel"));
f.setTransitionOutAnimator(
    MorphTransition.create(3000).
        morph(currentDemo.getDisplayName(),
        "DemoLabel"));
demoForm.show();

9.4.6. SwipeBackSupport

iOS7+ allows swiping back one form to the previous form, Codenmae One has an API to enable back swipe transition:

SwipeBackSupport.bindBack(currentForm, destination);

That one command will enable swiping back from currentForm. LazyValue allows us to pass a value lazily:

/**
 * Useful when passing a value that might not exist to a function, e.g. when we
 * pass a form that we might need to construct dynamically later on.
 */
public interface LazyValue<T> {
    /**
     * Returns the actual value.
     *
     * @param args optional arguments for the creation of the lazy value
     * @return the value
     */
    T get(Object... args);
}

This effectively allows us to pass a form and create it as necessary (e.g. for a GUI builder app we don’t have the actual previous form instance), notice that the arguments aren’t used for this case but will be used in other cases.

The code below should work for the transition sample above. Notice that this API was designed to work with "Slide Fade" transition and might have issues with other transition types:

SwipeBackSupport.bindBack(dest, (args) -> hi);

10. The EDT - Event Dispatch Thread

10.1. What Is The EDT

Codename One allows developers to create as many threads as they want; however in order to interact with the Codename One user interface components a developer must use the EDT. The EDT stands for "Event Dispatch Thread" but it handles a lot more than "events".

The EDT is the main thread of Codename One, by using one thread Codename One can avoid complex synchronization code and focus on simple functionality that assumes one thread.

This has huge advantages for your code. You can normally assume that all code will occur on a single thread and avoid complex synchronization logic.

You can visualize the EDT as a loop such as this:

while(codenameOneRunning) {
     performEventCallbacks();
     performCallSeriallyCalls();
     drawGraphicsAndAnimations();
     sleepUntilNextEDTCycle();
}

Normally, every call you receive from Codename One will occur on the EDT. E.g. every event, calls to paint(), lifecycle calls (start etc.) should all occur on the EDT.

This is pretty powerful, however it means that as long as your code is processing nothing else can happen in Codename One!

If your code takes too long to execute then no painting or event processing will occur during that time, so a call to Thread.sleep() will actually stop everything!

The solution is pretty simple, if you need to perform something that requires intensive CPU you can spawn a thread.

Codename One’s networking code automatically spawns its own network thread (see the NetworkManager). However, this also poses a problem…​

Codename One assumes all modifications to the UI are performed on the EDT but if we spawned a separate thread. How do we force our modifications back into the EDT?

Codename One includes helper methods in the Display class to help in these situations: isEDT(), callSerially(Runnable), callSeriallyOnIdle(Runnable), and callSeriallyAndWait(Runnable) (with an optional timeout overload).

isEDT() is useful for generic code that needs to test whether the current code is executing on the EDT.

10.2. Call Serially (And Wait)

callSerially(Runnable) should normally be called off the EDT (in a separate thread), the run method within the submitted runnable will be invoked on the EDT.

The Runnable passed to the callSerially and callSeriallyAndWait methods isn’t a Thread. use the Runnable interface as a convenient callback interface.
// this code is executing in a separate thread
final String res = methodThatTakesALongTime();
Display.getInstance().callSerially(new Runnable() {
     public void run() {
          // this occurs on the EDT so I can make changes to UI components
          resultLabel.setText(res);
     }
});
You can write this code more concisely using Java 8 lambda code as such:
// this code is executing in a separate thread
String res = methodThatTakesALongTime();
Display.getInstance().callSerially(() -> resultLabel.setText(res));

This allows code to leave the EDT and then later on return to it to perform things within the EDT.

The callSeriallyAndWait(Runnable) method blocks the current thread until the method completes, this is useful for cases such as user notification e.g.:

// this code is executing in a separate thread
methodThatTakesALongTime();
Display.getInstance().callSeriallyAndWait(() -> {
  // this occurs on the EDT so I can make changes to UI components
  globalFlag = Dialog.show("Are You Sure?", "Do you want to continue?", "Continue", "Stop");
});
// this code is executing the separate thread
// global flag was already set by the call above
if(!globalFlag) {
   return;
}
otherMethod();
If you’re unsure use callSerially. The use cases for callSeriallyAndWait are rare. When you do need to wait, the overload that accepts a timeout lets background threads marshal results back to the EDT without risking an indefinite stall if the EDT is busy.

If the work you’re posting back to the EDT is expensive and can wait until the UI finishes its current pass, use callSeriallyOnIdle(). This queues the runnable for execution after the EDT completes painting, animations, and any other queued tasks. Deferring longer tasks to the idle queue helps avoid starving animations and transitions when bursts of background callbacks arrive together.

10.2.1. callSerially On The EDT

One of the misunderstood topics is why would we ever want to invoke callSerially when you’re still on the EDT. This is best explained by example. Say you’ve a button that has quite a bit of functionality tied to its events e.g.:

  1. A user added an action listener to show a Dialog.

  2. A framework the user installed added some logging to the button.

  3. The button repaints a release animation as its being released.

However, this might cause a problem if the first event that we handle (the dialog) might cause an issue to the following events. E.g. a dialog will block the EDT (using invokeAndBlock), events will keep happening but since the event you’re in "already happened" the button repaint and the framework logging won’t occur. This might also happen if we show a form which might trigger logic that relies on the current form still being present.

One of the solutions to this problem is to wrap the action listeners body with a callSerially. In this case the callSerially will postpone the event to the next cycle (loop) of the EDT and let the other events in the chain complete. Notice that you shouldn’t use this normally since it includes an overhead and complicates application flow, however when you run into issues in event processing we suggest trying this to see if its the cause.

You should never invoke callSeriallyAndWait on the EDT since this would effectively mean sleeping on the EDT. We made that method throw an exception if its invoked from the EDT.

If you need to run logic on the EDT but must ensure nothing inside it blocks, the Display class also provides invokeWithoutBlocking() and invokeWithoutBlockingWithResultSync(). These helpers temporarily disable invokeAndBlock() for the duration of the runnable. Any nested call to invokeAndBlock() while blocking is disabled results in a BlockingDisallowedException. Framework code that wraps user callbacks can use these methods to guard against accidental nested blocking that would otherwise deadlock or stall the UI, yet still safely obtain a return value when needed via invokeWithoutBlockingWithResultSync().

10.3. Debugging EDT Violations

There are two types of EDT violations:

  1. Blocking the EDT thread so the UI performance is considerably slower.

  2. Invoking UI code on a separate thread

Codename One provides a tool to help you detect some of these violations some caveats may apply though…

It’s an imperfect tool. It might fire "false positives" meaning it might detect a violation for perfectly legal code and it might miss some illegal calls. However, it’s a valuable tool in the process of detecting hard to track bugs that are sometimes reproducible on the devices (due to race condition behavior).

To activate this tool select the Debug EDT menu option in the simulator and pick the level of output you wish to receive:

Debug EDT
Figure 294. Debug EDT

Full output will include stack traces to the area in the code that’s suspected in the violation.

10.4. Invoke And Block

Invoke and block is the exact opposite of callSeriallyAndWait(), it blocks the EDT and opens a separate thread for the runnable call. This functionality is inspired by the Foxtrot API, which is a remarkably powerful tool most Swing developers don’t know about.

This is best explained by an example. When we write typical code in Java we like that code is in sequence as such:

doOperationA();
doOperationB();
doOperationC();

This works well normally but on the EDT it might be a problem, if one of the operations is slow it might slow the whole EDT (painting, event processing etc.). Normally you can move operations into a separate thread e.g.:

doOperationA();
new Thread() {
    public void run() {
         doOperationB();
    }
}).start();
doOperationC();

Unfortunately, this means that operation C will happen in parallel to operation B which might be a problem…​
E.g. instead of using operation names lets use a more "real world" example:

updateUIToLoadingStatus();
readAndParseFile();
updateUIWithContentOfFile();

Notice that the first and last operations must be conducted on the EDT but the middle operation might be slow! Since updateUIWithContentOfFile needs readAndParseFile to occur before it starts doing the new thread won’t be enough.

A simplistic approach is to do something like this:

updateUIToLoadingStatus();
new Thread() {
    public void run() {
          readAndParseFile();
          updateUIWithContentOfFile();
    }
}).start();

But updateUIWithContentOfFile should be executed on the EDT and not on a random thread. So the right way to do this would be something like this:

updateUIToLoadingStatus();
new Thread() {
    public void run() {
          readAndParseFile();
          Display.getInstance().callSerially(new Runnable() {
               public void run() {
                     updateUIWithContentOfFile();
               }
          });
    }
}).start();

This is perfectly legal and would work reasonably well, however it gets complicated as we add more and more features that need to be chained serially after all these are 3 methods!

Invoke and block solves this in a unique way you can get almost the exact same behavior by using this:

updateUIToLoadingStatus();
Display.getInstance().invokeAndBlock(new Runnable() {
    public void run() {
          readAndParseFile();
    }
});
updateUIWithContentOfFile();

Or this with Java 8 syntax:

updateUIToLoadingStatus();
Display.getInstance().invokeAndBlock(() -> readAndParseFile());
updateUIWithContentOfFile();

Invoke and block effectively blocks the current EDT in a legal way. It spawns a separate thread that runs the run() method and when that run method completes it goes back to the EDT.

All events and EDT behavior still work while invokeAndBlock is running, this is because invokeAndBlock() keeps calling the main thread loop internally.

Notice that invokeAndBlock comes at a slight performance penalty. Also notice that nesting invokeAndBlock calls (or over using them) isn’t recommended.
However, they are convenient when working with multiple threads/UI.

Even if you never call invokeAndBlock directly you’re probably using it indirectly in API’s such as Dialog that show a dialog while blocking the current thread e.g.:

public void actionPerformed(ActionEvent ev) {
  // will return true if the user clicks "OK"
  if(!Dialog.show("Question", "How Are You", "OK", "Not OK")) {
  // ask what went wrong...
  }
}

Notice that the dialog show method will block the calling thread until the user clicks OK or Not OK…​

Other API’s such as NetworkManager.addToQueueAndWait() also make use of this feature. Pretty much every "AndWait" method or blocking method uses this API internally!

To explain how invokeAndBlock works you can return to the sample above of how the EDT works:

while(codenameOneRunning) {
     performEventCallbacks();
     performCallSeriallyCalls();
     drawGraphicsAndAnimations();
     sleepUntilNextEDTCycle();
}

invokeAndBlock() works in a similar way to this pseudo code:

void invokeAndBlock(Runnable r) {
    openThreadForR(r);
    while(r is still running) {
         performEventCallbacks();
         performCallSeriallyCalls();
         drawGraphicsAndAnimations();
         sleepUntilNextEDTCycle();
    }
}

So the EDT is effectively "blocked" but we "redo it" within the invokeAndBlock method…​

As you can see this is a simple approach for thread programming in UI, you don’t need to block your flow and track the UI thread. You can program in a way that seems sequential (top to bottom) but uses multi-threading correctly without blocking the EDT.

11. Graphics, drawing, images, and fonts

Drawing is considered a low-level API that might introduce some platform fragmentation.

11.1. Basics - where and how do I draw manually?

The Graphics class is responsible for drawing basics, shapes, images, and text. Developers never instantiate it directly; the Codename One API passes it in.

You can gain access to a Graphics object using one of the following methods:

  • Derive Component or a subclass of Component - Component includes many methods that let developers modify drawing behavior. Override them to change how the component is drawn:

    • paint(Graphics) - invoked to draw the component, this can be overridden to draw the component from scratch.

    • paintBackground(Graphics) / paintBackgrounds(Graphics) - these allow overriding the way the component background is painted although you would probably be better off implementing a painter (see below).

    • paintBorder(Graphics) - allows overriding the process of drawing a border, notice that border drawing might differ based on the style of the component.

    • paintComponent(Graphics) - allows painting the components contents while leaving the default paint behavior to the style.

    • paintScrollbars(Graphics), paintScrollbarX(Graphics), paintScrollbarY(Graphics) allows overriding the behavior of scrollbar painting.

  • Implement the painter interface; this interface can be used as a GlassPane or a background painter.

    The painter interface is simple and includes one paint method. It lets developers perform custom painting without subclassing Component. Painters can be chained together to create elaborate paint behavior with the PainterChain class.

    • Glass pane - a glass pane allows developers to paint on top of the form painting. This allows an overlay effect on top of a form.

      At first, a glass pane may seem similar to overriding the Form’s paint method and drawing after super.paint(g) completes. It isn’t the same. When a component repaints by invoking repaint(), that component is drawn, and Form’s paint() method isn’t invoked. The glass pane painter is invoked in those cases and behaves as expected.

      Container has a glass-pane method called paintGlass(Graphics), which you can override to provide a similar effect at the Container level. This is especially useful for complex containers such as Table, which draws its lines using this approach.

    • Background painter - the background painter is installed through the style. By default, Codename One installs its own custom background painter. Installing a custom painter lets a developer define exactly how the component background is drawn.
      Many background-style behaviors can also be achieved using styles alone.

A common mistake is overriding the paint(Graphics) method of Form. The problem is that a form has child components that may request a repaint. To avoid that, place a paintable component in the center of the Form, or override the glass pane or background painter.

A paint method can be implemented as such:

// hide the title
Form hi = new Form("", new BorderLayout());
hi.add(BorderLayout.CENTER, new Component() {
    @Override
    public void paint(Graphics g) {
        // red color
        g.setColor(0xff0000);

        // paint the screen in red
        g.fillRect(getX(), getY(), getWidth(), getHeight());

        // draw hi world in white text at the top left corner of the screen
        g.setColor(0xffffff);
        g.drawString("Hi World", getX(), getY());
    }
});
hi.show();
Hi world demo code
Figure 295. Hi world demo code, notice that the blue bar on top is the iOS7+ status bar

11.1.1. Painting with Gradients

Solid colors are the starting point. Graphics also understands "paint" objects that describe gradients and other patterns. You can pass an instance of Paint to setColor(Paint) in place of an integer color value to activate a gradient for subsequent fill and draw operations. The LinearGradientPaint class is the most common option and accepts a list of color stops along a line:

LinearGradientPaint gradient = new LinearGradientPaint(
        0, 0, getWidth(), 0,  // horizontal gradient
        new int[] {0xff4285f4, 0xff34a853, 0xfffbbc05},
        new float[] {0f, 0.5f, 1f}
);
g.setColor(gradient);
g.fillRect(getX(), getY(), getWidth(), getHeight());

The fillLinearGradient() convenience methods (with optional repeat flag) provide a shorthand when you need a two-color gradient without constructing your own Paint object.

Radial gradients are equally straightforward using fillRadialGradient() or fillRectRadialGradient(), which can render circular and rectangular radial transitions respectively. These APIs accept the inner/outer colors, focal point, and spread so you can combine them with linear gradients to build sophisticated backgrounds and lighting effects.

11.2. Glass Pane

The GlassPane `in Codename One is inspired by the Swing `GlassPane & LayeredPane with a few twists. You tried to imagine how Swing developers would have implemented the glass pane knowing what they do now about painters and Swings learning curve. But first: what is the glass pane?

A typical Codename One application is essentially composed of 3 layers (this is a gross simplification though), the background painters are responsible for drawing the background of all components including the main form. The component draws its own content (which might overrule the painter) and the glass pane paints last…​

Form layout graphic
Figure 296. Form layout graphic

Essentially the glass pane is a painter that allows you to draw an overlay on top of the Codename One application.

Overriding the paint method of a form isn’t a substitute for glasspane as it would appear to work initially, when you enter a Form. For example, when modifying an element within the form that element gets repainted not the entire Form!

So if you’ve a form with a Button and text drawn on top using the Form’s paint method it would get erased whenever the button gets focus.

The glass pane is called whenever a component gets painted, it paints within the clipping region of the component hence it won’t break the rest of the components on the Form which were not modified.

You can set a painter on a form using code like this:

hi.setGlassPane(new Painter() {
    @Override
    public void paint(Graphics g, Rectangle rect) {
    }
});

Or you can use Java 8 lambdas to tighten the code a bit:

hi.setGlassPane((g, rect) -> {
});

PainterChain allows you to chain many painters together to perform different logical tasks such as a validation painter coupled with a fade out painter. The sample below shows a crude validation panel that allows you to draw error icons next to components while exceeding their physical bounds as is common in many user interfaces

Form hi = new Form("Glass Pane", new BoxLayout(BoxLayout.Y_AXIS));
Style s = UIManager.getInstance().getComponentStyle("Label");
s.setFgColor(0xff0000);
s.setBgTransparency(0);
Image warningImage = FontImage.createMaterial(FontImage.MATERIAL_WARNING, s).toImage();
TextField tf1 = new TextField("My Field");
tf1.getAllStyles().setMarginUnit(Style.UNIT_TYPE_DIPS);
tf1.getAllStyles().setMargin(5, 5, 5, 5);
hi.add(tf1);
hi.setGlassPane((g, rect) -> {
    int x = tf1.getAbsoluteX() + tf1.getWidth();
    int y = tf1.getAbsoluteY();
    x -= warningImage.getWidth() / 2;
    y += (tf1.getHeight() / 2 - warningImage.getHeight() / 2);
    g.drawImage(warningImage, x, y);
});
hi.show();
The glass pane draws the warning sign on the border of the component partially peeking out
Figure 297. The glass pane draws the warning sign on the border of the component partially peeking out

11.3. Shapes & Transforms

The graphics API provides a high performance shape API that allows drawing arbitrary shapes by defining paths and curves and caching the shape drawn in the GPU.

11.4. Device Support

Shapes and transforms ship with all of Codename One’s actively maintained ports (Android, iOS, JavaScript, and desktop/Simulator). Older platforms that have reached end of life may lack these APIs, so keep the guard code shown below if you still target them with legacy builds.

Notice that perspective transform is missing from the desktop/simulator port. Unfortunately there is no real equivalent to perspective transform in Java SE that you could use.

11.5. A 2D Drawing App

You can demonstrate shape drawing with a simple example of a drawing app, that allows the user to tap the screen to draw a contour picture.

The app works by simply keeping a GeneralPath in memory, and continually adding points as bezier curves. Whenever a point is added, the path is redrawn to the screen.

The center of the app is the DrawingCanvas class, which extends Component.

public class DrawingCanvas extends Component {
    GeneralPath p = new GeneralPath();
    int strokeColor = 0x0000ff;
    int strokeWidth = 10;

    public void addPoint(float x, float y){
        // To be written
    }

    @Override
    protected void paintBackground(Graphics g) {
        super.paintBackground(g);
            Stroke stroke = new Stroke(
                strokeWidth,
                Stroke.CAP_BUTT,
                Stroke.JOIN_ROUND, 1f
            );
            g.setColor(strokeColor);

            // Draw the shape
            g.drawShape(p, stroke);

    }

    @Override
    public void pointerPressed(int x, int y) {
        addPoint(x-getParent().getAbsoluteX(), y-getParent().getAbsoluteY());
    }
}

Conceptually this is basic component. You will be overriding the paintBackground() method to draw the path. You keep a reference to a GeneralPath object (which is the concrete implementation of the Shape interface in Codename One) to store each successive point in the drawing. You also parametrize the stroke width and color.

The implementation of the paintBackground() method (shown above) should be fairly straight forward. It creates a stroke of the appropriate width, and sets the color on the graphics context. Then it calls drawShape() to render the path of points.

11.5.1. Implementing addPoint()

The addPoint method is designed to allow you to add points to the drawing. A simple implementation that uses straight lines rather than curves might look like this:

private float lastX = -1;
private float lastY = -1;

public void addPoint(float x, float y) {
    if (lastX == -1) {
        // this is the first point... don't draw a line yet
        p.moveTo(x, y);
    } else {
        p.lineTo(x, y);
    }
    lastX = x;
    lastY = y;

    repaint();
}

You introduced a couple house-keeping member vars (lastX and lastY) to store the last point that was added so that you know whether this is the first tap or a subsequent tap. The first tap triggers a moveTo() call, whereas subsequent taps trigger lineTo() calls, which draw lines from the last point to the current point.

A drawing might look like this:

lineTo example
Figure 298. lineTo example

11.5.2. Using Bezier Curves

Your previous implementation of addPoint() used lines for each segment of the drawing. Let you make an adjustment to allow for smoother edges by using quadratic curves instead of lines.

Codename One’s GeneralPath class includes two methods for drawing curves:

  1. quadTo() : Appends a quadratic bezier curve. It takes 2 points: a control point, and an end point.

  2. curveTo() : Appends a cubic bezier curve, taking 3 points: 2 control points, and an end point.

See the General Path javadocs for the full API.

You will make use of the quadTo() method to append curves to the drawing as follows:

private boolean odd=true;
public void addPoint(float x, float y){
    if ( lastX == -1 ){
        p.moveTo(x, y);

    } else {
        float controlX = odd ? lastX : x;
        float controlY = odd ? y : lastY;
        p.quadTo(controlX, controlY, x, y);
    }
    odd = !odd;
    lastX = x;
    lastY = y;
    repaint();
}

This change should be fairly straight forward except, perhaps, the business with the odd variable. Since quadratic curves require two points (in addition to the implied starting point), you can’t simply take the last tap point and the current tap point. You need a point between them to act as a control point. This is where you get the curve from. The control point works by exerting a sort of "gravity" on the line segment, to pull the line towards it. This results in the line being curved. I use the odd marker to alternate the control point between positions above the line and below the line.

A drawing from the resulting app looks like:

Result of quadTo example
Figure 299. Result of quadTo example

11.5.3. Detecting Platform Support

The DrawingCanvas example is a bit naive in that it assumes that the device supports the shape API. If I were to run this code on a device that doesn’t support the Shape API, it would draw a blank canvas where I expected my shape to be drawn. You can fall back gracefully if you make use of the Graphics.isShapeSupported() method. For example:

@Override
protected void paintBackground(Graphics g) {
    super.paintBackground(g);
    if ( g.isShapeSupported() ){
       // do my shape drawing code here
    } else {
        // draw an alternate representation for device
        // that doesn't support shapes.
        // E.g. you could defer to the Pisces
        // library in this case
    }

}

11.6. Transforms

The Graphics class has included limited support for 2D transformations for some time now including scaling, rotation, and translation:

  • scale(x,y) : Scales drawing operations by a factor in each direction.

  • translate(x,y) : Translates drawing operations by an offset in each direction.

  • rotate(angle) : Rotates about the origin.

  • rotate(angle, px, py) : Rotates about a pivot point.

scale() and rotate() methods are available on platforms that support Affine transforms. See table X for a compatibility list.

11.6.1. Device Support

All current Codename One ports expose affine transforms (that’s: scale() and rotate()). Use the following table as a quick reference when deciding whether you need a fallback path.

Table 7. Transforms Device Support

Platform

Affine Supported

Simulator/Desktop

Yes

iOS

Yes

Android

Yes

JavaScript

Yes

You can check if a particular Graphics context supports rotation and scaling using the isAffineSupported() method.

for example:

public void paint(Graphics g){
    if ( g.isAffineSupported() ){
        // Do something that requires rotation and scaling

    } else {
        // Fallback behavior here
    }
}

11.7. Example: Drawing an Analog Clock

In the following sections, I will implement an analog clock component. This will demonstrate three key concepts in Codename One’s graphics:

  1. Using the GeneralPath class for drawing arbitrary shapes.

  2. Using Graphics.translate() to translate your drawing position by an offset.

  3. Using Graphics.rotate() to rotate your drawing position.

There are three separate things that need to be drawn in a clock:

  1. The tick marks. For example: most clocks will have a tick mark for each second, larger tick marks for each hour, and sometimes even larger tick marks for each quarter hour.

  2. The numbers. You will draw the clock numbers (1 through 12) in the appropriate positions.

  3. The hands. You will draw the clock hands to point at the appropriate points to display the current time.

11.7.1. The AnalogClock Component

Your clock will extend the Component class, and override the paintBackground() method to draw the clock as follows:

public class AnalogClock extends Component {
    Date currentTime = new Date();

    @Override
    public void paintBackground(Graphics g) {
        // Draw the clock in this method
    }
}

11.7.2. Setting up the Parameters

Before you actually draw anything, let’s take a moment to figure out what values you need to know in order to draw an effective clock. Minimally, you need two values:

  1. The center point of the clock.

  2. The radius of the clock.

In addition, I am adding the following parameters to to help customize how the clock is rendered:

  1. The padding (that’s: the space between the edge of the component and the edge of the clock circle.

  2. The tick lengths. I will be using 3 different lengths of tick marks on this clock. The longest ticks will be displayed at quarter points (that’s: 12, 3, 6, and 9). Slightly shorter ticks will be displayed at the five-minute marks (that’s: where the numbers appear), and the remaining marks (corresponding with seconds) will be short.

// Hard code the padding at 10 pixels for now
double padding = 10;

// Clock radius
double r = Math.min(getWidth(), getHeight())/2-padding;

// Center point.
double cX = getX()+getWidth()/2;
double cY = getY()+getHeight()/2;

//Tick Styles
int tickLen = 10;  // short tick
int medTickLen = 30;  // at 5-minute intervals
int longTickLen = 50; // at the quarters
int tickColor = 0xCCCCCC;
Stroke tickStroke = new Stroke(2f, Stroke.CAP_BUTT, Stroke.JOIN_ROUND, 1f);

11.7.3. Drawing the Tick Marks

For the tick marks, you will use a single GeneralPath object, making use of the moveTo() and lineTo() methods to draw each individual tick.

// Draw a tick for each "second" (1 through 60)
for ( int i=1; i<= 60; i++){
    // default tick length is short
    int len = tickLen;
    if ( i % 15 == 0 ){
        // Longest tick on quarters (every 15 ticks)
        len = longTickLen;
    } else if ( i % 5 == 0 ){
        // Medium ticks on the '5's (every 5 ticks)
        len = medTickLen;
    }

    double di = (double)i; // tick num as double for easier math

    // Get the angle from 12 O'Clock to this tick (radians)
    double angleFrom12 = di/60.0*2.0*Math.PI;

    // Get the angle from 3 O'Clock to this tick
        // Note: 3 O'Clock corresponds with zero angle in unit circle
        // Makes it easier to do the math.
    double angleFrom3 = Math.PI/2.0-angleFrom12;

    // Move to the outer edge of the circle at correct position
    // for this tick.
    ticksPath.moveTo(
            (float)(cX+Math.cos(angleFrom3)*r),
            (float)(cY-Math.sin(angleFrom3)*r)
    );

    // Draw line inward along radius for length of tick mark
    ticksPath.lineTo(
            (float)(cX+Math.cos(angleFrom3)*(r-len)),
            (float)(cY-Math.sin(angleFrom3)*(r-len))
    );
}

// Draw the full shape onto the graphics context.
g.setColor(tickColor);
g.drawShape(ticksPath, tickStroke);
This example uses a little bit of trigonometry to calculate the (x,y) coordinates of the tick marks based on the angle and the radius. If math isn’t your thing, don’t worry. This example makes use of the identities: x=r*cosθ and y=r*sinθ.

At this point your clock should include a series of tick marks orbiting a blank center as shown below:

Drawing tick marks on the watch face
Figure 300. Drawing tick marks on the watch face

11.7.4. Drawing the Numbers

The Graphics.drawString(str, x, y) method allows you to draw text at any point of a component. The tricky part here is calculating the correct x and y values for each string so that the number appears in the correct location.

For the purposes of this tutorial, you will use the following strategy. For each number (1 through 12):

  1. Use the Graphics.translate(x,y) method to apply a translation from the clock’s center point to the point where the number should appear.

  2. Draw number (using drawString()) at the clock’s center. It should be rendered at the correct point due to your translation.

  3. Invert the translation performed in step 1.

for ( int i=1; i<=12; i++){
    // Calculate the string width and height so we can center it properly
    String numStr = ""+i;
    int charWidth = g.getFont().stringWidth(numStr);
    int charHeight = g.getFont().getHeight();

    double di = (double)i;  // number as double for easier math

    // Calculate the position along the edge of the clock where the number should
    // be drawn
     // Get the angle from 12 O'Clock to this tick (radians)
    double angleFrom12 = di/12.0*2.0*Math.PI;

    // Get the angle from 3 O'Clock to this tick
        // Note: 3 O'Clock corresponds with zero angle in unit circle
        // Makes it easier to do the math.
    double angleFrom3 = Math.PI/2.0-angleFrom12;

    // Get diff between number position and clock center
    int tx = (int)(Math.cos(angleFrom3)*(r-longTickLen));
    int ty = (int)(-Math.sin(angleFrom3)*(r-longTickLen));

    // For 6 and 12 we will shift number slightly so they are more even
    if ( i == 6 ){
        ty -= charHeight/2;
    } else if ( i == 12 ){
        ty += charHeight/2;
    }

    // Translate the graphics context by delta between clock center and
    // number position
    g.translate(
            tx,
            ty
    );


    // Draw number at clock center.
    g.drawString(numStr, (int)cX-charWidth/2, (int)cY-charHeight/2);

    // Undo translation
    g.translate(-tx, -ty);

}
This example is, admittedly, a little contrived to allow for a demonstration of the Graphics.translate() method. You could have as easily passed the exact location of the number to drawString() rather than draw at the clock center and translate to the correct location.

Now, you should have a clock with tick marks and numbers as shown below:

Drawing the numbers on the watch face
Figure 301. Drawing the numbers on the watch face

11.7.5. Drawing the Hands

The clock will include three hands: Hour, Minute, and Second. You will use a separate GeneralPath object for each hand. For the positioning/angle of each, I will employ the following strategy:

  1. Draw the hand at the clock center pointing toward 12 (straight up).

  2. Translate the hand slightly down so that it overlaps the center.

  3. Rotate the hand at the appropriate angle for the current time, using the clock center as a pivot point.

Drawing the Second Hand:

For the "second" hand, you will use a simple line from the clock center to the inside edge of the medium tick mark at the 12 o’clock position.

GeneralPath secondHand = new GeneralPath();
secondHand.moveTo((float)cX, (float)cY);
secondHand.lineTo((float)cX, (float)(cY-(r-medTickLen)));

And you will translate it down slightly so that it overlaps the center. This translation will be performed on the GeneralPath object directly rather than through the Graphics context:

Shape translatedSecondHand = secondHand.createTransformedShape(
    Transform.makeTranslation(0f, 5)
);

Rotating the Second Hand::

The rotation of the second hand will be performed in the Graphics context through the rotate(angle, px, py) method. This requires you to calculate the angle. The px and py arguments constitute the pivot point of the rotation, which, in your case will be the clock center.

The rotation pivot point is expected to be in absolute screen coordinates rather than relative coordinates of the component. Therefore you need to get the absolute clock center position in order to perform the rotation.
// Calculate the angle of the second hand
Calendar calendar = Calendar.getInstance(TimeZone.getDefault());
double second = (double)(calendar.get(Calendar.SECOND));
double secondAngle = second/60.0*2.0*Math.PI;

// Get absolute center position of the clock
double absCX = getAbsoluteX()+cX-getX();
double absCY = getAbsoluteY()+cY-getY();

g.rotate((float)secondAngle, (int)absCX, (int)absCY);
g.setColor(0xff0000);
g.drawShape(
        translatedSecondHand,
        new Stroke(2f, Stroke.CAP_BUTT, Stroke.JOIN_BEVEL, 1f)
);
g.resetAffine();
Remember to call resetAffine() after you’re done with the rotation, or you will see some unexpected results on your form.

Drawing the Minute And Hour Hands:

The mechanism for drawing the hour and minute hands is largely the same as for the minute hand. There are a couple of added complexities though:

  1. You will make these hands trapezoidal, and almost triangular rather than using a simple line. Therefore the GeneralPath construction will be slightly more complex.

  2. Calculation of the angles will be slightly more complex because they need to take into account many parameters. For example: The hour hand angle is informed by both the hour of the day and the minute of the hour.

The remaining drawing code is as follows:

// Draw the minute hand
GeneralPath minuteHand = new GeneralPath();
minuteHand.moveTo((float)cX, (float)cY);
minuteHand.lineTo((float)cX+6, (float)cY);
minuteHand.lineTo((float)cX+2, (float)(cY-(r-tickLen)));
minuteHand.lineTo((float)cX-2, (float)(cY-(r-tickLen)));
minuteHand.lineTo((float)cX-6, (float)cY);
minuteHand.closePath();

// Translate the minute hand slightly down so it overlaps the center
Shape translatedMinuteHand = minuteHand.createTransformedShape(
    Transform.makeTranslation(0f, 5)
);

double minute = (double)(calendar.get(Calendar.MINUTE)) +
        (double)(calendar.get(Calendar.SECOND))/60.0;

double minuteAngle = minute/60.0*2.0*Math.PI;

// Rotate and draw the minute hand
g.rotate((float)minuteAngle, (int)absCX, (int)absCY);
g.setColor(0x000000);
g.fillShape(translatedMinuteHand);
g.resetAffine();


// Draw the hour hand
GeneralPath hourHand = new GeneralPath();
hourHand.moveTo((float)cX, (float)cY);
hourHand.lineTo((float)cX+4, (float)cY);
hourHand.lineTo((float)cX+1, (float)(cY-(r-longTickLen)*0.75));
hourHand.lineTo((float)cX-1, (float)(cY-(r-longTickLen)*0.75));
hourHand.lineTo((float)cX-4, (float)cY);
hourHand.closePath();

Shape translatedHourHand = hourHand.createTransformedShape(
    Transform.makeTranslation(0f, 5)
);

//Calendar cal = Calendar.getInstance().get
double hour = (double)(calendar.get(Calendar.HOUR_OF_DAY)%12) +
        (double)(calendar.get(Calendar.MINUTE))/60.0;

double angle = hour/12.0*2.0*Math.PI;
g.rotate((float)angle, (int)absCX, (int)absCY);
g.setColor(0x000000);
g.fillShape(translatedHourHand);
g.resetAffine();

11.7.6. The Final Result

At this point, you’ve a complete clock as shown below:

The final result - fully rendered watch face
Figure 302. The final result - fully rendered watch face

11.7.7. Animating the Clock

The current clock component is cool, but it’s static. It displays the time at the point the clock was created. You discussed low-level animations in the animation section of the guide, here you will show a somewhat more elaborate example.

In order to animate your clock so that it updates once per second, you need to do two things:

  1. Implement the animate() method to indicate when the clock needs to be updated/re-drawn.

  2. Register the component with the form so that it will receive animation "pulses".

The animate() method in the AnalogClock class:

Date currentTime = new Date();
long lastRenderedTime = 0;

@Override
public boolean animate() {
    if ( System.currentTimeMillis()/1000 != lastRenderedTime/1000){
        currentTime.setTime(System.currentTimeMillis());
        return true;
    }
    return false;
}

This method will be invoked on each "pulse" of the EDT. It checks the last time the clock was rendered and returns true if the clock hasn’t been rendered in the current "time second" interval. Otherwise it returns false. This ensures that the clock will be redrawn when the time changes.

11.8. Starting and Stopping the Animation

Animations can be started and stopped through the Form.registerAnimated(component) and Form.deregisterAnimated(component) methods. You chose to encapsulate these calls in start() and stop() methods in the component as follows:

public void start(){
    getComponentForm().registerAnimated(this);
}

public void stop(){
    getComponentForm().deregisterAnimated(this);
}

So the code to instantiate the clock, and start the animation would be something like:

AnalogClock clock = new AnalogClock();
parent.addComponent(clock);
clock.start();

11.9. Shape Clipping

Clipping is one of the core tenants of graphics programming, you define the boundaries for drawing and when you exceed said boundaries things aren’t drawn. Shape clipping allows you to clip based on any arbitrary Shape and not a rectangle, this allows some unique effects generated in runtime.

For example: this code allows you to draw a rather complex image of duke:

Image duke = null;
try {
    // duke.png is just the default Codename One icon copied into place
    duke = Image.createImage("/duke.png");
} catch(IOException err) {
    Log.e(err);
}
final Image finalDuke = duke;

Form hi = new Form("Shape Clip");

// We create a 50 x 100 shape, this is arbitrary since we can scale it easily
GeneralPath path = new GeneralPath();
path.moveTo(20,0);
path.lineTo(30, 0);
path.lineTo(30, 100);
path.lineTo(20, 100);
path.lineTo(20, 15);
path.lineTo(5, 40);
path.lineTo(5, 25);
path.lineTo(20,0);

Stroke stroke = new Stroke(0.5f, Stroke.CAP_ROUND, Stroke.JOIN_ROUND, 4);
hi.getContentPane().getUnselectedStyle().setBgPainter((Graphics g, Rectangle rect) -> {
    g.setColor(0xff);
    float widthRatio = ((float)rect.getWidth()) / 50f;
    float heightRatio = ((float)rect.getHeight()) / 100f;
    g.scale(widthRatio, heightRatio);
    g.translate((int)(((float)rect.getX()) / widthRatio), (int)(((float)rect.getY()) / heightRatio));
    g.setClip(path);
    g.setAntiAliased(true);
    g.drawImage(finalDuke, 0, 0, 50, 100);
    g.setClip(path.getBounds());
    g.drawShape(path, stroke);
    g.translate(-(int)(((float)rect.getX()) / widthRatio), -(int)(((float)rect.getY()) / heightRatio));
    g.resetAffine();
});

hi.show();
Shape Clipping used to clip the image of duke within the given shape
Figure 303. Shape Clipping used to clip the image of duke within the given shape
Notice that this functionality isn’t available on all platforms so you normally need to test if shaped clipping is supported using isShapeClipSupported().

11.10. The Coordinate System

The Codename One coordinate system follows the example of Swing (and many other - but not all- graphics libraries) and places the origin in the upper left corner of the screen. X-values grow to the right, and Y-values grow downward as illustrated below:

The Codename One graphics coordinate space
Figure 304. The Codename One graphics coordinate space

Therefore the screen origin is at the top left corner of the screen. Given this information, consider the method call on the Graphics context g:

g.drawRect(10,10, 100, 100);

Where would this rectangle be drawn on the screen?

If you answered something something like "10 pixels from the top, and 10 pixels from the left of the screen", you might be right. It depends on whether the graphics has a translation or transform applied to it. If there is currently a translation of (20,20) (that’s: 20 pixels to the right, and 20 pixels down), then the rectangle would be rendered at (30, 30).

You can always find out the current translation of the graphics context using the Graphics.getTranslateX() and Graphics.getTranslateY() methods:

// Find out the current translation
int currX = g.getTranslateX();
int currY = g.getTranslateY();

// Reset the translation to zeroes
g.translate(-currX, -currY);

// Now we are working in absolute screen coordinates
g.drawRect(10, 10, 100, 100);

// This rectangle should now be drawn at the exact screen
// coordinates (10,10).

//Restore the translation
g.translate(currX, currY);
This example glosses over issues such as clipping and transforms which may cause it to not work as you expect. For example: When painting a component inside its paint() method, there is a clip applied to the context so that the content you draw within the bounds of the component will be seen.

If, in addition, there is a transform applied that rotates the context 45 degrees clockwise, then the rectangle will be drawn at a 45 degree angle with its top left corner somewhere on the left edge of the screen.

Luckily you usually don’t have to worry about the exact screen coordinates for the things you paint. Most of the time, you will be concerned with relative coordinates.

11.10.1. Relative Coordinates

Usually, when you’re drawing onto a Graphics context, you’re doing so within the context of a Component’s paint() method (or one of its variants). In this case, you generally don’t care what the exact screen coordinates are of your drawing. you’re concerned with their relative location within the coordinate. You can leave the positioning (and even sizing) of the coordinate up to Codename One. Thank you for reading.

To demonstrate this, let’s create a simple component called Rectangle component, that simply draws a rectangle on the screen. You will use the component’s position and size to dictate the size of the rectangle to be drawn. And you will keep a 5 pixel padding between the edge of the component and the edge of your rectangle.

class RectangleComponent extends Component {
    public void paint(Graphics g){
        g.setColor(0x0000ff);
        g.drawRect(getX()+5, getY()+5, getWidth()-10, getHeight()-10);
    }
}

The result is as follows:

The rectangle component
Figure 305. The rectangle component
The x and y coordinates that are passed to the drawRect(x,y,w,h) method are relative to the component’s parent’s origin — not the component itself.. its parent. This is why you the x position is getX()+5 and not 5.

11.10.2. Transforms and Rotations

Unlike the Graphics drawXXX primitives, methods for setting transformations, including scale(x,y) and rotate(angle), are always applied in terms of screen coordinates. This can be confusing at first, because you may be unsure whether to provide a relative coordinate or an absolute coordinate for a given method.

The general rule is:

  1. All coordinates passed to the drawXXX() and fillXXX() methods will be subject to the graphics context’s transform and translation settings.

  2. All coordinates passed to the context’s transformation settings are considered to be screen coordinates, and aren’t subject to current transform and translation settings.

Let you take your RectangleComponent as an example. Suppose you want to rotate the rectangle by 45 degrees, your first attempt might look something like:

    class RectangleComponent extends Component {

        @Override
        protected Dimension calcPreferredSize() {
            return new Dimension(250,250);
        }

        public void paint(Graphics g) {
            g.setColor(0x0000ff);
            g.rotate((float) (Math.PI / 4.0));
            g.drawRect(getX() + 5, getY() + 5, getWidth() - 10, getHeight() - 10);
            g.rotate(-(float) (Math.PI / 4.0));
        }
    }
When performing rotations and transformations inside a paint() method, always remember to revert your transformations at the end of the method so that it doesn’t pollute the rendering pipeline for subsequent components.

The behavior of this rotation will vary based on where the component is rendered on the screen. To demonstrate this, let’s try to place five of these components on a form inside a BorderLayout and see how it looks:

    class MyForm extends Form {

        public MyForm() {
            super("Rectangle Rotations");
            for ( int i=0; i< 10; i++ ){
                this.addComponent(new RectangleComponent());
            }
        }
    }

The result is as follows:

Rotating the rectangle
Figure 306. Rotating the rectangle

This may not be an intuitive outcome since you drew 10 rectangle components, be you see a portion of one rectangle. The reason is that the rotate(angle) method uses the screen origin as the pivot point for the rotation. Components nearer to this pivot point will experience a less dramatic effect than components farther from it. In your case, the rotation has caused all rectangles except the first one to be rotated outside the bounds of their containing component - so they are being clipped. A more sensible solution for your component would be to place the rotation pivot point somewhere inside the component. That way all of the components would look the same. Some possibilities would be:

Top Left Corner:

        public void paint(Graphics g) {
            g.setColor(0x0000ff);
            g.rotate((float)(Math.PI/4.0), getAbsoluteX(), getAbsoluteY());
            g.drawRect(getX() + 5, getY() + 5, getWidth() - 10, getHeight() - 10);
            g.rotate(-(float) (Math.PI / 4.0), getAbsoluteX(), getAbsoluteY());
        }
Rotating the rectangle with wrong pivot point
Figure 307. Rotating the rectangle with wrong pivot point

Center:

public void paint(Graphics g) {
    g.setColor(0x0000ff);
    g.rotate(
        (float)(Math.PI/4.0),
        getAbsoluteX()+getWidth()/2,
        getAbsoluteY()+getHeight()/2
    );
    g.drawRect(getX() + 5, getY() + 5, getWidth() - 10, getHeight() - 10);
    g.rotate(
        -(float)(Math.PI/4.0),
        getAbsoluteX()+getWidth()/2,
        getAbsoluteY()+getHeight()/2
    );
}
Rotating the rectangle with the center pivot point
Figure 308. Rotating the rectangle with the center pivot point

You could also use the Graphics.setTransform() class to apply rotations and other complex transformations (including 3D perspective transforms), but I will leave that for its own topic as it’s a little bit more complex.

11.10.3. Global Alpha & Anti-Aliasing

So far you’ve relied on the per-pixel alpha stored in images and gradients. Graphics also lets you apply a global alpha multiplier to every draw call by using setAlpha(int) or concatenateAlpha(int) after checking isAlphaSupported(). Both methods accept values from 0 (fully transparent) to 255 (fully opaque) and remain active until you change them again. concatenateAlpha() is especially handy when you need to temporarily fade a component because it returns the previous alpha so you can restore it later.

Anti-aliasing can likewise be toggled at runtime. Call isAntiAliasingSupported() and isAntiAliasedTextSupported() to discover which hints the current port exposes, then use setAntiAliased(boolean) and setAntiAliasedText(boolean) to opt into smoother edges for shapes and glyphs respectively. These switches make it easy to balance rendering quality versus speed depending on the type of content you draw.

11.10.4. Event Coordinates

The coordinate system and event handling are closely tied. You can listen for touch events on a component by overriding the pointerPressed(x,y) method. The coordinates received in this method will be absolute screen coordinates, so you may need to do some conversions on these coordinates before using them in your drawXXX() methods.

For example: a pointerPressed() callback method can look like this:

public void pointerPressed(int x, int y) {
    addPoint(x-getParent().getAbsoluteX(), y-getParent().getAbsoluteY());
}

In this case you translated these points so that they would be relative to the origin of the parent component. This is because the drawXXX() methods for this component take coordinates relative to the parent component.

11.11. Images

Codename One has a few image types: loaded, RGB (built-in), RGB (Codename One), Mutable, EncodedImage, SVG, MultiImage, FontImage & Timeline. There are also URLImage, FileEncodedImage, FileEncodedImageAsync, StorageEncodedImage/Async that will be covered in the IO section.

All image types are mostly seamless to use and will work with drawImage and various image related image API’s for the most part with caveats on performance etc.

For animation images the code must invoke the animate() method on the image (this is done automatically by Codename One when placing the image as a background or as an icon!
You need to do it if you invoke drawImage in code rather than use a built-in component).

Performance and memory wise you should read the section below carefully and be aware of the image types you use. The Codename One designer tries to conserve memory and be "clever" by using EncodedImage. While these are great for low memory you need to understand the complexities of image locking and be aware that you might pay a penalty if you don’t.

Here are the pros/cons and logic behind every image type. This covers the logic of how it’s created:

11.11.1. Loaded Image

This is the basic image you get when loading an image from the jar or network using Image.createImage(String), Image.createImage(InputStream) & Image.createImage(byte array,int,int),…​

Some other API’s might return this image type but those API’s do so explicitly!

In some platforms calling getGraphics() on an image like this will throw an exception as it’s immutable). This is true for almost all other images as well.

This restriction might not apply for all platforms.

The image is stored in RAM based on device logic and should be reasonably efficient in terms of drawing speed. For example, it usually takes up a lot of RAM.

To calculate the amount of RAM taken by a loaded image you use the following formula:

Image Width * Image Height * 4 = Size In RAM in Bytes

For example: a 50x100 image will take up 20,000 bytes of RAM.

The logic behind this is simple, every pixel contains 3 color channels and an alpha component hence 3 bytes for color and one for alpha.

This isn’t the case for all images but it’s common and you prefer calculating for the worst case scenario. Even with JPEG’s that don’t include an alpha channel some OS’s might reuire that additional byte.

11.11.2. The RGB Image’s

There are two types of RGB constructed images that are different from one another but since they are both technically "RGB image’s" you’re bundling them under the same subsection.

Internal

This is a close cousin of the loaded image. This image is created using the method Image.createImage(int array, int, int) and receives the AARRGGBB data to form the image. it’s more efficient than the Codename One RGB image but can’t be modified, at least not on the pixel level.

The goal of this image type is to provide an easy way to render RGB data that isn’t modified efficiently at platform native speeds. it’s technically a standard "Loaded Image" internally.

RGBImage class

RGBImage is effectively an AARRGGBB array that can be drawn by Codename One.

On most platforms this is inefficient but for some pixel level manipulations there is no other way.

An RGBImage is constructed with an int array (int[]) that includes width*height elements. You can then modify the colors and alpha channel directly within the array and draw the image to any source using standard image drawing API’s.

This is inefficient in terms of rendering speed and memory overhead. Only use this technique if there is absolutely no other way!

11.11.3. EncodedImage

EncodedImage is the workhorse of Codename One. Images returned from resource files are EncodedImage and many API’s expect it.

The EncodedImage is effectively a loaded image that’s "hidden" and extracted as needed to remove the memory overhead associated with loaded image. When creating an EncodedImage the PNG (or JPEG etc.) is loaded to an array in RAM. Normally such images are small (relatively) so they can be kept in memory without much overhead.

When image information is needed (pixels) the image is decoded into RAM and kept in a weak/sort reference. This allows the image to be cached for performance and allows the garbage collector to reclaim it when the memory becomes scarce.

Since the fully decoded image can be pretty big (width X height X 4) the ability to store the encoded image can be pretty stark. For example: taking your example above a 50x100 image will take up 20,000 bytes of RAM for a loaded image but an EncodedImage can reduce that to 1kb-2kb of RAM.

An EncodedImage might be more expensive than a loaded image as it will take up both the encoded size and the loaded size. So the cost might be slightly bigger in some cases. it’s main value is its ability to shrink.

When drawing an EncodedImage it checks the weak reference cache and if the image is cached then it’s shown otherwise the image is loaded the encoded image cache it then drawn.

EncodedImage isn’t final and can be derived to produce complex image fetching strategies for example: the URLImage class that can dynamically download its content from the web.

EncodedImage can be instantiated through the create methods in the EncodedImage class. Pretty much any image can be converted into an EncodedImage through the createFromImage(Image, boolean) method.

EncodedImage Locking

Naturally loading the image is more expensive so we want the images that are on the current form to remain in cache (otherwise GC will thrash a lot). that’s where lock() kicks in, when lock() is active we keep a hard reference to the actual native image so it won’t get GC’d. This significantly improves performance!

Internally this is invoked automatically for background images, icons etc. which results in a huge performance boost. This makes sense since these images are currently showing and they will be in RAM anyway. However, if you use a complex renderer or custom drawing UI you should lock() your images where possible!

To verify that locking might be a problem you can launch the performance monitor tool (accessible from the simulator menu), if you get log messages that indicate that an unlocked image was drawn you might have a problem.

11.11.4. MultiImage

Multi images don’t physically exist as a concept within the Codename One API so there is no way to actually create them and they are in no way distinguishable from EnclodedImage.

The built-in support for multi images is in the resource file loading logic where a MultiImage is decoded and the version that matches the current DPI is physically loaded. From that point on user code can treat it like any other EnclodedImage.

9-image borders use multi images by default to keep their appearance more refined on the different DPI’s.

11.11.5. FontImage & Material Design Icons

FontImage allows using an icon font as if it was an image. You can specify the character, color and size and then treat the FontImage as if its a regular image. The huge benefits are that the font image can adapt to platform conventions in terms of color and easily scale to adapt to DPI.

You can generate icon fonts using free tools on the internet such as this. Icon fonts are a remarkably simple and powerful technique to create a small, modern applications.

Icon fonts can be created in 2 basic ways the first is explicitly by defining all of the elements within the font.

Form hi = new Form("Icon Font");
Font materialFont = FontImage.getMaterialDesignFont();
int w = Display.getInstance().getDisplayWidth();
FontImage fntImage = FontImage.createFixed("\uE161", materialFont, 0xff0000, w, w);
hi.add(fntImage);
hi.show();
Icon font from material design icons created with the fixed size of display width
Figure 309. Icon font from material design icons created with the fixed size of display width
The samples use the built-in material design icon font. This is for convenience so the sample will work out of the box, for everyone. For example you should be able to do this with any arbitrary icon font off the internet as long as its a valid TTF file.

A more common and arguably "correct" way to construct such an icon would be thru the Style object. The Style object can provide the color, size and background information needed by FontImage.

There are two versions of this method, the first one expects the Style object to have the correct icon font set to its font attribute. The second accepts a Font object as an argument. The latter is useful for a case where you want to reuse the same Style object that you defined for a general UI element for example: you can set an icon for a Button like this and it will take up the style of the Button:

Form hi = new Form("Icon Font");
Font materialFont = FontImage.getMaterialDesignFont();
int size = Display.getInstance().convertToPixels(6, true);
materialFont = materialFont.derive(size, Font.STYLE_PLAIN);
Button myButton = new Button("Save");
myButton.setIcon(FontImage.create("\uE161", myButton.getUnselectedStyle(), materialFont));
hi.add(myButton);
hi.show();
An image created from the Style object
Figure 310. An image created from the Style object
Notice that for this specific version of the method the size of the font is used to determine the icon size. In the other methods for FontImage creation the size of the font is ignored!
Material Design Icons

There are many icon fonts in the web, the field is rather volatile and constantly changing. For example, you wanted to have built-in icons that would allow you to create better looking demos and built-in components.

that’s why you picked the material design icon font for inclusion in the Codename One distribution. It features a relatively stable core set of icons, that aren’t IP encumbered.

You can use the built-in font directly as demonstrated above but there are far better ways to create a material design icon. To find the icon you want you can check out the material design icon gallery. For example: you used the save icon in the samples above.

To recreate the save icon from above you can do something like:

Form hi = new Form("Icon Font");
Button myButton = new Button("Save");
myButton.setIcon(FontImage.createMaterial(FontImage.MATERIAL_SAVE, myButton.getUnselectedStyle()));
hi.add(myButton);
Material save icon
Figure 311. Material save icon
Notice that the icon is smaller now as it’s calculated based on the font size of the Button UIID.

You can even write the code in a more terse style using:

Form hi = new Form("Icon Font");
Button myButton = new Button("Save");
FontImage.setMaterialIcon(myButton, FontImage.MATERIAL_SAVE);
hi.add(myButton);

This will produce the same result for slightly shorter syntax.

FontImage can conflict with some complex API’s that expect a "real" image underneath. Some odd issues can often be resolved by using the toImage() or toEncodedImage() methods to convert the scaled FontImage to a loaded image.

11.11.6. Timeline

Timeline’s allow rudimentary animation and enable GIF importing using the Codename One Designer. Effectively a timeline is a set of images that can be moved rotated, scaled & blended to provide interesting animation effects. It can be created manually using the Timeline class.

11.11.7. Image Masking

Image masking allows you to manipulate images by changing the opacity of an image according to a mask image. The mask image can be hardcoded or generated dynamically, it’s then converted to a Mask object that can be applied to any image. Notice that the masking process is computationally intensive, it should be done once and cached/saved.

The code below can convert an image to a rounded image:

Toolbar.setGlobalToolbar(true);
Form hi = new Form("Rounder", new BorderLayout());
Label picture = new Label("", "Container");
hi.add(BorderLayout.CENTER, picture);
hi.getUnselectedStyle().setBgColor(0xff0000);
hi.getUnselectedStyle().setBgTransparency(255);
Style s = UIManager.getInstance().getComponentStyle("TitleCommand");
Image camera = FontImage.createMaterial(FontImage.MATERIAL_CAMERA, s);
hi.getToolbar().addCommandToRightBar("", camera, (ev) -> {
    try {
        int width = Display.getInstance().getDisplayWidth();
        Image capturedImage = Image.createImage(Capture.capturePhoto(width, -1));
        Image roundMask = Image.createImage(width, capturedImage.getHeight(), 0xff000000);
        Graphics gr = roundMask.getGraphics();
        gr.setColor(0xffffff);
        gr.fillArc(0, 0, width, width, 0, 360);
        Object mask = roundMask.createMask();
        capturedImage = capturedImage.applyMask(mask);
        picture.setIcon(capturedImage);
        hi.revalidate();
    } catch(IOException err) {
        Log.e(err);
    }
});
Picture after the capture was complete and the resulted image was rounded. The background was set to red so the rounding effect will be more noticeable
Figure 312. Picture after the capture was complete and the resulted image was rounded. The background was set to red so the rounding effect will be more noticeable

Notice that this example is simplistic in order to be self contained. You often recommend that developers ship "ready made" mask images with their application which can allow complex effects on the images.

11.11.8. URLImage

URLImage is an image created with a URL, it implicitly downloads and adapts the image in the given URL while caching it locally. The typical adapt process scales the image or crops it to fit into the same size which is a hard restriction because of the way URLImage is implemented.

How Does URLImage Work?

The reason for the size restriction lies in the implementation of URLImage. URLImage is physically an animated image and so the UI thread tries to invoke its animate() method to refresh. The URLImage uses that call to check if the image was fetched and if not fetches it asynchronously.

Once the image was fetched the animate() method returns true to refresh the UI. During the loading process the placeholder is shown, the reason for the restriction in size is that image animations can’t "grow" the image. They are assumed to be fixed so the placeholder must match the dimensions of the resulting image.

The simple use case is pretty trivial:

Image i = URLImage.createToStorage(placeholder, "fileNameInStorage", "http://xxx/myurl.jpg", URLImage.RESIZE_SCALE);

Alternatively you can use the similar URLImage.createToFileSystem method instead of the Storage version.

This image can now be used anywhere a regular image will appear, it will initially show the placeholder image and then seamlessly replace it with the file after it was downloaded and stored. Notice that if you make changes to the image itself (for example: the scaled method) it will generate a new image which won’t be able to fetch the actual image.

Since ImageIO is used to perform the operations of the adapter interface its required that ImageIO will work. it’s currently working in Java SE, Android, iOS & Windows Phone.

If the file in the URL contains an image that’s too big it will scale it to match the size of the placeholder precisely!
There is also an option to fail if the sizes don’t match. Notice that the image that will be saved is the scaled image, this means you will have little overhead in downloading images that are the wrong size although you will get some artifacts.

The last argument is powerful, its an interface called URLImage.ImageAdapter and you can implement it to adapt the downloaded image in any way you like. For example: you can use an image mask to automatically create a rounded version of the downloaded image.

To do this you can override:

public EncodedImage adaptImage(EncodedImage downloadedImage, Image placeholderImage)

In the adapter interface and return the processed encoded image. If you do heavy processing (for example: rounded edge images) you would need to convert the processed image back to an encoded image so it can be saved. You would then also want to indicate that this operation should run asynchronously through the appropriate method in the class.

If you need to download the file instantly and not wait for the image to appear before download initiates you can explicitly invoke the fetch() method which will asynchronously fetch the image from the network. Notice that the downloading will still take time so the placeholder is still required.

Mask Adapter

A URLImage can be created with a mask adapter to apply an effect to an image. This allows you to round downloaded images or apply any sort of masking for example: you can adapt the round mask code above as such:

Image roundMask = Image.createImage(placeholder.getWidth(), placeholder.getHeight(), 0xff000000);
Graphics gr = roundMask.getGraphics();
gr.setColor(0xffffff);
gr.fillArc(0, 0, placeholder.getWidth(), placeholder.getHeight(), 0, 360);

URLImage.ImageAdapter ada = URLImage.createMaskAdapter(roundMask);
Image i = URLImage.createToStorage(placeholder, "fileNameInStorage", "http://xxx/myurl.jpg", ada);
URLImage In Lists

The biggest problem with image download service is with lists. You decided to attack this issue at the core by integrating URLImage support directly into GenericListCellRenderer which means it will work with MultiList, List & ContainerList. To use this support define the name of the component (name not UIID) to end with _URLImage and give it an icon to use as the placeholder. This is easy to do in the multilist by changing the name of icon to icon_URLImage then using this in the data:

map.put("icon_URLImage", urlToActualImage);

Make sure you also set a "real" icon to the entry in the GUI builder or in handcoded applications. This is important since the icon will be implicitly extracted and used as the placeholder value. Everything else should be handled automatically. You can use setDefaultAdapter & setAdapter on the generic list cell renderer to install adapters for the images. The default is a scale adapter although you might change that to scale fill in the future.

Style s = UIManager.getInstance().getComponentStyle("Button");
FontImage p = FontImage.createMaterial(FontImage.MATERIAL_PORTRAIT, s);
EncodedImage placeholder = EncodedImage.createFromImage(p.scaled(p.getWidth() * 3, p.getHeight() * 4), false);

Form hi = new Form("MultiList", new BorderLayout());

ArrayList<Map<String, Object>> data = new ArrayList<>();

data.add(createListEntry("A Game of Thrones", "1996", "http://www.georgerrmartin.com/wp-content/uploads/2013/03/GOTMTI2.jpg"));
data.add(createListEntry("A Clash Of Kings", "1998", "http://www.georgerrmartin.com/wp-content/uploads/2012/08/clashofkings.jpg"));
data.add(createListEntry("A Storm Of Swords", "2000", "http://www.georgerrmartin.com/wp-content/uploads/2013/03/stormswordsMTI.jpg"));
data.add(createListEntry("A Feast For Crows", "2005", "http://www.georgerrmartin.com/wp-content/uploads/2012/08/feastforcrows.jpg"));
data.add(createListEntry("A Dance With Dragons", "2011", "http://georgerrmartin.com/gallery/art/dragons05.jpg"));
data.add(createListEntry("The Winds of Winter", "2016 (please, please, please)", "http://www.georgerrmartin.com/wp-content/uploads/2013/03/GOTMTI2.jpg"));
data.add(createListEntry("A Dream of Spring", "Ugh", "http://www.georgerrmartin.com/wp-content/uploads/2013/03/GOTMTI2.jpg"));

DefaultListModel<Map<String, Object>> model = new DefaultListModel<>(data);
MultiList ml = new MultiList(model);
ml.getUnselectedButton().setIconName("icon_URLImage");
ml.getSelectedButton().setIconName("icon_URLImage");
ml.getUnselectedButton().setIcon(placeholder);
ml.getSelectedButton().setIcon(placeholder);
hi.add(BorderLayout.CENTER, ml);

The createListEntry method then looks like this:

private Map<String, Object> createListEntry(String name, String date, String coverURL) {
    Map<String, Object> entry = new HashMap<>();
    entry.put("Line1", name);
    entry.put("Line2", date);
    entry.put("icon_URLImage", coverURL);
    entry.put("icon_URLImageName", name);
    return entry;
}
A URL image fetched dynamically into the list model
Figure 313. A URL image fetched dynamically into the list model

11.12. Charts

Codename One includes a charting toolkit in the com.codename1.charts package that’s designed to integrate with regular UI layouts. Charts are drawn by creating an appropriate dataset and renderer pair, instantiating the matching chart view class, and wrapping it in a ChartComponent so it can be added to a form.

XYSeriesRenderer seriesRenderer = new XYSeriesRenderer();
seriesRenderer.setColor(0xff0000);

XYMultipleSeriesRenderer renderer = new XYMultipleSeriesRenderer();
renderer.addSeriesRenderer(seriesRenderer);

XYSeries series = new XYSeries("Sales");
series.add(1, 42);
series.add(2, 57);

XYMultipleSeriesDataset dataset = new XYMultipleSeriesDataset();
dataset.addSeries(series);

BarChart chart = new BarChart(dataset, renderer, BarChart.Type.DEFAULT);
Form form = new Form(new BorderLayout());
form.add(BorderLayout.CENTER, new ChartComponent(chart));
form.show();

The following classes are available for different kinds of visualisations:

Chart classDataset & rendererNotes

BarChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Draws categorical data as vertical bars. The Type constructor parameter controls default, stacked, or heaped bars.

BubbleChart

XYMultipleSeriesDataset containing XYValueSeries / XYMultipleSeriesRenderer

Represents each data point as a circle whose size is proportional to a third value.

CombinedXYChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Combines several XY chart types in a single plot using XYCombinedChartDef to map series to chart implementations.

CubicLineChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Smooths line series with cubic interpolation. Pass a smoothness factor to the constructor to control the curve.

DialChart

CategorySeries / DialRenderer

Renders one or more gauges on a dial, making it useful for KPI dashboards.

DoughnutChart

MultipleCategorySeries / DefaultRenderer

Shows hierarchical proportions as concentric rings around a common center.

LineChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Connects series of points using straight line segments. Supports optional fill areas and point markers.

PieChart

CategorySeries / DefaultRenderer

Splits a circle into slices that are proportional to each category value.

RadarChart

AreaSeries / DefaultRenderer

Draws a spider/web chart that compares multiple categories across the same set of axes.

RangeBarChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Variation of BarChart that uses paired min/max values to render ranges.

RoundChart

CategorySeries / DefaultRenderer

Abstract base class for circular charts. Use subclasses such as PieChart, DoughnutChart, or DialChart directly.

ScatterChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Plots unconnected X/Y points with configurable marker shapes.

TimeChart

XYMultipleSeriesDataset / XYMultipleSeriesRenderer

Extends LineChart with date-aware labelling on the X axis for time series data.

12. Events

Most events in Codename One are routed via the high-level events (e.g. action listener) but sometimes you need access to low-level events (e.g. when drawing via Graphics) that provide more fine grained access. Typically working with the higher level events is far more potable since it might map to different functionality on different devices.

12.1. high-level Events

high-level events are broadcast using an addListener/setListener - publish/subscribe system. Most of them are channeled via the EventDispatcher class which further simplifies that and makes sending events correctly far easier.

All events are fired on the Event Dispatch Thread, the EventDispatcher makes sure of that.

12.1.1. Chain Of Events

Since all events fire on the EDT some complexities occur. E.g.:

you have two listeners monitoring the same event (or related events e.g. pointer event and button click event both of which will fire when the button is touched).

When the event occurs you can run into a scenario like this:

  1. First event fires

  2. It shows a blocking dialog or invokes an "AndWait" API

  3. Second event fires after the dialog was dismissed!

This happens because events are processed in-order per cycle. Since the old EDT cycle is stuck (because of the Dialog) the rest of the events within the cycle can’t complete. New events are in a new EDT cycle so they can finish fine!

A workaround to this issue is to wrap the code in a callSerially, you shouldn’t do this universally as this can create a case of shifting the problem to the next EDT cycle. However, using callSerially will allow the current cycle to flush which should help.

Another workaround for the issue is avoiding blocking calls within an event chain.

12.1.2. Action Events

The most common high-level event is the ActionListener which allows binding a generic action event to pretty much anything. This is so ubiquitous in Codename One that it’s even used for networking (as a base class) and for some of the low-level event options.

E.g. you can bind an event callback for a Button by using:

Button b = new Button("Click Me");
b.addActionListener(new ActionListener() {
    public void actionPerformed(ActionEvent ev) {
        // button was clicked, you can do anything you want here...
    }
});

Or thanks to the Java 8 lambdas you can write it as:

Button b = new Button("Click Me");
b.addActionListener((ev) ->
    // button was clicked, you can do anything you want here...
});

Notice that the click will work whether the button was touched using a mouse, finger or keypad shortcut seamlessly with an action listener. Many components work with action events e.g. buttons, text components, slider etc.

There are quite a few types of high-level event types that are more specific to requirements.

Types Of Action Events

When an action event is fired it’s given a type, however this type might change as the event evolves e.g. a command triggered by a pointer event won’t include details of the original pointer event.

You can get the event type from getEventType(), this also gives you a rather exhaustive list of the possible event types for the action event.

Modern gesture components also publish custom action types. For example, SwipeableContainer dispatches ActionEvent.Type.Swipe when the top component is fully opened, allowing code to react to swipe gestures without monitoring low-level drags. Listening for these higher level events keeps gesture handling portable across touch and desktop targets.

Source Of Event

ActionEvent has a source object, what that source is depends heavily on the event type. For most component based events this is the component but there are some nuances.

The getComponent() method might not get the actual component. In case of a lead component such as MultiButton the underlying Button will be returned and not the MultiButton itself.

To get the component that you would logically think of as the source component use the getActualComponent() method.

Event Consumption

An ActionEvent can be consumed, once consumed it will no longer proceed down the chain of event processing. This is useful for some cases where we would like to block behavior from proceeding down the path.

E.g. the event dispatch thread allows us to listen to errors on the EDT using:

Display.getInstance().addEdtErrorHandler((e) -> {
    Exception err = (Exception)e.getSource();
    // ...
});

This will work great but you will still get the default error message from the EDT over that exception. To prevent the event from proceeding to the default error handling you can do this:

Display.getInstance().addEdtErrorHandler((e) -> {
    e.consume();
    Exception err = (Exception)e.getSource();
    // ...
});

Notice that you can check if an event was already consumed using the isConsumed() method but it’s pretty unlikely that you will receive a consumed event as the system will usually stop sending it.

NetworkEvent

NetworkEvent is a subclass of ActionEvent that’s passed to actionPerformed callbacks made in relation to generic network code. E.g.

NetworkManager.getInstance().addErrorListener(new ActionListener<NetworkEvent>() {
    public void actionPerformed(NetworkEvent ev) {
        // now we have access to the methods on NetworkEvent that provide more information about the network specific flags
    }
});

Or with Java 8 lambdas:

NetworkManager.getInstance().addErrorListener((ev) -> {
    // now we have access to the methods on NetworkEvent that provide more information about the network specific flags
});

The NetworkEvent allows the networking code to reuse the EventDispatcher infrastructure and to simplify event firing thru the EDT. But you should notice that some code might not be equivalent e.g. we could do this to read the input stream:

ConnectionRequest r = new ConnectionRequest() {
    @Override
    protected void readResponse(InputStream input) throws IOException {
        // read the input stream
    }
};

or you can do something similar using this code:

ConnectionRequest r = new ConnectionRequest();
r.addResponseListener((e) -> {
    byte[] data = (byte[])e.getMetaData();
    // work with the byte data
});

These seem similar but they have one important distinction. The latter code is invoked on the EDT, so if data is big it might slow down processing significantly. The ConnectionRequest is invoked on the network thread and so can process any amount of data without slowing down the UI significantly.

MessageEvent And The Cross-Platform Message Bus

Bridging to native code often means passing messages between Codename One Java and platform specific code. The cross-platform message bus provides a high-level abstraction for that by letting you post messages to the native layer and subscribe for messages that originate there. Use Display.postMessage() to send an MessageEvent to the platform, and Display.addMessageListener() to receive events that arrive from native code, JavaScript bridges, or background services. Message events include helpers like isPromptForAudioRecorder(), isPromptForAudioPlayer(), and getPromptPromise() that allow you to hook into permission prompts emitted by the JavaScript port so custom UI can respond to platform requests while keeping the event dispatch on the EDT. This API complements NetworkEvent by covering native-to-Java messaging without requiring direct low-level callbacks.

12.1.3. DataChangeListener

The DataChangedListener is used in several places to indicate that the underlying model data has changed:

  • TextField - the text field provides an action listener but that "fires" when the data input is complete. DataChangeListener fires with every key entered and thus allows functionality such as "auto complete" and is indeed used internally in the Codename One AutoCompleteTextField.

  • TableModel & ListModel - the model for the Table class notifies the view that its content has changed via this event, thus allowing the UI to refresh properly.

There is a exhaustive example of search that’s implemented using the DataChangedListener in the Toolbar section.

12.1.4. FocusListener

The focus listener allows us to track the currently "selected" or focused component. It isn’t as useful as it used to be in feature phones.

You can bind a focus listener to the Component itself and receive an event when it gained focus, or you can bind the listener to the Form and receive events for every focus change event within the hierarchy.

12.1.5. ScrollListener

ScrollListener allows tracking scroll events so UI elements can be adapted if necessary.

Normally scrolling is seamless and this event isn’t necessary, however if developers wish to "shrink" or "fade" an element on scrolling this interface can be used to achieve that. Notice that you should bind the scroll listener to the actual scrollable component and not to an arbitrary component.

E.g. in this code from the Flickr demo the Toolbar is faded based on scroll position:

public class CustomToolbar extends Toolbar implements ScrollListener {
    private int alpha;

    public CustomToolbar() {
    }

    public void paintComponentBackground(Graphics g) {
        int a = g.getAlpha();
        g.setAlpha(alpha);
        super.paintComponentBackground(g);
        g.setAlpha(a);
    }

    public void scrollChanged(int scrollX, int scrollY, int oldscrollX, int oldscrollY) {
        alpha = scrollY;
        alpha = Math.max(alpha, 0);
        alpha = Math.min(alpha, 255);
    }
}
There is a better way of implementing this exact effect using title animations illustrated here.

12.1.6. SelectionListener

The SelectionListener event is mostly used to broadcast list model selection changes to the list view. Since list supports the ActionListener event callback its usually the better option since it’s more coarse grained.

SelectionListener gets fired too often for events and that might result in a performance penalty. When running on non-touch devices list selection could be changed with the keypad and a specific fire button click would fire the action event, for those cases SelectionListener made a lot of sense. However, in touch devices this API isn’t as useful.

12.1.7. StyleListener

StyleListener allows components to track changes to the style objects. E.g. if the developer does something like:

cmp.getUnselectedStyle().setFgColor(0xffffff);

This will trigger a style event that will eventually lead to the component being repainted. This is quite important for the component class but not a important event for general user code. it’s recommended that developers don’t bind a style listener.

12.1.8. Component State Change Events

Component instances now publish lifecycle hooks that fire when they become initialized on a form and when they are removed. You can subscribe with Component.addStateChangeListener() to receive ComponentStateChangeEvent instances that indicate whether the component is transitioning to the initialized state. This is especially useful for running setup or teardown logic alongside focus, scroll, and selection listeners.

12.1.9. Event Dispatcher

When creating your own components and objects you sometimes want to broadcast your own events, for that purpose Codename One has the EventDispatcher class which saves a lot of coding effort in this regard. E.g. if you wish to provide an ActionListener event for components you can add this to your class:

private final EventDispatcher listeners = new EventDispatcher();

public void addActionListener(ActionListener a) {
    listeners.addListener(a);
}
public void removeActionListener(ActionListener a) {
    listeners.removeListener(a);
}

Then when you need to broadcast the event use:

private void fireEvent(ActionEvent ev) {
    listeners.fireActionEvent(ev);
}

12.2. low-level Events

low-level events map to "system" events directly. Touch events are considered low-level since they might expose platform specific nuances to your code.

E.g. one platform might send a large number of events during drag while another might send a few. Normally the high-level event handling hides those complexities but some of them trickle down into the low-level event handling.

Codename One tries to hide some of the complexities from the low-level events as well. However, due to the nature of the event types it’s a more challenging task.

low-level events can be bound in one of 3 ways:

  • Use one of the add listener methods in Form e.g. addPointerPressedListener.

  • Override one of the event callbacks on Form

  • Override one of the event callbacks on a Component.

When you override event callbacks on a Component the Component in question must be focusable and have focus at that point. This can be an advantage for some use cases as it will save you the need of handling unrelated events.

Each of those has advantages and disadvantages, specifically:

  • 'Form' based events and callbacks deliver pointer events in the 'Form' coordinate space.

  • 'Component' based events require focus

  • 'Form' based events can block existing functionality from proceeding thru the event chain e.g. you can avoid calling super in a form event and thus block other events from happening (e.g. block a listener or component event from triggering).

Table 8. Event type map

Listener

Override Form

Override Component

Coordinate System

Form

Form

Component

Block current functionality

Yes, just avoid super

Partially (event consume)

No

12.2.1. low-level Event Types

There are two basic types of low-level events: Key and Pointer.

Key events are relevant to physical keys and won’t trigger on virtual keyboard keys, to track those use a TextField with a DataChangeListener as mentioned above.

The pointer events (touch events) can be intercepted by overriding one or more of these methods in Component or Form. Notice that unless you want to block functionality you should probably invoke super when overriding:

public void pointerDragged(int[] x, int[] y)
public void pointerDragged(final int x, final int y)
public void pointerPressed(int[] x, int[] y)
public void pointerPressed(int x, int y)
public void pointerReleased(int[] x, int[] y)
public void pointerReleased(int x, int y)
public void pointerHover(int[] x, int[] y)
public void pointerHoverPressed(int[] x, int[] y)
public void pointerHoverReleased(int[] x, int[] y)
public void longPointerPress(int x, int y)
public void keyPressed(int keyCode)
public void keyReleased(int keyCode)
public void keyRepeated(int keyCode)

Notice that most pointer events have a version that accepts an array as an argument, this allows for multi-touch event handling by sending all the currently touched coordinates. Desktop and pen-enabled devices can also trigger hover events without a press. To respond to those you can override the pointerHover* callbacks on Form or Component, which are invoked before a button receives focus or a drag begins on those platforms.

While you can override longPointerPress, there is usually no need. The dedicated Component.addLongPressListener() helper wires long press detection into an action listener so you can keep gesture logic in the high-level API.

Drag and drop lifecycles also expose a completion hook. When Component.addDragFinishedListener() is registered it receives ActionEvent.Type.DragFinished once the framework has completed its cleanup, allowing you to reset state or trigger follow-up actions that should occur after the drag image is hidden.

12.2.2. Drag Event Sanitation

Drag events are quite difficult to handle properly across devices. Some devices send a ridiculous number of events for even the lightest touch while others send too little. It seems like too many drag events wouldn’t be a problem, however if we drag over a button then it might disable the buttons action event (since this might be the user trying to scroll).

Drag sensitivity is about the component being dragged which is why you’ve the method getDragRegionStatus that allows us to "hint" to the drag API whether you’re interested in drag events or not and if so in which directional bias.

E.g. if our component is a painting app where you’re trying to draw using drag gestures we would use code such as:

public class MyComponent extends Component {
    protected int getDragRegionStatus(int x, int y) {
        return DRAG_REGION_LIKELY_DRAG_XY;
    }
}

This indicates that we want all drag events on both AXIS to be sent as soon as possible. Notice that this doesn’t completely disable event sanitation.

12.3. BrowserNavigationCallback

The BrowserNavigationCallback isn’t quite an "event" but there is no real "proper" classification for it.

The callback method of this interface is invoked off the EDT! You must NEVER block this method and must not access UI or Codename One sensitive elements in this method!

The browser navigation callback is invoked directly from the native web component as it navigates to a new page. Because of that it’s invoked on the native OS thread and gives us a unique opportunity to handle the navigation ourselves as we see fit. that’s why it MUST be invoked on the native thread, since the native browser is pending on our response to that method, spanning an invokeAndBlock/callSerially would be to slow and would bog down the browser.

You can use the browser navigation callback to change the UI or even to invoke Java code from JavaScript code e.g.:

bc.setBrowserNavigationCallback((url) -> {
    if(url.startsWith("http://click")) {
        Display.getInstance().callSerially(() -> bc.execute("fnc('<p>You clicked!</p>')"));
        return false;
    }
    return true;
});

13. File system, storage, network, and parsing

13.1. JAR resources

Resources packaged within the "JAR" don’t belong in this section of the developer guide, but they are often confused with Storage and FileSystemStorage, so this is a good place to clarify them.

You can place arbitrary files within the src directory of a Codename One project. The file is packaged into the final distribution. In standard Java SE you can usually do something like:

InputStream i = getClass().getResourceAsStream("/myFile");

This isn’t guaranteed to work on all platforms and will probably fail on some. Instead, use something like:

InputStream i = Display.getInstance().getResourceAsStream(getClass(), "/myFile");

This isn’t the limitation. You can’t use hierarchies, so something like this fails:

InputStream i = Display.getInstance().getResourceAsStream(getClass(), "/res/myFile");

You can’t use relative paths either, so this also fails (notice the missing first slash):

InputStream i = Display.getInstance().getResourceAsStream(getClass(), "myFile");

Those limitations exist for portability. iOS and Android handle resources differently, so supporting the full Java SE semantics is unrealistic.

This is even worse in some cases. Because of the way iOS works with resources, some file names can fail. For example, names with the @ character or more than one . can cause problems (for example, file.ext.act).

Just like in Java SE, the entries within the "JAR" are read and can’t be modified. You can access the stream, but not the actual file.

13.2. Storage

Storage is accessed through the Storage class. it’s a flat, filesystem-like interface that can list, delete, and write named storage entries.

The Storage API also provides convenient methods to write objects to Storage and read them back with readObject and writeObject.

Objects in Storage are usually deleted when an app is uninstalled, but they are retained between application updates. A notable exception is Android, which on some devices keeps objects in Storage after uninstalling an app. To force Android to remove them on uninstall, use the build hint android.allowBackup=false.

The sample code below demonstrates listing storage content, adding and viewing entries, and deleting entries:

Toolbar.setGlobalToolbar(true);
Form hi = new Form("Storage", new BoxLayout(BoxLayout.Y_AXIS));
hi.getToolbar().addCommandToRightBar("+", null, e -> {
    TextField tf = new TextField("", "File Name", 20, TextField.ANY);
    TextArea body = new TextArea(5, 20);
    body.setHint("File Body");
    Command ok = new Command("OK");
    Command cancel = new Command("Cancel");
    Command result = Dialog.show("File Name", BorderLayout.north(tf).add(BorderLayout.CENTER, body), ok, cancel);
    if(ok == result) {
        try(OutputStream os = Storage.getInstance().createOutputStream(tf.getText());) {
            os.write(body.getText().getBytes("UTF-8"));
            createFileEntry(hi, tf.getText());
            hi.getContentPane().animateLayout(250);
        } catch(IOException err) {
            Log.e(err);
        }
    }
});
for(String file : Storage.getInstance().listEntries()) {
    createFileEntry(hi, file);
}
hi.show();

private void createFileEntry(Form hi, String file) {
   Label fileField = new Label(file);
   Button delete = new Button();
   Button view = new Button();
   FontImage.setMaterialIcon(delete, FontImage.MATERIAL_DELETE);
   FontImage.setMaterialIcon(view, FontImage.MATERIAL_OPEN_IN_NEW);
   Container content = BorderLayout.center(fileField);
   int size = Storage.getInstance().entrySize(file);
   content.add(BorderLayout.EAST, BoxLayout.encloseX(new Label(size + "bytes"), delete, view));
   delete.addActionListener(e -> {
       Storage.getInstance().deleteStorageFile(file);
       content.setY(hi.getWidth());
       hi.getContentPane().animateUnlayoutAndWait(150, 255);
       hi.removeComponent(content);
       hi.getContentPane().animateLayout(150);
   });
   view.addActionListener(e -> {
       try(InputStream is = Storage.getInstance().createInputStream(file);) {
           String s = Util.readToString(is, "UTF-8");
           Dialog.show(file, s, "OK", null);
       } catch(IOException err) {
           Log.e(err);
       }
   });
   hi.add(content);
}
List of files within the storage
Figure 314. List of files within the storage
Content of a file added to the storage
Figure 315. Content of a file added to the storage

13.2.1. The preferences API

Storage also offers a simple API in the form of the Preferences class. The Preferences class lets developers store simple variables, strings, numbers, booleans, and similar values without writing storage code. This is a common use case in applications. For example, you might need to store a server token:

Preferences.set("token", myToken);

You can then read the token like this:

String token = Preferences.get("token", null);

The backing store filename defaults to "codenameone.properties", but you can override it by calling Preferences.setPreferencesLocation(String) before your app touches the API. This is useful when you need separate preference namespaces per user or when you want to plug in an encrypted storage layer.

When you’ve a batch of updates, prefer the Preferences.set(Map<String,Object>) overload so that all values are persisted with a single disk write.

Preferences can also notify interested code when a key changes. Register a PreferenceListener with addPreferenceListener() to react to updates made in other parts of your code or triggered remotely through Codename One Push. Remember to remove listeners you no longer need to avoid leaks.

This gets somewhat confusing with primitive numbers for example: if you use Preferences.set("primitiveLongValue", myLongNumber) then invoke Preferences.get("primitiveLongValue", 0) you might get an exception!
This would happen because the value is physically a Long object but you’re trying to get an Integer. The workaround is to remain consistent and use code like this Preferences.get("primitiveLongValue", (long)0).

13.3. File System

FileSystemStorage provides file system access. It maps to the underlying OS’s file system API providing most of the common operations expected from a file API somewhat in the vain of java.io.File & java.io.FileInputStream for example: opening, renaming, deleting etc.

Notice that the file system API is somewhat platform specific in its behavior. All paths used the API should be absolute otherwise they aren’t guaranteed to work.

The main reason java.io.File & java.io.FileInputStream were not supported directly has a lot to do with the richness of those two API’s. They effectively allow saving a file anywhere, however mobile devices are far more restrictive and don’t allow apps to see/modify files that are owned by other apps.

13.3.1. File Paths & App Home

All paths in FileSystemStorage are absolute, this simplifies the issue of portability significantly since the concept of relativity and current working directory aren’t portable.

All URL’s use the / as their path separator you try to enforce this behavior even in Windows.

Directories end with the / character and thus can be easily distinguished by their name.

The FileSystemStorage API provides a getRoots() call to list the root directories of the file system (you can then "dig in" through the listFiles API). For example, this is confusing and unintuitive for developers.

To simplify the process of creating/reading files you added the getAppHomePath() method. This method allows you to obtain the path to a directory where files can be stored/read.

You can use this directory to place an image to share as you did in the share sample.

A common Android hack is to write files to the SDCard storage to share them among apps. Android 4.x disabled the ability to write to arbitrary directories on the SDCard even when the appropriate permission was requested.

A more advanced usage of the FileSystemStorage API can be a FileSystemStorage Tree:

Form hi = new Form("FileSystemTree", new BorderLayout());
TreeModel tm = new TreeModel() {
    @Override
    public Vector getChildren(Object parent) {
        String[] files;
        if(parent == null) {
            files = FileSystemStorage.getInstance().getRoots();
            return new Vector<Object>(Arrays.asList(files));
        } else {
            try {
                files = FileSystemStorage.getInstance().listFiles((String)parent);
            } catch(IOException err) {
                Log.e(err);
                files = new String[0];
            }
        }
        String p = (String)parent;
        Vector result = new Vector();
        for(String s : files) {
            result.add(p + s);
        }
        return result;
    }

    @Override
    public boolean isLeaf(Object node) {
        return !FileSystemStorage.getInstance().isDirectory((String)node);
    }
};
Tree t = new Tree(tm) {
    @Override
    protected String childToDisplayLabel(Object child) {
        String n = (String)child;
        int pos = n.lastIndexOf("/");
        if(pos < 0) {
            return n;
        }
        return n.substring(pos);
    }
};
hi.add(BorderLayout.CENTER, t);
hi.show();
Simple sample of a tree for the FileSystemStorage API
Figure 316. Simple sample of a tree for the FileSystemStorage API

13.3.2. Storage vs. File System

The question of storage vs. file system is often confusing for novice mobile developers. This embeds two separate questions:

  • Why are there 2 API’s where one would have worked?

  • Which one should I pick?

The main reasons for the 2 API’s are technical. Many OS’s provide 2 ways of accessing data specific to the app and this is reflected within the API. For example: on Android the FileSystemStorage maps to API’s such as java.io.FileInputStream whereas the Storage maps to Context.openFileInput().

The secondary reason for the two API’s is conceptual. FileSystemStorage is more powerful and in a sense provides more ways to fail, this is compounded by the complex on-device behavior of the API. Storage is designed to be friendlier to the uninitiated and more portable.

You should pick Storage unless you’ve a specific requirement that prevents it. Some API’s such as Capture expect a FileSystemStorage URI so in those cases this would also be a requirement.

Another case where FileSystemStorage is beneficial is the case of hierarchy or native API usage. If you need a a directory structure or need to communicate with a native API the FileSystemStorage approach is usually easier.

In some OS’s the FileSystemStorage API can find the content of the Storage API. As one is implemented on top of the other. This is undocumented behavior that can change at any moment!

To summarize the differences between the 3 file storage options:

Table 9. Compare Storage, FileSystem & Jar Resources
OptionStorageFile SystemJAR Resource

Main Use Case

General application Data

low-level access

Ship data within the app

Initial State

Blank

Blank

As defined by developer

Modifiable

Yes

Yes

No

Supports Hierarchies

No

Yes

No

13.4. SQL

Most new devices contain one version of sqlite or another; sqlite is a lightweight SQL database designed for embedding into devices. For portability recommend avoiding SQL altogether since it’s both fragmented between devices (different sqlite versions) and isn’t supported on all devices.

In general SQL seems overly complex for most embedded device programming tasks.

Portability Of SQLite

SQLite is supported on iOS, Android, JavaScript, and Desktop/Simulator builds. The JavaScript port relies on the browser’s WebSQL implementation, so it may be unavailable in environments that have already removed that feature.

The biggest issue with SQLite portability is in iOS. The SQLite version for most platforms is threadsafe and as a result very stable. However, the iOS version isn’t!

This might not seem like a big deal normally, however if you forget to close a connection the GC might close it for you thus producing a crash. This is such a common occurrence that Codename One logs a warning when the GC collects a database resource on the simulator.

SQL is pretty powerful and well suited for common tabular data. The Codename One SQL API is similar in spirit to JDBC but considerably simpler since many of the abstractions of JDBC designed for pluggable database architecture make no sense for a local database.

The Database API is a high-level abstraction that allows you to open an arbitrary database file using syntax such as:

Database db = Display.getInstance().openOrCreate("databaseName");

Some SQLite apps ship with a "ready made" database. You allow you to replace the DB file by using the code:

String path = Display.getInstance().getDatabasePath("databaseName");

You can then use the FileSystemStorage class to write the content of your DB file into the path. Notice that it must be a valid SQLite file!

getDatabasePath() isn’t supported in the Javascript port. It will always return null.

This is useful for applications that need to synchronize with a central server or applications that ship with a large database as part of their core product.

Working with a database is pretty trivial, the application logic below can send arbitrary queries to the database and present the results in a Table. You can probably integrate this code into your app as a debugging tool:

Toolbar.setGlobalToolbar(true);
Style s = UIManager.getInstance().getComponentStyle("TitleCommand");
FontImage icon = FontImage.createMaterial(FontImage.MATERIAL_QUERY_BUILDER, s);
Form hi = new Form("SQL Explorer", new BorderLayout());
hi.getToolbar().addCommandToRightBar("", icon, (e) -> {
    TextArea query = new TextArea(3, 80);
    Command ok = new Command("Execute");
    Command cancel = new Command("Cancel");
    if(Dialog.show("Query", query, ok, cancel) == ok) {
        Database db = null;
        Cursor cur = null;
        try {
            db = Display.getInstance().openOrCreate("MyDB.db");
            if(query.getText().startsWith("select")) {
                cur = db.executeQuery(query.getText());
                int columns = cur.getColumnCount();
                hi.removeAll();
                if(columns > 0) {
                    boolean next = cur.next();
                    if(next) {
                        ArrayList<String[]> data = new ArrayList<>();
                        String[] columnNames = new String[columns];
                        for(int iter = 0 ; iter < columns ; iter++) {
                            columnNames[iter] = cur.getColumnName(iter);
                        }
                        while(next) {
                            Row currentRow = cur.getRow();
                            String[] currentRowArray = new String[columns];
                            for(int iter = 0 ; iter < columns ; iter++) {
                                currentRowArray[iter] = currentRow.getString(iter);
                            }
                            data.add(currentRowArray);
                            next = cur.next();
                        }
                        Object[][] arr = new Object[data.size()][];
                        data.toArray(arr);
                        hi.add(BorderLayout.CENTER, new Table(new DefaultTableModel(columnNames, arr)));
                    } else {
                        hi.add(BorderLayout.CENTER, "Query returned no results");
                    }
                } else {
                    hi.add(BorderLayout.CENTER, "Query returned no results");
                }
            } else {
                db.execute(query.getText());
                hi.add(BorderLayout.CENTER, "Query completed successfully");
            }
            hi.revalidate();
        } catch(IOException err) {
            Log.e(err);
            hi.removeAll();
            hi.add(BorderLayout.CENTER, "Error: " + err);
            hi.revalidate();
        } finally {
            Util.cleanup(db);
            Util.cleanup(cur);
        }
    }
});
hi.show();
Querying the temp demo generated by the SQLDemo application
Figure 317. Querying the temp demo generated by the SQLDemo application
Issuing a query
Figure 318. Issuing a query

13.5. Network Manager & Connection Request

One of the more common problems in Network programming is spawning a new thread to handle the network operations. In Codename One this is done seamlessly and becomes unessential thanks to the NetworkManager.

NetworkManager effectively alleviates the need for managing network threads by managing the complexity of network threading. The connection request class can be used to facilitate web service requests when coupled with the JSON/XML parsing capabilities.

To open a connection one needs to use a ConnectionRequest object, which has some similarities to the networking mechanism in JavaScript but is obviously somewhat more elaborate.

You can send a get request to a URL using something like:

ConnectionRequest request = new ConnectionRequest(url, false);
request.addResponseListener((e) -> {
    // process the response
});

// request will be handled asynchronously
NetworkManager.getInstance().addToQueue(request);

Notice that you can also implement the same thing and much more by avoiding the response listener code and instead overriding the methods of the ConnectionRequest class which offers many points to override for example:

ConnectionRequest request = new ConnectionRequest(url, false) {
   protected void readResponse(InputStream input) {
        // just read from the response input stream
   }

   protected void postResponse() {
        // invoked on the EDT after processing is complete to allow the networking code
        // to update the UI
   }

   protected void buildRequestBody(OutputStream os) {
        // writes post data, by default this "just works" but if you want to write this
       // manually then override this
   }
};
NetworkManager.getInstance().addToQueue(request);
Notice that overriding buildRequestBody(OutputStream) will work for POST requests and will replace writing the arguments
You don’t need to close the output/input streams passed to the request methods. They are implicitly cleaned up.

NetworkManager also supports synchronous requests which work in a similar way to Dialog through the invokeAndBlock call and thus don’t block the EDT [9] illegally. For example: you can do something like this:

ConnectionRequest request = new ConnectionRequest(url, false);
// request will be handled synchronously
NetworkManager.getInstance().addToQueueAndWait(request);
byte[] resultOfRequest = request.getData();

Notice that in this case the addToQueueAndWait method returned after the connection completed. Also notice that this was totally legal to do on the EDT!

13.5.1. Timeouts & Retries

Each request can override the global timeout using setTimeout(int), which expects a duration in milliseconds. This is especially useful when you’re talking to endpoints that occasionally need a longer window than the default NetworkManager setting. You can also configure how many times Codename One should retry a failing call silently by using setSilentRetryCount(int). When the silent retry limit is reached the standard error handling kicks in (for example: listeners fire, fail dialogs show, etc.).

13.5.2. Threading

By default the NetworkManager launches with a single network thread. This is sufficient for simple applications that don’t do too much networking but if you need to fetch many images concurrently and perform web services in parallel this might be an issue.

Once you increase the thread count there is no guarantee of order for your requests. Requests might not execute in the order with which you added them to the queue!

To update the number of threads use:

NetworkManager.getInstance().updateThreadCount(4);

All the callbacks in the ConnectionRequest occur on the network thread and not on the EDT!

There is one exception to this rule which is the postResponse() method designed to update the UI after the networking code completes.

Never change the UI from a ConnectionRequest callback. You can either use a listener on the ConnectionRequest, use postResponse() (which is the exception to this rule) or wrap your UI code with callSerially.

13.5.3. VPN Detection (Best Effort)

NetworkManager includes two APIs for querying VPN state:

NetworkManager nm = NetworkManager.getInstance();
if (nm.isVPNDetectionSupported()) {
    boolean vpnActive = nm.isVPNActive();
}
This is a heuristic signal, not a security control.

Both Android and iOS implementations rely on platform networking metadata and interface-name patterns (for example: tun, ppp, utun, ipsec). This means the result can be wrong in either direction:

  • False negatives: Some VPNs may hide or avoid these patterns.

  • False positives: Other virtual/tunnel interfaces may look like VPNs.

Use this API for UX or diagnostics (for example: warnings, telemetry, or logging), not for access control or fraud prevention by itself.

13.5.4. Arguments, Headers & Methods

HTTP/S is a complex protocol that expects complex encoded data for its requests. Codename One tries to simplify and abstract most of these complexities behind common sense API’s while still providing the full low-level access you would expect from such an API.

Arguments

HTTP supports many "request methods", most commonly GET & POST but also a few others such as HEAD, PUT, DELETE etc.

Arguments in HTTP are passed differently between GET and POST methods. that’s what the setPost method in Codename One determines, whether arguments added to the request should be placed using the GET semantics or the POST semantics.

So if you continue your example from above you can do something like this:

ConnectionRequest request = new ConnectionRequest(url, false);
request.addArgument("MyArgName", value);

This will implicitly add a get argument with the content of value. Notice that you don’t care what value is. it’s implicitly HTTP encoded based on the get/post semantics. In this case it will use the get encoding since you passed false to the constructor.

A simpler implementation could do something like this:

ConnectionRequest request = new ConnectionRequest(url +
    "MyArgName=" + Util.encodeUrl(value), false);

This would be almost identical but doesn’t provide the convenience for switching back and forth between GET/POST and it isn’t as fluent.

You can skip the encoding in complex cases where server code expects illegal HTTP characters (this happens) using the addArgumentNoEncoding method. You can also add many arguments with the same key using addArgumentArray.

Methods

As you explained above, the setPost() method allows you to manipulate the get/post semantics of a request. This implicitly changes the POST or GET method submitted to the server.

For example, if you wish to have finer grained control over the submission process for example: for making a HEAD request you can do this with code like:

ConnectionRequest request = new ConnectionRequest(url, false);
request.setHttpMethod("HEAD");
Headers

When communicating with HTTP servers you often pass data within headers mostly for authentication/authorization but also to convey various properties.

Some headers are built-in as direct API’s for example: content type is directly exposed within the API since it’s a pretty common use case. You can set the content type of a post request using:

ConnectionRequest request = new ConnectionRequest(url, true);
request.setContentType("text/xml");

You can also add any arbitrary header type you want, for example: a common use case is basic authorization where the authorization header includes the Base64 encoded user/password combination as such:

String authCode = user + ":" + password;
String authHeader = "Basic " + Base64.encode(authCode.getBytes());
request.addRequestHeader("Authorization", authHeader);

This can be tedious to do if you want all requests from your app to use this header. For this use case you can use:

String authCode = user + ":" + password;
String authHeader = "Basic " + Base64.encode(authCode.getBytes());
NetworkManager.getInstance().addDefaultHeader("Authorization", authHeader);
Server Headers

Server returned headers are a bit trickier to read. You need to subclass the connection request and override the readHeaders method for example:

ConnectionRequest request = new ConnectionRequest(url, false) {
    protected void readHeaders(Object connection) throws IOException {
        String[] headerNames = getHeaderFieldNames(connection);
        for(String headerName : headerNames) {
            String headerValue = getHeader(headerName);
            //....
        }
    }
    protected void readResponse(InputStream input) {
        // just read from the response input stream
    }
};
NetworkManager.getInstance().addToQueue(request);

Here you can extract the headers one by one to handle complex headers such as cookies, authentication etc.

Error Handling

As you noticed above practically all of the methods in the ConectionRequest throw IOException. This allows you to avoid the try/catch semantics and let the error propagate up the chain so it can be handled uniformly by the application.

There are two distinct placed where you can handle a networking error:

  • The ConnectionRequest - by overriding callback methods

  • The NetworkManager error handler

Notice that the NetworkManager error handler takes precedence thus allowing you to define a global policy for network error handling by consuming errors.

For example: if I would like to block all network errors from showing anything to the user I could do something like this:

NetworkManager.getInstance().addToQueue(request);
NetworkManager.getInstance().addErrorListener((e) -> e.consume());

The error listener is invoked first with the NetworkEvent matching the error. Consuming the event prevents it from propagating further down the chain into the ConnectionRequest callbacks.

You can also override the error callbacks of the various types in the request for example: in the case of a server error code you can do:

ConnectionRequest request = new ConnectionRequest(url, false) {
    protected void handleErrorResponseCode(int code, String message) {
        if(code == 444) {
            // do something
        }
    }
    protected void readResponse(InputStream input) {
        // just read from the response input stream
    }
};
NetworkManager.getInstance().addToQueue(request);
The error callback callback is triggered in the network thread!
As a result it can’t access the UI to show a Dialog or anything like that.

Another approach is to use the setFailSilently(true) method on the ConnectionRequest. This will prevent the ConnectionRequest from displaying any errors to the user. it’s a powerful strategy if you use the synchronous version of the API’s for example:

ConnectionRequest request = new ConnectionRequest(url, false);
request.setFailSilently(true);
NetworkManager.getInstance().addToQueueAndWait(request);
if(request.getResponseCode() != 200) {
    // probably an error...
}
This code will work with the synchronous "AndWait" version of the method since the response code will take a while to return for the non-wait version.
Error Stream

When you get an error code that isn’t 200/300 you ignore the result. This is problematic as the result might contain information you need. For example: many webservices provide further XML/JSON based details describing the reason for the error code.

Calling setReadResponseForErrors(true) will trigger a mode where even errors will receive the readResponse callback with the error stream. This also means that API’s like getData and the listener API’s will also work correctly in case of error.

13.5.5. GZIP

Gzip is a common compression format based on the lz algorithm, it’s used by web servers around the world to compress data.

Codename One supports GZipInputStream and GZipOutputStream, which allow you to compress data seamlessly into a stream and extract compressed data from a stream. This is useful and can be applied to every arbitrary stream.

Codename One also features a GZConnectionRequest, which will automatically unzip an HTTP response if it’s indeed gzipped. Notice that some devices (iOS) always request gzip’ed data and always decompress it for you, however in the case of iOS it doesn’t remove the gziped header. The GZConnectionRequest is aware of such behaviors so it’s better to use that when connecting to the network (if applicable).

By default GZConnectionRequest doesn’t request gzipped data ( unzips it when its received) but its pretty easy to do so add the HTTP header Accept-Encoding: gzip for example:

GZConnectionRequest con = new GZConnectionRequest();
con.addRequestHeader("Accept-Encoding", "gzip");

Do the rest as usual and you should have smaller responses from the servers.

13.5.6. File Upload

MultipartRequest tries to simplify the process of uploading a file from the local device to a remote server.

You can always submit data in the buildRequestBody but this is flaky and has some limitations in terms of devices/size allowed. HTTP standardized file upload capabilities thru the multipart request protocol, this is implemented by countless servers and is well documented. Codename One supports this out of the box:

MultipartRequest request = new MultipartRequest();
request.setUrl(url);
request.addData("myFileName", fullPathToFile, "text/plain")
NetworkManager.getInstance().addToQueue(request);
MultipartRequest is a ConnectionRequest most stuff you expect from there should work. Even addArgument etc.

Since you assume most developers reading this will be familiar with Java here is the way to implement the multipart upload in the servlet API:

@WebServlet(name = "UploadServlet", urlPatterns = {"/upload"})
@MultipartConfig(fileSizeThreshold = 1024 * 1024 * 100, // 10 MB
        maxFileSize = 1024 * 1024 * 150, // 50 MB
        maxRequestSize = 1024 * 1024 * 200)      // 100 MB
public class UploadServlet extends HttpServlet {

    @Override
    public void doPost(HttpServletRequest req, HttpServletResponse res)
            throws ServletException, IOException {
        Collection<Part> parts = req.getParts();
        Part data = parts.iterator().next();
        try(InputStream is = data.getInputStream();) {}
            // store or do something with the input stream
        }
    }
}

13.5.7. Parsing

Codename One has many built in parsers for JSON, XML, CSV & Properties formats. You can use those parsers to read data from the Internet or data that’s shipping with your product. For example: use the CSV data to setup default values for your application.

All your parsers are designed with simplicity and small distribution size; they don’t validate and will fail in odd ways when faced with broken data. The main logic behind this is that validation takes up CPU time on the device where CPU is a precious resource.

Parsing CSV

CSV is probably the easiest to use, the "Comma Separated Values" format is a list of values separated by commas (or some other character) with new lines to indicate another row in the table. These usually map well to an Excel spreadsheet or database table and are supported by default in all spreadsheets.

To parse a CSV use the CSVParser class as such:

Form hi = new Form("CSV Parsing", new BorderLayout());
CSVParser parser = new CSVParser();
try(Reader r = new CharArrayReader("1997,Ford,E350,\"Super, \"\"luxurious\"\" truck\"".toCharArray());) {
    String[][] data = parser.parse(r);
    String[] columnNames = new String[data[0].length];
    for(int iter=  0 ; iter < columnNames.length ; iter++) {
        columnNames[iter] = "Col " + (iter + 1);
    }
    TableModel tm = new DefaultTableModel(columnNames, data);
    hi.add(BorderLayout.CENTER, new Table(tm));
} catch(IOException err) {
    Log.e(err);
}
hi.show();
CSV parsing results notice the properly escaped parentheses and comma
Figure 319. CSV parsing results, notice the properly escaped parentheses and comma

The data contains a two dimensional array of the CSV content. You can change the delimiter character by using the CSVParser constructor that accepts a character.

Notice that you used CharArrayReader from the com.codename1.io package for this sample. Normally you would want to use java.util.InputStreamReader for real world data.
JSON

The JSON ("Java Script Object Notation") format is popular on the web for passing values to/from webservices since it works so well with JavaScript. Parsing JSON is as easy but has two different variations. You can use the JSONParser class to build a tree of the JSON data as such:

JSONParser parser = new JSONParser();
Hashtable response = parser.parse(reader);

The response is a Map containing a nested hierarchy of Collection (java.util.List), Strings and numbers to represent the content of the submitted JSON. To extract the data from a specific path iterate the Map keys and recurs into it.

The sample below uses results from an API of ice and fire that queries structured data about the "Song Of Ice & Fire" book series. Here is a sample result returned from the API for the query http://www.anapioficeandfire.com/api/characters?page=5&pageSize=3 :

[
  {
    "url": "http://www.anapioficeandfire.com/api/characters/13",
    "name": "Chayle",
    "culture": "",
    "born": "",
    "died": "In 299 AC, at Winterfell",
    "titles": [
      "Septon"
    ],
    "aliases": [],
    "father": "",
    "mother": "",
    "spouse": "",
    "allegiances": [],
    "books": [
      "http://www.anapioficeandfire.com/api/books/1",
      "http://www.anapioficeandfire.com/api/books/2",
      "http://www.anapioficeandfire.com/api/books/3"
    ],
    "povBooks": [],
    "tvSeries": [],
    "playedBy": []
  },
  {
    "url": "http://www.anapioficeandfire.com/api/characters/14",
    "name": "Gillam",
    "culture": "",
    "born": "",
    "died": "",
    "titles": [
      "Brother"
    ],
    "aliases": [],
    "father": "",
    "mother": "",
    "spouse": "",
    "allegiances": [],
    "books": [
      "http://www.anapioficeandfire.com/api/books/5"
    ],
    "povBooks": [],
    "tvSeries": [],
    "playedBy": []
  },
  {
    "url": "http://www.anapioficeandfire.com/api/characters/15",
    "name": "High Septon",
    "culture": "",
    "born": "",
    "died": "",
    "titles": [
      "High Septon",
      "His High Holiness",
      "Father of the Faithful",
      "Voice of the Seven on Earth"
    ],
    "aliases": [
      "The High Sparrow"
    ],
    "father": "",
    "mother": "",
    "spouse": "",
    "allegiances": [],
    "books": [
      "http://www.anapioficeandfire.com/api/books/5",
      "http://www.anapioficeandfire.com/api/books/8"
    ],
    "povBooks": [],
    "tvSeries": [
      "Season 5"
    ],
    "playedBy": [
      "Jonathan Pryce"
    ]
  }
]

You will place that into a file named "anapioficeandfire.json" in the src directory to make the next sample simpler:

Form hi = new Form("JSON Parsing", new BoxLayout(BoxLayout.Y_AXIS));
JSONParser json = new JSONParser();
try(Reader r = new InputStreamReader(Display.getInstance().getResourceAsStream(getClass(), "/anapioficeandfire.json"), "UTF-8");) {
    Map<String, Object> data = json.parseJSON(r);
    java.util.List<Map<String, Object>> content = (java.util.List<Map<String, Object>>)data.get("root"); (1)
    for(Map<String, Object> obj : content) { (2)
        String url = (String)obj.get("url");
        String name = (String)obj.get("name");
        java.util.List<String> titles =  (java.util.List<String>)obj.get("titles"); (3)
        if(name == null || name.length() == 0) {
            java.util.List<String> aliases = (java.util.List<String>)obj.get("aliases");
            if(aliases != null && aliases.size() > 0) {
                name = aliases.get(0);
            }
        }
        MultiButton mb = new MultiButton(name);
        if(titles != null && titles.size() > 0) {
            mb.setTextLine2(titles.get(0));
        }
        mb.addActionListener((e) -> Display.getInstance().execute(url));
        hi.add(mb);
    }
} catch(IOException err) {
    Log.e(err);
}
hi.show();
1The JSONParser returns a Map which is great if the root object is a Map but in some cases its a list of elements (as is the case above). In this case a special case "root" element is created to contain the actual list of elements.
2You rely that the entries are all maps, this might not be the case for every API type.
3Notice that the "titles" and "aliases" entries are both lists of elements. You use java.util.List to avoid a clash with com.codename1.ui.List.
Parsed JSON result
Figure 320. Parsed JSON result, clicking the elements opens the URL from the JSON
The structure of the returned map is sometimes unintuitive when looking at the raw JSON. The easiest thing to do is set a breakpoint on the method and use the inspect variables capability of your IDE to inspect the returned element hierarchy while writing the code to extract that data

An alternative approach is to use the static data parse() method of the JSONParser class and implement a callback parser for example:

JSONParser.parse(reader, callback);

Notice that a static version of the method is used! The callback object is an instance of the JSONParseCallback interface, which includes many methods. These methods are invoked by the parser to indicate internal parser states, this is similar to the way traditional XML SAX event parsers work.

XML Parsing

The XMLParser started its life as an HTML parser built for displaying mobile HTML. That usage has since been deprecated but the parser can still parse many HTML pages and is "loose" in terms of verification. This is both good and bad as the parser will work with invalid data without complaining.

The simplest usage of XMLParser looks a bit like this:

XMLParser parser = new XMLParser();
Element elem = parser.parse(reader);

The Element contains children and attributes. It represents a tag within the XML document and even the root document itself. You can iterate over the XML tree to extract the data from within the XML file.

You’ve had a great sample of working with XMLParser in the Tree Section of this guide.

XMLParser has the complimentary XMLWriter class which can generate XML from the Element hierarchy. This allows a developers to mutate (modify) the elements and save them to a writer stream.

XPath Processing

The Result class provides a subset of XPath, but it isn’t limited to XML documents, it can also work with JSON documents, and even with raw Map objects.

Lets start by demonstrating how to process a response from the Google Reverse Geocoder API. Lets start with this XML snippet:

<?xml version="1.0" encoding="UTF-8"?>
<GeocodeResponse>
  <status>OK</status>
  <result> <!-- (irrelevant content removed) -->
      <address_component>
          <long_name>London</long_name>
          <short_name>London</short_name>
          <type>locality</type>
          <type>political</type>
      </address_component>
      <!-- (irrelevant content removed) -->
     <address_component>
          <long_name>Ontario</long_name>
          <short_name>ON</short_name>
          <type>administrative_area_level_1</type>
          <type>political</type>
      </address_component>
      <address_component>
         <long_name>Canada</long_name>
         <short_name>CA</short_name>
         <type>country</type>
         <type>political</type>
      </address_component>
  </result>
</GeocodeResponse>

You want to extract some of the data above into simpler string results. You can do this using:

Result result = Result.fromContent(input, Result.XML);
String country = result.getAsString("/result/address_component[type='country']/long_name");
String region = result.getAsString("/result/address_component[type='administrative_area_level_1']/long_name");
String city = result.getAsString("/result/address_component[type='locality']/long_name");

If you’re at all familiar with processing responses from webservices, you will notice that what would normally require many lines of code of selecting and testing nodes in regular java can now be done in a single line using the new path expressions.

In the code above, input can be any of:

  • InputStream directly from ConnectionRequest.readResponse(java.io.InputStream).

  • XML or JSON document in the form of a {@code String}</li>

  • XML DOM Element returned from XMLParser

  • JSON DOM Map returned from JSONParser

To use the expression processor when calling a webservice, you could use something like the following to parse JSON (notice this is interchangeable between JSON and XML):

Form hi = new Form("Location", new BoxLayout(BoxLayout.Y_AXIS));
hi.add("Pinpointing Location");
Display.getInstance().callSerially(() -> {
    Location l = Display.getInstance().getLocationManager().getCurrentLocationSync();
    ConnectionRequest request = new ConnectionRequest("http://maps.googleapis.com/maps/api/geocode/json", false) {
        private String country;
        private String region;
        private String city;
        private String json;

        @Override
        protected void readResponse(InputStream input) throws IOException {
                Result result = Result.fromContent(input, Result.JSON);
                country = result.getAsString("/results/address_components[types='country']/long_name");
                region = result.getAsString("/results/address_components[types='administrative_area_level_1']/long_name");
                city = result.getAsString("/results/address_components[types='locality']/long_name");
                json = result.toString();
        }

        @Override
        protected void postResponse() {
            hi.removeAll();
            hi.add(country);
            hi.add(region);
            hi.add(city);
            hi.add(new SpanLabel(json));
            hi.revalidate();
        }
    };
    request.setContentType("application/json");
    request.addRequestHeader("Accept", "application/json");
    request.addArgument("sensor", "true");
    request.addArgument("latlng", l.getLatitude() + "," + l.getLongitude());

    NetworkManager.getInstance().addToQueue(request);
});
hi.show();
[source,java]

The returned JSON looks something like this (notice it’s snipped because the data is too long):

{
  "status": "OK",
  "results": [
    {
      "place_id": "ChIJJ5T9-iFawokRTPGaOginEO4",
      "formatted_address": "280 Broadway, New York, NY 10007, USA",
      "address_components": [
        {
          "short_name": "280",
          "types": ["street_number"],
          "long_name": "280"
        },
        {
          "short_name": "Broadway",
          "types": ["route"],
          "long_name": "Broadway"
        },
        {
          "short_name": "Lower Manhattan",
          "types": [
            "neighborhood",
            "political"
          ],
          "long_name": "Lower Manhattan"
        },
        {
          "short_name": "Manhattan",
          "types": [
            "sublocality_level_1",
            "sublocality",
            "political"
          ],
          "long_name": "Manhattan"
        },
        {
          "short_name": "New York",
          "types": [
            "locality",
            "political"
          ],
          "long_name": "New York"
        },
        {
          "short_name": "New York County",
          "types": [
            "administrative_area_level_2",
            "political"
          ],
          "long_name": "New York County"
        },
        {
          "short_name": "NY",
          "types": [
            "administrative_area_level_1",
            "political"
          ],
          "long_name": "New York"
        },
        {
          "short_name": "US",
          "types": [
            "country",
            "political"
          ],
          "long_name": "United States"
        },
        {
          "short_name": "10007",
          "types": ["postal_code"],
          "long_name": "10007"
        },
        {
          "short_name": "1868",
          "types": ["postal_code_suffix"],
          "long_name": "1868"
        }
      ],
      "types": ["street_address"],
      "geometry": {
        "viewport": {
          "northeast": {
            "lng": -74.0044642197085,
            "lat": 40.7156470802915
          },
          "southwest": {
            "lng": -74.0071621802915,
            "lat": 40.7129491197085
          }
        },
        "location_type": "ROOFTOP",
        "location": {
          "lng": -74.00581319999999,
          "lat": 40.7142981
        }
      }
    }
    /* SNIPED the rest */
  ]
}
Running the geocode sample above in the simulator
Figure 321. Running the geocode sample above in the simulator

The XML processor currently handles global selections by using a double slash anywhere within the expression, for example:

// get all address_component names anywhere in the document with a type "political"
String array[] = result.getAsStringArray("//address_component[type='political']/long_name");

// get all types anywhere under the second result (dimension is 0-based)
String array[] = result.getAsStringArray("/result[1]//type");
Notice that Google’s JSON webservice uses plural form for each of the node names in that API (ie. results, address_components, and types) where they don’t in the XML services (ie result, address_component etc.)
Second Example

It also possible to do some more complex expressions. You’ll use the following XML fragment for the next batch of examples:

<rankings type="aus" gender="male" date="2011-12-31">
    <player id="1036" coretennisid="6752" rank="1"
       delta="0" singlespoints="485000" doublespoints="675"
       deductedpoints="0" totalpoints="485675">
        <firstname>Bernard</firstname>
        <lastname>Tomic</lastname>
        <town>SOUTHPORT</town>
        <state>QLD</state>
        <dob>1992-10-21</dob>
    </player>
    <player id="2585" coretennisid="1500" rank="2"
       delta="0" singlespoints="313500" doublespoints="12630"
       deductedpoints="0" totalpoints="326130">
        <firstname>Mathew</firstname>
        <lastname>Ebden</lastname>
        <town>CHURCHLANDS</town>
        <state>WA</state>
        <dob>1987-11-26</dob>
    </player>
    <player id="6457" coretennisid="287" rank="3"
        delta="0" singlespoints="132500" doublespoints="1500"
        deductedpoints="0" totalpoints="134000">
       <firstname>Lleyton</firstname>
       <lastname>Hewitt</lastname>
       <town>EXETER</town>
       <state>SA</state>
       <dob>1981-02-24</dob>
    </player>
    <!-- ... etc ... -->
</rankings>

Above, if you want to select the IDs of all players that are ranked in the top 2, you can use an expression like:

int top2[] = result.getAsIntegerArray("//player[@rank < 3]/@id");
Notice above that the expression is using an attribute for selecting both rank and id. In JSON documents, if you attempt to select an attribute, it will look for a child node under the attribute name you ask for)

If a document is ordered, you might want to select nodes by their position, for example:

String first2[] = result.getAsStringArray("//player[position() < 3]/firstname");

String secondLast = result.getAsString("//player[last() - 1]/firstName");

it’s also possible to select parent nodes, by using the ‘..’ expression. For example:

int id = result.getAsInteger("//lastname[text()='Hewitt']/../@id");

Above, you globally find a lastname element with a value of ‘Hewitt’, then grab the parent node of lastname which happens to be the player node, then grab the id attribute from the player node. Alternatively, you could get the same result from the following simpler statement:

int id = result.getAsInteger("//player[lastname='Hewitt']/@id");

it’s also possible to nest expressions, for example:

String id=result.getAsInteger("//player[//address[country/isocode='CA']]/@id");

In the above example, if the player node had an address object, you’d be selecting all players from Canada. This is a simple example of a nested expression, but they can get much more complex, which will be required as the documents themselves get more complex.
Moving on, to select a node based on the existence of an attribute:

int id[] = result.getAsIntegerArray("//player[@rank]/@id");

Above, you selected the IDs of all ranked players. Conversely, you can select the non-ranked players like this:

int id[] = result.getAsIntegerArray("//player[@rank=null]/@id");
Logical not (!) operators currently aren’t implemented)

You can also select by the existence of a child node

int id[] = result.getAsIntegerArray("//player[middlename]/@id");

Above, you selected all players that have a middle name.<br/> Keep in mind that the Codename One path expression language isn’t a full implementation of XPath 1.0, but does already handle many of the most useful features of the specification.

Properties Files

Properties files are standard key/value pairs encoded into a text file. This file format is familiar to Java developers and the Codename One specific version tries to be as close as possible to the original Java implementation.

Notice that properties file both in Java proper and in Codename One don’t support non-ascii characters. In order to encode unicode values into the properties file format you should use the native2ascii tool that ships with the JDK.

One major difference between standard Java properties and the ones in Codename One is that Codename One sorts properties alphabetically when saving. Java uses random order based on the Hashtable natural ordering.

This was done to provide consistency for saved files.

13.6. Debugging Network Connections

Debugging Network Connections
Figure 322. Debugging Network Connections

Codename One includes a Network Monitor tool which you can access through the simulator menu option. This tool reflects all the requests made through the connection requests and displays them in the left pane. This allows you to track issues in your code/web service and see everything the is "going through the wire".

This is a remarkably useful tool for optimizing and for figuring out what exactly is happening with your server connection logic.

13.6.1. Simpler Downloads

A common task is file download to storage or filesystem.

The Util class has simple utility methods:

downloadUrlToFileSystemInBackground, downloadUrlToStorageInBackground, downloadUrlToFile & downloadUrlToStorage.

These all delegate to a feature in ConnectionRequest:

ConnectionRequest.setDestinationStorage(fileName) & ConnectionRequest.setDestinationFile(fileName);

Both of which simplify the whole process of downloading a file.

Downloading Images

Codename One has many ways to download an image and the general recommendation is the URLImage. For example, the URLImage assumes that you know the size of the image in advance or that you’re willing to resize it. In that regard it works great for some use cases but not so much for others.

The download methods mentioned above are great alternatives but they are a bit verbose when working with images and don’t provide fine grained control over the ConnectionRequest for example: making a POST request to get an image.

Adding global headers is another use case but you can use addDefaultHeader to add those.

To make this process simpler there is a set of helper methods in ConnectionRequest that downloads images directly.

These methods complement the Util methods but go a bit further and feature terse syntax for example: you can download a ConnectionRequest to Storage using code like this:

request.downloadImageToStorage(url, (img) -> theImageIsHereDoSomethingWithIt(img));

This effectively maps the ConnectionRequest directly to a SuccessCallback for further processing.

URLImage Caching

URLImage is great. It changed the way you do some things in Codename One.

For example, when you introduced it you didn’t have support for the cache filesystem or for the JavaScript port. The cache filesystem is probably the best place for images of URLImage so supporting that as a target is a "no brainer" but JavaScript seems to work so why would it need a special case?

JavaScript already knows how to download and cache images from the web. URLImage is actually a step back from the things a good browser can do so why not use the native abilities of the browser when you’re running there and fallback to using the cache filesystem if it’s available and as a last resort go to storage…​

that’s exactly what the new method of URLImage does:

public static Image createCachedImage(String imageName, String url, Image placeholder, int resizeRule);

There are a few important things you need to notice about this method:

  • It returns Image and not URLImage. This is crucial. Down casting to `URLImage* will work on the simulator but might fail in some platforms (for example: JavaScript) so don’t do that!
    Since this is implemented natively in JavaScript you need a different abstraction for that platform.

  • It doesn’t support image adapters and instead uses a simplified resize rule. Image adapters work on URLImage since you’ve a lot of control in that class. For example, in the browser your control is limited and so an adapter won’t work.

If you do use this approach it would be far more efficient when running in the JavaScript port and will make better use of caching in most OS’s.

13.7. Rest API

The Rest API makes it easy to invoke a restfull webservice without many of the nuances of ConnectionRequest. You can use it to define the HTTP method and start building based on that. So if I want to get a parsed JSON result from a URL you could do:

Map<String, Object> jsonData = Rest.get(myUrl).getAsJsonMap();

For a lot of REST requests this will fail because you need to add an HTTP header indicating that you accept JSON results. you’ve a special case support for that:

Map<String, Object> jsonData = Rest.get(myUrl).acceptJson().getAsJsonMap();

You can also do POST requests as easily:

Map<String, Object> jsonData = Rest.post(myUrl).body(bodyValueAsString).getAsJsonMap();

Notice the usage of post and the body builder method. There are MANY methods in the builder class that cover pretty much everything you would expect and then some when it comes to the needs of rest services.

Some highlights that are easy to miss:

  • .priority(byte) lets you change the underlying ConnectionRequest priority when you need certain calls to jump the queue.

  • .cookiesEnabled(boolean) controls whether cookies are persisted for the request when you need stateless behavior.

  • .useBoolean(boolean) and .useLongs(boolean) toggle how the JSON parser materializes number and boolean types inside the resulting Map, which is handy when your backend is strict about data types.

  • .cacheMode(…​) and .postParameters(…​) expose the same knobs as ConnectionRequest, keeping you in the fluent API even for advanced tweaks.

I changed the code in the kitchen sink webservice sample to use this API. I was able to make it shorter and more readable without sacrificing anything.

13.7.1. Rest in Practice - Twilio

The best way to explain the usage of this API is through a concrete "real world" example. Twilio provides many great telephony oriented webservices to developers. One of those is an SMS sending webservice which can be useful for things such as "device activation".

To get started you would need to signup to Twilio and have the following 3 variable values:

String accountSID = "----------------";
String authToken = "---------------";
String fromPhone = "your Twilio phone number here";
You can open a trial Twilio account and it tags all of your SMS’s. Notice you would need to use a US based number if you don’t want to pay

You can now send hello world as an SMS to the end user. Once this is in place sending an SMS through REST is a matter of using the Rest API:

Response<Map> result = Rest.post("https://api.twilio.com/2010-04-01/Accounts/" + accountSID + "/Messages.json").
        queryParam("To", destinationPhone).
        queryParam("From", fromPhone).
        queryParam("Body", "Hello World").
        basicAuth(accountSID, authToken)).
        getAsJsonMap();

Notice that this is equivalent of this "curl" command:

curl 'https://api.twilio.com/2010-04-01/Accounts/[accountSID]/Messages.json' -X POST \
--data-urlencode 'To=[destinationPhone]' \
--data-urlencode 'From=[fromPhone]' \
--data-urlencode 'Body=Hello World' \
-u [accountSID]:[AuthToken]

that’s pretty cool as the curl command maps almost directly to the Rest API call!

What you do here is actually pretty trivial, you open a connection the the api messages URL. You add arguments to the body of the post request and define the basic authentication data.

The result is in JSON form you mostly ignore it since it isn’t that important but it might be useful for error handling. This is a sample response (redacted keys):

{
    "sid": "[sid value]",
    "date_created": "Sat, 09 Sep 2017 19:47:30 +0000",
    "date_updated": "Sat, 09 Sep 2017 19:47:30 +0000",
    "date_sent": null,
    "account_sid": "[sid value]",
    "to": "[to phone number]",
    "from": "[from phone number]",
    "messaging_service_sid": null,
    "body": "Sent from your Twilio trial account - Hello World",
    "status": "queued",
    "num_segments": "1",
    "num_media": "0",
    "direction": "outbound-api",
    "api_version": "2010-04-01",
    "price": null,
    "price_unit": "USD",
    "error_code": null,
    "error_message": null,
    "uri": "/2010-04-01/Accounts/[sid value]/Messages/SMe802d86b9f2246989c7c66e74b2d84ef.json",
    "subresource_uris": {
        "media": "/2010-04-01/Accounts/[sid value]/Messages/[message value]/Media.json"
    }
}

Notice the error message entry which is null meaning there was no error, if there was an error you’d have a message there or an error code that isn’t in the 200-210 range.

This should display an error message to the user if there was a problem sending the SMS:

if(result.getResponseData() != null) {
    String error = (String)result.getResponseData().get("error_message");
    if(error != null) {
        ToastBar.showErrorMessage(error);
    }
} else {
    ToastBar.showErrorMessage("Error sending SMS: " + result.getResponseCode());
}

13.8. Webservice Wizard

The Webservice Wizard can be invoked directly from the plugin. It generates stubs for the client side that allow performing simple method invocations on the server. It also generates a servlet that can be installed on any servlet container to intercept client side calls.

There are limits to the types of values that can be passed through the webservice wizard protocol but it’s highly efficient since it’s a binary protocol and extensible thru object externalization. All methods are provided both as asynchronous and synchronous calls for the convenience of the developer.

The first step in creating a client/server connection using the webservice wizard is to create a web application
Figure 323. The first step in creating a client/server connection using the webservice wizard is to create a web application
Any name will do
Figure 324. Any name will do

Normally you should have a server setup locally. I use Tomcat since it’s trivial and I don’t need much but there are many great Java webservers out there and this should work with all of them!

Setup your webserver in the IDE
Figure 325. Setup your webserver in the IDE
Configure the application server to the newly created app
Figure 326. Configure the application server to the newly created app, notice the application context value which you will use later
In the main Codename One project right click and select the WebService Wizard option
Figure 327. In the main Codename One project right click and select the WebService Wizard option
Set the package and class name for the webservice abstraction (notice this isn’t your main class name) and then add the methods you want in the webservice
Figure 328. Set the package and class name for the webservice abstraction (notice this isn’t your main class name) and then add the methods you want in the webservice
Add the methods and their arguments/return types. Once you finished adding all of those press the "Generate" button
Figure 329. Add the methods and their arguments/return types. Once you finished adding all of those press the "Generate" button
The types of arguments are pretty limited however you can pass an arbitrary Externalizable object which can be "anything"
Pick the directory in the server project to which the source files will be generated by default this is the src/java directory under the project you created in the first step
Figure 330. Pick the directory in the server project to which the source files will be generated by default this is the src/java directory under the project you created in the first step
If you saved to the right location the server project directory should look like this
Figure 331. If you saved to the right location the server project directory should look like this

You can now open the GameOfThronesServiceServer.java file in the server and it looks like this:

public class GameOfThronesServiceServer {
    public static String[] getBookNames() {
        // your code goes here...
        return null;
    }

    public static String[] getBookPovCharacters(String bookName) {
        // your code goes here...
        return null;
    }
}

All you need to do is fill in the code, for this example you will implement the first method for simplicity:

public class GameOfThronesServiceServer {
    public static String[] getBookNames() {
        return new String[] {
            "A Game of Thrones", "A Clash Of Kings", "A Storm Of Swords", "A Feast For Crows",
            "A Dance With Dragons", "The Winds of Winter", "A Dream of Spring"
        };
    }

    public static String[] getBookPovCharacters(String bookName) {
        // your code goes here...
        return null;
    }
}

Now lets open the client side code, in the GameOfThronesService.java file you see this

public class GameOfThronesService {
    private static final String DESTINATION_URL = "http://localhost:8080/cn1proxy";

//...
}

The destination URL needs to point at the actual server which you will recall from the new project creation should include "HelloWebServiceWizard". So you can fix the URL to:

private static final String DESTINATION_URL = "http://localhost:8080/HelloWebServiceWizard/cn1proxy";

You would naturally need to update the host name of the server for running on a device otherwise the device would need to reside within your internal network and point to your IP address.

it’s now time to write the actual client code that calls this. Every method you defined above is now defined as a static method within the GameOfThronesService class with two permutations. One is a synchronous permutation that behaves exactly as expected. It blocks the calling thread while calling the server and might throw an IOException if something failed.

This type of method (synchronous method) is easy to work with since it’s completely legal to call it from the event dispatch thread and it’s easy to map it to application logic flow.

The second type of method uses the async JavaScript style callbacks and accepts the callback interface. It returns immediately and doesn’t throw any exception. It will call onSuccess/onError based on the server result.

You can pick either one of these approaches based on your personal preferences. Here you demonstrate both uses with the server API:

Form hi = new Form("WebService Wizard", new BoxLayout(BoxLayout.Y_AXIS));
Button getNamesSync = new Button("Get Names - Sync");
Button getNamesASync = new Button("Get Names - ASync");
hi.add(getNamesSync).add(getNamesASync);

getNamesSync.addActionListener((e) -> {
    try {
        String[] books = GameOfThronesService.getBookNames();
        hi.add("--- SYNC");
        for(String b : books) {
            hi.add(b);
        }
        hi.revalidate();
    } catch(IOException err) {
        Log.e(err);
    }
});

getNamesASync.addActionListener((e) -> {
    GameOfThronesService.getBookNamesAsync(new Callback<String[]>() {
        @Override
        public void onSucess(String[] value) {
            hi.add("--- ASYNC");
            for(String b : value) {
                hi.add(b);
            }
            hi.revalidate();
        }

        @Override
        public void onError(Object sender, Throwable err, int errorCode, String errorMessage) {
            Log.e(err);
        }
    });
});
The final result of the WebService Wizard code
Figure 332. The final result of the WebService Wizard code

13.9. Connection Request Caching

Caching server data locally is a huge part of the advantage a native app has over a web app. Normally this is non-trivial as it requires a delicate balance especially if you want to test the server resource for changes.

HTTP provides two ways to do that the ETag and Last-Modified. While both are great they are non-trivial to use and by no definition seamless.

You added an experimental feature to connection request that allows you to set the caching mode to one of 4 states either globally or per connection request:

  • OFF is the default meaning no caching.

  • SMART means all get requests are cached intelligently and caching is "mostly" seamless

  • MANUAL means that the developer is responsible for the actual caching but the system won’t do a request on a resource that’s already "fresh"

  • OFFLINE will fetch data from the cache and wont try to go to the server. It will generate a 404 error if data isn’t available

You can toggle these in the specific request by using setCacheMode(CachingMode) and set the global default using setDefaultCacheMode(CachingMode).

Caching applies to GET operations, it won’t work for POST or other methods

There are many methods of interest to keep an eye for:

protected InputStream getCachedData() throws IOException;
protected void cacheUnmodified() throws IOException;
public void purgeCache();
public static void purgeCacheDirectory() throws IOException;

13.9.1. getCachedData()

This returns the cached data. This is invoked to implement readResponse(InputStream) when running offline or when you detect that the local cache isn’t stale.

The smart mode implements this properly and will fetch the right data. For example, the manual mode doesn’t store the data and relies on you to do so. In that case you need to return the data you stored at this point and must implement this method for manual mode.

13.9.2. cacheUnmodified()

This is a callback that’s invoked to indicate a cache hit, meaning that you already have the data.

The default implementation still tries to call all the pieces for compatibility (for example: readResponse). For example, if this is unnecessary you can override that method with a custom implementation or even a blank implementation to block such a case.

13.9.3. purgeCache & purgeCacheDirectory

These methods are pretty self-explanatory. Notice one caveat though…​

When you download a file or a storage element you don’t cache them and rely on the file/storage element to be present and serve as "cache". When purging you won’t delete a file or storage element you downloaded and thus these might remain.

For example, you do remove the ETag and Last-Modified data so the files might get refreshed the next time around.

13.10. Cached Data Service

The CachedDataService allows caching data and updating it if the data changed on the server. Normally the download API’s won’t check for update if there is a local cache of the data (for example: URLImage always uses the local copy). This isn’t a bad thing, it’s pretty efficient.

For example, it might be important to update the image if it changed but you still want caching.

The CachedDataService will fetch data if it isn’t cached locally and cache it. When you "refresh" it will send a special HTTP request that will send back the data if it has been updated since the last refresh:

CachedDataService.register();
CachedData d = (CachedData)Storage.getInstance().readObject("LocallyCachedData");

if(d == null) {
  d = new CachedData();
  d.setUrl("http://....");
}
// check if there is a new version of this on the server
CachedDataService.updateData(d, new ActionListener() {
    public void actionPerformed(ActionEvent ev) {
        // invoked when/if the data arrives, we now have a fresh cache
        Storage.getInstance().writeObject("LocallyCachedData", d);
    }
});

13.11. Externalizable Objects

Codename One provides the Externalizable interface, which is similar to the Java SE Externalizable interface. This interface allows an object to declare itself as Externalizable for serialization (so an object can be stored in a file/storage or sent over the network). For example, due to the lack of reflection and use of obfuscation these objects must be registered with the Util class.

Codename One doesn’t support the Java SE Serialization API due to the size issues and complexities related to obfuscation.

The major objects that are supported by default in the Codename One Externalizable are: String, Collection, Map, ArrayList, HashMap, Vector, Hashtable, Integer, Double, Float, Byte, Short, Long, Character, Boolean, Object[], byte[], int[], float[], long[], double[].

Externalizing an object such as h below should work fine:

Map<String, Object> h = new HashMap<>();
h.put("Hi","World");
h.put("data", new byte[] {(byte)1});
Storage.getInstance().writeObject("Test", h);

For example, notice that some things aren’t polymorphic for example: if you will externalize a String[] you will get back an Object[] since String arrays aren’t detected by the implementation.

The externalization process caches objects so the app will seem to work and fail on restart!

Implementing the Externalizable interface is important when you want to store a proprietary object. In this case you must register the object with the com.codename1.io.Util class so the externalization algorithm will be able to recognize it by name by invoking:

Util.register("MyClass", MyClass.class);
You should do this early on in the app for example: in the init(Object) but you shouldn’t do it in a static initializer within the object as that might never be invoked!

An Externalizable object must have a default public constructor and must implement the following 4 methods:

public int getVersion();
public void externalize(DataOutputStream out) throws IOException;
public void internalize(int version, DataInputStream in) throws IOException;
public String getObjectId();

The getVersion() method returns the current version of the object allowing the stored data to change its structure in the future (the version is then passed when internalizing the object). The object id is a String uniquely representing the object; it usually corresponds to the class name (in the example above the Unique Name should be MyClass).

it’s a common mistake to use getClass().getName() to implement getObjectId() and it would seem to work in the simulator. This isn’t the case though!
Since devices obfuscate the class names this becomes a problem as data is stored in a random name that changes with every release.

Developers need to write the data of the object in the externalize method using the methods in the data output stream and read the data of the object in the internalize method for example:

public void externalize(DataOutputStream out) throws IOException {
    out.writeUTF(name);
    if(value != null) {
        out.writeBoolean(true);
        out.writeUTF(value);
    } else {
        out.writeBoolean(false);
    }
    if(domain != null) {
        out.writeBoolean(true);
        out.writeUTF(domain);
    } else {
        out.writeBoolean(false);
    }
    out.writeLong(expires);
}

public void internalize(int version, DataInputStream in) throws IOException {
    name = in.readUTF();
    if(in.readBoolean()) {
        value = in.readUTF();
    }
    if(in.readBoolean()) {
        domain = in.readUTF();
    }
    expires = in.readLong();
}

Since strings might be null sometimes you also included convenience methods to implement such externalization. This effectively writes a boolean before writing the UTF to indicate whether the string is null:

public void externalize(DataOutputStream out) throws IOException {
    Util.writeUTF(name, out);
    Util.writeUTF(value, out);
    Util.writeUTF(domain, out);
    out.writeLong(expires);
}

public void internalize(int version, DataInputStream in) throws IOException {
    name = Util.readUTF(in);
    value = Util.readUTF(in);
    domain = Util.readUTF(in);
    expires = in.readLong();
}

Assuming you added a new date field to the object you can do the following. Notice that a Date is a long value in Java that can be null. For completeness the full class is presented below:

public class MyClass implements Externalizable {
    private static final int VERSION = 2;
    private String name;
    private String value;
    private String domain;
    private Date date;
    private long expires;

    public MyClass() {}

    public int getVersion() {
        return VERSION;
    }

    public String getObjectId() {
        return "MyClass";
    }

    public void externalize(DataOutputStream out) throws IOException {
        Util.writeUTF(name, out);
        Util.writeUTF(value, out);
        Util.writeUTF(domain, out);
        if(date != null) {
            out.writeBoolean(true);
            out.writeLong(date.getTime());
        } else {
            out.writeBoolean(false);
        }
        out.writeLong(expires);
    }

    public void internalize(int version, DataInputStream in) throws IOException {
        name = Util.readUTF(in);
        value = Util.readUTF(in);
        domain = Util.readUTF(in);
        if(version > 1) {
            boolean hasDate = in.readBoolean();
            if(hasDate) {
                date = new Date(in.readLong());
            }
        }
        expires = in.readLong();
    }
}

Notice that you need to check for compatibility during the reading process as the writing process always writes the latest version of the data.

13.12. UI Bindings & Utilities

Codename One provides many tools to simplify the path between networking/IO & GUI. A common task of showing a wait dialog or progress indication while fetching network data can be simplified by using the InfiniteProgress class for example:

InfiniteProgress ip = new InfiniteProgress();
Dialog dlg = ip.showInifiniteBlocking();
request.setDisposeOnCompletion(dlg);

The process of showing a progress bar for a long IO operation such as downloading is automatically mapped to the IO stream in Codename One using the SliderBridge class.

You can simulate network delays and disconnected network in the Simulator menu

The SliderBridge class can bind a ConnectionRequest to a Slider and effectively indicate the progress of the download. For example:

Form hi = new Form("Download Progress", new BorderLayout());
Slider progress = new Slider();
Button download = new Button("Download");
download.addActionListener((e) -> {
    ConnectionRequest cr = new ConnectionRequest("https://www.codenameone.com/img/blog/new_icon.png", false);
    SliderBridge.bindProgress(cr, progress);
    NetworkManager.getInstance().addToQueueAndWait(cr);
    if(cr.getResponseCode() == 200) {
        hi.add(BorderLayout.CENTER, new ScaleImageLabel(EncodedImage.create(cr.getResponseData())));
        hi.revalidate();
    }
});
hi.add(BorderLayout.SOUTH, progress).add(BorderLayout.NORTH, download);
hi.show();
SliderBridge progress for downloading the image in the slow network mode
Figure 333. SliderBridge progress for downloading the image in the slow network mode

13.13. Logging & Crash Protection

Codename One includes a Log API that allows developers to invoke Log.p(String) or Log.e(Throwable) to log information to storage.

As part of the premium cloud features it’s possible to invoke Log.sendLog() in order to email a log directly to the developer account. Codename One can do that seamlessly based on changes printed into the log or based on exceptions that are uncaught or logged for example:

Log.setReportingLevel(Log.REPORTING_DEBUG);
DefaultCrashReporter.init(true, 2);

This code will send a log every 2 minutes to your email if anything was changed. You can place it within the init(Object) method of your application.

For a production application you can use Log.REPORTING_PRODUCTION which will email the log on exception.

13.14. Sockets

At this moment Codename One supports TCP sockets. Server socket (listen/accept) is available on Android and the simulator but not on iOS.

You can check if Sockets are supported using the Socket.isSupported(). You can test for server socket support using Socket.isServerSocketSupported().

To use sockets you can use the Socket.connect(String host, int port, SocketConnection eventCallback) method.

To listen on sockets you can use the Socket.listen(int port, Class scClass) method which will instantiate a SocketConnection instance (scClass is expected to be a subclass of SocketConnection) for every incoming connection.

This simple example allows you to create a server and a client assuming the device supports both:

public class MyApplication {
    private Form current;

    public void init(Object context) {
        try {
            Resources theme = Resources.openLayered("/theme");
            UIManager.getInstance().setThemeProps(theme.getTheme(theme.getThemeResourceNames()[0]));
        } catch(IOException e){
            e.printStackTrace();
        }
    }

    public void start() {
        if(current != null){
            current.show();
            return;
        }
        final Form soc = new Form("Socket Test");
        Button btn = new Button("Create Server");
        Button connect = new Button("Connect");
        final TextField host = new TextField("127.0.0.1");
        btn.addActionListener((evt) -> {
            soc.addComponent(new Label("Listening: " + Socket.getIP()));
            soc.revalidate();
            Socket.listen(5557, SocketListenerCallback.class);
        });
        connect.addActionListener((evt) -> {
            Socket.connect(host.getText(), 5557, new SocketConnection() {
                @Override
                public void connectionError(int errorCode, String message) {
                    System.out.println("Error");
                }

                @Override
                public void connectionEstablished(InputStream is, OutputStream os) {
                    try {
                        int counter = 1;
                        while(isConnected()) {
                            os.write(("Hi: " + counter).getBytes());
                            counter++;
                            Thread.sleep(2000);
                        }
                    } catch(Exception err) {
                        err.printStackTrace();
                    }
                }
            });
        });
        soc.setLayout(new BoxLayout(BoxLayout.Y_AXIS));
        soc.addComponent(btn);
        soc.addComponent(connect);
        soc.addComponent(host);
        soc.show();
    }

    public static class SocketListenerCallback extends SocketConnection {
        private Label connectionLabel;

        @Override
        public void connectionError(int errorCode, String message) {
            System.out.println("Error");
        }

        private void updateLabel(final String t) {
            Display.getInstance().callSerially(new Runnable() {
                public void run() {
                    if(connectionLabel == null) {
                        connectionLabel = new Label(t);
                        Display.getInstance().getCurrent().addComponent(connectionLabel);
                    } else {
                        connectionLabel.setText(t);
                    }
                    Display.getInstance().getCurrent().revalidate();
                }
            });
        }

        @Override
        public void connectionEstablished(InputStream is, OutputStream os) {
            try {
                byte[] buffer = new byte[8192];
                while(isConnected()) {
                    int pending = is.available();
                    if(pending > 0) {
                        int size = is.read(buffer, 0, 8192);
                        if(size == -1) {
                            return;
                        }
                        if(size > 0) {
                            updateLabel(new String(buffer, 0, size));
                        }
                    } else {
                        Thread.sleep(50);
                    }
                }
            } catch(Exception err) {
                err.printStackTrace();
            }
        }
    }

    public void stop() {
        current = Display.getInstance().getCurrent();
    }

    public void destroy() {
    }
}

13.15. Properties

In standard Java you usually have a POJO (Plain Old Java Object) which has getters/setters for example: you can have a simple Meeting class like this:

public class Meeting {
     private Date when;
     private String subject;
     private int attendance;

     public Date getWhen() {
        return when;
    }

     public String getSubject() {
        return subject;
     }

     public int getAttendance() {
        return attendance;
     }

     public void setWhen(Date when) {
        this.when = when;
    }

     public void setSubject(String subject) {
        this.subject  = subject;
     }

     public void setAttendance(int attendance) {
        this.attendance = attendance;
     }
}

that’s a classic POJO and it’s the force that underlies JavaBeans and a few tools in Java.

The properties are effectively the getters/setters for example: subject, when etc. but properties have many features that are crucial:

  • They can be manipulated in runtime by a tool that had no knowledge of them during compile time

  • They are observable - a tool can monitor changes to a value of a property

  • They can have meta-data associated with them

These features are crucial since properties allow you all kinds of magic for example: hibernate/ORM uses properties to bind Java objects to a database representation, jaxb does it to parse XML directly into Java objects and GUI builders use them to let you customize UI’s visually.

POJO’s don’t support most of that so pretty much all Java based tools use a lot of reflection & bytecode manipulation. This works but has a lot of downsides for example: say I want to map an object both to the Database and to XML/JSON.

Would the bytecode manipulation collide?

Would it result in duplicate efforts?

And how do I write custom generic code that uses such abilities? Do I need to manipulate the VM?

13.15.1. Properties in Java

These are all abstract ideas, lets look at how you think properties should look in Java and how you can benefit from this moving forward.

This is the same class as the one above written with properties:

public class Meeting implements PropertyBusinessObject {
     public final Property<Date,Meeting> when = new Property<>("when");
     public final Property<String,Meeting> subject = new Property<>("subject");
     public final Property<Integer,Meeting>  attendance = new Property<>("attendance");
     private final PropertyIndex idx = new PropertyIndex(this, "Meeting", when, subject, attendance);

    @Override
    public PropertyIndex getPropertyIndex() {
        return idx;
    }
}

This looks a bit like a handful so let’s start with usage which might clarify a few things then dig into the class itself.

When you used a POJO you did this:

Meeting meet = new Meeting();
meet.setSubject("My Subject");
Log.p(meet.getSubject());

With properties you do this:

Meeting meet = new Meeting();
meet.subject.set("My Subject");
Log.p(meet.subject.get());
Encapsulation

At first glance it looks like you created public fields (which you did) but if you will look closely at the declaration you will notice the final keyword:

public final Property<String,Meeting> subject = new Property<>("subject");

This means that this code won’t compile:

meet.subject = otherValue;

So all setting/getting must happen thru the set/get methods and they can be replaced. For example: this is valid syntax that prevents setting the property to null and defaults it to an empty string:

public final Property<String,Meeting> subject = new Property<>("subject", "") {
     public Meeting set(String value) {
         if(value == null) {
            return Meeting.this;
         }
         return super.set(value);
     }
};
You will discuss the reason for returning the Meeting instance below
Introspection & Observability

Since Property is a common class it’s pretty easy for introspective code to manipulate properties. For example, it can’t detect properties in an object without reflection.

that’s why you’ve the index object and the PropertyBusinessObject interface (which defines getPropertyIndex).

The PropertyIndex class provides meta data for the surrounding class including the list of the properties within. It allows enumerating the properties and iterating over them making them accessible to all tools.

Furthermore all properties are observable with the property change listener. I can write this to instantly print out any change made to the property:

meet.subject.addChangeListener((p) -> Log.p("New property value is: " + p.get()));

13.15.2. The Cool Stuff

that’s the simple stuff that can be done with properties, but they can do much more!

For starters all the common methods of Object can be implemented with almost no code:

public class Meeting implements PropertyBusinessObject {
     public final Property<Date,Meeting> when = new Property<>("when");
     public final Property<String,Meeting> subject = new Property<>("subject");
     public final Property<Integer,Meeting>  attendance = new Property<>("attendance");
     private final PropertyIndex idx = new PropertyIndex(this, "Meeting", when, subject, attendance);

    @Override
    public PropertyIndex getPropertyIndex() {
        return idx;
    }

    public String toString() {
        return idx.toString();
    }

    @Override
    public boolean equals(Object obj) {
        return obj.getClass() == getClass() && idx.equals(((TodoTask)obj).getPropertyIndex());
    }

    @Override
    public int hashCode() {
        return idx.hashCode();
    }
}

This is easy thanks to introspection…​

You already have some simple code that can convert an object to/from JSON Maps for example: this can fill the property values from parsed JSON:

meet.getPropertyIndex().populateFromMap(jsonParsedData);

And visa versa:

String jsonString = meet.toJSON();

You also have a simple ORM solution that maps values to table columns and can create tables. it’s no hibernate but sqlite isn’t exactly big iron so it might be good enough.

Constructors

One of the problematic issues with constructors is that any change starts propagating everywhere. If I have fields in the constructor and I add a new field later I need to keep the old constructor for compatibility.

So you added a new syntax:

Meeting meet = new Meeting().
        subject.set("My Subject").
        when.set(new Date());

that’s why every property in the definition needed the Meeting generic and the set method returns the Meeting instance…​

you’re pretty conflicted on this feature and are thinking about removing it.

Without this feature the code would look like this:

Meeting meet = new Meeting();
meet.subject.set("My Subject");
meet.when.set(new Date());
Seamless Serialization

Lets assume I have an object called Contacts which includes contact information of contact for example:

public class Contact implements PropertyBusinessObject {
    public final IntProperty<Contact> id  = new IntProperty<>("id");
    public final Property<String, Contact> name = new Property<>("name");
    public final Property<String, Contact> email = new Property<>("email");
    public final Property<String, Contact> phone = new Property<>("phone");
    public final Property<Date, Contact> dateOfBirth = new Property<>("dateOfBirth", Date.class);
    public final Property<String, Contact> gender  = new Property<>("gender");
    public final IntProperty<Contact> rank  = new IntProperty<>("rank");
    public final PropertyIndex idx = new PropertyIndex(this, "Contact", id, name, email, phone, dateOfBirth, gender, rank);

    @Override
    public PropertyIndex getPropertyIndex() {
        return idx;
    }

    public Contact() {
        name.setLabel("Name");
        email.setLabel("E-Mail");
        phone.setLabel("Phone");
        dateOfBirth.setLabel("Date Of Birth");
        gender.setLabel("Gender");
        rank.setLabel("Rank");
    }
}

Standard Java Objects can be serialized in Codename One by implementing the Codename One Externalizable interface. You also need to register the Externalizable object so the implementation will be aware of it. Codename One business objects are seamlessly Externalizable and you need to register them.

For example: you can do something like this in your init(Object) method:

new Contact().getPropertyIndex().registerExternalizable();

After you do that once you can write/read contacts from storage if you so desire:

Storage.getInstance().writeObject("MyContact", contact);

Contact readContact = (Contact)Storage.getInstance().readObject("MyContact");

This will obviously also work for things like List<Contact> etc…​

Seamless SQL Storage

Writing SQL code can be tedious. Which is why SQLMap is such an important API for some of you. SQLMap allows CRUD (Create, Read, Update, Delete) operations on the built-in SQLite database using property objects.

If you continue the example from above to show persistence to the SQL database you can do something like this:

private Database db;
private SQLMap sm;
public void init(Object context) {
    theme = UIManager.initFirstTheme("/theme");
    Toolbar.setGlobalToolbar(true);
    Log.bindCrashProtection(true);

    try {
        Contact c = new Contact();
        db = Display.getInstance().openOrCreate("propertiesdemo.db"); (1)
        sm = SQLMap.create(db); (2)
        sm.setPrimaryKeyAutoIncrement(c, c.id); (3)
        sm.createTable(c); (4)
    } catch(IOException err) {
        Log.e(err);
    }
}

In the above code you do the following:

1Create or open an SQLite database using the standard syntax
2Create a properties binding instance
3Define the primary key for contact as id and set it to auto increment which will give it a unique value from the database
4Call SQL’s createTable if the table doesn’t exist yet!
Notice that at this time altering a created table isn’t possible so if you add a new property you might need to detect that and do an alter call manually

You can then add entries to the contact table using:

sm.insert(myContact);

You can update an entry using:

sm.update(myContact);

And delete an entry using:

sm.delete(myContact);

Listing the entries is more interesting:

List<PropertyBusinessObject> contacts = sm.select(c, c.name, true, 1000, 0);

for(PropertyBusinessObject cc : contacts) {
    Contact currentContact = (Contact)cc;

   // ...
}

The arguments for the select method are:

  • The object type

  • The attribute by which you want to sort the result (can be null)

  • Whether sort is ascending

  • Number of elements to fetch

  • Page to start with - in this case if you’ve more than 1000 elements you can fetch the next page using sm.select(c, c.name, true, 1000, 1)

There are many additional configurations where you can fine tune how a specific property maps to a column etc.

What’s Still Missing

The SQLMap API is simplistic and doesn’t try to be Hibernate/JPA for mobile. So basic things aren’t available at this time and won’t work. This isn’t necessarily a problem as mobile databases don’t need to be as powerful as server databases.

Relational Mappings/JOIN

Right now you can’t map an object to another object in the database with the typical one-many, one-one etc. relationships that would could do with JPA. The SQLMap API is simplistic and isn’t suited for that level of mapping at this time.

If there is demand for this it’s something you might add moving forward but your goal isn’t to re-invent hibernate.

Threading

SQLite is sensitive to threading issues especially on iOS. You mostly ignored the issue of threading and issue all calls in process. This can be a problem for larger data sets as the calls would usually go on the EDT.

This is something you might want to fix for the generic SQLite API so low-level SQL queries will work with your mapping in a sensible way.

Alter

Right now you don’t support table altering to support updated schemas. This is doable and shouldn’t be too hard to implement correctly so if there is demand for doing it you will probably add support for this.

Complex SQL/Transactions

You ignored functions, joins, transactions and a lot of other SQL capabilities.

You can use SQL directly to use all of these capabilities for example: if you begin a transaction before inserting/updating or deleting this will work as advertised however if a rollback occurs your mapping will be unaware of that so you will need to re-fetch the data.

You will notice you mapped auto-increment so you will generally try to map things that make sense for various use cases, if you’ve such a use case you’d appreciate pull requests and feedback on the implementation.

Caching/Collision

As mentioned above, you don’t cache anything and there might be a collision if you select the same object twice you will get two separate instances that might collide if you update both (one will "win").

That means you need to pay attention to the way you cache objects to avoid a case of a modified version of an object kept with an older version.

Preferences Binding

Some objects make sense as global objects, you can use the Preferences API to store that data directly but then you don’t have the type safety that property objects bring to the table. that’s where the binding of property objects to preferences makes sense. For example: say you’ve a global Settings property object you can bind it to preferences using:

PreferencesObject.create(settingsInstance).bind();

So if settings has a property called companyName it would bind into Preferences under the Settings.companyName entry.

You can do some more elaborate bindings such as:

PreferencesObject.create(settingsInstance).
    setPrefix("MySettings-").
    setName(settingsInstance.companyName, "company").
    bind();

This would customize all entry keys to start with MySettings- instead of Settings.. This would also set the company name entry to company so in this case instead of Settings.companyName you’d have MySettings-company.

UI Binding

One of the bigger features of properties are their ability to bind UI to a property. For example: if you continue the sample above with the Contact class let’s say you’ve a text field on the form and you want the property (which you mapped to the database) to have the value of the text field. You could do something like this:

myNameTextField.setText(myNameTextField.getText());
myNameTextField.addActionListener(e -> myContact.name.set(myNameTextField.getText()));

That would work nicely but what if you changed the property value, that wouldn’t be reflected back into the text field?

Also that works nicely for text field but what about other types for example: numbers, check boxes, pickers etc. this becomes a bit more tedious with those.

Binding makes this all seamless. For example: the code above can be written as:

UiBinding uib = new UiBinding();
uib.bind(myNameTextField, myContact.name);

The cool thing is that this works with many component types and property types almost magically. Binding works by using an adapter class to convert the data to/from the component. The adapter itself works with a generic converter for example: this code:

uib.bind(myRankTextField, myContact.rank);

Seems similar to the one above but it takes a String that’s returned by the text field and seamlessly converts it to the integer needed by rank. This also works in the other direction…​

You can easily build a UI that would allow you to edit the Contact property in memory:

Container resp = new Container(BoxLayout.y());
UiBinding uib = new UiBinding();

TextField nameTf = new TextField();
uib.bind(c.name, nameTf);
resp.add(c.name.getLabel()). (1)
        add(nameTf);

TextField emailTf = new TextField();
emailTf.setConstraint(TextField.EMAILADDR);
uib.bind(c.email, emailTf);
resp.add(c.email.getLabel()).
        add(emailTf);

TextField phoneTf = new TextField();
phoneTf.setConstraint(TextField.PHONENUMBER);
uib.bind(c.phone, phoneTf);
resp.add(c.phone.getLabel()).
        add(phoneTf);

Picker dateOfBirth = new Picker();
dateOfBirth.setType(Display.PICKER_TYPE_DATE); (2)
uib.bind(c.dateOfBirth, dateOfBirth);
resp.add(c.dateOfBirth.getLabel()).
        add(dateOfBirth);

ButtonGroup genderGroup = new ButtonGroup();
RadioButton male = RadioButton.createToggle("Male", genderGroup);
RadioButton female = RadioButton.createToggle("Female", genderGroup);
RadioButton undefined = RadioButton.createToggle("Undefined", genderGroup);
uib.bindGroup(c.gender, new String[] {"M", "F", "U"}, male, female, undefined); (3)
resp.add(c.gender.getLabel()).
        add(GridLayout.encloseIn(3, male, female, undefined));

TextField rankTf = new TextField();
rankTf.setConstraint(TextField.NUMERIC);
uib.bind(c.rank, rankTf); (4)
resp.add(c.rank.getLabel()).
        add(rankTf);
1Notice I use the label of the property which allows better encapsulation
2You can bind picker seamlessly
3You can bind many radio buttons to a single property to allow the user to select the gender, notice that labels and values can be different for example: "Male" selection will translate to "M" as the value
4Numeric bindings "work"
Properties form for the contact
Figure 334. Properties form for the contact
Binding Object & Auto Commit

You skipped a couple of fact about the bind() method. It has an additional version that accepts a ComponentAdapter which allows you to adapt the binding to any custom 3rd party component. that’s a bit advanced for now but I might discuss this later.

For example, the big thing I "skipped" was the return value…​ bind returns a UiBinding.Binding object when performing the bind. This object allows you to manipulate aspects of the binding specifically unbind a component and also manipulate auto commit for a specific binding.

Auto commit determines if a property is changed instantly or on commit. This is useful for a case where you’ve an "OK" button and want the changes to the UI to update the properties when "OK" is pressed (this might not matter if you keep different instances of the object). When auto-commit is on (the default which you can change through setAutoCommit in the UiBinding) changes reflect instantly, when it’s off you need to explicitly call commit() or rollback() on the Binding class.

commit() applies the changes in the UI to the properties, rollback() restores the UI to the values from the properties object (useful for a "reset changes" button).

Binding also includes the ability to "unbind" this is important if you’ve a global object that’s bound to a UI that’s discarded. Binding might hold a hard reference to the UI and the property object might create a memory leak.

By using the disconnect() method in Binding you can separate the UI from the object and allow the GC to cleanup.

UI Generation

Up until now this was pretty cool but if you looked at the UI construction code above you would see that it’s pretty full of boilerplate code. The thing about boilerplate is that it shows where automation can be applied, that’s the exact idea behind the magical "InstantUI" class. This means that the UI above can be generated using this code:

InstantUI iui = new InstantUI();
iui.excludeProperty(myContact.id); (1)
iui.setMultiChoiceLabels(myContact.gender, "Male", "Female", "Undefined"); (2)
iui.setMultiChoiceValues(myContact.gender, "M", "F", "U");
Container cnt = iui.createEditUI(myContact, true); (3)
1The id property is useful for database storage but you want to exclude it from the UI
2This implements the gender toggle button selection, you provide a hint to the UI so labels and values differ
3You create the UI from the screenshot above with one line and it’s seamlessly bound to the properties of myContact. The second argument indicates the "auto commit" status.

This still carries most of the flexibilities of the regular binding for example: I can still get a binding object using:

UiBinding.Binding b = iui.getBindings(cnt);

You might not have noticed this but in the previous vebose code you had lines like:

emailTf.setConstraint(TextField.EMAILADDR);

You might be surprised to know that this will still work seamlessly without doing anything, as would the picker component used to pick a date…​

The picker component implicitly works for date type properties, numeric constraints and numbers are implicitly used for number properties and check boxes are used for booleans.

But how do you know to use an email constraint for the email property?

you’ve some special case defaults for some common property names, so if your property is named email it will use an email constraint by default. If it’s named url or password etc. it will do the "right thing" unless you explicitly state otherwise. You can customize the constraint for a specific property using something like:

iui.setTextFieldConstraint(contact.email, TextArea.ANY);

This will override the defaults you’ve in place. The goal of this tool is to have sensible "magical" defaults that "work".

14. Push Notifications

This chapter discusses push support in Codename One applications. It covers how to set up push on the various platforms, how to respond to push notifications in your app, and how to send push notifications to your app.

Push notifications require a Codename One Pro account or higher. You must register your app to receive push notification using Display.getInstance().registerPush();
For a quick reference on setting up Push notifications, check out the Push Cheatsheet.

14.1. Understanding Push Notifications

Push notifications provide a way to inform users that something of interest has taken place. it’s one of the few mechanisms available to interact with the user even when the app isn’t running. If your app is registered to receive push notifications, then you can send messages to the user’s device through REST API either from another device, or, as is usually the case, from a web server.

Messages may contain a short title and text body that will be displayed to the user in their device’s messages stream. They may also specify a badge to display on the app’s icon (for example: that red circle on your mail app icon that indicates how many unread messages you’ve), a sound to play then the message arrives, an image attachment, and a set of "actions" that the user can perform directly in the push notification.

In addition to messages that the user sees, a push notification can contain non-visual information that’s silently sent to your app.

14.2. Implementing Push Support

Enabling push support in your application is a matter of implementing the PushCallback interface in your application’s main class (that’s: the class that includes your start(), init(), etc…​ methods.

public class MyApplication implements PushCallback {

    // ....

    /**
     * Invoked when the push notification occurs
     *
     * @param value the value of the push notification
     */
    public void push(String value) {
        System.out.println("Received push message: "+value);
    }

    /**
     * Invoked when push registration is complete to pass the device ID to the application.
     *
     * @param deviceId OS native push id you should not use this value and instead use <code>Push.getPushKey()</code>
     * @see Push#getPushKey()
     */
    public void registeredForPush(String deviceId) {
        System.out.println("The Push ID for this device is "+Push.getPushKey());
    }

    /**
     * Invoked to indicate an error occurred during registration for push notification
     * @param error descriptive error string
     * @param errorCode an error code
     */
    public void pushRegistrationError(String error, int errorCode) {
        System.out.println("An error occurred during push registration.");
    }
}

There will be additional steps required to deploy to each platform (for example: iOS requires you to generate push certificates, Android needs you to register your app ID with their cloud messaging platform, etc…​), but, fundamentally, this is all that’s required to enable push support in your app.

14.3. The Push Lifecycle

Let you take minute to go over the three callbacks in your application.

14.3.1. Registration

When your application first opens, it needs to register with the platform’s central cloud messaging infrastructure. On Android this involves a call to their GCM/FCM server; on iOS, the call will be to the APNS server. And so on. That server will return a unique device ID that can be used to send push notifications to the device. This device ID will then be passed to your registeredForPush() method as the deviceId parameter so that you can save it somewhere. Typically you would send this value to your own web service so that you can use it to send notifications to the device later on. The device ID will generally not change unless you uninstall and reinstall the app, but you will receive the callback every time the app starts.

The deviceId parameter can’t be used directly when sending push messages through the Codename One push service. It needs to be prefixed with a platform identifier so the that push server knows which messaging service to route the message through. You can obtain the complete device ID, including the platform prefix, by calling Push.getPushKey()

If the registration failed for some reason, the the pushRegistrationError() callback will be fired instead.

Notice that all of this happens seamlessly behind the scenes when your app loads. You don’t need to initiate any of this workflow.

14.3.2. Sending a Push Notification

Codename One provides a secure REST API for sending push notifications. As an HTTP API, it’s language agnostic. You can send push notifications to your app using Java, PHP, Python, Ruby, or even by hand using something like curl. Each HTTP request can contain a push message and a list of device IDs to which the message should be sent. You don’t need to worry about whether your app is running on Android, iOS, Windows, or the web. A single HTTP request can send a message to many devices at once.

14.3.3. Receiving a Push Notification

There are two different scenarios to be aware of when it comes to receiving push notifications. If your app is running in the foreground when the message arrives, then it will be passed directly to your push() callback. If your app is either in the background, or not running, then the notification will be displayed in your device’s notifications. If the user then taps the notification, it will open your app, and the push() callback will be run with the contents of the message.

Some push message types include hidden content that won’t be displayed in your device’s notifications. These hidden messages (or portions of messages) are passed directly to the push() callback of your app for processing.

On iOS, hidden push messages (push type 2) won’t be delivered when the app is in the background.
You can set the android.background_push_handling build hint to "true" to deliver push messages on Android when the app is minimized (running in the background). There is no equivalent setting on other platforms currently.

14.4. Handling Long-Running Background Push Tasks

By default, the platform signals the completion of the push processing immediately after your push(String) callback returns. For example, some tasks, such as playing audio (for example: for Push-To-Talk apps), require more time to complete. If the app is in the background, the OS might suspend the app before the task completes if it thinks the push handling is finished.

To handle this, you can opt-in to manually signaling the completion of the push task using the delayPushCompletion build hint.

  1. Add the delayPushCompletion=true build hint to your codenameone_settings.properties.

  2. In your push(String) callback, start your asynchronous task.

  3. When your task is complete, call Display.getInstance().notifyPushCompletion().

Example:

public void push(String message) {
    if (isAudioMessage(message)) {
        // Play audio asynchronously
        playAudio(message, new Runnable() {
            public void run() {
                // Audio finished playing
                Display.getInstance().notifyPushCompletion();
            }
        });
    } else {
        // For standard messages, we can notify immediately or let it timeout (safest to notify)
        Display.getInstance().notifyPushCompletion();
    }
}

How it works:

  • Android: The system acquires a PARTIAL_WAKE_LOCK when the push is received, keeping the CPU running even if the screen is off. Calling notifyPushCompletion() releases this lock. The lock has a safety timeout (for example:, 30 seconds) to prevent battery drain if you forget to call it.

  • iOS: The system delays calling the completion handler passed to the push delegate. This provides your app background execution time. Calling notifyPushCompletion() invokes the system completion handler.

If you enable this feature, you must call Display.getInstance().notifyPushCompletion() in all code paths of your push() callback to ensure the device can sleep/suspend properly.

14.5. Testing Push Support

The easiest way to test push notifications in your app is to use the push simulation feature of the Codename One Simulator.

Push simulation menu item
Figure 335. The "Push Simulation" menu item in the simulator opens the push simulator tool.

The "Registered Successfully" button will trigger your app’s registeredForPush() method, and the "Registration Error" button will trigger your app’s pushRegistrationError() method.

The "Send" button will trigger the push() callback with the message body that you place in the "Send Message" field.

The "Push Type" drop-down allows you to select the "type" of the push message. This dictates how the message body (that’s: the contents of the "Send Message" field) is interpreted. Some push types simply pass the message to the device verbatim, while others assume that the message contains structure that’s meant to be parsed by the client to extract such things as badges, sounds, images, and actions that are associated with the message. You will go over the available push types in a moment, but for now, you will keep it simple by using a push type of "1" - which sends the message verbatim.

Sending a basic Hello World push
Figure 336. Sending a basic hello world push from the push simulator

Let you try a simple "hello world" push message. Select "1" from the "Push Type" drop-down menu, and enter "Hello World" into the "Send Message" field as shown above. Then press "send".

Assuming your push() method looks like:

public void push(String value) {
    System.out.println("Received push message: "+value);
}

You should see the following output in your console:

Received push message: Hello World

This experiment simulated a push notification while the app is running in the foreground. Now let’s simulate the case where the app isn’t running, or running in the background. You can simulate this by pausing the app. Return to the Codename One simulator window, and select "Pause App" from the "Simulate" menu as shown below.

Pausing app in the simulator
Figure 337. Pausing the app in the simulator so you can simulate push notifications while app is in the background.

When the app is paused it will simply display a white screen in the simulator with the text "Paused" in the middle.

Now return to the push simulator again, and press "Send" again with same values in the other fields (Push type 1, and Message "Hello World"). Rather than running the push() callback this time, it will display a popup dialog outside the app, as shown below.

Push popup when app paused
Figure 338. Push message causes a popup dialog in the simulator when the app is paused.

While this popup dialog doesn’t replicate what a push notification will look like in a device’s notifications stream when the app is closed, it does simulate the conceptual workflow. The process whereby the user is notified of the message outside of the app, and the app isn’t notified until/unless the user taps on the notification.

If you monitor the console for your app, you should notice that the push() callback hasn’t been called yet for this notification, but if you click "OK" in the dialog, your push() callback will be run. Clicking OK is analogous to the user tapping on the notification. If you simply close the dialog box (by clicking the "x" in the corner), this would be analogous to the user dismissing the notification. In this case the push() callback would not be called at all.

14.6. Push Types and Message Structure

The example above sends a simple message to be displayed to the user. Push notifications can include more data than an alert message, though. When the selected "push type" is 0 or 1, the push server will interpret the message body a simple alert string. Selecting a different push type will affect how the message body is interpreted. The following push types are supported:

  • 0, 1 - The default push types, they work everywhere and present the string as the push alert to the user

  • 2 - hidden, non-visual push. This won’t show any visual indicator on any OS!
    In Android (before API 27) this will trigger the push(String) call with the message body. After API 27, it will trigger the message body the moment the app is put in the foreground. In iOS this will happen if the application is in the foreground otherwise the push will be lost.

  • 3 - 1 + 2 = 3 allows combining a visual push with a non-visual portion. Expects a message in the form: This is what the user will see;This is something he won’t see. For example: you can bundle a special ID or even a JSON string in the hidden part while including a friendly message in the visual part.
    When active this will trigger the push(String) method twice, once with the visual and once with the hidden data.

  • 4 - Allows splitting a visual push request based on the format title;body to provide better visual representation in some OS’s.

  • 5 - Sends a regular push message but doesn’t play a sound when the push arrives

  • 99 - The message body is expected to be XML, where the root element contains at least type and body attributes which correspond to one of the other push push types and message body respectively. This push type supports additional information such as image attachments and push actions. For example: <push type="1" body="Hello World"/>

  • 100 - Applicable to iOS and Windows. Allows setting the numeric badge on the icon to the given number. The body of the message must be a number for example: unread count.

  • 101 - identical to 100 with an added message payload separated with a space. For example: 30 you’ve 30 unread messages will set the badge to "30" and present the push notification text of "you’ve 30 unread messages". Supported on Android, iOS, and Windows.

  • 102 - Combines badge, title, and body in a single payload formatted as badge;title;body. Supported on Android, iOS, and Windows.

The following sections will show examples of the various kinds of pushes. You can try them out yourself by opening the push simulator.

14.6.1. Example Push Type 1

Push Type 1; Message Body: "Hello World"

Push popup when app paused
Figure 339. Push type 1 "Hello World" message in simulator.
Push type 1 on Android
Figure 340. Push type 1 "Hello World" message in Android when app is in background.
Push type 1 on iOS
Figure 341. Push type 1 "Hello World" message in iOS when app is in background.
Push type 1 on Chrome desktop
Figure 342. Push type 1 "Hello World" message in Chrome desktop.

In all cases, if the user taps/clicks the notification, it will bring the app to the foreground and call the push() callback with "Hello World" as the argument.

14.6.2. Example Push Type 2

Push Type 2; Message Body: "Hello World"

Push type 2 is a hidden push so it will behave differently on different platforms. On Android (before API 27), the push() callback will be fired even if the app is in the background. After API 27, it will be fired the moment the app is put in the foreground. On iOS, it will simply be ignored if the app is in the background.

If the app is in the foreground, this will trigger the push() callback with "Hello World" as the argument.

You can determine the the type of push that has been received in your push() callback by calling Display.getInstance().getProperty("pushType"). This will return a String of the push type. For example: in this case Display.getInstance().getProperty("pushType") will return "2".

14.6.3. Example Push Type 3

Push Type 3; Message Body Hello World;{"from":"Jim", "content":"Hello World"}

Push type 3 combines an alert message with some hidden content that the user won’t see. In the example above, the alert message is "Hello World" and the hidden content is a JSON string that will be passed to your app to be parsed.

If the app is in the background, then the alert message will be posted to the user’s notifications. See "Example Push Type 1" above as this message will be identical.

Push type 3
Figure 343. Push type 3 shows the alert message (the portion before the first ";").

This push will result in your push() callback being fired twice; once with the alert message, and once with the hidden content. When it’s fired with the alert message, Display.getInstance().getProperty("pushType") will report a type of "1". When it’s fired with the JSON hidden content, it will report a push type of "2".

14.6.4. Example Push Type 4

Push Type 4; Message Body "Hello World;I am saying hello"

Push type 4 specifies a title and a message body. In this example, alert title will be "Hello World", and the body will by "I am saying hello".

Push popup when app paused
Figure 344. Push type 4 "Hello World" message in simulator.
Push type 4 on Android
Figure 345. Push type 4 "Hello World" message in Android when app is in background.
Push type 4 on iOS
Figure 346. Push type 4 "Hello World" message in iOS when app is in background.
Push type 4 on Firefox desktop
Figure 347. Push type 4 "Hello World" message in Firefox desktop.

With this push type, the push() callback will be fired if the user taps/opens the notification, and the argument will contain the entire message ("Title;Body").

On some platforms, the argument of the push() callback will include the "body" portion of the payload, and in other platforms it will include the full "Title;Body" payload.

14.6.5. Example Push Type 5

Push Type 5; Message Body "Hello World"

Push type 5 will behave identically to push type 1, except that the notification won’t make any sound on the device. On some platforms, Display.getInstance().getProperty("pushType") will report a push type of "1", when it receives a push of type 5.

14.6.6. Example Push Type 100

Push Type 100; Message Body "5"

Push type 100 expects an integer in the message body. This is interpreted as the badge that should be set on the app. This is currently supported on Windows and iOS.

Push type 100 with badge set to 5 on iOS
Figure 348. Push type 100 on iOS, setting the badge to "5"

Push type 100 should not trigger the push() callback.

14.6.7. Example Push Type 101

Push Type 101; Message Body "5 Hello World"

Push type 101 combines a badge with an alert message. The badge number should be the first thing in the payload, followed by a space, and the remainder is the alert message.

On platforms that don’t support badges, Push type 101 will behave exactly as push type 1, except that the badge prefix will be stripped from the message.

The push() callback will be called if the user taps the notification. Display.getInstance().getProperty("pushType") will return "1" for this type.

14.6.8. Example Push Type 102

Push Type 102; Message Body "5;Hello World;you’ve 5 new tasks"

Push type 102 allows you to set the badge, title, and body in a single payload. The first segment (before the first semicolon) is the badge value, the second segment is the notification title, and the remainder after the second semicolon is the body that will be displayed to the user.

On platforms that don’t support badges or titles, the payload will fall back to the features that are supported. When your push() callback is invoked it will receive the title;body portion ("Hello World;you’ve 5 new tasks" in this example).

Badging on iOS

The badge number can be set thru code as well, this is useful if you want the badge to represent the unread count within your application.

To do this you’ve two methods in the Display class: isBadgingSupported() and setBadgeNumber(int). Notice that even if isBadgingSupported will return true, it won’t work unless you activate push support!

To truly utilize this you might need to disable the clearing of the badges on startup which you can do with the build hint ios.enableBadgeClear=false.

14.7. Rich Push Notifications

Rich push notifications refer to push notifications that include functionality above and beyond simply displaying an alert message to the user. Codename One’s support for rich notifications includes image attachments and push actions.

14.7.1. Image Attachment Support

When you attach an image to a push notification, it will appear as a large image in the push notification on the user’s device if that device supports it. iOS supports image attachments in iOS 10, Android supports them in API 26. The Javascript port doesn’t currently support image attachments. If a platform that doesn’t support image attachments receives a push notification with an image attachment, it will ignore it.

Push type "99" is used to send rich push notifications. it’s sort of a "meta" push type, or a "container", as it can be used to send any of the other push types, but to attach additional content, such as image attachments.

The message body should be an XML string. A minimal example of a push type 99 that actually sends a push type 1, which message "Hello World", but with an attached image is:

<push type="1" body="Hello World"><img src="https://exmaple.com/myimage.jpg"/></push>

To avoid hand-coding this XML you can use the com.codename1.push.PushBuilder helper which assembles the payload for you and returns the correct push type to send:

PushBuilder builder = new PushBuilder()
        .type(1)
        .body("Hello World")
        .imageUrl("https://example.com/myimage.jpg");
String payload = builder.build();
int pushType = builder.getType(); // Will be 99 when image/category metadata is present

You can then send payload as the message body with pushType as the type through the REST API, the Push helper, or any of the other examples below.

The image URL must be a secure URL (that’s: start with "https:" and not "http:", otherwise, iOS will simply ignore it.
Push popup when app paused
Figure 349. Push type 99 with attached image in simulator.
Push type 99 on Android with attached image
Figure 350. Push type 99 with attached image in Android when app is in background.
Push type 99 on iOS with attached image
Figure 351. Push type 99 with attached image in iOS when app is in background.
The image will be shown if you press and pull down on the notification. When the notification initially appears in the user’s notifications it will appear like a normal alert - but possibly with the image shown as a small thumbnail.

The push() callback will receive "Hello World" as its argument and Display.getInstance().getProperty("pushType") will return "1" in this example.

You can access additional information about the push content using the com.codename1.push.PushContent class, as follows:

public void push(String message) {
    PushContent content = PushContent.get();
    if (content != null) {
        String title = content.getTitle();
        String body = content.getBody();
        String hiddenMeta = content.getMetaData();
        String imageUrl = content.getImageUrl();
        String replyText = content.getTextResponse();
        // Use these values (title/body/hiddenMeta/imageUrl/replyText) as needed in your application logic.
    }
}
Make sure to call PushContent.get() once inside your push() callback, and store the return value. PushContent.get() works like a queue of size=1, and it pops off the item from the front of the queue when it’s called. If you call it twice, the second time will return null.

PushContent exposes all of the fields that might accompany a rich notification: getTitle()/getBody() for the visible text, getMetaData() for hidden metadata (such as the second segment of a type 3 payload), getImageUrl() for attachments, getCategory()/getActionId() for actions, and getTextResponse() for any user-entered reply text.

14.7.2. Notification Actions

When you include actions in a push notification, the user will be presented with buttons as part of the notification on supported platforms. For example: if the notification is intended to invite the user to an event, you might want to include buttons/actions like "Attending", "Not Attending", "Maybe", so that the user can respond quickly to the notification and not necessarily have to open your app.

You can determine whether the user has pressed a particular button on the notification using the `PushContent.getActionId()` method inside your `push()` callback.

How it works

Your app defines which action categories it supports, and associates a set of actions with each category. If a push notification includes a "category" attribute, then the notification will be presented with the associated actions manifested as buttons.

Defining the Categories and Actions

You can specify the available categories and actions for your app by implementing the com.codename1.push.PushActionsProvider interface in your app’s main class.

For example:

import com.codename1.push.PushAction;
import com.codename1.push.PushActionCategory;
import com.codename1.push.PushActionsProvider;
...

public class MyApplication implements PushCallback, PushActionsProvider {

    ...

    @Override
    public PushActionCategory[] getPushActionCategories() {
        return new PushActionCategory[]{
            new PushActionCategory("invite", new PushAction[]{
                new PushAction("yes", "Yes"),
                new PushAction("no", "No"),
                new PushAction("maybe", "Maybe"),
                new PushAction("reply", "Reply", null, "Type your response...", "Send")
            })

        };
    }
}

In the above example, you create a single category, "invite" that has actions "yes", "no", "maybe", and a "reply" action that prompts the user for text input. A text-input action is enabled by providing either a placeholder, button text, or both when constructing the PushAction.

Sending a Push Notification with "invite" Category

Now you can test your new category. In the push simulator, you can select Push Type "99", with the message body:

<push type="1" body="Would you like to come to a party?" category="invite"/>
Push with actions in simulator
Figure 352. Push notification with "invite" category on the simulator will show dialog with buttons to select between the actions defined in the "invite" category.
Push with actions on Android
Figure 353. Push notification with "invite" category on the android will show dialog with buttons to select between the actions defined in the "invite" category.
Push with actions on iOS
Figure 354. Push notification with "invite" category on the android will show dialog with buttons to select between the actions defined in the "invite" category.
Push with actions on Chrome Desktop
Figure 355. Push notification with "invite" category on the Chrome desktop includes a "More" dropdown where user can select the action.

The push() callback will be fired after the user taps on the notification, or one of its actions. If the user taps the notification itself, and not one of the actions, then your PushContent.getActionId() will return null. If they selected one of the actions, then the action ID of that action can be obtained from getActionId(). For text-input actions, the user’s reply text is returned by PushContent.getTextResponse().

The category of the notification will be made available through the getCategory() method of PushContent.

For example:

public void push(String message) {
    PushContent content = PushContent.get();
    if (content != null) {
        if ("invite".equals(content.getCategory())) {
            if (content.getActionId() != null) {
                System.out.println("The user selected the "+content.getActionId()+" action");
                if (content.getTextResponse() != null) {
                    System.out.println("They replied: "+content.getTextResponse());
                }
            } else {
                System.out.println("The user clicked on the invite notification, but didn't select an action.");
            }
        }
    }
}

14.8. Deploying Push-Enabled Apps to Device

So, you’ve implemented the Push callback in your app, and tested it in the push simulator and it works. If you try to deploy your app to a device, you may be disappointed to discover that your app doesn’t seem to be receiving push notifications when installed on the device. This is because each platform has its own bureaucracy and hoops that you’ve to jump through before they will deliver notifications to your app. Read on to find out how to satisfy their requirements.

14.8.1. The Push Bureaucracy - Android

To set the push icon place a 24x24 icon named ic_stat_notify.png under the native/android folder of the app. The icon can be white with transparency areas

Android Push goes thru Google servers and to do that you need to register with Google to get keys for server usage. Google uses Firebase for its cloud messaging, so you will begin by creating a Firebase project.

Go to https://console.firebase.google.com/ and click Add project:

Click "click Add project"
Figure 356. Click "Add project"

This will open a form as shown here:

Enter project name
Figure 357. Enter project name

Enter the project name, select your country, read/accept their terms, and press "Create Project".

Once the project has been created (should take a few seconds), you’ll be sent to your new project’s dashboard.

Firebase project dashboard
Figure 358. Firebase Project Dashboard

Expand the "Grow" section of the left menu bar, then click on the "Cloud Messaging" link.

Expand Grow section and select Cloud Messaging
Figure 359. Expand "Grow" Section and select "Cloud Messaging"

On the next screen, click on the Android icon where is says "Add an app to get started".

Click on the Android icon
Figure 360. Click on the "Android" icon to add an Android App to the project

This will bring you to the "Add Application Form", which visually shows you the remainder of the steps.

Fill in the Android package name with the package name of your project, and the app nickname with your app’s name.

The Debug signing certificate SHA-1 is optional, but you can paste the SHA-1 from your app’s certificate here if you like.

Fill in the package name
Figure 361. Fill in the package name

Press "Register app" once you’ve filled in the required fields.

This will expand "Step 2" of this form: "Download config file".

Download google-services.json
Figure 362. Download the google-services.json file

All you need to do here is press the "Download google-services.json" file, then copy the file into your project’s native/android directory.

Firebase console directs you to copy the google-services.json file into the "app" directory of your project. Ignore this direction as it applies for Android studio projects. For Codename One, this file goes into the native/android directory of your project.

There is one last piece of information that you need so that you can send push notifications to your app: The FCM_SERVER_API_KEY value.

Go to your project dashboard in Firebase console. Then click the "Settings" menu (the "Gear" icon next to "Project Overview" in the upper left):

Press Project Settings
Figure 363. Select "Project settings"

Then select the "Cloud Messaging" tab.

The "Server Key" displayed here is the FCM_SERVER_API_KEY that you refer to throughout this document. It will be used to send push notifications to your app from a server, or from another device. You can copy and paste this value now, or you can retrieve it later by logging into the Firebase console.

Save the Server Key for later use
Figure 364. Save the Server key for later use.
The Sender ID shown in the above isn’t required for your Android app, however it it’s helpful/required to support Push notifications in Javascript builds (in Chrome). This value is referred to elsewhere in this document as GCM_SENDER_ID.

14.8.2. The Push Bureaucracy - iOS

Push on iOS is much harder to handle than the Android version, however you simplified this significantly with the certificate wizard.

iOS push needs two additional P12 certificates.

Please notice that these are NOT the signing certificates!
They are completely different certificates that have nothing to do with the build process!

The certificate wizard can generate these additional push certificates and do a few other things if you check this flag in the end of the wizard:

Enable Push in the certificate wizard
Figure 365. Enable Push in the certificate wizard
If you already have signing certificated defined for your app skip the certificate generation phase (answer no) the rest will work as usual.

You can then install the push certificates locally and use them later on but there is an easier way.

You need to host the push certificates in the cloud so they will be reachable by the push servers, Codename One that for you seamlessly.
Once you go thru the wizard you should get an automated email containing information about push and the location of the push certificates, it should start like this:

iOS Push certificates have been created for your app with bundle ID com.mycompany.myapp.mypushdemo.  Please file this email away for safe keeping as you will need the details about the certificate locations and passwords to use Push successfully in your apps.

Development Push Certificate URL:
https://codename-one-push-certificates.s3.amazonaws.com/com.mycompany.myapp.mypushdemo_DevelopmentPush_LONG_UNIQUE_KEY.p12

Development Push Certificate Password: ssDfdsfer324

Production Push Certificate URL:
https://codename-one-push-certificates.s3.amazonaws.com/com.mycompany.myapp.mypushdemo_ProductionPush_LONG_UNIQUE_KEY.p12

Production Push Certificate Password: ssDfdsfer324

The URL’s and passwords are everything that you will need later on to get push working on iOS. Notice that the wizard also performs a couple of other tasks specifically it sets the ios.includePush build hint to true & adds push to the provisioning profile etc.

You can read more about the certificate wizard in the signing section.

14.8.3. Historical Note About UWP Push

The Codename One UWP target was discontinued in release 7.0.229. Older references to WNS setup, Package SID values, and client secrets are preserved in archived material for teams maintaining legacy code outside the current supported build flow.

14.8.4. The Push Bureaucracy - Javascript

Codename One apps support push in browsers that implement the Web Push API. At time of writing, this list includes:

  • Firefox (Version 50)

  • Chrome (Version 49)

  • Opera (Version 42)

  • Chrome for Android (Version 56)

  • MS Edge

Firefox doesn’t require any special setup for Push. If your main class implements the PushCallback interface, it should * work*.

Chrome uses FCM for its push notifications - the same system that Android uses. The directions for setting up a FCM account are the same as provided here, and you can reuse the same GCM_SENDER_ID and FCM_API_SERVER_KEY values. For Chrome push support you will need to add the GCM_SENDER_ID in the gcm.sender_id build hint so that the GCM_SENDER_ID will be added to the app’s manifest file:

gcm.sender_id=GCM_SENDER_ID

Where GCM_SENDER_ID is your GCM_SENDER_ID.

Push support requires that your app be served over https with a valid SSL certificate. It won’t work with the "preview" version of your app. You’ll need to download the.zip or.war file and host the file on your own site - with a valid SSL certificate.

14.9. Sending Push Messages

You can send a push message in many ways for example: from another device or any type of server but there are some values that you will need regardless of the way in which you send the push message.

private static final String PUSH_TOKEN = "********-****-****-****-*************";

The push token is a unique "key" that you can use to send push thru your Codename One account. It allows you to send push messages without placing your Codename One email or password into your source files.

You can get it by going to the Codename One build server dashboard at https://www.codenameone.com/build-server.html and selecting the Account tab.

The token should appear at the bottom as such:

Push Token from the build server
Figure 366. Push Token from the build server

The instructions for extracting the API key for Google are listed above.

private static final String FCM_SERVER_API_KEY = "******************-********************";

Historical UWP push credentials (SID/client secret) were used by the discontinued UWP target, which was removed in release 7.0.229.

When sending push to iOS devices you’ve two modes: - Production - Distribution

This allows you to debug the push related functionality without risking the possibility of sending a push into a production app. Its important to send the values to the right server during development/production.

private static final boolean ITUNES_PRODUCTION_PUSH = false;

iOS needs a certificate in order to send a push, this allows you to prove to Apples push servers that you’re who you claim to be (the author of the app).

These aren’t the signing certificates and are completely separate from them!

You can obtain these two certificates (for development/App Store) through the certificate wizard as explained above.

private static final String ITUNES_PRODUCTION_PUSH_CERT = "https://domain.com/linkToP12Prod.p12";
private static final String ITUNES_PRODUCTION_PUSH_CERT_PASSWORD = "ProdPassword";
private static final String ITUNES_DEVELOPMENT_PUSH_CERT = "https://domain.com/linkToP12Dev.p12";
private static final String ITUNES_DEVELOPMENT_PUSH_CERT_PASSWORD = "DevPassword";

14.9.1. Sending a Push Message From Codename One

While normally sending a push message to a device should involve a server code there might be cases (for example: instant messaging/social) where initiating a push from one client to another makes sense.

To simplify these use cases you added the Push API. To use the Push API you need the device key of the destination device to which you want to send the message. You can get that value from the Push.getPushKey() method. Notice that you need that value from the destination device and not the local device!

To send a message to another device use:

String cert = ITUNES_DEVELOPMENT_PUSH_CERT;
String pass = ITUNES_DEVELOPMENT_PUSH_CERT_PASSWORD;
if(ITUNES_PRODUCTION_PUSH) {
 cert = ITUNES_PRODUCTION_PUSH_CERT;
 pass = ITUNES_PRODUCTION_PUSH_CERT_PASSWORD;
}

PushBuilder builder = new PushBuilder()
.type(102)
.badge(5)
.title("Hello World")
.body("you've 5 new tasks")
.metaData("taskListId=123");

new Push(PUSH_TOKEN, builder.build(), deviceKey)
.pushType(builder.getType())
.apnsAuth(cert, pass, ITUNES_PRODUCTION_PUSH)
.gcmAuth(FCM_SERVER_API_KEY)
.wnsAuth(WNS_SID, WNS_CLIENT_SECRET)
.send();

The "builder" style API used in the above sample was added post Codename One 3.6 to facilitate the addition of new Push services. If you’re building against Codename one 3.6 or earlier, you should use the static Push.sendPushMessage() instead as shown below:

Push.sendPushMessage(PUSH_TOKEN, "Hello World",
         ITUNES_PRODUCTION_PUSH, FCM_SERVER_API_KEY, cert, pass, 1, deviceKey));

This will send the push message "Hello World" to the device with the key deviceKey. The 1 argument represents the standard push message type, which you discussed previously.

14.9.2. Sending Push Message From A Java or Generic Server

Sending a push message from the server is a more elaborate affair and might require sending push messages to many devices in a single batch.

You can send a push message as an HTTP POST request to https://push.codenameone.com/push/push. That URL accepts the following arguments:

  • token - your developer token to identify the account sending the push - PUSH_TOKEN

  • device - one or more device keys to send the push to. You can send push to up to 500 devices with a single request -

  • type - the message type identical to the old set of supported types in the old push servers

  • body - the body of the message

  • auth - the Google push auth key - FCM_SERVER_API_KEY (also used for sending to Chrome Javascript Apps)

  • production - true/false whether to push to production or sandbox environment in iOS - ITUNES_PRODUCTION_PUSH

  • certPassword - password for the push certificate in iOS push - ITUNES_DEVELOPMENT_PUSH_CERT_PASSWORD or ITUNES_PRODUCTION_PUSH_CERT_PASSWORD

  • cert - http or https URL containing the push certificate for an iOS push - ITUNES_DEVELOPMENT_PUSH_CERT or ITUNES_PRODUCTION_PUSH_CERT

You can thus send a push from Java EE using code like this:

HttpURLConnection connection = (HttpURLConnection)new URL("https://push.codenameone.com/push/push").openConnection();
connection.setDoOutput(true);
connection.setRequestMethod("POST");
connection.setRequestProperty("Content-Type", "application/x-www-form-urlencoded;charset=UTF-8");
String cert = ITUNES_DEVELOPMENT_PUSH_CERT;
String pass = ITUNES_DEVELOPMENT_PUSH_CERT_PASSWORD;
if(ITUNES_PRODUCTION_PUSH) {
 cert = ITUNES_PRODUCTION_PUSH_CERT;
 pass = ITUNES_PRODUCTION_PUSH_CERT_PASSWORD;
}
String query = "token=" + PUSH_TOKEN +
 "&device=" + URLEncoder.encode(deviceId1, "UTF-8") +
 "&device=" + URLEncoder.encode(deviceId2, "UTF-8") +
 "&device=" + URLEncoder.encode(deviceId3, "UTF-8") +
 "&type=1" +
 "&auth=" + URLEncoder.encode(FCM_SERVER_API_KEY, "UTF-8") +
 "&certPassword=" + URLEncoder.encode(pass, "UTF-8") +
 "&cert=" + URLEncoder.encode(cert, "UTF-8") +
 "&body=" + URLEncoder.encode(MESSAGE_BODY, "UTF-8") +
 "&production=" + ITUNES_PRODUCTION_PUSH +
 "&sid=" + URLEncoder.encode(WNS_SID, "UTF-8") +
 "&client_secret=" + URLEncoder.encode(WNS_CLIENT_SECRET, "UTF-8");
try (OutputStream output = connection.getOutputStream()) {
 output.write(query.getBytes("UTF-8"));
}
int c = connection.getResponseCode();
// read response JSON

Notice that you can send a push to 500 devices. To send in larger batches you need to split the push requests into 500 device batches.

Server JSON Responses

The push servers send responses in JSON form. it’s crucial to parse and manage those as they might contain important information.

If there is an error that isn’t fatal such as quota exceeded etc. you will get an error message like this:

{"error":"Error message"}

A normal response, will be an array with results:

[
 {"id"="deviceId","status"="error","message"="Invalid Device ID"},
 {"id"="cn1-gcm-nativegcmkey","status"="updateId", "newId"="cn1-gcm-newgcmkey"},
 {"id"="cn1-gcm-okgcmkey","status"="OK"},
 {"id"="cn1-gcm-errorkey","status"="error","message"="Server error message"},
 {"id"="cn1-ios-iphonekey","status"="inactive"},
]

There are many things to notice in the responses above:

  • If the response contains status=updateId it means that the GCM server wants you to update the device id to a new device id. You should do that in the database and avoid sending pushes to the old key

  • iOS doesn’t acknowledge device receipt but it does send a status=inactive result which you should use to remove the device from the list of devices

APNS (Apple’s push service) returns uppercase key results. This means that code for managing the keys in your database must be case insensitive
Apple doesn’t always send back a result for a device being inactive and might fail silently

15. Miscellaneous Features

15.1. Phone Functions

Most of the low-level phone functionality is accessible in the Display class. Think of it as a global class that covers access to the "system".

15.1.1. SMS

Codename One supports sending SMS messages but not receiving them as this functionality isn’t portable. You can send an SMS using either the Display singleton or the static helper methods on CN. Both APIs throw IOException, which you should handle in case the native layer reports a failure:

try {
    Display.getInstance().sendSMS("+999999999", "My SMS Message");
    // Or: CN.sendSMS("+999999999", "My SMS Message");
} catch(IOException err) {
    Log.e(err);
    Dialog.show("SMS Failed", "Unable to send the SMS", "OK", null);
}

Android supports sending SMS messages in the background without any UI. iOS doesn’t provide that ability, so the best it can offer is to launch the native SMS app with your message composed for the user to send. Android supports that interactive flow as well (launching the OS native SMS app).

The default sendSMS API ignores that difference and simply works interactively on iOS while sending in the background for Android when the platform allows it.

The getSMSSupport API returns one of the following options:

  • SMS_NOT_SUPPORTED - for desktop, tablet etc.

  • SMS_SEAMLESS - sendSMS won’t show a UI and will send in the background

  • SMS_INTERACTIVE - sendSMS will show an SMS sending UI

  • SMS_BOTH - sendSMS can support both seamless and interactive mode, this currently works on Android

The sendSMS can accept an interactive argument: sendSMS(String phoneNumber, String message, boolean interactive)

The last argument will be ignored unless SMS_BOTH is returned from getSMSSupport at which point you would be able to choose one way or the other. The default behavior (when not using that flag) is the background sending which is the current behavior on Android.

A typical use of this API would be something like this:

try {
    switch(Display.getInstance().getSMSSupport()) {
        case Display.SMS_NOT_SUPPORTED:
            return;
        case Display.SMS_SEAMLESS:
            showUIDialogToEditMessageData();
            Display.getInstance().sendSMS(phone, data);
            return;
        default:
            Display.getInstance().sendSMS(phone, data);
            return;
    }
} catch(IOException err) {
    Log.e(err);
    Dialog.show("SMS Failed", "Unable to send the SMS", "OK", null);
}

15.1.2. Dialing

Dialing the phone is pretty trivial. This should open the dialer UI without physically dialing the phone, as that’s discouraged by device vendors.

You can dial the phone by using:

Display.getInstance().dial("+999999999");

15.1.3. Call Detection

Codename One includes a generic call detection API through Display.isCallDetectionSupported() and Display.isInCall().

This API is intentionally best effort and should be used as a UX hint (for example, to defer a non-critical animation while the app is interrupted).

On iOS, isInCall() is inferred from app interruption lifecycle events, which means it can report true for non-call interruptions (for example: Control Center, app switching, permission sheets), and some call flows may still be missed.

Because iOS toggles this flag during app lifecycle transitions, polling it with a UITimer can miss the interruption window entirely (timers are paused while the app is inactive, and the flag is reset when the app becomes active again). If you need to react, check it from lifecycle callbacks such as your app’s stop()/start() flow instead of periodic polling.

On Android, call detection is currently unsupported because robust detection would require invasive telephony permissions that are intentionally avoided.

Display display = Display.getInstance();
if (display.isCallDetectionSupported() && display.isInCall()) {
    Log.p("Call interruption is currently active (heuristic)");
}

15.1.4. E-Mail

You can send an email through the platforms native email client with code such as this:

Message m = new Message("Body of message");
Display.getInstance().sendMessage(new String[] {"someone@gmail.com"}, "Subject of message", m);

You can add one attachment by using setAttachment and setAttachmentMimeType.

You need to use files from FileSystemStorage and NOT Storage files!

You can add more than one attachment by putting them directly into the attachment map for example:

Message m = new Message("Body of message");
m.getAttachments().put(textAttachmentUri, "text/plain");
m.getAttachments().put(imageAttachmentUri, "image/png");
Display.getInstance().sendMessage(new String[] {"someone@gmail.com"}, "Subject of message", m);
Some features such as attachments etc. don’t work correctly in the simulator but should work on iOS/Android

15.2. Larger Text Accessibility

Codename One can adapt to the operating system’s larger text accessibility setting. The Display APIs expose two signals: isLargerTextEnabled() indicates whether the user has enabled larger text, and getLargerTextScale() returns the scale factor that should be applied to fonts.

If you want the theme system to automatically scale its fonts when larger text is enabled, enable the UIManager setting:

UIManager.getInstance().setUseLargerTextScale(true);

You can also enable this behavior in the theme by setting the useLargerTextScaleBool theme constant to true.

If you need to apply the scale manually for custom fonts or layout calculations, read the values directly:

Display display = Display.getInstance();
if (display.isLargerTextEnabled()) {
    float scale = display.getLargerTextScale();
    Font base = UIManager.getInstance().getLookAndFeel().getDefaultStyle().getFont();
    Font scaled = base.derive(base.getHeight() * scale, base.getStyle());
    someComponent.getUnselectedStyle().setFont(scaled);
}

15.2.1. How the scale is computed per platform

  • iOS — the scale is the ratio between the body text size at the user’s current Dynamic Type setting and the iOS standard 17pt body size, i.e. [UIFont preferredFontForTextStyle:UIFontTextStyleBody].pointSize / [UIFont systemFontSize]. Scales for the standard slider stops range from 0.82× (Extra Small) through 1.00× (Large, default) up to 1.35× (Extra Extra Extra Large). When the user enables Larger Accessibility Sizes in Settings → Accessibility → Display & Text Size → Larger Text, the slider extends with five additional stops whose scales reach as high as 3.12×. These values match what every native iOS app sees from UIFontMetrics.

  • Android — the scale is Configuration.fontScale, which is bucketed by Android (typically 0.85, 1.0, 1.15, 1.30).

Because the scale is multiplicative, a base font size that is already larger than the platform default will compound. For example, a defaultFontSizeInt: 18 in your CSS is roughly 6% larger than iOS’s 17pt body, so at iOS Dynamic Type Extra Extra Extra Large (1.35×) your text will render at roughly 24.3pt versus a native iOS app’s 23pt. If you intentionally use a base size larger than the platform default and you also enable useLargerTextScaleBool, expect the absolute size at high accessibility settings to be visibly larger than typical native apps. Many native iOS apps cap Dynamic Type via UIFontMetrics maximumPointSize: for non-text-heavy UIs to avoid layout breakage.

15.2.2. Previewing in the simulator

The JavaSE simulator includes a Simulate → Larger Text menu that lets you preview every iOS Dynamic Type stop (Extra Small through Accessibility 5) without leaving your desktop. The simulator returns the same scale factor that the corresponding iOS device would report, so this is the recommended way to verify how your UI behaves at each setting before testing on hardware. The selected stop is persisted across simulator restarts.

If your app looks correct in the simulator at Large (default) but fonts appear oversized on your iPhone with the Display & Brightness slider near the middle, check whether Settings → Accessibility → Display & Text Size → Larger Text → Larger Accessibility Sizes is enabled on the device. When that toggle is on, the system reports the larger Accessibility size categories whose scales begin at 1.65× and exceed what the standard slider can reach.

15.3. Contacts API

The contacts API provides you with the means to query the phone’s address book, delete elements from it and create new entries into it. To get the platform specific list of contacts you can use String[] contacts = ContactsManager.getAllContacts();

Notice that on some platforms this will prompt the user for permissions and the user might choose not to grant that permission. To detect whether this is the case you can invoke isContactsPermissionGranted() after invoking getAllContacts(). This can help you adapt your error message to the user.

Once you’ve a Contact you can use the getContactById method, however the default method is a bit slow if you want to pull a large batch of contacts. The solution for this is to extract the data that you need through

getContactById(String id, boolean includesFullName,
            boolean includesPicture, boolean includesNumbers, boolean includesEmail,
            boolean includeAddress)

Here you can specify true for the attributes that actually matter to you.

Another capability of the contacts API is the ability to extract all of the contacts quickly. This isn’t supported on all platforms but platforms such as Android can get a boost from this API as extracting the contacts one by one is remarkably slow on Android.

You can check if a platform supports the extraction of all the contacts quickly thru ContactsManager.isAllContactsFast().

When retrieving all the contacts, notice that you should probably not retrieve all the data and should set some fields to false to perform a more efficient query

You can then extract all the contacts using code that looks a bit like this, notice that you use a thread so the UI won’t be blocked!

Form hi = new Form("Contacts", new BoxLayout(BoxLayout.Y_AXIS));
hi.add(new InfiniteProgress());
Display.getInstance().scheduleBackgroundTask(() -> {
    Contact[] contacts = ContactsManager.getContacts(true, true, false, true, false, false);
    Display.getInstance().callSerially(() -> {
        hi.removeAll();
        for(Contact c : contacts) {
            MultiButton mb = new MultiButton(c.getDisplayName());
            mb.setTextLine2(c.getPrimaryPhoneNumber());
            hi.add(mb);
            mb.putClientProperty("id", c.getId());
        }
        hi.getContentPane().animateLayout(150);
    });
});
hi.show();
List of contacts
Figure 367. List of contacts

Notice that you didn’t fetch the image of the contact as the performance of loading these images might be prohibitive. You can enhance the code above to include images by using slightly more complex code such as this:

The scheduleBackgroundTask method is similar to new Thread() in some regards. It places elements in a queue instead of opening too many threads so it can be good for non-urgent tasks
Form hi = new Form("Contacts", new BoxLayout(BoxLayout.Y_AXIS));
hi.add(new InfiniteProgress());
int size = Display.getInstance().convertToPixels(5, true);
FontImage fi = FontImage.createFixed("" + FontImage.MATERIAL_PERSON, FontImage.getMaterialDesignFont(), 0xff, size, size);

Display.getInstance().scheduleBackgroundTask(() -> {
    Contact[] contacts = ContactsManager.getContacts(true, true, false, true, false, false);
    Display.getInstance().callSerially(() -> {
        hi.removeAll();
        for(Contact c : contacts) {
            MultiButton mb = new MultiButton(c.getDisplayName());
            mb.setIcon(fi);
            mb.setTextLine2(c.getPrimaryPhoneNumber());
            hi.add(mb);
            mb.putClientProperty("id", c.getId());
            Display.getInstance().scheduleBackgroundTask(() -> {
                Contact cc = ContactsManager.getContactById(c.getId(), false, true, false, false, false);
                Display.getInstance().callSerially(() -> {
                    Image photo = cc.getPhoto();
                    if(photo != null) {
                        mb.setIcon(photo.fill(size, size));
                        mb.revalidate();
                    }
                });
            });
        }
        hi.getContentPane().animateLayout(150);
    });
});
Contacts with the default photos on the simulator
Figure 368. Contacts with the default photos on the simulator, on device these will use actual user photos when available
Notice that the code above uses callSerially & scheduleBackgroundTask in a liberal nested way. This is important to avoid an EDT violation

You can use createContact(String firstName, String familyName, String officePhone, String homePhone, String cellPhone, String email) to add a new contact and deleteContact(String id) to delete a contact.

15.4. Localization & Internationalization (L10N & I18N)

Localization (l10n) means adapting to a locale which is more than translating to a specific language but also to a specific language within environment for example: en_US!= en_UK. Internationalization (i18n) is the process of creating one application that adapts to all locales and regional requirements.

Codename One supports automatic localization and seamless internationalization of an application using Java properties bundles.

Place locale-specific properties files inside an l10n directory directly under your module’s main directory (for example: common/src/main/l10n). Each file inside this directory is treated as a resource bundle and will be packaged automatically with your app, allowing you to version translations alongside the rest of your source code.

When you’re iterating on translations you can also use the simulator to capture bundles automatically. Open the Simulator menu and enable Auto Update Default Bundle so that running your app in the Codename One simulator will create any missing resource bundles on the fly as you interact with the UI, which makes it simple to populate keys without manually editing files during development. You can install the bundle using code like this:

UIManager.getInstance().setBundle(res.getL10N("l10n", local));

The device language (as an ISO 639 two letter code) could be retrieved with this:

String local = L10NManager.getInstance().getLanguage();

Once installed a resource bundle takes over the UI and every string set to a label (and label like components) will be automatically localized based on the bundle. You can also use the localize method of UIManager to perform localization on your own:

UIManager.getInstance().localize( "KeyInBundle", "DefaultValue");

The list of available languages in the resource bundle could be retrieved like this. Notice that this a list that was set by you and doesn’t need to confirm to the ISO language code standards:

Resources res = fetchResourceFile();
Enumeration locales = res.listL10NLocales( "l10n" );

An exception for localization is the TextField/TextArea components both of which contain user data, in those cases the text won’t be localized to avoid accidental localization of user input.

You can export and import resource bundles as standard Java properties files, CSV and XML. The formats are pretty standard for most localization shops, the XML format Codename One supports is the one used by Android’s string bundles which means most localization specialists should easily localize it

The resource bundle is a map between keys and values for example: the code below displays "This Label is localized" on the Label with the hardcoded resource bundle. It would work the same with a resource bundle loaded from a resource file:

Form hi = new Form("L10N", new BoxLayout(BoxLayout.Y_AXIS));
HashMap<String, String> resourceBudle = new HashMap<String, String>();
resourceBudle.put("Localize", "This Label is localized");
UIManager.getInstance().setBundle(resourceBudle);
hi.add(new Label("Localize"));
hi.show();
Localized label
Figure 369. Localized label

15.4.1. Localization Manager

The L10NManager class includes a multitude of features useful for common localization tasks.

It allows formatting numbers/dates & time based on platform locale. It also provides a great deal of the information you need such as the language/locale information you need to pick the proper resource bundle.

Form hi = new Form("L10N", new TableLayout(16, 2));
L10NManager l10n = L10NManager.getInstance();
hi.add("format(double)").add(l10n.format(11.11)).
    add("format(int)").add(l10n.format(33)).
    add("formatCurrency").add(l10n.formatCurrency(53.267)).
    add("formatDateLongStyle").add(l10n.formatDateLongStyle(new Date())).
    add("formatDateShortStyle").add(l10n.formatDateShortStyle(new Date())).
    add("formatDateTime").add(l10n.formatDateTime(new Date())).
    add("formatDateTimeMedium").add(l10n.formatDateTimeMedium(new Date())).
    add("formatDateTimeShort").add(l10n.formatDateTimeShort(new Date())).
    add("getCurrencySymbol").add(l10n.getCurrencySymbol()).
    add("getLanguage").add(l10n.getLanguage()).
    add("getLocale").add(l10n.getLocale()).
    add("isRTLLocale").add("" + l10n.isRTLLocale()).
    add("parseCurrency").add(l10n.formatCurrency(l10n.parseCurrency("33.77$"))).
    add("parseDouble").add(l10n.format(l10n.parseDouble("34.35"))).
    add("parseInt").add(l10n.format(l10n.parseInt("56"))).
    add("parseLong").add("" + l10n.parseLong("4444444"));
hi.show();
Localization formatting/parsing and information
Figure 370. Localization formatting/parsing and information

15.4.2. RTL/Bidi

RTL stands for right to left, in the world of internationalization it refers to languages that are written from right to left (Arabic, Hebrew, Syriac, Thaana).

Most western languages are written from left to right (LTR), however some languages are written from right to left (RTL) speakers of these languages expect the UI to flow in the opposite direction otherwise it seems weird like reading this word would be to most English speakers: "drieW".

The problem posed by RTL languages is known as BiDi (Bi-directional) and not as RTL since the "true" problem isn’t the reversal of the writing/UI but rather the mixing of RTL and LTR together. For example: numbers are always written from left to right ( like in English) so in an RTL language the direction is from right to left and once you reach a number or English text embedded in the middle of the sentence (such as a name) the direction switches for a duration and is later restored.

The main issue in the Codename One world is in the layouts, which need to reverse on the fly. Codename One supports this through an RTL flag on all components that’s derived from the global RTL flag in UIManager.

Resource bundles can also include special case constant @rtl, which indicates if a language is written from right to left. This allows everything to automatically reverse.

When in RTL mode the UI will be the exact mirror so WEST will become EAST, RIGHT will become LEFT and this would be true for paddings/margins as well.

If you’ve a special case where you don’t want this behavior you will need to wrap it with an isRTL check. You can also use setRTL on a per Component basis to disable RTL behavior for a specific Component.

Most UI API’s have special cases for BiDi instead of applying it globally for example: AWT introduced constants such as LEADING instead of making WEST mean the opposite direction. You think that was a mistake since the cases where you wouldn’t want the behavior of automatic reversal are rare.

Codename One’s support for bidi includes the following components:

  • Bidi algorithm - allows converting between logical to visual representation for rendering

  • Global RTL flag - default flag for the entire application indicating the UI should flow from right to left

  • Individual RTL flag - flag indicating that the specific component/container should be presented as an RTL/LTR component (for example: for displaying English elements within a RTL UI).

  • RTL text field input

Most of Codename One’s RTL support is under the hood, the LookAndFeel global RTL flag can be enabled using:

UIManager.getInstance().getLookAndFeel().setRTL(true);

Once RTL is activated all positions in Codename One become reversed and the UI becomes a mirror of itself. For example: Adding a Toolbar command to the left will actually make it appear on the right. Padding on the left becomes padding on the right. The scroll moves to the left etc.

This applies to the layout managers (except for group layout) and most components. Bidi is mostly seamless in Codename One but a developer still needs to be aware that his UI might be mirrored for these cases.

15.4.3. Localizing Native iOS Strings

Some strings in iOS need to be localized using iOS’s native mechanisms - namely providing *.lproj directories with .strings files. For example, if you want the app to have a different bundle display name for each language, or you want to translate the "UsageDescription" strings of your Info.plist into many languages, you would need to use iOS' native localization facilities.

Example: Localizing the App Name

The app name, as it’s displayed to the user, is defined in using the CFBundleDisplayName key of the app’s Info.plist file. Normally, this will be automatically set to your app’s display name, as defined in your codenameone_settings.properties file. This works fine if your app will have the same name in every locale, but suppose you want your app to take on a different name in French than in English. For example: You want your app to be called "Hello App" for English-speaking users, and "Bonjour App" for French-speaking users.

In this case, you need to add iOS localization bundles "en.lproj" and "fr.lproj", each with a file named "InfoPlist.strings". If you’re using Maven, then you can add these directly inside the ios/src/main/strings directory of your project.

You will need to create the strings directory manually, if it doesn’t exist yet.
ios strings directory screenshot
Figure 371. Maven project with English, French, and Spanish localizations for Info.plist. English and French language bundles are contained in the ios/src/main/strings directory. The Spanish bundle is included as a zip file in ios/src/main/resources. Both methods are supported (zipped in resources and unzipped in strings).
Listing 23. ios/src/main/strings/en.lproj/InfoPlist.strings
"CFBundleDisplayName"="Hello App";
Listing 24. ios/src/main/strings/en.lproj/InfoPlist.strings
"CFBundleDisplayName"="Bonjour App";

The strings format is similar to the properties file format, except that both the "key" and the "value" must be wrapped in quotes. And if there are many strings, then they must be delimited by a semi-colon ;.

Legacy Ant Projects

Legacy Ant projects have a different directory structure. They have no equivalent location to the Maven ios/src/main/strings directory, but the legacy ios/src/main/resources content can be replicated under native/ios. To include native iOS localizations in those projects, place zipped versions of your .lproj directories inside the native/ios directory. E.g. en.lproj.zip, fr.lproj.zip, etc.

Whenever possible, migrate legacy builds to Maven to take advantage of the modern workflow. See Chapter 1, Maven Project Workflow for automated migration options.
Example: Localization App Usage Description Strings

iOS requires you to supply usage descriptions for many features that will be displayed to the user when the app requests permission to use the feature. For example, the NSCameraUsageDescription string must be provided if your app needs to use the camera. You can specify these values as build hints using the pattern ios.NSXXXUsageDescription=This feature is needed blah blah blah. In the NSCameraUsageDescription case, you might include the build hint:

ios.NSCameraUsageDescription=This app needs to use your camera to scan bar codes

Ultimately these descriptions are embedded in your app’s Info.plist file, so they can be localized the same way you localize other Info.plist values - in the localized InfoPlist.strings file.

See the above example for instructions on localizing values in the Info.plist file. Then simply add translations to the InfoPlist.strings file for your usage descriptions.

Listing 25. ios/src/main/strings/en.lproj/InfoPlist.strings
"CFBundleDisplayName"="Hello App";
"NSCameraUsageDescription"="This app needs to use your camera to scan bar codes";
Listing 26. ios/src/main/strings/en.lproj/InfoPlist.strings
"CFBundleDisplayName"="Bonjour App";
"NSCameraUsageDescription"="Cette application doit utiliser votre appareil photo pour scanner les codes à barres";

15.4.4. Localizing the App Icon

Codename One can ship a different launcher icon per locale on iOS and Android by detecting specially-named PNG files during the build. Drop your per-locale artwork into common/src/main/resources using the convention:

cn1_icon_<lang>[_<country>].png

<lang> is a two-letter ISO 639-1 language code and the optional <country> is a two-letter ISO 3166-1 country code. Language is treated as case-insensitive; the country component is normalized to uppercase. A few valid examples:

  • cn1_icon_fr.png — French (any region)

  • cn1_icon_en_GB.png — British English

  • cn1_icon_es_MX.png — Mexican Spanish

Supply a square source image at least 432×432 pixels (the largest size emitted for Android adaptive icons); the build resizes it to every target density. The default app icon continues to be controlled by your codenameone_settings.properties file and is used whenever the device locale doesn’t match any of the localized variants. At runtime the builders look for a <lang>_<COUNTRY> match first, then fall back to a bare <lang> match. Providing both (for example cn1_icon_en.png plus cn1_icon_en_GB.png) lets you give British users a country-specific icon while every other English locale still receives the generic English icon.

Android Behaviour

On Android the build generates locale-qualified drawable resources at every density so the platform picks the right icon automatically based on the device’s current locale:

  • drawable-<lang>[-r<COUNTRY>]/icon.png at 36, 48, 72, 96, 128, 144 and 192 pixels for legacy launchers.

  • When android.enableAdaptiveIcons=true the same variants are also written as mipmap-<dpi>-<lang>[-r<COUNTRY>]/ic_launcher.png and ic_launcher_foreground.png. The default adaptive background and the mipmap-anydpi-v26/ic_launcher.xml definition are reused as-is.

No code changes are required — Android’s resource framework switches icons when the locale changes.

iOS Behaviour

iOS does not localize launcher icons natively, so Codename One wires up alternate app icons for you:

  • For each detected locale the build generates AppIcon_<lang>_<COUNTRY>60x60@2x.png (120×120), @3x.png (180×180) and 76x76@2x~ipad.png (152×152) in the app bundle root.

  • A CFBundleIcons (and CFBundleIcons~ipad) entry is injected into Info.plist containing a CFBundleAlternateIcons dictionary with one entry per locale. CFBundlePrimaryIcon continues to reference the default iPhone7App/iPadApp7 image families.

  • The CodenameOne_GLAppDelegate is patched to call -[UIApplication setAlternateIconName:completionHandler:] at launch. The delegate reads [NSLocale preferredLanguages], tries the full <lang>_<COUNTRY> key first, then falls back to the language-only key, and clears the alternate icon (reverting to the default) if no variant matches.

  • The injection is idempotent and runs before the ios.afterFinishLaunching hook, so any custom code you supply via that build hint is unaffected.

iOS briefly displays a system alert the first time an app switches to an alternate icon. This is platform-standard behaviour — Codename One cannot suppress it.
Tips and Troubleshooting
  • File names are matched case-insensitively. cn1_icon_EN_uk.png is treated the same as cn1_icon_en_UK.png.

  • Names that don’t fit the <2-letter lang>[_<2-letter country>] pattern are logged and skipped; the rest of the build continues.

  • The original cn1_icon_*.png files are removed after processing so they aren’t shipped as stray bundle resources.

  • To override the default (non-localized) icon, keep using the Icon setting in codenameone_settings.properties or the icon image in CN1Resource.res — this feature only adds alternate icons for specific locales.

15.5. Location - GPS

The Location API allows you to track changes in device location or the current user position.

The Simulator includes a Location Simulation tool that you can launch to determine the current position of the simulator and debug location events

The most basic usage for the API allows you to fetch a device Location, notice that this API is blocking and can take a while to return:

Location position = LocationManager.getLocationManager().getCurrentLocationSync();
In order for location to work on iOS you MUST define the build hint ios.locationUsageDescription and describe why your application needs access to location. Otherwise you won’t get location updates!

The getCurrentLocationSync() method is good for cases where you need to fetch a current location once and not repeatedly query location. It activates the GPS then turns it off to avoid excessive battery usage. For example, if an application needs to track motion or position over time it should use the location listener API to track location as such:

Notice that there is a method called getCurrentLocation() which will return the current state immediately and might not be accurate for some cases.
public MyListener implements LocationListener {
    public void locationUpdated(Location location) {
        // update UI etc.
    }

    public void providerStateChanged(int newState) {
        // handle status changes/errors appropriately
    }
}
LocationManager.getLocationManager().setLocationListener(new MyListener());
On Android location maps to low-level API’s if you disable the usage of Google Play Services. By default location should perform well if you leave the Google Play Services on

15.5.1. Location In The Background - Geofencing

Polling location is generally expensive and requires a special permission on iOS. Its also implemented rather differently both in iOS and Android. Both platforms place restrictions on the location API usage in the background.

Because of the nature of background location the API is non-trivial. It starts with the venerable LocationManager but instead of using the standard API you need to use setBackgroundLocationListener.

Instead of passing a LocationListener instance you need to pass a Class object instance. This is important because background location might be invoked when the app isn’t running and an object would need to be allocated.

Notice that you should NOT perform long operations in the background listener callback. IOS wake-up time is limited to approximately 10 seconds and the app could get killed if it exceeds that time slice.

Notice that the listener can also send events when the app is in the foreground, therefore it’s recommended to check the app state before deciding how to process this event. You can use Display.isMinimized() to determine if the app is currently running or in the background.

When implementing this make sure that:

  • The class passed to the API is a public class in the global scope. Not an inner class or anything like that!

  • The class has a public no-argument constructor

  • You need to pass it as a class literal for example: MyClassName.class. don’t use Class.forName("my.package.MyClassName")!
    Class names are problematic since device builds are obfuscated, you should use literals which the obfuscator detects and handles correctly.

The following code demonstrates usage of the GeoFence API:

Geofence gf = new Geofence("test", loc, 100, 100000);

LocationManager.getLocationManager()
        .addGeoFencing(GeofenceListenerImpl.class, gf);
Android Background Location Permissions (API 30+)

On Android 11 (API level 30) and higher, requesting background location permission requires a two-step process. First, foreground location permissions must be granted. Then, the app must request background location access, which will direct the user to the system settings to select "Allow all the time". Codename One handles this flow automatically when you use LocationManager.

For Android 11+ (API 30+), Codename One detects if background location is needed and presents a dialog explaining the requirement before redirecting the user to the app settings. You can customize the permission prompt message using the localization key android.permission.ACCESS_BACKGROUND_LOCATION.

public class GeofenceListenerImpl implements GeofenceListener {
    @Override
    public void onExit(String id) {
    }

    @Override
    public void onEntered(String id) {
        if(Display.getInstance().isMinimized()) {
            Display.getInstance().callSerially(() -> {
                Dialog.show("Welcome", "Thanks for arriving", "OK", null);
            });
        } else {
            LocalNotification ln = new LocalNotification();
            ln.setAlertTitle("Welcome");
            ln.setAlertBody("Thanks for arriving!");
            Display.getInstance().scheduleLocalNotification(ln, 10, false);
        }
    }
}

15.6. Background Music Playback

Codename One supports playing music in the background (for example: when the app is minimized) which is useful for developers building a music player style application.

This support isn’t totally portable since the Android and iOS approaches for background music playback differ a great deal. To get this to work on Android you need to use the API: MediaManager.createBackgroundMedia().

You should use that API when you want to create a media stream that will work even when your app is minimized.

For iOS you will need to use a special build hint: ios.background_modes=music.

Which should allow background playback of music on iOS and would work with the createBackgroundMedia() method.

15.7. Capture - Photos, Video, Audio

The capture API allows you to use the camera to capture photographs or the microphone to capture audio. It even includes an API for video capture.
The API itself couldn’t be simpler:

String filePath = Capture.capturePhoto();

Just captures and returns a path to a photo you can either open it using the Image class or save it somewhere.

The returned file is a temporary file, you shouldn’t store a reference to it and instead copy it locally or work with the Image object

For example: you can copy the Image to Storage using:

String filePath = Capture.capturePhoto();
if(filePath != null) {
    Util.copy(FileSystemStorage.getInstance().openInputStream(filePath), Storage.getInstance().createOutputStream(myImageFileName));
}
When running on the simulator the Capture API opens a file chooser API instead of physically capturing the data. This makes debugging device or situation specific issues simpler

You can capture an image from the camera using an API like this:

Form hi = new Form("Capture", new BorderLayout());
hi.setToolbar(new Toolbar());
Style s = UIManager.getInstance().getComponentStyle("Title");
FontImage icon = FontImage.createMaterial(FontImage.MATERIAL_CAMERA, s);

ImageViewer iv = new ImageViewer(icon);

hi.getToolbar().addCommandToRightBar("", icon, (ev) -> {
    String filePath = Capture.capturePhoto();
    if(filePath != null) {
        try {
            DefaultListModel<Image> m = (DefaultListModel<Image>)iv.getImageList();
            Image img = Image.createImage(filePath);
            if(m == null) {
                m = new DefaultListModel<>(img);
                iv.setImageList(m);
                iv.setImage(img);
            } else {
                m.addItem(img);
            }
            m.setSelectedIndex(m.getSize() - 1);
        } catch(IOException err) {
            Log.e(err);
        }
    }
});

hi.add(BorderLayout.CENTER, iv);
hi.show();
Captured photos previewed in the ImageViewer
Figure 372. Captured photos previewed in the ImageViewer

You demonstrate video capture in the MediaManager section.

The sample below captures audio recordings (using the 'Capture' API) and copies them locally under unique names. It also demonstrates the storage and organization of captured audio:

Form hi = new Form("Capture", BoxLayout.y());
hi.setToolbar(new Toolbar());
Style s = UIManager.getInstance().getComponentStyle("Title");
FontImage icon = FontImage.createMaterial(FontImage.MATERIAL_MIC, s);

FileSystemStorage fs = FileSystemStorage.getInstance();
String recordingsDir = fs.getAppHomePath() + "recordings/";
fs.mkdir(recordingsDir);
try {
    for(String file : fs.listFiles(recordingsDir)) {
        MultiButton mb = new MultiButton(file.substring(file.lastIndexOf("/") + 1));
        mb.addActionListener((e) -> {
            try {
                Media m = MediaManager.createMedia(recordingsDir + file, false);
                m.play();
            } catch(IOException err) {
                Log.e(err);
            }
        });
        hi.add(mb);
    }

    hi.getToolbar().addCommandToRightBar("", icon, (ev) -> {
        try {
            String file = Capture.captureAudio();
            if(file != null) {
                SimpleDateFormat sd = new SimpleDateFormat("yyyy-MMM-dd-kk-mm");
                String fileName =sd.format(new Date());
                String filePath = recordingsDir + fileName;
                Util.copy(fs.openInputStream(file), fs.openOutputStream(filePath));
                MultiButton mb = new MultiButton(fileName);
                mb.addActionListener((e) -> {
                    try {
                        Media m = MediaManager.createMedia(filePath, false);
                        m.play();
                    } catch(IOException err) {
                        Log.e(err);
                    }
                });
                hi.add(mb);
                hi.revalidate();
            }
        } catch(IOException err) {
            Log.e(err);
        }
    });
} catch(IOException err) {
    Log.e(err);
}
hi.show();
Captured recordings in the demo
Figure 373. Captured recordings in the demo

Alternatively, you can use the Media, MediaManager and MediaRecorderBuilder APIs to capture audio, as a more customizable approach than using the Capture API:

    private static final EasyThread countTime = EasyThread.start("countTime");

    public void start() {
        if (current != null) {
            current.show();
            return;
        }
        Form hi = new Form("Recording audio", BoxLayout.y());
        hi.add(new SpanLabel("Example of recording and playback audio using the Media, MediaManager and MediaRecorderBuilder APIs"));
        hi.add(recordAudio((String filePath) -> {
            ToastBar.showInfoMessage("Do something with the recorded audio file: " + filePath);
        }));
        hi.show();
    }

    public static Component recordAudio(OnComplete<String> callback) {
        try {
            // mime types supported by Android: audio/amr, audio/aac, audio/mp4
            // mime types supported by iOS: audio/mp4, audio/aac, audio/m4a
            // mime type supported by Simulator: audio/wav
            // more info: https://www.iana.org/assignments/media-types/media-types.xhtml

            List<String> availableMimetypes = Arrays.asList(MediaManager.getAvailableRecordingMimeTypes());
            String mimetype;
            if (availableMimetypes.contains("audio/aac")) {
                // Android and iOS
                mimetype = "audio/aac";
            } else if (availableMimetypes.contains("audio/wav")) {
                // Simulator
                mimetype = "audio/wav";
            } else {
                // others
                mimetype = availableMimetypes.get(0);
            }
            String fileName = "audioExample." + mimetype.substring(mimetype.indexOf("/") + 1);
            String output = FileSystemStorage.getInstance().getAppHomePath() + "/" + fileName;
            // https://tritondigitalcommunity.force.com/s/article/Choosing-Audio-Bitrate-Settings
            MediaRecorderBuilder options = new MediaRecorderBuilder()
                    .mimeType(mimetype)
                    .path(output)
                    .bitRate(64000)
                    .samplingRate(44100);
            Media[] microphone = {MediaManager.createMediaRecorder(options)};
            Media[] speaker = {null};

            Container recordingUI = new Container(BoxLayout.y());
            Label time = new Label("0:00");
            Button recordBtn = new Button("", FontImage.MATERIAL_FIBER_MANUAL_RECORD, "Button");
            Button playBtn = new Button("", FontImage.MATERIAL_PLAY_ARROW, "Button");
            Button stopBtn = new Button("", FontImage.MATERIAL_STOP, "Button");
            Button sendBtn = new Button("Send");
            sendBtn.setEnabled(false);
            Container buttons = GridLayout.encloseIn(3, recordBtn, stopBtn, sendBtn);
            recordingUI.addAll(FlowLayout.encloseCenter(time), FlowLayout.encloseCenter(buttons));

            recordBtn.addActionListener(l -> {
                try {
                    // every time we have to create a new instance of Media to make it working correctly (as reported in the Javadoc)
                    microphone[0] = MediaManager.createMediaRecorder(options);
                    if (speaker[0] != null && speaker[0].isPlaying()) {
                        return; // do nothing if the audio is currently recorded or played
                    }
                    recordBtn.setEnabled(false);
                    sendBtn.setEnabled(true);
                    Log.p("Audio recording started", Log.DEBUG);
                    if (buttons.contains(playBtn)) {
                        buttons.replace(playBtn, stopBtn, CommonTransitions.createEmpty());
                        buttons.revalidateWithAnimationSafety();
                    }
                    if (speaker[0] != null) {
                        speaker[0].pause();
                    }

                    microphone[0].play();
                    startWatch(time);
                } catch (IOException ex) {
                    Log.p("ERROR recording audio", Log.ERROR);
                    Log.e(ex);
                }
            });

            stopBtn.addActionListener(l -> {
                if (!microphone[0].isPlaying() && (speaker[0] == null || !speaker[0].isPlaying())) {
                    return; // do nothing if the audio is NOT currently recorded or played
                }
                recordBtn.setEnabled(true);
                sendBtn.setEnabled(true);
                Log.p("Audio recording stopped");
                if (microphone[0].isPlaying()) {
                    microphone[0].pause();
                } else if (speaker[0] != null) {
                    speaker[0].pause();
                } else {
                    return;
                }
                stopWatch(time);
                if (buttons.contains(stopBtn)) {
                    buttons.replace(stopBtn, playBtn, CommonTransitions.createEmpty());
                    buttons.revalidateWithAnimationSafety();
                }
                if (FileSystemStorage.getInstance().exists(output)) {
                    Log.p("Audio saved to: " + output);
                } else {
                    ToastBar.showErrorMessage("Error recording audio", 5000);
                    Log.p("ERROR SAVING AUDIO");
                }
            });

            playBtn.addActionListener(l -> {
                // every time we have to create a new instance of Media to make it working correctly (as reported in the Javadoc)
                if (microphone[0].isPlaying() || (speaker[0] != null && speaker[0].isPlaying())) {
                    return; // do nothing if the audio is currently recorded or played
                }
                recordBtn.setEnabled(false);
                sendBtn.setEnabled(true);
                if (buttons.contains(playBtn)) {
                    buttons.replace(playBtn, stopBtn, CommonTransitions.createEmpty());
                    buttons.revalidateWithAnimationSafety();
                }
                if (FileSystemStorage.getInstance().exists(output)) {
                    try {
                        speaker[0] = MediaManager.createMedia(output, false, () -> {
                            // callback on completation
                            recordBtn.setEnabled(true);
                            if (speaker[0].isPlaying()) {
                                speaker[0].pause();
                            }
                            stopWatch(time);
                            if (buttons.contains(stopBtn)) {
                                buttons.replace(stopBtn, playBtn, CommonTransitions.createEmpty());
                                buttons.revalidateWithAnimationSafety();
                            }
                        });
                        speaker[0].play();
                        startWatch(time);
                    } catch (IOException ex) {
                        Log.p("ERROR playing audio", Log.ERROR);
                        Log.e(ex);
                    }
                }
            });

            sendBtn.addActionListener(l -> {
                if (microphone[0].isPlaying()) {
                    microphone[0].pause();
                }
                if (speaker[0] != null && speaker[0].isPlaying()) {
                    speaker[0].pause();
                }
                if (buttons.contains(stopBtn)) {
                    buttons.replace(stopBtn, playBtn, CommonTransitions.createEmpty());
                    buttons.revalidateWithAnimationSafety();
                }
                stopWatch(time);
                recordBtn.setEnabled(true);

                callback.completed(output);
            });

            return FlowLayout.encloseCenter(recordingUI);

        } catch (IOException ex) {
            Log.p("ERROR recording audio", Log.ERROR);
            Log.e(ex);
            return new Label("Error recording audio");
        }

    }

    private static void startWatch(Label label) {
        label.putClientProperty("stopTime", Boolean.FALSE);
        countTime.run(() -> {
            long startTime = System.currentTimeMillis();
            while (label.getClientProperty("stopTime") == Boolean.FALSE) {
                // the sleep is every 200ms instead of 1000ms to make the app more reactive when stop is tapped
                Util.sleep(200);
                int seconds = (int) ((System.currentTimeMillis() - startTime) / 1000);
                String min = (seconds / 60) + "";
                String sec = (seconds % 60) + "";
                if (sec.length() == 1) {
                    sec = "0" + sec;
                }
                String newTime = min + ":" + sec;
                if (!label.getText().equals(newTime)) {
                    CN.callSerially(() -> {
                        label.setText(newTime);
                        if (label.getParent() != null) {
                            label.getParent().revalidateWithAnimationSafety();
                        }
                    });
                }
            }
        });
    }

    private static void stopWatch(Label label) {
        label.putClientProperty("stopTime", Boolean.TRUE);
    }
Example of recording and playback audio using Media API

15.7.1. Capture Asynchronous API

The Capture API also includes a callback based API that uses the ActionListener interface to implement capture. For example: you can adapt the previous sample to use this API as such:

hi.getToolbar().addCommandToRightBar("", icon, (ev) -> {
    Capture.capturePhoto((e) -> {
        if(e != null && e.getSource() != null) {
            try {
                DefaultListModel<Image> m = (DefaultListModel<Image>)iv.getImageList();
                Image img = Image.createImage((String)e.getSource());
                if(m == null) {
                    m = new DefaultListModel<>(img);
                    iv.setImageList(m);
                    iv.setImage(img);
                } else {
                    m.addItem(img);
                }
                m.setSelectedIndex(m.getSize() - 1);
            } catch(IOException err) {
                Log.e(err);
            }
        }
    });
});

The gallery API allows picking an image and/or video from the cameras gallery (camera roll).

Like the Capture API the image returned is a temporary image that should be copied locally, this is due to device restrictions that don’t allow direct modifications of the gallery

You can adapt the Capture sample above to use the gallery as such:

Form hi = new Form("Capture", new BorderLayout());
hi.setToolbar(new Toolbar());
Style s = UIManager.getInstance().getComponentStyle("Title");
FontImage icon = FontImage.createMaterial(FontImage.MATERIAL_CAMERA, s);

ImageViewer iv = new ImageViewer(icon);

hi.getToolbar().addCommandToRightBar("", icon, (ev) -> {
    Display.getInstance().openGallery((e) -> {
        if(e != null && e.getSource() != null) {
            try {
                DefaultListModel<Image> m = (DefaultListModel<Image>)iv.getImageList();
                Image img = Image.createImage((String)e.getSource());
                if(m == null) {
                    m = new DefaultListModel<>(img);
                    iv.setImageList(m);
                    iv.setImage(img);
                } else {
                    m.addItem(img);
                }
                m.setSelectedIndex(m.getSize() - 1);
            } catch(IOException err) {
                Log.e(err);
            }
        }
    }, Display.GALLERY_IMAGE);
});

hi.add(BorderLayout.CENTER, iv);
There is no need for a screenshot as it will look identical to the capture image screenshot above

The last value is the type of content picked which can be one of: Display.GALLERY_ALL, Display.GALLERY_VIDEO or Display.GALLERY_IMAGE.

15.9. Analytics Integration

One of the features in Codename One is built-in support for analytic instrumentation. Currently Codename One has built-in support for Google Analytics, which provides reasonable enough statistics of application usage.

Analytics is pretty seamless for the old GUI builder since navigation occurs through the Codename One API and can be logged without developer interaction. For example, to begin the instrumentation one needs to add the line:

AnalyticsService.setAppsMode(true);
AnalyticsService.init(agent, domain);

To get the value for the agent value create a Google Analytics account and add a domain, then copy and paste the string that looks something like UA-99999999-8 from the console to the agent string. Once this is in place you should start receiving statistic events for the application.

If your application isn’t a GUI builder application or you would like to send more detailed data you can use the Analytics.visit() method to indicate that you’re entering a specific page.

15.9.1. Application Level Analytics

In 2013 Google introduced an improved application level analytics API that’s specifically built for mobile apps. For example, it requires a slightly different API usage. You can activate this specific mode by invoking setAppsMode(true).

When using this mode you can also report errors and crashes to the Google analytics server using the sendCrashReport(Throwable, String message, boolean fatal) method.

You generally recommend using this mode and setting up an apps analytics account as the results are more refined.

15.9.2. Overriding The Analytics Implementation

The Analytics API can also be enhanced to support any other form of analytics solution of your own choosing by deriving the AnalyticsService class.

This allows you to integrate with any 3rd party through native or otherwise by overriding methods in the AnalyticsService class then invoking:

AnalyticsService.init(new MyAnalyticsServiceSubclass());

Notice that this removes the need to invoke the other init method or setAppsMode(boolean).

15.10. Native Facebook Support

Check out the ShareButton section it might be enough for most of your needs.

Codename One supports Facebooks Oauth2 login and Facebooks single sign on for iOS and Android.

15.10.1. Getting Started - Web Setup

To get started first you will need to create a facebook app on the Facebook developer portal at https://developers.facebook.com/apps/

Create New App
Figure 374. Create New App

You need to repeat the process for web, Android & iOS (web is used by the simulator):

Pick Platform
Figure 375. Pick Platform

For the first platform you need to enter the app name:

Pick Name
Figure 376. Pick app name

And provide some basic details:

Details
Figure 377. Basic details for the app

For iOS you need the bundle ID which is the exact same thing you used in the Google+ login to identify the iOS app its effectively your package name:

Details
Figure 378. iOS specific basic details

You should end up with something that looks like this:

Details
Figure 379. Finished Facebook app

The Android process is pretty similar but in this case you need the activity name too.

The activity name should match the main class name followed by the word Stub (uppercase s). For example: for the main class SociallChat you would use SocialChatStub as the activity name
Details
Figure 380. Android Activity definition

To build the native Android app you must make sure that you setup the keystore correctly for your application. If you don’t have an Android certificate you can use the visual wizard (in the Android section in the project preferences the button labeled Generate) or use the command line:

keytool -genkey -keystore Keystore.ks -alias [alias_name] -keyalg RSA -keysize 2048 -validity 15000 -dname "CN=[full name], OU=[ou], O=[comp], L=[City], S=[State], C=[Country Code]" -storepass [password] -keypass [password]
You can reuse the certificate in all your apps, some developers like having a different certificate for every app. This is like having one master key for all your doors, or a huge keyring filled with keys.

With the certificate you need an SHA1 key to further authenticate you to Facebook and you do this using the keytool command line on Linux/Mac:

keytool -exportcert -alias (your_keystore_alias) -keystore (path_to_your_keystore) | openssl sha1 -binary | openssl base64

And on Windows:

keytool -exportcert -alias androiddebugkey -keystore %HOMEPATH%\.android\debug.keystore | openssl sha1 -binary | openssl base64

You can read more about it on the Facebook guide here.

Hash
Figure 381. Hash generation process, notice the command lines are listed as part of the web wizard

Lastly you need to publish the Facebook app by flipping the switch in the apps "Status & Review" page as such:

Enable The App
Figure 382. Without flipping the switch the app won’t "appear"

15.10.2. IDE Setup

You now need to set some important build hints in the project so it will work correctly. To set the build hints right click the project select project properties and in the Codename One section pick the second tab. Add this entry into the table:

facebook.appId=...

The app ID will be visible in your Facebook app page in the top left position.

15.10.3. The Code

To bind your mobile app into the Facebook app you can use the following code:

Login fb = FacebookConnect.getInstance();

fb.setClientId("9999999");
fb.setRedirectURI("http://www.youruri.com/");
fb.setClientSecret("-------");

// Sets a LoginCallback listener
fb.setCallback(new LoginCallback() {
    public void loginSuccessful() {
        // we can now start fetching stuff from Facebook!
    }

    public void loginFailed(String errorMessage) {}
});

// trigger the login if not already logged in
if(!fb.isUserLoggedIn()){
    fb.doLogin();
} else {
    // get the token and now you can query the Facebook API
    String token = fb.getAccessToken().getToken();
    // ...
}
All of these values are from the web version of the app!
They are used in the simulator and on "unsupported" platforms as a fallback. Android and iOS will use the native login

15.10.4. Facebook Publish Permissions

In order to post something to Facebook you need to request a write permission, you can do write operations within the callback which is invoked when the user approves the permission.

You can prompt the user for publish permissions by using this code on a logged in FacebookConnect:

FacebookConnect.getInstance()askPublishPermissions(new LoginCallback() {
    public void loginSuccessful() {
         // do something...
    }
    public void loginFailed(String errorMessage) {
        // show error or just ignore
    }
});
Notice that this won’t always prompt the user, but its required to verify that your token is valid for writing.

15.11. Google Sign-In

Google Login is a bit of a moving target, as they are regularly creating new APIs and deprecating old ones. Codename One 3.7 and earlier used the Google+ API for sign-in, which is now deprecated. While this API still works, it’s no longer useful on iOS as it redirects to Safari to perform login, and Apple no longer allows this practice.

The new, approved API is called Google Sign-In. Rather than using Safari to handle login (on iOS), it uses an embedded web view, which is permitted by Apple.

The process involves four parts:

OAuth Setup is required for using Google Sign-In in the simulator, and for accessing other Google APIs in Android.

15.11.1. iOS Setup Instructions

Short Version

Go to the Google Developer Portal, follow the steps to create an App, and enable Google Sign-In, and download the GoogleService-Info.plist file. Then copy this file into your project’s native/ios directory.

Long Version

Point your browser to this page.

Google Setup Mobile App Form
Figure 383. Set up mobile app form on Google

Click on the "Getting Started" button.

Getting started button
Figure 384. Getting started button

Then click "iOS App"

Pick a platform
Figure 385. Pick a platform

Now enter an app name and the bundle ID for your app on the form below. The app name doesn’t necessary need to match your app’s name, but the bundle ID should match the package name of your app.

Create or Choose App
Figure 386. Create or Choose App

Select your country, and then click the "Choose and Configure Services" button.

Choose and Configure Services
Figure 387. Choose and Configure Services

You’ll be presented with the following screen

Choose and Configure Services form
Figure 388. Choose and Configure Services form

Click on "Google Sign-In".

Then press the "Enable Google Sign-In" button that appears.

Enable Google Sign-In
Figure 389. Enable Google Sign-In

You should then be presented with another button to "Generate Configuration Files" as shown below

Generate Configuration Files
Figure 390. Generate Configuration Files

Finally you will be presented with a button to "Download GoogleServices-Info.plist".

Download GoogleService-Info plist file
Figure 391. Download GoogleService-Info.plist file

Press this button to download the GoogleService-Info.plist file. Then copy this into the "native/ios" directory of your Codename One project.

Project structure
Figure 392. Project file structure after placing the GoogleService-Info.plist into the native/ios directory

At this point, your app should be able to use Google Sign-In. Notice that you don’t require any build hints. Only that the GoogleService-Info.plist file is added to the project’s native/ios directory.

15.11.2. Android Setup Instructions

Short Version

Go to the Google Developer Portal, follow the steps to create an App, and enable Google Sign-In, and download the google-services.json file. Then copy this file into your project’s native/android directory.

Long Version

Point your browser to this page.

Google Setup Mobile App Form
Figure 393. Set up mobile app form on Google

Click on the "Getting Started" button.

Getting started button

Then click "Android App"

Pick a platform

Now enter an app name and the platform for your app on the form below. The app name doesn’t necessary need to match your app’s name, but the package name should match the package name of your app.

Create or Choose App
Figure 394. Create or Choose App

Select your country, and then click the "Choose and Configure Services" button.

Choose and Configure Services
Figure 395. Choose and Configure Services

Click on "Google Sign-In"

Then you’ll be presented with a field to enter the Android Signing Certificate SHA-1.

Android Signing Certifiate SHA-1
Figure 396. Android Signing Certifiate SHA-1

The value that you enter here should be obtained from the certificate that you’re using to build your app. You an use the keytool app that’s distributed with the JDK to extract this value

$ keytool -exportcert -alias myAlias -keystore /path/to/my-keystore.keystore -list -v

The snippet above assumes that your keystore is located at /path/to/my-keystore.keystore, and the certificate alias is "myAlias". You’ll be prompted to enter the password for your keystore, then the output will look something like:

Alias name: myAlias
Creation date: 22-Jan-2014
Entry type: PrivateKeyEntry
Certificate chain length: 1
Certificate[1]:
Owner: CN=My Own Company Corp., OU=, O=, L=Vancouver, ST=British Columbia, C=CA
Issuer: CN=My Own Company Corp., OU=, O=, L=Vancouver, ST=British Columbia, C=CA
Serial number: 56b2fd42
Valid from: Wed Jan 22 12:23:50 PST 2014 until: Tue Feb 16 12:23:50 PST 2055
Certificate fingerprints:
	 MD5:  98:F9:34:5B:B5:1A:14:2D:3C:5D:F4:92:D2:73:30:6B
	 SHA1: 76:BA:AA:11:A9:22:42:24:93:82:6D:33:7E:48:BC:AF:45:4D:79:B0
	 SHA256: 3D:04:33:67:6A:13:FF:4F:EE:E8:C9:7D:D2:CC:DF:70:33:E1:90:44:BF:22:B6:96:11:C7:00:67:8D:CD:53:BC
	 Signature algorithm name: SHA256withRSA
	 Version: 3

Extensions:

#1: ObjectId: 2.5.29.14 Criticality=false
SubjectKeyIdentifier [
KeyIdentifier [
0000: C2 A0 48 AA 60 BA DD E3   0C 3F 00 B4 2C D5 92 A5  ..H.`.......D...
0010: 31 16 EF A2                                        1...
]
]

You will be interested in SHA1 fingerprint. In the snippet above, the SHA1 fingerprint is:

76:BA:AA:11:A9:22:42:24:93:82:6D:33:7E:48:BC:AF:45:4D:79:B0

You would paste this value into the "Android Signing Certificate SHA-1" field in the web form.

After pasting that in, you’ll see a new button with label "Enable Google Sign-in"

Enable Google Sign-In
Figure 397. Enable Google Sign-In

Press this button and you’ll be presented with another button to "Generate Configuration Files" as shown below

Generate Configuration Files
Figure 398. Generate Configuration Files

Finally you will be presented with a button to "Download google-services.json".

Download google-services json file
Figure 399. Download google-services.json file

Press this button to download the google-services.json file. Then copy this into the "native/android" directory of your Codename One project.

Project structure
Figure 400. Project file structure after placing the GoogleService-Info.plist into the native/android directory

At this point, your app should be able to use Google Sign-In. Notice that you don’t require any build hints. Only that the google-services.json file is added to the project’s native/android directory.

If you want to access additional information about the logged in user using Google’s REST APIs, you will require an OAuth2.0 client ID of type Web Application for this project as well. See Section 15.11.3, “OAuth Setup (Simulator and REST API Access)” for details.

15.11.3. OAuth Setup (Simulator and REST API Access)

Getting Google Sign-In to work in the Codename One simulator requires an additional step after you’ve set up iOS and/or Android apps. The Simulator can’t use the native Google Sign-In APIs, so it uses the standard Web Application OAuth2.0 API. In addition, the Android App requires a Web Application OAuth2.0 client ID to access additional Google REST APIs.

If you’ve set up the Google Sign-In API for either Android or iOS, then Google will have already automatically generated a Web Application OAuth2.0 client ID for you. You need to provide the ClientID and ClientSecret to the GoogleConnect instance (in your java code).

Client ID, Client Secret and Redirect URL
  1. Log into the Google Cloud Platform API console.

  2. Select your app from the drop-down-menu in the top bar

  3. Click on "Credentials" in the left menu. You’ll see a screen like this

    Credentials
  4. Under the "OAuth2.0 Client IDs", find the row with "Web application" listed in the type column

  5. Click the "Edit icon for that row.

  6. Make note of the "Client ID" and "Client Secret" on this page, as you’ll need to add them to your Java source in the next step.

  7. In the "Authorized redirect URIs" section, you will need to enter the URL to the page that the user will be sent to after a successful login. This page will appear in the simulator for a split second, as Codename One’s BrowserComponent will intercept this request to obtain the access token upon successful login. You can use any URL you like here, but it must match the value you give to GoogleConnect.setRedirectURL() in Section 15.11.5, “The Code”.

    Redirect URL

15.11.4. Javascript Setup Instructions

The Javascript port can use the same OAuth2.0 credentials as the simulator does. It doesn’t require your Client Secret or redirect URL. It requires your Client ID, which you can specify using the GoogleConnect.setClientID() method.

15.11.5. The Code

Login gc = GoogleConnect.getInstance();
gc.setClientId("*****************.apps.googleusercontent.com");
gc.setRedirectURI("https://yourURL.com/");
gc.setClientSecret("-------------------");

// Sets a LoginCallback listener
gc.setCallback(new LoginCallback() {
    public void loginSuccessful() {
        // we can now start fetching stuff from Google+!
    }

    public void loginFailed(String errorMessage) {}
});

// trigger the login if not already logged in
if(!gc.isUserLoggedIn()){
    gc.doLogin();
} else {
    // get the token and now you can query the Google API
    String token = gc.getAccessToken().getToken();
      // NOTE: On Android, this token will be null unless you provide valid
      // client ID and secrets.
}
The client ID and client secret values here are the ones from your OAuth2.0 Web Application.
The Client ID and Client Secret values are used on both the Simulator and on Android. On simulator these values are required for login to work at all. On Android these values are required to obtain an access token to query the Google API further using its various REST APIs. If you don’t include these values on Android, login will still work, but gc.getAccessToken().getToken() will return null.

15.12. Lead Component

Codename One has two basic ways to create new components:

  1. Subclass a Component override paint, implement event callbacks etc.

  2. Compose many components into a new component, usually by subclassing a Container.

Components such as Tabs subclass Container which make a lot of sense for that component since it’s physically a Container.

For example, components like MultiButton, SpanButton & SpanLabel don’t necessarily seem like the right candidate for compositing but they are all Container subclasses.

Using a Container provides you a lot of flexibility in terms of layout & functionality for a specific component. MultiButton is a great example of that. it’s a Container internally that’s composed of 5 labels and a Button.

Codename One makes the MultiButton "feel" like a single button thru the use of setLeadComponent(Component) which turns the button into the "leader" of the component.

When a Container hierarchy is placed under a leader all events within the hierarchy are sent to the leader, so if a label within the lead component receives a pointer pressed event this event will be sent to the leader.

For example: in the case of the MultiButton the internal button will receive that event and send the action performed event, change the state etc.

This creates some potential issues for instance in MultiButton:

myMultiButton.addActionListener((e) -> {
    if(e.getComponent() == myMultiButton) {
        // this won't occur since the source component is really a button!
    }
    if(e.getActualComponent() == myMultiButton) {
        // this will happen...
    }
});

The leader also determines the style state, so all the elements being lead are in the same state. For example: if the the button is pressed all elements will display their pressed states, notice that they will do so with their own styles but they will each pick the pressed version of that style so a Label UIID within a lead component in the pressed state would return the Pressed state for a Label not for the Button.

This is convenient when you need to construct more elaborate UI’s and the cool thing about it’s that you can do this entirely in the designer which allows assembling containers and defining the lead component inside the hierarchy.

For example: the SpanButton class is similar to this code:

public class SpanButton extends Container {
    private Button actualButton;
    private TextArea text;

    public SpanButton(String txt) {
        setUIID("Button");
        setLayout(new BorderLayout());
        text = new TextArea(getUIManager().localize(txt, txt));
        text.setUIID("Button");
        text.setEditable(false);
        text.setFocusable(false);
        actualButton = new Button();
        addComponent(BorderLayout.WEST, actualButton);
        addComponent(BorderLayout.CENTER, text);
        setLeadComponent(actualButton);
    }


    public void setText(String t) {
        text.setText(getUIManager().localize(t, t));
    }

    public void setIcon(Image i) {
        actualButton.setIcon(i);
    }

    public String getText() {
        return text.getText();
    }

    public Image getIcon() {
        return actualButton.getIcon();
    }

    public void addActionListener(ActionListener l) {
        actualButton.addActionListener(l);
    }

    public void removeActionListener(ActionListener l) {
        actualButton.removeActionListener(l);
    }

}

15.12.1. Blocking Lead Behavior

The Component class has two methods that allow you to exclude a component from lead behavior: setBlockLead(boolean) & isBlockLead().

Effectively when you’ve a Component within the lead hierarchy that you would like to treat differently from the rest you can use this method to exclude it from the lead component behavior while keeping the rest in line…​

This should have no effect if the component isn’t a part of a lead component.

The sample below is based on the Accordion component which uses a lead component internally.

Form f = new Form("Accordion", new BorderLayout());
Accordion accr = new Accordion();
f.getToolbar().addMaterialCommandToRightBar("", FontImage.MATERIAL_ADD, e -> addEntry(accr));
addEntry(accr);
f.add(BorderLayout.CENTER, accr);
f.show();

void addEntry(Accordion accr) {
    TextArea t = new TextArea("New Entry");
    Button delete = new Button();
    FontImage.setMaterialIcon(delete, FontImage.MATERIAL_DELETE);
    Label title = new Label(t.getText());
    t.addActionListener(ee -> title.setText(t.getText()));
    delete.addActionListener(ee -> {
        accr.removeContent(t);
        accr.animateLayout(200);
    });
    delete.setBlockLead(true);
    delete.setUIID("Label");
    Container header = BorderLayout.center(title).
            add(BorderLayout.EAST, delete);
    accr.addContent(header, t);
    accr.animateLayout(200);
}

This allows you to add/edit entries but it also allows the delete button above to actually work separately. Without a call to setBlockLead(true) the delete button would cat as the rest of the accordion title.

Accordion with delete button entries that work despite the surrounding lead
Figure 401. Accordion with delete button entries that work despite the surrounding lead

15.13. Pull To Refresh

Pull to refresh is the common UI paradigm that Twitter popularized where the user can pull down the form/container to receive an update. Adding this to Codename One couldn’t be simpler!

Just invoke addPullToRefresh(Runnable) on a scrollable container (or form) and the runnable method will be invoked when the refresh operation occurs.

Pull to refresh is implicitly implements in the InifiniteContainer
Form hi = new Form("Pull To Refresh", BoxLayout.y());
hi.getContentPane().addPullToRefresh(() -> {
    hi.add("Pulled at " + L10NManager.getInstance().formatDateTimeShort(new Date()));
});
hi.show();
Simple pull to refresh demo
Figure 402. Pull to refresh demo

15.14. Running 3rd Party Apps Using Display’s execute

The Display class’s execute method allows you to invoke a URL which is bound to a particular application.

This works rather well assuming the application is installed. For example: this list contains a set of valid URL’s that can be used on iOS to run common applications and use built-in functionality.

Some URL’s might not be supported if an app isn’t installed, on Android there isn’t much that can be done but iOS has a canOpenURL method for Objective-C.

On iOS you can use the Display.canExecute() method which returns a Boolean instead of a boolean which allows you to support 3 result states:

  1. Boolean.TRUE - the URL can be executed

  2. Boolean.FALSE - the URL isn’t supported or the app is missing

  3. null - you’ve no idea whether the URL will work on this platform.

The sample below launches a "godfather" search on IMDB when this is sure to work ( on iOS currently). You can actually try to search in the case of null as well but this sample plays it safe by using the http link which is sure to work:

Boolean can = Display.getInstance().canExecute("imdb:///find?q=godfather");
if(can != null && can) {
    Display.getInstance().execute("imdb:///find?q=godfather");
} else {
    Display.getInstance().execute("http://www.imdb.com");
}

15.15. Automatic Build Hint Configuration

You try to make Codename One "seamless", this expresses itself in small details such as the automatic detection of permissions on Android etc. The build servers go a long way in setting up the environment as intuitive. But it isn’t enough, build hints are often confusing and obscure. it’s hard to abstract the mess that’s native mobile OS’s and the odd policies from Apple/Google…​

A good example for a common problem developers face is location code that doesn’t work in iOS. This is due to the ios.locationUsageDescription build hint that’s required. The reason that build hint was added is a requirement by Apple to provide a description for every app that uses the location service.

To solve this sort of used case you’ve two API’s in Display:

/**
 * Returns the build hints for the simulator, this will only work in the debug environment and it's
 * designed to allow extensions/API's to verify user settings/build hints exist
 * @return map of the build hints that isn't modified without the codename1.arg. prefix
 */
public Map<String, String> getProjectBuildHints() {}

/**
 * Sets a build hint into the settings while overwriting any previous value. This will only work in the
 * debug environment and it's designed to allow extensions/API's to verify user settings/build hints exist.
 * Important: this will throw an exception outside of the simulator!
 * @param key the build hint without the codename1.arg. prefix
 * @param value the value for the hint
 */
public void setProjectBuildHint(String key, String value) {}

Both of these allow you to detect if a build hint is set and if not (or if it’s set incorrectly) set its value…​

So if you will use the location API from the simulator and you didn’t define ios.locationUsageDescription Codename One will implicitly define a string there. The cool thing is that you will now see that string in your settings and you would be able to customize it easily.

For example, this gets way better than that trivial example!

The real value is for 3rd party cn1lib authors. For example: Google Maps or Parse. They can inspect the build hints in the simulator and show an error in case of a misconfiguration. They can even show a setup UI. Demos that need special keys in place can force the developer to set them up properly before continuing.

15.16. Easy Thread

Working with threads is usually ranked as one of the least intuitive and painful tasks in programming. This is such an error prone task that some platforms/languages took the route of avoiding threads entirely. I needed to convert some code to work on a separate thread but I still wanted the ability to communicate and transfer data from that thread.

This is possible in Java but non-trivial, the thing is that this is relatively easy to do in Codename One with tools such as callSerially I can let arbitrary code run on the EDT. Why not offer that to any random thread?

that’s why I created EasyThread which takes some of the concepts of Codeame One’s threading and makes them more accessible to an arbitrary thread. This way you can move things like resource loading into a separate thread and easily synchronize the data back into the EDT as needed…​

Easy thread can be created like this:

EasyThread e = EasyThread.start("ThreadName");

You can send a task to the thread using:

e.run(() -> doThisOnTheThread());

But it gets better, say you want to return a value:

e.run((success) -> success.onSuccess(doThisOnTheThread()), (myResult) -> onEDTGotResult(myRsult));

Lets break that down…​ You ran the thread with the success callback on the new thread then the callback got invoked on the EDT as a result. So this code (success) → success.onSuccess(doThisOnTheThread()) ran off the EDT in the thread and when you invoked the onSuccess callback it sent it asynchronously to the EDT here: (myResult) → onEDTGotResult(myRsult).

These asynchronous calls make things a bit painful to wade thru so instead I chose to wrap them in a simplified synchronous version:

EasyThread e = EasyThread.start("Hi");
int result = e.run(() -> {
    System.out.println("This is a thread");
    return 3;
});

There are a few other variants like runAndWait and there is a kill() method which stops a thread and releases its resources.

15.17. Mouse Cursor

Codename one can change the mouse cursor when hovering over specific areas to indicate resizability, movability etc. For obvious reasons this feature is available in the desktop and JavaScript ports as the other ports rely mostly on touch interaction. The feature is off by default and needs to be enabled on a Form by using Form.setEnableCursors(true);. If you’re writing a custom component that can use cursors such as SplitPane you can use:

@Override
protected void initComponent() {
    super.initComponent();
    getComponentForm().setEnableCursors(true);
}

Once this is enabled you can set the cursor over a specific region using cmp.setCursor() which accepts one of the cursor constants defined in Component.

15.18. Working With GIT

Working with GIT for storing Codename One projects isn’t exactly a feature but since it’s so ubiquitous you think it’s important to have a common guideline.

When you first started committing to git you used something like this for netbeans projects:

*.jar
nbproject/private/
build/
dist/
lib/CodenameOne_SRC.zip

Removing the jars, build, private folder etc. makes a lot of sense but there are a few nuances that are missing here…​

15.18.1. cn1lib’s

You will notice you excluded the jars which are stored under lib and you exclude the Codename One source zip. But I didn’t exclude cn1libs…​ That was an omission since the original project you committed didn’t have cn1libs. But should you commit a binary file to git?

I don’t know. Generally git isn’t good with binaries but cn1libs make sense. In another project that did have a cn1lib I did this:

*.jar
nbproject/private/
build/
dist/
lib/CodenameOne_SRC.zip
lib/impl/
native/internal_tmp/

The important lines are lib/impl/ and native/internal_tmp/. Technically cn1libs are zips. When you do a refresh libs they unzip into the right directories under lib/impl and native/internal_tmp. By excluding these directories you can remove duplicates that can result in conflicts.

15.18.2. Resource Files

Committing the res file is a matter of personal choice. it’s committed in the git ignore files above but you can remove it. The res file is at risk of corruption and in that case having a history you can refer to, matters a lot.

But the resource file is a bit of a problematic file. As a binary file if you’ve a team working with it the conflicts can be a major blocker. This was far worse with the old GUI builder, that was one of the big motivations of moving into the new GUI builder which works better for teams.

Still, if you want to keep an eye of every change in the resource file you can switch on the FileXML Team Mode which should be on by default. This mode creates a file hierarchy under the res directory to match the res file you opened. For example: if you’ve a file named src/theme.res it will create a matching res/theme.xml and also nest all the images and resources you use in the res directory.

that’s useful as you can edit the files directly and keep track of every file in git. For example, this has two big drawbacks:

  • it’s flaky - while this mode works it never reached the stability of the regular res file mode

  • It conflicts - the simulator/device are oblivious to this mode. So if you fetch an update you also need to update the res file and you might still have conflicts related to that file

Ultimately both of these issues shouldn’t be a deal breaker. Even though this mode is a bit flaky it’s better than the alternative as you can literally "see" the content of the resource file. You can easily revert and reapply your changes to the res file when merging from git, it’s tedious but again not a deal breaker.

15.18.3. Eclipse Version

Building on the gitignore you’ve for NetBeans the eclipse version should look like this:

.DS_Store
*.jar
build/
dist/
lib/impl/
native/internal_tmp/
.metadata
bin/
tmp/
*.tmp
*.bak
*.swp
*.zip
*~.nib
local.properties
.settings/
.loadpath
.recommenders
.externalToolBuilders/
*.launch
*.pydevproject
.cproject
.factorypath
.buildpath
.project
.classpath

15.18.4. IntelliJ/IDEA

.DS_Store
*.jar
build/
dist/
lib/impl/
native/internal_tmp/
*.zip
.idea/**/workspace.xml
.idea/**/tasks.xml
.idea/dictionaries
.idea/**/dataSources/
.idea/**/dataSources.ids
.idea/**/dataSources.xml
.idea/**/dataSources.local.xml
.idea/**/sqlDataSources.xml
.idea/**/dynamic.xml
.idea/**/uiDesigner.xml
.idea/**/gradle.xml
.idea/**/libraries
*.iws
/out/
atlassian-ide-plugin.xml

16. Performance, Size & Debugging

16.1. Reducing Resource File Size

It’s easy to lose track of size/performance when you’re working within the comforts of a visual tool like the Codename One Designer. When optimizing resource files you need to keep in mind one thing: it’s all about image sizes.

Images will take up 95-99% of the resource file size; everything else pales in comparison.

Like every optimization the first rule is to reduce the size of the biggest images which will provide your biggest improvements, for this purpose we introduced the ability to see image sizes in kilobytes. To launch that feature use the menu item ImagesImage Sizes (KB) in the designer.

Image sizes window that allows us to find the biggest impact on our RAM/Storage
Figure 403. Image sizes window that allows us to find the biggest impact on our RAM/Storage

This produces a list of images sorted by size with their sizes. Often the top entries will be multi-images, which include HD resolution values that can be pretty large. These high-resolution images take up a significant amount of space!

Just going to the multi-images, selecting the unnecessary resolutions & deleting these images can saves significant amounts of space:

Removing unused DPI’s
Figure 404. Removing unused DPI’s
You can see the size in KB at the top right side in the designers image viewer

Applications using the old GUI builder can use the ImagesDelete Unused Images menu option (it’s also under the Images menu). This tool allows detecting and deleting images that aren’t used within the theme/GUI.

If you’ve a large image that’s opaque you might want to consider converting it to JPEG and replacing the built in PNG’s. Notice that JPEG’s work on all supported devices and are typically smaller.

Convert a MultiImage to use JPEGs instead of PNGs
Figure 405. Convert a MultiImage to use JPEGs instead of PNGs

You can use the excellent OptiPng tool to optimize image files right from the Codename One designer. To use this feature you need to install OptiPng then select ImagesLaunch OptiPng from the menu. Once you do that the tool will automatically optimize all your PNG’s.

When faced with size issues make sure to check the size of your res file, if your JAR file is large open it with a tool such as 7-zip and sort elements by size. Start reviewing which element justifies the size overhead.

16.2. Improving Performance

There are quite a few things you can do as a developer in order to improve the performance and memory footprint of a Codename One application. This sometimes depends on specific device behaviors but some of the tips here are true for all devices.

The simulator contains some tools to measure performance overhead of a specific component and also detect EDT blocking logic. Other than that follow these guidelines to create more performance code:

  • Avoid round rect borders - they have a huge overhead on all platforms. Use image borders instead (counter intuitively they are MUCH faster)

  • Avoid Gradients - they perform poorly on most OS’s. Use a background image instead

  • Use larger images when tiling or building image borders, using a 1 pixel (or event a few pixels) wide or high image and tiling it repeatedly can be expensive

  • Shrink resource file sizes - Otherwise data might get collected by the garbage collector and reloading data might be expensive

  • Check that you don’t have too many image lock misses - this is discussed in the graphics section

  • On some platforms mutable images are slow - mutable images are images you can draw on (using getGraphics()). On some platforms they perform quite badly (e.g. iOS) and should generally be avoided. You can check if mutable images are fast in a platform using Display.areMutableImagesFast()

  • * Make components either transparent or opaque * - a translucent component must paint it’s parent every time. This can be expensive. An opaque component might have margins that would require that we paint the parent so there is often overdraw in such cases (overdraw means the same pixel being painted twice).

16.2.1. ParparVM Native Translation Performance Hints

For ParparVM-generated native code, we now support method-level optimization hints via annotations. These can provide good wins in hot code paths, but they come with tradeoffs and should be applied surgically.

Method-level codegen hints
  • @DisableDebugInfo
    Suppresses generated line/debug metadata for the annotated method. This can reduce generated C size and remove some per-instruction debug overhead.

  • @DisableNullChecksAndArrayBoundsChecks
    Suppresses generated null and array-bounds checks for the annotated method. This can significantly reduce branch-heavy code in tight loops.

Use these on methods that are both performance-critical and well-covered by tests. These annotations intentionally trade runtime safety diagnostics for speed.
Class-level concrete implementation hints

For native ParparVM output (C/Objective-C), you can also provide a class-level hint that a base type always maps to a known concrete subclass at runtime:

  • @Concrete(name="fully.qualified.ConcreteClassName")
    Allows the translator to bypass virtual table lookup for invokevirtual calls on the annotated base class. The translator first attempts a direct call on the concrete class; if the method is not implemented there, it falls back to the annotated base class implementation.

This is useful for platform abstraction classes where one implementation is guaranteed in the native pipeline.

For example, Codename One annotates:

@Concrete(name = "com.codename1.impl.ios.IOSImplementation")
public abstract class CodenameOneImplementation {
    // ...
}
This hint is intended for ParparVM native translation and does not apply to the JavaScript backend.
Fast method-stack path

The translator can emit a fast method-stack prologue/epilogue (DEFINE_METHOD_STACK_FAST_* and CN1_FAST_RETURN_RELEASE) for methods that meet strict safety criteria.

In practice, this tends to help for:

  • Small, hot methods.

  • Methods without monitor usage / exception-heavy flow.

  • Methods with straightforward control flow and low instruction complexity.

Tradeoffs:

  • Overly broad fast-path eligibility can regress performance if extra branches or memory writes are introduced.

  • Primitive- fast-frame variants may not always outperform a straightforward full clear on all targets/compilers.

Benchmark representative workloads after enabling fast-stack behavior. Keep eligibility conservative and expand where measurement shows consistent gains.
Base64-style hot-loop guidelines

For low-level loops (e.g. Base64 encode/decode):

  • Prefer simple loop bodies with predictable branches.

  • Cache decode/lookup tables in primitive arrays (int[] lookup tables can reduce per-iteration conversion overhead).

  • Avoid adding “defensive” branches in the inner-most loop unless they are required for correctness in production inputs.

Build configuration matters

When benchmarking translator output, ensure native projects are compiled with optimization enabled (e.g. CMake Release builds). Debug/default builds can hide improvements or produce misleading regressions.

If you’re using the integration test harness, make sure CMake is configured with:

-DCMAKE_BUILD_TYPE=Release

Without this setting, comparison between Java and ParparVM native output is often noisy and can lead to incorrect optimization conclusions.

16.3. SIMD: Data-Parallel Primitives

SIMD stands for Single Instruction, Multiple Data. It is a family of CPU instructions that apply the same arithmetic or logical operation to several values at once, packed together into a single wide register. On a 128-bit NEON or SSE register you can hold sixteen bytes, eight 16-bit integers, four 32-bit integers, or four 32-bit floats, and a single instruction such as VADD or PADDD then operates on every lane in parallel. For data-parallel workloads — Base64 encode/decode, pixel blending, alpha-mask compositing, colour-channel manipulation, table lookups — SIMD typically delivers a 3× to 10× speedup over scalar code.

Modern mobile and desktop CPUs expose several SIMD instruction sets:

  • x86/x64 — MMX, SSE, SSE2/3/4, AVX, AVX2, AVX-512

  • ARM/ARM64 — NEON (Advanced SIMD) and SVE

Codename One exposes those primitives as portable Java method calls on com.codename1.util.Simd. On ParparVM (iOS) the translator lowers them to NEON intrinsics; on Android and the JavaSE simulator a pure-Java fallback in JavaSESimd provides the same semantics so code written against Simd runs everywhere and simply performs better where native SIMD is available.

16.3.1. When to Use SIMD

SIMD is worth reaching for when all of the following hold:

  • You are processing a buffer of at least dozens of elements at a time.

  • The operation per element is simple (add, min, blend, table lookup, interleave/unpack) and identical across elements.

  • Control flow is regular — no per-element early exit, no data-dependent branches that differ across lanes.

  • Data is contiguous in a primitive array (byte[], int[], float[]).

Classic fits are image pixel passes, codecs (Base64, UTF-8 validation, hex encoding), checksums, audio mixing, and vector arithmetic. Poor fits are tight loops with pointer chasing, per-element branching on complex state, or buffers smaller than a single SIMD register.

If you are not sure whether your platform has a vectorized implementation available, call Simd.get().isSupported(). The fallback path still returns correct results; isSupported() only tells you whether you will see the speedup.

16.3.2. Getting an Instance

Simd is accessed as a singleton:

Simd simd = Simd.get(); // equivalent to CN.getSimd()
if (simd.isSupported()) {
    // native SIMD is wired up on this platform
}

The returned object is safe to cache in a field as long as the cache is refreshed across simulator restarts (the simulator may swap the backing implementation).

16.3.3. Allocation: Alignment and Provenance

SIMD load/store instructions prefer — and on some architectures require — that the memory address they read from or write to be a multiple of the register width (16 bytes on NEON and SSE). Misaligned access either throws a hardware fault on strict platforms or silently costs extra cycles because the CPU has to split the transaction across two cache lines. A JVM offers no guarantee that new byte[64] is aligned to anything beyond the platform’s object-header convention, so the framework forbids passing arbitrary new-allocated arrays to Simd primitives.

Every buffer used with a Simd primitive must therefore come from one of the allocation helpers on Simd:

byte[]  bytes  = simd.allocByte(64);   // heap, 16-byte aligned, registered
int[]   ints   = simd.allocInt(32);    // heap, 16-byte aligned, registered
float[] floats = simd.allocFloat(32);  // heap, 16-byte aligned, registered

All three methods enforce a minimum size of 16 elements and throw IllegalArgumentException for anything smaller; the minimum keeps each buffer large enough to hold a full SIMD register and leaves room for alignment padding.

Do not construct SIMD buffers with new byte[64] and pass them to Simd. The simulator enforces this at runtime (see Simulator Tracking below) and the iOS native path assumes alignment. Passing an unregistered array yields either an IllegalArgumentException in the simulator or undefined results on device.

16.3.4. A Minimal End-to-End Example

Simd simd = Simd.get();

byte[] a   = simd.allocByte(64);
byte[] b   = simd.allocByte(64);
byte[] out = simd.allocByte(64);

// fill a and b with your data (plain array writes are fine)
for (int i = 0; i < 64; i++) {
    a[i] = (byte) i;
    b[i] = (byte) (64 - i);
}

// saturating byte add, one vector instruction per 16 bytes on NEON
simd.add(a, b, out, 0, 64);

All Simd ops take explicit offset / length pairs so callers can chunk a large buffer through a small scratch array without reallocating. Many methods have interleaved variants — unpackBytesInterleaved3/4, packBytesInterleaved3/4 — designed for packed pixel formats (RGB, RGBA) and fused operations like blendByMaskTestNonzero and replaceTopByteFromUnsignedBytes that collapse common three- or four-pass pixel pipelines into a single vector pass.

16.3.5. Scratch Allocations: alloca*

A SIMD primitive often needs a short-lived working buffer: somewhere to stage intermediate lanes, hold a temporary mask, or accumulate partial results. Allocating a new byte[] per call via allocByte would dominate the runtime of the primitive it was trying to accelerate — heap allocation, zero-fill, and eventual GC reclamation all add up. The natural solution is to let the compiler place these buffers on the call stack where they cost nothing to create and are reclaimed for free when the method returns. This is what the alloca* family exposes:

byte[]  scratchB = simd.allocaByte(64);
int[]   scratchI = simd.allocaInt(32);
float[] scratchF = simd.allocaFloat(32);

// Deterministic initial contents:
byte[]  zeroed   = simd.allocaByteZeroed(64);
int[]   filled   = simd.allocaIntFilled(32, -1);

On the simulator (and on Android) these behave like heap allocations with registration. On ParparVM the translator intercepts each alloca* call and rewrites it into a C-level __builtin_alloca that carves a faux JavaArrayPrototype out of the current C stack frame. The resulting pointer masquerades as an ordinary Java array for the lifetime of the enclosing method and is reclaimed on return.

The distinction between allocByte and allocaByte mirrors the distinction between new byte[N] and C’s alloca(N):

alloc* (heap)alloca* (stack on ParparVM)

Cost to allocate

object header + zero fill + GC bookkeeping

register adjust, essentially free

Lifetime

until last reference dropped

until enclosing method returns

Can be stored in a field

yes

no — use-after-free on device

Can be returned from the method

yes

no

Can be passed to non-Simd methods

yes

no

Initial contents

zero

undefined (use *Zeroed / *Filled)

Size limit

heap

bounded by remaining stack

alloca* memory, like any stack memory, starts out containing whatever the previous frame left behind. Callers that require predictable initial contents should use allocaByteZeroed / allocaIntZeroed / allocaFloatZeroed, or the *Filled variants that accept an explicit initial value, rather than rolling their own loop.

16.3.6. Rules for alloca* Scratch Arrays

Because alloca* memory cannot safely outlive its defining method on ParparVM, the array it returns must be treated as strictly method-local. The framework enforces four rules at build and run time:

  1. Do not return an alloca* array from the method that allocated it.

  2. Do not store an alloca* array in an instance or static field, or into an object array.

  3. Do not pass an alloca* array to a method whose owner is not Simd, IOSSimd, or JavaSESimd. Helper methods outside the SIMD package might themselves violate one of the other rules.

  4. Do not pass an alloca* array through invokedynamic; dynamic dispatch cannot be analysed statically.

Inside the defining method you are free to pass the array to any number of Simd primitives, copy values into and out of it, combine it with other buffers, and so on.

16.3.7. Build-Time Verification

The Maven plugin ships a bytecode-compliance goal (compliance-check) that walks every method in the application’s compiled classes and performs a dataflow pass whose only job is to track whether each value on the operand stack or in a local variable was produced by an alloca* call. The pass is an ASM BasicInterpreter subclass that taints every value returned from a method on Simd, IOSSimd, or JavaSESimd whose name begins with alloca followed by an upper-case letter. The taint propagates through DUP, ASTORE/ALOAD, CHECKCAST, and every control-flow merge, so a value keeps its provenance through any amount of local plumbing.

The verifier fails the build if a tainted value reaches any of:

  • ARETURN — "SIMD alloca value returned from method"

  • PUTFIELD / PUTSTATIC — "SIMD alloca value stored into instance/static field"

  • AASTORE — "SIMD alloca value stored into object array"

  • INVOKE* whose owner is not Simd, IOSSimd, or JavaSESimd

  • INVOKEDYNAMIC — refused unconditionally

Every violation is reported with the offending class, method, and the hint "Keep SIMD alloca scratch arrays method-local and only pass them to Simd methods." Because this is wired into the Maven build, code that would dereference freed stack memory on device cannot ship.

A complementary guard lives inside the translator itself: CustomInvoke.appendSimdAllocaExpression only performs stack lowering when the length argument is a compile-time constant. A call like simd.allocaByte(n) with a variable n falls through to the default codegen and becomes a normal heap allocation, which avoids both unbounded stack growth and an alloca whose size the translator cannot inspect.

16.3.8. Simulator Tracking of Aligned Arrays

The JavaSE simulator runs on the desktop where there is no NEON, no __builtin_alloca, and no guarantee that a given byte[] is 16-byte aligned. To keep developer bugs from hiding on the desktop and reappearing only on device, the simulator takes a strict stance: only arrays obtained from Simd.alloc / Simd.alloca* are accepted as inputs to SIMD primitives.*

Internally this is an identity-based registry. Every allocation helper routes its result through a registration call that stores the array’s System.identityHashCode — the JVM’s per-object identity hash, stable for the object’s lifetime regardless of GC movement. Every SIMD entry point validates its array arguments against the same set and throws IllegalArgumentException if a caller hands it a plain new byte[64]:

java.lang.IllegalArgumentException: SIMD array argument was not
allocated using Simd.alloc*(). objectId=…

Combined with the build-time verifier, both static analysis and dynamic execution refuse to accept arrays that would not be 16-byte aligned on device. On the device itself no such validation occurs — by that point the build has already proved the invariant.

16.3.9. Built-In SIMD Paths

You usually benefit from SIMD without touching the API directly. com.codename1.util.Base64 detects Simd.isSupported() at encode/decode entry points and routes the hot loop through unpackLookupBytesInterleaved4, lookupBytes, or, and shl with cached per-call constant tables; the bodies of Image.applyMask, Image.modifyAlpha, and Image.removeColor use fused primitives like replaceTopByteFromUnsignedBytes and blendByMaskTestNonzero to collapse multi-pass pixel pipelines into a single vector loop.

If you are writing your own hot loop on a primitive buffer and the data is already contiguous and aligned in a Simd.alloc* array, reach for the Simd API before optimizing further with the ParparVM annotations described above — vectorization and annotation hints compose, but vectorization is usually the larger win.

16.4. Performance Monitor

The Performance Monitor tool can be accessible via the SimulatorPerformance Monitor menu option in the simulator. This launches the following UI that can help you improve application performance:

Main tab of the performance monitor: Logs and timings
Figure 406. Main tab of the performance monitor: Logs and timings

The first tab of the performance monitor includes a table of the drawn components. Each entry includes the number of times it was drawn and the slowest/fastest and average drawing time. The toolbar across the top includes Pause/Continue buttons so you can freeze the counters while you inspect the current snapshot, a "Clear Data" action to reset the tables, and a "GC" button that invokes the simulator’s garbage collector so you can see how memory usage changes.

This is useful if a Form is slow. You might be able to pinpoint it to a specific component using this tool.

The Log on the bottom includes debug related information. E.g. it warns about the usage of mutable images which might be slow on some platforms. This also displays warnings when an unlocked image is drawn etc. A live "Image Memory Overhead" meter summarizes how much native image memory the current form consumes so you can correlate spikes with your drawing code.

Rendering tree
Figure 407. Rendering tree

The rendering tree view allows us to inspect the hierarchy painting. You can press the refresh button which will trigger the painting of the current Form. Every graphics operation is logged and so is the stack to it.

You can then inspect the hierarchy and see what was drawn by the various components. You can click the "stack" buttons to see the specific stack trace that lead to that specific drawing operation.

This is a remarkably powerful debugging tool as you can literally see "overdraw" within this tool. E.g if you see fillRect or similar API’s invoked in the parent and then again and again in the children this could indicate a problem.

Android devices have a nice overdraw debugging tool

16.5. Network Speed

Network speed tool
Figure 408. Network speed tool

This feature is actually more useful for general debugging however it’s sometimes useful to simulate a slow/disconnected network to see how this affects performance.

For this purpose the Codename One simulator allows you to slow down networking or even fake a disconnected network to see how your application handles such cases.

16.6. Debugging Codename One Sources

When you debug your app with our source code you can place breakpoints deep within Codename One and gain unique insight. You can also use the profilers and profile into Codename One to gain similar performance specific insight.

When you run into a bug or a missing feature you can push that feature/fix back to Codename One using a pull request. Github makes that process trivial and in this new video and slides below we show you how. The steps to use the code are:

  1. Signup for Github

  2. Fork http://github.com/codenameone/CodenameOne and http://github.com/codenameone/codenameone-skins (also star and watch the projects for good measure).

  3. Clone the git URL’s from the projects into the IDE using the TeamGitClone menu option. Notice that you must deselect projects in the IDE for the menu to appear.

  4. Download the cn1-binaries project from github here.

  5. Unzip the cn1-binaries project and make sure the directory has the name cn1-binaries. Verify that cn1-binaries, CodenameOne and codenameone-skins are within the same parent directory. .In your own project remove the jars both in the build & run libraries section. Replace the build libraries with the CodenameOne/CodenameOne project. Replace the runtime libraries with the CodenameOne/Ports/JavaSEPort project.

This allows you to run the existing Codename One project with the Codename One source code and debug into Codename One. You can now also commit, push and send a pull request with the changes.

16.7. Device Testing Framework/Unit Testing

Codename One includes a built in testing framework and test recorder tool as part of the simulator. This allows developers to build both functional and unit test execution on top of Codename One. It even enables sending tests for execution on the device (pro- feature).

To get started with the testing framework, launch the application and open the test recorder in the simulator menu.

The test recorder tool in the simulator
Figure 409. The test recorder tool in the simulator

Once you press record a test will be generate for you as you use the application.

Test recording in progress
Figure 410. Test recording in progress, when done press the save icon

You can build tests using the Codename One testing package to manipulate the Codename One UI programmatically and perform various assertions.

Unlike frameworks such as JUnit which assign a method per test, the Codename One test framework uses a class per test. This allows the framework to avoid reflection and thus allows it to work properly on the device.

16.8. EDT Error Handler and sendLog

Handling errors or exceptions in a deployed product is pretty difficult, most users would throw away your app and some would give it a negative rating without providing you with the opportunity to actually fix the bug that might have happened.

Default error dialog
Figure 411. Default error dialog

Google improved on this a bit by allowing users to submit stack traces for failures on Android devices but this requires the users approval for sending personal data which you might not need if you want to receive the stack trace and maybe some basic application state (without violating user privacy).

For quite some time Codename One had a powerful feature that allows you to both catch and report such errors, the error reporting feature uses the Codename One cloud which is exclusive for pro/enterprise users. Normally in Codename One we catch all exceptions on the EDT (which is where most exceptions occur) and display an error to the user as you can see in the picture. Unfortunately this isn’t helpful to us as developers who want to see the stack; furthermore we might prefer the user doesn’t see an error message at all!

Codename One allows us to grab all exceptions that occur on the EDT and handle them using the method addEdtErrorHandler in the Display class. Adding this to the Log’s ability to report errors directly to us and you can get a powerful tool that will send us an email with information when a crash occurs!

This can be accomplished with a single line of code:

Log.bindCrashProtection(true);

We normally place this in the init(Object) method so all future on-device errors are emailed to you. Internally this method uses the Display.getInstance().addEdtErrorHandler() API to bind error listeners to the EDT. When an exception is thrown there it’s swallowed (using ActionEvent.consume()). The Log data is then sent using Log.sendLog().

If your crash handler runs while networking is unavailable or you want to avoid blocking the EDT, use Log.sendLogAsync() instead. It performs the upload in a background thread and is what Codename One’s lifecycle helper falls back to when regular error reporting fails.

You can also plug in your own crash reporting pipeline by calling Display.getInstance().setCrashReporter(CrashReport). The CrashReport callback will receive the exception, device information, and log payload so you can forward it to services like Firebase Crashlytics or your in-house tools.

To truly benefit from this feature you need to use the Log class for all logging and exception handling instead of API’s such as System.out.

To log standard printouts you can use the Log.p(String) method and to log exceptions with their stack trace you can use Log.e(Throwable).

16.9. Kitchen Sink Case Study

Performance is one of those vague subjects that’s often taught by example.

During our debugging of the contacts demo that’s a part of the new kitchen sink demo we noticed its performance was sub par. We assumed this was due to the implementation of getAllContacts & that there is nothing to do. While debugging another issue we noticed an anomaly during the loading of the contacts.

This led to the discovery that you’re loading the same resource file over and over again for every single contact in the list!

In the new Contacts demo you’ve a share button for each contact, the code for constructing a ShareButton looks like this:

public ShareButton() {
    setUIID("ShareButton");
    FontImage.setMaterialIcon(this, FontImage.MATERIAL_SHARE);
    addActionListener(this);
    shareServices.addElement(new SMSShare());
    shareServices.addElement(new EmailShare());
    shareServices.addElement(new FacebookShare());
}

This seems reasonable until you realize that the constructors for SMSShare, EmailShare & FacebookShare load the icons for each of those…​

These icons are in a shared resource file that we load and don’t properly cache. The initial workaround was to cache this resource but a better solution was to convert this code:

public SMSShare() {
    super("SMS", Resources.getSystemResource().getImage("sms.png"));
}

Into this code:

public SMSShare() {
    super("SMS", null);
}

@Override
public Image getIcon() {
    Image i = super.getIcon();
    if(i == null) {
        i = Resources.getSystemResource().getImage("sms.png");
        setIcon(i);
    }
    return i;
}

This way the resource uses lazy loading as needed.

This small change boosted the loading performance and probably the general performance due to less memory fragmentation.

The lesson that you should learn every day is to never assume about performance…​

16.9.1. Scroll Performance - Threads aren’t magic

Another performance pitfall in this same demo came during scrolling. Scrolling was janky (uneven/unsmooth) right after loading finished would recover after a couple of minutes.

This relates to the images of the contacts.

To hasten the loading of contacts we load them all without images. We then launch a thread that iterates the contacts and loads an individual image for a contact. Then sets that image to the contact and replaces the placeholder image.

This performed well in the simulator but didn’t do too well even on powerful mobile phones. We assumed this wouldn’t be a problem because we used Util.sleep() to yield CPU time but that wasn’t enough.

Often when we see performance penalty the response is: "move it to a separate thread". The problem is that this separate thread needs to compete for the same system resources and merge its changes back into the EDT. When we perform something intensive you need to make sure that the CPU isn’t needed right now…​

In this and past cases we solved this using a class member indicating the last time a user interacted with the UI.

Here we defined:

private long lastScroll;

Then we did this within the background loading thread:

// don't do anything while we are scrolling or animating
long idle = System.currentTimeMillis() - lastScroll;
while(idle < 1500 || contactsDemo.getAnimationManager().isAnimating() || scrollY != contactsDemo.getScrollY()) {
    scrollY = contactsDemo.getScrollY();
    Util.sleep(Math.min(1500, Math.max(100, 2000 - ((int)idle))));
    idle = System.currentTimeMillis() - lastScroll;
}

This effectively sleeps when the user interacts with the UI and loads the images if the user hasn’t touched the UI in a while.

Notice that we also check if the scroll changes, this allows us to notice cases like the animation of scroll winding down.

All you need to do now is update the lastScroll variable whenever user interaction is in place. This works for user touches:

parentForm.addPointerDraggedListener(e -> lastScroll = System.currentTimeMillis());

This works for general scrolling:

contactsDemo.addScrollListener(new ScrollListener() {
    int initial = -1;
    @Override
    public void scrollChanged(int scrollX, int scrollY, int oldscrollX, int oldscrollY) {
        // scrolling is sensitive on devices...
        if(initial < 0) {
            initial = scrollY;
        }
        lastScroll = System.currentTimeMillis();
        ...
    }
});
Due to technical constraints you can’t use a lambda in this specific case…​

17. Monetization

Codename One integrates many built-in monetization options such as ad network support and in-app purchases.

Many monetization options are available as third-party cn1libs that you can install through the Codename One website.

17.1. Google Play ads

The simplest banner-ad support is often the easiest network to use. To enable mobile ads, create an ad unit in AdMob’s website. You should end up with a key similar to this:

ca-app-pub-8610616152754010/3413603324

To enable this for Android, define android.googleAdUnitId=ca-app-pub-8610616152754010/3413603324 in the build arguments. For iOS, use the same value in ios.googleAdUnitId. The rest is automatic: the correct ad appears at the bottom of the screen, and the form shrinks to fit the ad. iOS and Android implement that shrinking differently because of platform constraints, but the result should work well with device rotation.

Google Play ads
Figure 412. Google Play ads

There is a special ad unit ID for test ads. If you specify ca-app-pub-3940256099942544/6300978111, you get test ads during development. This matters because you aren’t allowed to click your own ads. When it’s time for a production release, replace it with the real value you generated in AdMob.

17.2. In-app purchase

In-app purchase is a helpful way to make app development profitable. Codename One supports in-app purchases of consumable and non-consumable products on Android and iOS. It also supports subscriptions. Even though the concept is simple, in-app purchase involves many moving parts, especially for subscriptions.

17.2.1. The SKU

In-app purchase support centers around the set of SKUs you want to sell. Each product, whether it’s a one-month subscription, an upgrade to the "Pro" version, or "10 disco credits", has a SKU (stock-keeping unit). Ideally, you can use the same SKU across every store that sells your app.

17.2.2. Types of Products

There are generally 4 classifications for products:

  1. Non-consumable Product - This is a product that the user purchases once to "own". They can’t re-purchase it. One example is a product that upgrades your app to a "Pro" version.

  2. Consumable Product - This is a product that the user can buy more than once. For example, you might have a product for "10 Credits" that lets the user buy items in a game.

  3. Non-Renewable Subscription - A subscription that you buy once, and won’t be "auto-renewed" by the app store. These are almost identical to consumable products, except that subscriptions need to be transferable across all the user’s devices. This means that non-renewable subscriptions require that you’ve a server that keeps track of the subscriptions.

  4. Renewable Subscriptions - A subscription that the app store manages. The user will be automatically billed when the subscription period ends, and the subscription will renew.

These subscription categories may not be explicitly supported by a given store, or they may use different names. You can integrate each product type in a cross-platform way using Codename One. For example, Google Play doesn’t distinguish between consumable products and non-renewable subscriptions, but iTunes does.

17.2.3. The "Hello World" of in-app purchase

Start with a simple example of an app that sells "Worlds". First, pick the SKU for the product. Here you use com.codename1.world.

public static final String SKU_WORLD = "com.codename1.world";
Although this example uses the package-name convention for a SKU, you can use any name you want, for example UA8879.

Next, the app’s main class needs to implement the PurchaseCallback interface

public class HelloWorldIAP implements PurchaseCallback {
    ....

 @Override
 public void itemPurchased(String sku) {
...
 }

 @Override
 public void itemPurchaseError(String sku, String errorMessage) {
...
 }

 @Override
 public void paymentFailed(String paymentCode, String failureReason) {
...
 }

 @Override
 public void paymentSucceeded(String paymentCode, double amount, String currency) {
...
 }

}

Using these callbacks, the app receives notifications whenever a purchase changes. For this simple app, only itemPurchased() and itemPurchaseError() matter. The legacy itemRefunded(), subscriptionStarted(), and subscriptionCanceled() hooks are deprecated in the core API and are no longer dispatched by the stores. Instead of relying on callbacks for long-term entitlement state, query the current receipts at runtime with helpers such as Purchase.wasPurchased(…​), Purchase.isSubscribed(…​), or Purchase.getReceipts(). That keeps the UI aligned with the latest data from the underlying store.

Now in the start() method, add a button that lets the user buy the world:

 public void start() {
 if(current!= null){
 current.show();
 return;
 }
 Form hi = new Form("Hi World");
 Button buyWorld = new Button("Buy World");
 buyWorld.addActionListener(e->{
 if (Purchase.getInAppPurchase().wasPurchased(SKU_WORLD)) {
 Dialog.show("can't Buy It", "You already Own It", "OK", null);
 } else {
 Purchase.getInAppPurchase().purchase(SKU_WORLD);
 }
 });

 hi.addComponent(buyWorld);
 hi.show();
 }

At this point, the app can track the sale of the world. To make it more useful, add ToastBar feedback for purchase completion.

 @Override
 public void itemPurchased(String sku) {
 ToastBar.showMessage("Thanks. You now own the world", FontImage.MATERIAL_THUMB_UP);
 }

 @Override
 public void itemPurchaseError(String sku, String errorMessage) {
 ToastBar.showErrorMessage("Failure occurred: "+errorMessage);
 }
You can test out this code in the simulator without doing any additional setup and it will work. If you want the code to work properly on Android and iOS, you’ll need to set up the app and in-app purchase settings in the Google Play and iTunes stores respectively as explained below

When the app first opens we see our button:

In-app purchase demo app
Figure 413. In-app purchase demo app

In the simulator, clicking on the "Buy World" button will bring up a prompt to ask you if you want to approve the purchase.

Approving the purchase in the simulator
Figure 414. Approving the purchase in the simulator

Now if I try to buy the product again, it pops up the dialog to let me know that I already own it.

In App purchase already owned
Figure 415. In App purchase already owned

17.2.4. Making it Consumable

In the "Buy World" example above, the "world" product was non-consumable, since we could only buy the world once. We could change it to a consumable product by disregarding whether it was purchased before & keeping track of how many times it had been purchased.

We’ll use storage to keep track of the number of worlds that the user purchased. We need two methods to manage this count. One method gets the number of worlds that we own, and another adds a world to this count.

private static final String NUM_WORLDS_KEY = "NUM_WORLDS.dat";
public int getNumWorlds() {
 synchronized (NUM_WORLDS_KEY) {
 Storage s = Storage.getInstance();
 if (s.exists(NUM_WORLDS_KEY)) {
 return (Integer)s.readObject(NUM_WORLDS_KEY);
 } else {
 return 0;
 }
 }
}

public void addWorld() {
 synchronized (NUM_WORLDS_KEY) {
 Storage s = Storage.getInstance();
 int count = 0;
 if (s.exists(NUM_WORLDS_KEY)) {
 count = (Integer)s.readObject(NUM_WORLDS_KEY);
 }
 count++;
 s.writeObject(NUM_WORLDS_KEY, new Integer(count));
 }
}

Now we’ll change our purchase code as follows:

buyWorld.addActionListener(e->{
 if (Dialog.show("Confirm", "You own "+getNumWorlds()+
 " worlds. Do you want to buy another one?", "Yes", "No")) {
 Purchase.getInAppPurchase().purchase(SKU_WORLD);
 }
});

And our itemPurchased() callback will need to add a world:

@Override
public void itemPurchased(String sku) {
 addWorld();
 ToastBar.showMessage("Thanks. You now own "+getNumWorlds()+" worlds", FontImage.MATERIAL_THUMB_UP);
}
When we set up the products in the iTunes store we will need to mark the product as a consumable product or iTunes will prevent us from purchasing it more than once

17.2.5. Non-Renewable Subscriptions

As we discussed before, there are two types of subscriptions:

  1. Non-renewable

  2. Auto-renewable

Non-renewable subscriptions are the same as consumable products, except that they are shareable across devices. Auto-renewable subscriptions will continue as long as the user doesn’t cancel the subscription. They will be re-billed automatically by the appropriate app-store when the chosen period expires, and the app-store handles the management details itself.

The concept of an "Non-renewable" subscription is unique to iTunes. Google Play has no formal similar option. In order to create a non-renewable subscription SKU that behaves the same in your iOS and Android apps you would create it as a regular product in Google play, and a Non-renewable subscription in the iTunes store. We’ll learn more about that in a later post when we go into the specifics of app store setup.
The Purchase class includes both a purchase() method and a subscribe() method. On some platforms it makes no difference which one you use, but on Android it matters. If the product is set up as a subscription in Google Play, then you must use subscribe() to purchase the product. If it is set up as a regular product, then you must use purchase(). Since we enter "Non-renewable" subscriptions as regular products in the play store, we would use the purchase() method.

17.2.6. Promotional offers (iOS)

Apple allows you to present discounted introductory pricing to existing subscribers via promotional offers. Codename One surfaces this capability through overloads of both Purchase.purchase(String, PromotionalOffer) and Purchase.subscribe(String, PromotionalOffer), which forward the promotional context to StoreKit when you initiate the transaction. Promotional offers are only honoured by iOS, so the overloads simply fall back to the regular purchase flow on other platforms.

To build the signed discount payload required by Apple you can use the ApplePromotionalOffer helper:

ApplePromotionalOffer offer = new ApplePromotionalOffer();
offer.setOfferIdentifier("my-intro-offer");
offer.setKeyIdentifier("A1B2C3D4");
offer.setNonce(UUID.randomUUID().toString());
offer.setSignature(signatureFromYourServer);
offer.setTimestamp(timestampFromYourServer);

Purchase purchase = Purchase.getInAppPurchase();
purchase.subscribe(SKU_WORLD_MONTHLY, offer);

Apple generates the signature and timestamp from your App Store Connect server notifications endpoint; Codename One simply passes them to the native StoreKit APIs. For one-time products you can call purchase(sku, offer) instead of subscribe(…​).

17.2.7. Restoring purchases and managing subscriptions

Both Apple and Google provide built-in user interfaces for restoring past purchases and managing subscription billing preferences. Codename One exposes these entry points so you can surface the native flows without reimplementing them yourself.

  • Restores: Call Purchase.isRestoreSupported() before presenting a "Restore purchases" button. When supported (iOS currently implements this natively), invoke Purchase.restore() to prompt the operating system to re-deliver past transactions. Your app should implement RestoreCallback (similar to how you implement PurchaseCallback) so you can respond to individual itemRestored(…​) events and to the completion or failure of the restore request.

  • Subscription management: Use Purchase.isManageSubscriptionsSupported() to detect whether the platform can show the subscription management UI. When it returns true, calling Purchase.manageSubscriptions(null) opens the store-specific settings screen (Apple’s subscription center on iOS and Google Play’s subscription management activity on Android). On Android you can optionally pass a SKU to deep-link directly to the plan the user should manage.

Because these flows are handled by the underlying store your UI doesn’t need to rebuild any billing screens. Simply gate the buttons on the capability checks above so that iOS and Android users get the familiar restore/manage dialogs while other platforms can fall back to your own help copy.

17.2.8. The Server-Side

Since a subscription purchased on one user device needs to be available across the user’s devices (Apple’s rules for non-renewable subscriptions), our app will need to have a server-component. In this section, we’ll gloss over that & "mock" the server interface. We’ll go into the specifics of the server-side below.

The Receipts API

Subscriptions, in Codename One use the "Receipts" API. It’s up to you to register a receipt store with the In-App purchase instance, which allows Codename one to load receipts (from your server), and submit new receipts to your server. A Receipt includes information such as:

  1. Store code (since you may be dealing with receipts from itunes, google play & Microsoft)

  2. SKU

  3. Transaction ID (store specific)

  4. Expiry Date

  5. Cancellation date

  6. Purchase date

  7. Order Data (that you can use on the server-side to verify the receipt and load receipt details directly from the store it originated from).

The Purchase provides a set of methods for interacting with the receipt store, such as:

  1. isSubscribed([skus]) - Checks to see if the user is currently subscribed to any of the provided skus.

  2. getExpiryDate([skus]) - Checks the expiry date for a set of skus.

  3. synchronizeReceipts() - Synchronizes the receipts with the receipt store. This will attempt to submit any pending purchase receipts to the receipt store, and the reload receipts from the receipt store.

In order for any of this to work, you must implement the ReceiptStore interface, and register it with the Purchase instance. Your receipt store must implement two methods:

  1. fetchReceipts(SuccessCallback<Receipt[]> callback) - Loads all of the receipts from your receipt store for the current user.

  2. submitReceipt(Receipt receipt, SuccessCallback<Boolean> callback) - Submits a receipt to your receipt store. This gives you an opportunity to add details to the receipt such as an expiry date.

17.2.9. The "Hello World" of Non-Renewable Subscriptions

We’ll expand on the theme of "Buying" the world for this app, except, this time we will "Rent" the world for a period of time. We’ll have two products:

  1. A 1 month subscription

  2. A 1 year subscription

public static final String SKU_WORLD_1_MONTH = "com.codename1.world.subscribe.1month";
public static final String SKU_WORLD_1_YEAR = "com.codename1.world.subscribe.1year";

public static final String[] PRODUCTS = {
 SKU_WORLD_1_MONTH,
 SKU_WORLD_1_YEAR
};

Notice that we create two separate SKUs for the 1 month and 1 year subscription. Each subscription period must have its own SKU. I have created an array (PRODUCTS) that contains both of the SKUs. This is handy, as you’ll see in the examples ahead, because the APIs for checking status and expiry date of a subscription take the SKUs in a "subscription group" as input.

Different SKUs that sell the same service/product but for different periods form a "subscription group". Conceptually, customers are not subscribing to a particular SKU, they are subscribing to the subscription group of which that SKU is a member. As an example, if a user purchases a 1 month subscription to "the world", they are actually subscribing to "the world" subscription group.

It’s up to you to know the grouping of your SKUs. Any methods in the Purchase class that check subscription status or expiry date of a SKU should be passed all SKUs of that subscription group. E.g. If you want to know if the user is subscribed to the SKU_WORLD_1_MONTH subscription, it would not be sufficient to call iap.isSubscribed(SKU_WORLD_1_MONTH), because that wouldn’t take into account if the user had purchased a 1 year subscription. The correct way is to always call iap.isSubscribed(SKU_WORLD_1_MONTH, SKU_WORLD_1_YEAR), or simply iap.isSubscribed(PRODUCTS) since we have placed both SKUs into our PRODUCTS array.

Implementing the Receipt Store
The receipt store is intended to interface with a server so that the subscriptions can be synced with multiple devices, as required by Apple’s guidelines. For this post we’ll just store our receipts on device using internal storage. Moving the logic to a server is a simple matter that we will cover in a future post when we cover the server-side.
The Receipt store is a layer between your server and Codename One
Figure 416. The Receipt store is a layer between your server and Codename One

A basic receipt store needs to implement just two methods:

  1. fetchReceipts

  2. submitReceipt

Generally we’ll register it in our app’s init() method so that it’s always available.

public void init(Object context) {
...

 Purchase.getInAppPurchase().setReceiptStore(new ReceiptStore() {

 @Override
 public void fetchReceipts(SuccessCallback<Receipt[]> callback) {
 // Fetch receipts from storage and pass them to the callback
 }

 @Override
 public void submitReceipt(Receipt receipt, SuccessCallback<Boolean> callback) {
 // Save a receipt to storage. Make sure to call callback when done.
 }
 });
}

These methods are designed to be asynchronous since real-world apps will always be connecting to some sort of network service. Therefore, instead of returning a value, both of these methods are passed instances of the SuccessCallback class. It’s important to make sure to call callback.onSuccess() ALWAYS when the methods have completed, even if there is an error, or the Purchase class will just assume that you’re taking a long time to complete the task, and will continue to wait for you to finish.

Once implemented, our fetchReceipts() method will look like:

// static declarations used by receipt store

// Storage key where list of receipts are stored
private static final String RECEIPTS_KEY = "RECEIPTS.dat";

@Override
public void fetchReceipts(SuccessCallback<Receipt[]> callback) {
 Storage s = Storage.getInstance();
 Receipt[] found;
 synchronized(RECEIPTS_KEY) {
 if (s.exists(RECEIPTS_KEY)) {
 List<Receipt> receipts = (List<Receipt>)s.readObject(RECEIPTS_KEY);
 found = receipts.toArray(new Receipt[receipts.size()]);
 } else {
 found = new Receipt[0];
 }
 }
 // Make sure this is outside the synchronized block
 callback.onSucess(found);
}

This is fairly straight forward. We’re checking to see if we already have a list of receipts stored. If so we return that list to the callback. If not we return an empty array of receipts.

Receipt implements Externalizable so you are able to write instances directly to Storage.

The submitReceipt() method is a little more complex, as it needs to calculate the new expiry date for our subscription.

@Override
public void submitReceipt(Receipt receipt, SuccessCallback<Boolean> callback) {
 Storage s = Storage.getInstance();
 synchronized(RECEIPTS_KEY) {
 List<Receipt> receipts;
 if (s.exists(RECEIPTS_KEY)) {
 receipts = (List<Receipt>)s.readObject(RECEIPTS_KEY);
 } else {
 receipts = new ArrayList<Receipt>();
 }
 // Check to see if this receipt already exists
 // This probably won't ever happen (that you will be asked to submit an
 // existing receipt, but better safe than sorry
 for (Receipt r : receipts) {
 if (r.getStoreCode().equals(receipt.getStoreCode()) &&
 r.getTransactionId().equals(receipt.getTransactionId())) {
 // If you've already got this receipt, you will this submission.
 return;
 }
 }

 // Now try to find the current expiry date
 Date currExpiry = new Date();
 List<String> lProducts = Arrays.asList(PRODUCTS);
 for (Receipt r : receipts) {
 if (!lProducts.contains(receipt.getSku())) {
 continue;
 }
 if (r.getCancellationDate()!= null) {
 continue;
 }
 if (r.getExpiryDate() == null) {
 continue;
 }
 if (r.getExpiryDate().getTime() > currExpiry.getTime()) {
 currExpiry = r.getExpiryDate();
 }
 }

 // Now set the appropriate expiry date by adding time onto
 // the end of the current expiry date
 Calendar cal = Calendar.getInstance();
 cal.setTime(currExpiry);
 switch (receipt.getSku()) {
 case SKU_WORLD_1_MONTH:
 cal.add(Calendar.MONTH, 1);
 break;
 case SKU_WORLD_1_YEAR:
 cal.add(Calendar.YEAR, 1);
 }
 Date newExpiry = cal.getTime();

 receipt.setExpiryDate(newExpiry);
 receipts.add(receipt);
 s.writeObject(RECEIPTS_KEY, receipts);

 }
 // Make sure this is outside the synchronized block
 callback.onSucess(Boolean.TRUE);
}

The main logic of this method involves iterating through all of the existing receipts to find the latest current expiry date, so that when the user purchases a subscription, it’s added onto the end of the current subscription (if one exists) rather than going from today’s date. This enables users to safely renew their subscription before the subscription has expired.

In the real-world, we would implement this logic on the server-side.

The iTunes store and Play store have no knowledge of your subscription durations. This is why it’s up to you to set the expiry date in the submitReceipt method. Non-renewable subscriptions are essentially no different than regular consumable products. It’s up to you to manage the subscription logic - and Apple, in particular, requires you to do so using a server.
Synchronizing Receipts

In order for your app to provide you with current data about the user’s subscriptions and expiry dates, you need to synchronize the receipts with your receipt store. Purchase provides a set of methods for doing this. Generally I’ll call one of them inside the start() method, and I may resynchronize at other strategic times if I suspect that the information may have changed.

The following methods can be used for synchronization:

  1. synchronizeReceipts() - Asynchronously synchronizes receipts in the background. You won’t be notified when it’s complete.

  2. synchronizeReceiptsSync() - Synchronously synchronizes receipts, and blocks until it’s complete. This is safe to use on the EDT as it employs invokeAndBlock under the covers.

  3. synchronizeReceipts(final long ifOlderThanMs, final SuccessCallback<Boolean> callback) - Asynchronously synchronizes receipts, but only if they haven’t been synchronized in the specified time period. E.g. In your start() method you might decide that you only want to synchronize receipts once per day. This also includes a callback that will be called when synchronization is complete.

  4. synchronizeReceiptsSync(long ifOlderThanMs) - A synchronous version that will only refetch if data is older than given time.

In our hello world app we synchronize the subscriptions in a few places.

At the end of the start() method:

public void start() {

...

 // Now synchronize the receipts
 iap.synchronizeReceipts(0, res->{
 // Update the UI as necessary to reflect

 });
}

And we also provide a button to allow the user to manually synchronize the receipts.

Button syncReceipts = new Button("Synchronize Receipts");

syncReceipts.addActionListener(e->{

 iap.synchronizeReceipts(0, res->{
 // Update the UI
 });
});
Expiry Dates and Subscription Status

Now that we have a receipt store registered, and we have synchronized our receipts, we can query the Purchase instance to see if a SKU or set of SKUs is currently subscribed. There are three useful methods in this realm:

  1. boolean isSubscribed(String…​ skus) - Checks to see if the user is currently subscribed to any of the provided SKUs.

  2. Date getExpiryDate(String…​ skus) - Gets the latest expiry date of a set of SKUs.

  3. Receipt getFirstReceiptExpiringAfter(Date dt, String…​ skus) - This method will return the earliest receipt with an expiry date after the given date. This is needed in cases where you need to decide if the user should have access to some content based on its publication date. E.g. If you published an issue of your e-zine on March 1, and the user purchased a subscription on March 15th, then they should get access to the March 1st issue even though it doesn’t necessarily fall in the subscription period. Being able to easily fetch the first receipt after a given date makes it easier to determine if a particular issue should be covered by a subscription.

If you need to know more information about subscriptions, you can always just call getReceipts() to obtain a list of all of the current receipts and determine for yourself what the user should have access to.

In the hello world app we’ll use this information in a few different places. On our main form we’ll include a label to show the current expiry date, and we allow the user to press a button to synchronize receipts manually if they think the value is out of date.

//...

SpanLabel rentalStatus = new SpanLabel("Loading rental details...");
Button syncReceipts = new Button("Synchronize Receipts");

syncReceipts.addActionListener(e->{

 iap.synchronizeReceipts(0, res->{
 if (iap.isSubscribed(PRODUCTS)) {
 rentalStatus.setText("World rental expires "+iap.getExpiryDate(PRODUCTS));
 } else {
 rentalStatus.setText("You don't currently have a subscription to the world");
 }
 hi.revalidate();
 });
});
Allowing the User to Purchase the Subscription

You should now have all of the background required to implement the Hello World Subscription app. So we’ll return to the code and see how the user purchases a subscription.

In the main form, we want two buttons to subscribe to the "World", for one month and one year respectively. They look like:

Purchase iap = Purchase.getInAppPurchase();
//...
Button rentWorld1M = new Button("Rent World 1 Month");
rentWorld1M.addActionListener(e->{
 String msg = null;
 if (iap.isSubscribed(PRODUCTS)) { (1)
 msg = "you're already renting the world until "
 +iap.getExpiryDate(PRODUCTS) (2)
 +". Extend it for one more month?";
 } else {
 msg = "Rent the world for 1 month?";
 }
 if (Dialog.show("Confirm", msg, "Yes", "No")) {
 Purchase.getInAppPurchase().purchase(SKU_WORLD_1_MONTH); (3)
 // Note: since this is a non-renewable subscription it's a regular
 // product in the play store - therefore you use the purchase() method.
 // If it were a "subscription" product in the play store, then you
 // would use subscribe() instead.
 }
});

Button rentWorld1Y = new Button("Rent World 1 Year");
rentWorld1Y.addActionListener(e->{
 String msg = null;
 if (iap.isSubscribed(PRODUCTS)) {
 msg = "you're already renting the world until "+
 iap.getExpiryDate(PRODUCTS)+
 ". Extend it for one more year?";
 } else {
 msg = "Rent the world for 1 year?";
 }
 if (Dialog.show("Confirm", msg, "Yes", "No")) {
 Purchase.getInAppPurchase().purchase(SKU_WORLD_1_YEAR);
 // Note: since this is a non-renewable subscription it's a regular
 // product in the play store - therefore you use the purchase() method.
 // If it were a "subscription" product in the play store, then you
 // would use subscribe() instead.
 }
});
1In the event handler we check if the user is subscribed by calling isSubscribed(PRODUCTS). Notice that we check it against the array of both the one month and one year subscription SKUs.
2We are able to tell the user when the current expiry date is so that they can gauge whether to proceed.
3Since this is a non-renewable subscription, we use the Purchase.purchase() method. See following note about subscribe() vs purchase()

17.2.10. subscribe() vs purchase()

The Purchase class includes two methods for initiating a purchase:

  1. purchase(sku)

  2. subscribe(sku)

Which one you use depends on the type of product that is being purchased. If your product is set up as a subscription in the Google Play store, then you should use subscribe(sku). Otherwise, you should use purchase(sku).

Handling Purchase Callbacks

The purchase callbacks are very similar to the ones that we implemented in the regular in-app purchase examples:

@Override
public void itemPurchased(String sku) {
 Purchase iap = Purchase.getInAppPurchase();

 // Force you to reload the receipts from the store.
 iap.synchronizeReceiptsSync(0);
 ToastBar.showMessage("Your subscription has been extended to "+iap.getExpiryDate(PRODUCTS), FontImage.MATERIAL_THUMB_UP);
}

@Override
public void itemPurchaseError(String sku, String errorMessage) {
 ToastBar.showErrorMessage("Failure occurred: "+errorMessage);
}

Notice that, in itemPurchased() we don’t need to explicitly create any receipts or submit anything to the receipt store. This is handled for you automatically. We do make a call to synchronizeReceiptsSync() but this is just to ensure that our toast message has the new expiry date loaded already.

17.2.11. Screenshots

Main form
Figure 417. Main form
Dialog shown when subscribing to a product
Figure 418. Dialog shown when subscribing to a product
Simulator confirm dialog when purchasing a subscription
Figure 419. Simulator confirm dialog when purchasing a subscription
Upon successful purchase
Figure 420. Upon successful purchase, the toastbar message is shown

17.2.12. Summary

This section demonstrated how to set up an app to use non-renewable subscriptions using in-app purchase. Non-renewable subscriptions are the same as regular consumable products except for the fact that they are shared by all of the user’s devices, and thus, require a server component. The app store has no knowledge of the duration of your non-renewable subscriptions. It’s up to you to specify the expiry date of purchased subscriptions on their receipts when they are submitted. Google play doesn’t formally have a "non-renewable" subscription product type. To implement them in Google play, you would just set up a regular product. It’s how you handle it internally that makes it a subscription, and not just a regular product.

Codename One uses the Receipt class as the foundation for its subscriptions infrastructure. You, as the developer, are responsible for implementing the ReceiptStore interface to provide the receipts. The Purchase instance will load receipts from your ReceiptStore, and use them to determine whether the user is currently subscribed to a subscription, and when the subscription expires.

17.2.13. Auto-Renewable Subscriptions

Auto-renewable subscriptions provide, arguably, an easier path to recurring revenue than non-renewable subscriptions because all of the subscription stuff is handled by the app store. You defer almost entirely to the app store (iTunes for iOS, and Play for Android) for billing and management.

If there is a down-side, it would be that you are also subject to the rules of each app store - and they take their cut of the revenue.

  1. For more information about Apple’s auto-renewable subscription features and rules see this document.

  2. For more information about subscriptions in Google play, see this document.

17.2.14. Auto-Renewable vs Non-Renewable. Best Choice?

When deciding between auto-renewable and non-renewable subscriptions, as always, the answer will depend on your needs and preferences. Auto-renewables are nice because it takes the process completely out of your hands. You just get paid. On the other hand, there are valid reasons to want to use non-renewables. E.g. You can’t cancel an auto-renewable subscription for a user. They have to do that themselves. You may also want more control over the subscription and renewal process, in which case a non-renewable might make more sense.

There are some developers that are opposed to auto-renewable subscriptions, we don’t have enough information to make a solid recommendation on this matter

On a practical level, if you are using auto-renewable subscriptions (and therefore subscription products in the Google play store) you must use the Purchase.subscribe(sku) method for initiating the purchase workflow. For non-renewable subscriptions (and therefore regular products in the Google play store), you must use the Purchase.purchase(sku) method.

17.2.15. Learning By Example

In this section we’ll describe the general workflow of subscription management on the server. We also demonstrate how use Apple’s and Google’s web services to validate receipts and stay informed of important events (such as when users cancel or renew their subscriptions).

17.2.16. Building the IAP Demo Project

To aid in this process, we’ve created a fully-functional in-app purchase demo project that includes both a client app and a server app.

Setting up the Client Project
  1. Create a new Codename One project in Netbeans, and choose the "Bare-bones Hello World Template". You should make your package name something unique so that you are able to create real corresponding apps in both Google Play and iTunes connect.

  2. Once the project is created, copy this source file contents into your main class file. Then change the package name, and class name in the file to match your project settings. E.g. change package ca.weblite.iapdemo; to package <your.package.name.here>; and class IAPDemo implements PurchaseCallback to class YourClassName implements PurchaseCallback.

  3. Add the Generic Web Service Client library to your project by going to "Codename Settings" > "Extensions", finding that library, and click "Download". Then "Refresh CN1 libs" as it suggests.

  4. Change the localHost property to point to your local machine’s network address. Using "http://localhost" is not going to cut it here because when the app is running on a phone, it needs to be able to connect to your web server over the network. This address will be your local network address (e.g. 192.168.0.9, or something like that).

    private static final String localHost = "http://10.0.1.32";
  5. Add the ios.plistInject build hint to your project with the value "<key>NSAppTransportSecurity</key> <dict> <key>NSAllowsArbitraryLoads</key> <true/> </dict>". This is so that we can use http urls in iOS. Since we don’t intend to fully publish this app, we can cut corners like this. If you were creating a real app, you would use proper secure URLs.

Setting up the Server Project

Download the CN1-IAP-Server demo project from Github, and run its "install-deps" ANT task in order to download and install its dependencies to your local Maven repo.

For the following commands to work, make sure you have "ant", "mvn", and "git" in your environment PATH.
$ git clone https://github.com/shannah/cn1-iap-demo-server
$ cd cn1-iap-demo-server
$ ant install-deps

Open the project in Netbeans

Setting up the Database
  1. Create a new database in your preferred DBMS. Call it anything you like.

  2. Create a new table named "RECEIPTS" in this database with the following structure:

    create TABLE RECEIPTS
    (
    	TRANSACTION_ID VARCHAR(128) not null,
    	USERNAME VARCHAR(64) not null,
    	SKU VARCHAR(128) not null,
    	ORDER_DATA VARCHAR(32000),
    	PURCHASE_DATE BIGINT,
    	EXPIRY_DATE BIGINT,
    	CANCELLATION_DATE BIGINT,
    	LAST_VALIDATED BIGINT,
    	STORE_CODE VARCHAR(20) default '' not null,
    	primary key (TRANSACTION_ID, STORE_CODE)
    )
  3. Open the "persistence.xml" file in the server netbeans project.

    Persistence File
  4. Change the data source to the database you just created.

    Edit persistence.xml file data source

If you’re not sure how to create a data source, see my previous tutorial on connecting to a MySQL database.

Testing the Project

At this point we should be able to test out the project in the Codename One simulator to make sure it’s working.

  1. Build and Run the server project in Netbeans. You may need to tell it which application server you wish to run it on. I am running it on the Glassfish 4.1 that comes bundled with Netbeans.

  2. Build and run the client project in Netbeans. This should open the Codename One simulator.

When the app first opens you’ll see a screen as follows:

First screen of app
Figure 421. First screen of app

This screen is for testing consumable products, so we won’t be making use of this right now.

Open the hamburger menu and select "Subscriptions". You should see something like this:

Subscriptions form
Figure 422. Subscriptions form

Click on the "Subscribe 1 Month No Ads" button. You will be prompted to accept the purchase:

Approve purchase dialog
Figure 423. Approve purchase dialog

Upon completion, the app will submit the purchase to your server, and if all went well, it will retrieve the updated list of receipts from your server also, and update the label on this form to say "No Ads. Expires <some date>":

After successful purchase
Figure 424. After successful purchase
This project is set up to use an expedited expiry date schedule for purchases from the simulator. 1 month = 5 minutes. 3 months = 15 minutes. This helps for testing. That is why your expiry date may be different than expected.

Just to verify that the receipt was inserted correctly, you should check the contents of your "RECEIPTS" table in your database. In Netbeans, I can do this easily from the "Services" pane. Expand the database connection down to the RECEIPTS table, right click "RECEIPTS" and select "View Data". This will open a data table similar the the following:

Receipts table after insertion
Figure 425. Receipts table after insertion
Table view
Figure 426. Table view

A few things to mention here:

  1. The "username" was provided by the client. It’s hard-coded to "admin", but the idea is that you would have the user log in and you would have access to their real username.

  2. All dates are stored as unix timestamps in milliseconds.

If you delete the receipt from your database, then press the "Synchronize Receipts" button in your app, the app will again say "No subscriptions." Similarly if you wait 5 minutes and hit "Synchronize receipts" the app will say no subscriptions found, and the "ads" will be back.

Troubleshooting

Let’s not pretend that everything worked for you on the first try. There’s a lot that could go wrong here. If you make a purchase and nothing appears to happen, the first thing you should do is check the Network Monitor in the simulator ("Simulate" > "Network" > "Network Monitor"). You should see a list of network requests. Some will be GET requests and there will be at least one POST request. Check the response of these requests to see if they succeeded.

Also check the Glassfish server log to see if there is an exception.

Common problems would be that the URL you have set in the client app for endpointURL is incorrect, or that there is a database connection problem.

17.2.17. Looking at the Source of the App

Now that we’ve set up and built the app, let’s take a look at the source code so you can see how it all works.

Client Side

I use the Generic Webservice Client Library from inside my ReceiptStore implementation to load receipts from the web service, and insert new receipts to the database.

The source for my ReceiptStore is as follows:

private ReceiptStore createReceiptStore() {
 return new ReceiptStore() {

 RESTfulWebServiceClient client = createRESTClient(receiptsEndpoint);

 @Override
 public void fetchReceipts(SuccessCallback<Receipt[]> callback) {
 RESTfulWebServiceClient.Query query = new RESTfulWebServiceClient.Query() {

 @Override
 protected void setupConnectionRequest(RESTfulWebServiceClient client, ConnectionRequest req) {
 super.setupConnectionRequest(client, req);
 req.setUrl(receiptsEndpoint);
 }

 };
 client.find(query, rowset->{
 List<Receipt> out = new ArrayList<Receipt>();
 for (Map m : rowset) {
 Result res = Result.fromContent(m);
 Receipt r = new Receipt();
 r.setTransactionId(res.getAsString("transactionId"));
 r.setPurchaseDate(new Date(res.getAsLong("purchaseDate")));
 r.setQuantity(1);
 r.setStoreCode(m.getAsString("storeCode"));
 r.setSku(res.getAsString("sku"));

 if (m.containsKey("cancellationDate") && m.get("cancellationDate")!= null) {
 r.setCancellationDate(new Date(res.getAsLong("cancellationDate")));
 }
 if (m.containsKey("expiryDate") && m.get("expiryDate")!= null) {
 r.setExpiryDate(new Date(res.getAsLong("expiryDate")));
 }
 out.add(r);

 }
 callback.onSucess(out.toArray(new Receipt[out.size()]));
 });
 }

 @Override
 public void submitReceipt(Receipt r, SuccessCallback<Boolean> callback) {
 Map m = new HashMap();
 m.put("transactionId", r.getTransactionId());
 m.put("sku", r.getSku());
 m.put("purchaseDate", r.getPurchaseDate().getTime());
 m.put("orderData", r.getOrderData());
 m.put("storeCode", r.getStoreCode());
 client.create(m, callback);
 }

 };
}

Notice that we are not doing any calculation of expiry dates in our client app, as we did in the previous post (on non-renewable receipts). Since we are using a server now, it makes sense to move all of that logic over to the server.

The createRESTClient() method shown there simply creates a RESTfulWebServiceClient and configuring it to use basic authentication with a username and password. The idea is that your user would have logged into your app at some point, and you would have a username and password on hand to pass back to the web service with the receipt data so that you can connect the subscription to a user account. The source of that method is listed here:

/**
 * Creates a REST client to connect to a particular endpoint. The REST client
 * generated here will automatically add the Authorization header
 * which tells the service what platform you're on.
 * @param url The url of the endpoint.
 * @return
 */
private RESTfulWebServiceClient createRESTClient(String url) {
 return new RESTfulWebServiceClient(url) {

 @Override
 protected void setupConnectionRequest(ConnectionRequest req) {
 try {
 req.addRequestHeader("Authorization", "Basic " + Base64.encode((getUsername()+":"+getPassword()).getBytes("UTF-8")));
 } catch (Exception ex) {}
 }

 };
}
Server-Side

On the server-side, our REST controller is a standard JAX-RS REST interface. I used Netbeans web service wizard to generate it and then modified it to suit my purposes. The methods of the ReceiptsFacadeREST class pertaining to the REST API are shown here:

@Stateless
@Path("com.codename1.demos.iapserver.receipts")
public class ReceiptsFacadeREST extends AbstractFacade<Receipts> {

 //...

 @POST
 @Consumes({"application/xml", "application/json"})
 public void create(Receipts entity) {

 String username = credentialsWithBasicAuthentication(request).getName();
 entity.setUsername(username);

 // Save the receipt first in case something goes wrong in the validation stage
 super.create(entity);

 // Let you validate the receipt
 validateAndSaveReceipt(entity);
 // validates the receipt against appropriate web service
 // and updates database if expiry date has changed.
 }

 //...
 @GET
 @Override
 @Produces({"application/xml", "application/json"})
 public List<Receipts> findAll() {
 String username = credentialsWithBasicAuthentication(request).getName();
 return getEntityManager()
.createNamedQuery("Receipts.findByUsername")
.setParameter("username", username)
.getResultList();
 }
}

The magic happens inside that validateAndSaveReceipt() method, which I’ll cover in detail soon.

Notifications

It’s important to note that you will not be notified by apple or google when changes are made to subscriptions. It’s up to you to periodically "poll" their web service to find if any changes have been made. Changes we would be interested in are primarily renewals and cancellations. In order to deal with this, set up a method to run periodically (once-per day might be enough). For testing, I actually set it up to run once per minute as shown below:

private static final long ONE_DAY = 24 * 60 * 60 * 1000;
private static final long ONE_DAY_SANDBOX = 10 * 1000;
@Schedule(hour="*", minute="*")
public void validateSubscriptionsCron() {
 System.out.println("----------- DOING TIMED TASK ---------");
 List<Receipts> res = null;
 final Set<String> completedTransactionIds = new HashSet<String>();
 for (String storeCode : new String[]{Receipt.STORE_CODE_ITUNES, Receipt.STORE_CODE_PLAY}) {
 while (!(res = getEntityManager().createNamedQuery("Receipts.findNextToValidate")
.setParameter("threshold", System.currentTimeMillis() - ONE_DAY_SANDBOX)
.setParameter("storeCode", storeCode)
.setMaxResults(1)
.getResultList()).isEmpty() &&
!completedTransactionIds.contains(res.get(0).getTransactionId())) {

 final Receipts curr = res.get(0);
 completedTransactionIds.add(curr.getTransactionId());
 Receipts[] validatedReceipts = validateAndSaveReceipt(curr);
 em.flush();
 for (Receipts r : validatedReceipts) {
 completedTransactionIds.add(r.getTransactionId());
 }

 }
 }
}

That method simply finds all of the receipts in the database that haven’t been validated in some period of time, and validates it. Again, the magic happens inside the validateAndSaveReceipt() method which we cover later.

In this example we only validate receipts from the iTunes and Play stores because those are the only ones that we currently support auto-renewing subscriptions on.

17.2.18. The CN1-IAP-Validator Library

For the purpose of this tutorial, I created a library to handle receipt validation in a way that hides as much of the complexity as possible. It supports both Google Play receipts and iTunes receipts.

The general usage is as follows:

IAPValidator validator = IAPValidator.getValidatorForPlatform(receipt.getStoreCode());
if (validator == null) {
 // no validators were found for this store
 // Do custom validation
} else {
 validator.setAppleSecret(APPLE_SECRET);
 validator.setGoogleClientId(GOOGLE_DEVELOPER_API_CLIENT_ID);
 validator.setGooglePrivateKey(GOOGLE_DEVELOPER_PRIVATE_KEY);
 Receipt[] result = validator.validate(receipt);
...
}

As you can see from this snippet, the complexity of receipt validation has been reduced to entering three configuration strings:

  1. APPLE_SECRET - This is a "secret" string that you will get from iTunes connect when you set up your in-app products.

  2. GOOGLE_DEVELOPER_API_CLIENT_ID - A client ID that you’ll get from the google developer API console when you set up your API service credentials.

  3. GOOGLE_DEVELOPER_PRIVATE_KEY - A PKCS8 encoded string with an RSA private key that you’ll receive at the same time as the GOOGLE_DEVELOPER_API_CLIENT_ID.

I will go through the steps to obtain these values soon.

17.2.19. The validateAndSaveReceipt() Method

You are now ready to see the full magic of the validateAndSaveReceipt() method in all its glory:

/**
 * Validates a given receipt, updating the expiry date,
 * @param receipt The receipt to be validated
 * @param forInsert If true, then an expiry date will be calculated even if there is no validator.
 */
private Receipts[] validateAndSaveReceipt(Receipts receipt) {
 EntityManager em = getEntityManager();
 Receipts managedReceipt = getManagedReceipt(receipt);
 // managedReceipt == receipt if receipt is in database or null otherwise

 if (Receipt.STORE_CODE_SIMULATOR.equals(receipt.getStoreCode())) { (1)
 if (receipt.getExpiryDate() == null && managedReceipt == null) {
 //Not inserted yet and no expiry date set yet
 Date dt = calculateExpiryDate(receipt.getSku(), true);
 if (dt!= null) {
 receipt.setExpiryDate(dt.getTime());
 }
 }
 if (managedReceipt == null) {
 // Receipt isn't in the database yet. Add it
 em.persist(receipt);
 return new Receipts[]{receipt};
 } else {
 // The receipt is already in the database. Update it.
 em.merge(managedReceipt);
 return new Receipts[]{managedReceipt};
 }
 } else {
 // It isn't a simulator receipt
 IAPValidator validator = IAPValidator.getValidatorForPlatform(receipt.getStoreCode());
 if (validator == null) {
 // Receipt must have come from a platform other than iTunes or Play
 // Because there is no validator

 if (receipt.getExpiryDate() == null && managedReceipt == null) {
 // No expiry date.
 // Generate one.
 Date dt = calculateExpiryDate(receipt.getSku(), false);
 if (dt!= null) {
 receipt.setExpiryDate(dt.getTime());
 }

 }
 if (managedReceipt == null) {
 em.persist(receipt);
 return new Receipts[]{receipt};
 } else {
 em.merge(managedReceipt);
 return new Receipts[]{managedReceipt};
 }

 }

 // Set credentials for the validator
 validator.setAppleSecret(APPLE_SECRET);
 validator.setGoogleClientId(GOOGLE_DEVELOPER_API_CLIENT_ID);
 validator.setGooglePrivateKey(GOOGLE_DEVELOPER_PRIVATE_KEY);

 // Create a dummy receipt with transaction ID and order data to pass
 // to the validator. Really all it needs is order data to be able to validate
 Receipt r2 = Receipt();
 r2.setTransactionId(receipt.getTransactionId());
 r2.setOrderData(receipt.getOrderData());
 try {
 Receipt[] result = validator.validate(r2);
 // Depending on the platform, result may contain many receipts or a single receipt
 // matching your receipt. In the case of iTunes, none of the receipt transaction IDs
 // might match the original receipt's transactionId because the validator
 // will set the transaction ID to the *original* receipt's transaction ID.
 // If none match, then you should remove your receipt, and update each of the returned
 // receipts in the database.
 Receipt matchingValidatedReceipt = null;
 for (Receipt r3 : result) {
 if (r3.getTransactionId().equals(receipt.getTransactionId())) {
 matchingValidatedReceipt = r3;
 break;
 }
 }

 if (matchingValidatedReceipt == null) {
 // Since the validator didn't find your receipt,
 // you should remove the receipt. The equivalent
 // is stored under the original receipt's transaction ID
 if (managedReceipt!= null) {
 em.remove(managedReceipt);
 managedReceipt = null;
 }
 }
 List<Receipts> out = new ArrayList<Receipts>();
 // Now go through and
 for (Receipt r3 : result) {
 if (r3.getOrderData() == null) {
 // No order data found in receipt. Setting it to the original order data
 r3.setOrderData(receipt.getOrderData());
 }
 Receipts eReceipt = new Receipts();
 eReceipt.setTransactionId(r3.getTransactionId());
 eReceipt.setStoreCode(receipt.getStoreCode());
 Receipts eManagedReceipt = getManagedReceipt(eReceipt);
 if (eManagedReceipt == null) {
 copy(eReceipt, r3);
 eReceipt.setUsername(receipt.getUsername());
 eReceipt.setLastValidated(System.currentTimeMillis());
 em.persist(eReceipt);
 out.add(eReceipt);
 } else {

 copy(eManagedReceipt, r3);
 eManagedReceipt.setUsername(receipt.getUsername());
 eManagedReceipt.setLastValidated(System.currentTimeMillis());
 em.merge(eManagedReceipt);
 out.add(eManagedReceipt);
 }
 }

 return out.toArray(new Receipts[out.size()]);

 } catch (Exception ex) {
 // You should probably store some info about the failure in the
 // database to make it easier to find receipts that aren't validating,
 // but for now you will log it.
 Log.p("Failed to validate receipt "+r2);
 Log.p("Reason: "+ex.getMessage());
 Log.e(ex);
 return new Receipts[]{receipt};

 }
 }
}
1We need to handle the case where the app is being used in the CN1 simulator. We’ll treat this as a non-renewable receipt, and we’ll calculate the expiry date using an "accelerated" clock to assist in testing.
In many of the code snippets for the Server-side code, you’ll see references to both a Receipts class and a Receipt class. I know this is slightly confusing. The Receipts class is a JPA entity the encapsulates a row from the "receipts" table of our SQL database. The Receipt class is com.codename1.payment.Receipt. It’s used to interface with the IAP validation library.

17.2.20. Google Play Setup

Creating the App in Google Play

In order to test out in-app purchase on an Android device, you’ll need to create an app the Google Play Developer Console. I won’t describe the process in this section, but there is plenty of information around the internet on how to do this. Some useful references for this include:

  1. Getting Started With Publishing - If you don’t already have an account with Google to publish your apps.

  2. Launch Checklist

Graphics, Icons, etc..

You are required to upload some screenshots and feature graphics. Don’t waste time making these perfect. For the screenshots, you can just use the "Screenshot" option in the simulator. (Use the Nexus 5 skin). For the feature graphics, I used this site that will generate the graphics in the correct dimensions for Google Play. You can also just leave the icon as the default Codename One icon.

Creating Test Accounts
You cannot purchase in-app products from your app using your publisher account. You need to set up at least one test account for the purpose of testing the app.

In order to test your app, you need to set up a test account. A test account must be associated with a real gmail email address. If you have a domain that is managed by Google apps, then you can also use an address from that domain.

The full process for testing in-app billing can be found in this google document. However, I personally found this documentation difficult to follow.

For your purposes, you’ll need to set up a tester list in Google Play. Choose "Settings" > "Tester Lists". Then create a list with all of the email address that you want to have treated as test accounts. Any purchases made by these email addresses will be treated as "Sandbox" purchases, and won’t require real money to change hands.

Alpha Channel Distribution

In order to test in-app purchase on Android, you must first publish your app. You can’t just build and install your app manually. The app needs to be published on the Play store, and it must be installed through the play store for in-app purchase to work. Luckily you can publish to an Alpha channel so that your app won’t be publicly available.

For more information about setting up alpha testing on Google play see this Google support document on the subject.

Once you have set your app up for alpha testing, you can send an invite link to your test accounts. You can find the link in the Google Play console under the APK section, under the "Alpha" tab (and assuming you’ve enabled alpha testing.

Alpha testing tab in google play
Figure 427. Alpha testing tab in google play

The format of the link is https://play.google.com/apps/testing/your-app-id in case you can’t find it. You can email this to your alpha testers. Make sure that you have added all testers to your tester lists so that their purchases will be made in the sandbox environment.

Also, before proceeding with testing in-app purchases, you need to add the in-app products in Google Play.

Adding In-App Products

After you have published your APK to the alpha channel, you can create the products. For the purposes of this tutorial, we’ll just add two products:

  1. iapdemo.noads.month.auto - The 1 month subscription.

  2. iapdemo.noads.3month.auto - The 3 month subscription.

Since we will be adding products as "Subscriptions" in the pay store, your app must use the Purchase.subscribe(sku) method for initiating a purchase on these products, and not the Purchase.purchase(sku) method. If you accidentally use purchase() to purchase a subscription on Android, the payment will go through, but your purchase callback will receive an error.

Adding 1 month Subscription

  1. Open Google Play Developer Console, and navigate to your app.

  2. Click on "In-app Products" in the menu. Then click the "Add New Product" button.

  3. Select "Subscription", and enter "iapdemo.noads.month.auto" for the Product ID. Then click "Continue"

Add new product dialog
Figure 428. Add new product dialog

Now fill in the form. You can choose your own price and name for the product. The following is a screenshot of the options I chose.

Add product to google
Figure 429. Add product to google

Adding 3 month Subscription

Follow the same process as for the 1 month subscription except use "iapdemo.noads.3month.auto" for the product ID, and select "3 months" for the billing period instead of "Monthly".

Testing The App

At this point we should be ready to test our app. Assuming you’ve installed the app using the invite link you sent yourself from Google play, as a test account that is listed on your testers list, you should be good to go.

Open the app, click on "Subscriptions", and try to purchase a 1-month subscription. If all goes well, it should insert the subscription into your database. But with no expiry date, since we haven’t yet implemented receipt validation yet. We’ll do that next.

Creating Google Play Receipt Validation Credentials

Google play receipt validation is accomplished via the android-publisher Purchases: get API. The CN1-IAP-Validation library shields you from most of the complexities of using this API, but you still need to obtain a "private key" and a "client id" to access this API. Both of these are provided when you set up an OAuth2 Service Account for your app.

The following steps assume that you have already created your app in Google play and have published it to at least the alpha channel. See my previous post on this topic here (Link to be provided).

Steps:

  1. Open the Google API Developer Console, and select your App from the the menu.

  2. Click on the "Library" menu item in the left menu, and then click the "Google Play Developer API" link.

    Google Play Developer API Link
    Figure 430. Google Play Developer API Link
  3. Click on the button that says "Enable". (If you already have it enabled, then just proceed to the next step).

    Enable API button
    Figure 431. Enable API button
  4. Click on the "Credentials" menu item in the left menu.

  5. In the "Credentials" drop-down menu, select the "Service Account Key" option.

    Credentials dropdown
    Figure 432. Credentials dropdown
  6. You will be presented with a new form. In the "Service Account" drop-down, select "New Service Account". This will give you some additional options.

    Create service account key
    Figure 433. Create service account key
  7. Enter anything you like for the "Service account name". For the role, we’ll select "Project" > "Owner" for now just so we don’t run into permissions issues. You’ll probably want to investigate further to fine a more limited role that only allows receipt verification, but for now, I don’t want any unnecessary road blocks for getting this to work. We’re probably going to run into "permission denied" errors at first anyways, so the fewer reasons for this, the better.

  8. It will auto-generate an account ID for you.

  9. Finally, for the "Key type", select "JSON". Then click the "Create" button.

This should prompt the download of a JSON file that will have contents similar to the following:

{
 "type": "service_account",
 "project_id": "iapdemo-152500",
 "private_key_id": "1b1d39************7d839826b8a",
 "private_key": "-----BEGIN PRIVATE KEY-----... some private key string -----END PRIVATE KEY-----\n",
 "client_email": "iapdemo@iapdemo-152500.iam.gserviceaccount.com",
 "client_id": "117601572633333082772",
 "auth_uri": "https://accounts.google.com/o/oauth2/auth",
 "token_uri": "https://accounts.google.com/o/oauth2/token",
 "auth_provider_x509_cert_url": "https://www.googleapis.com/oauth2/v1/certs",
 "client_x509_cert_url": "https://www.googleapis.com/robot/v1/metadata/x509/iapdemo%40iapdemo-152500.iam.gserviceaccount.com"
}

This is where we get the information we’re looking for. The "client_email" is what we’ll use for your googleClientId, and the "private_key" is what we’ll use for the googlePrivateKey.

Use the "client_email" value as our client ID, not the "client_id" value as you might be tempted to do.

We’ll set these in our constants:

public static final String GOOGLE_DEVELOPER_API_CLIENT_ID="iapdemo@iapdemo-152500.iam.gserviceaccount.com";
public static final String GOOGLE_DEVELOPER_PRIVATE_KEY="-----BEGIN PRIVATE KEY-----... -----END PRIVATE KEY-----\n";

...

validator.setGoogleClientId(GOOGLE_DEVELOPER_API_CLIENT_ID);
validator.setGooglePrivateKey(GOOGLE_DEVELOPER_PRIVATE_KEY);

NOT DONE YET

Before we can use these credentials to verify receipts for our app, we need to link our app to this new service account from within Google Play.

Steps:

  1. Open the Google Play Developer Console, then click on "Settings" > "API Access".

  2. You should see your app listed on this page. Click the "Link" button next to your app.

    Link to API
    Figure 434. Link to API
  3. This should reveal some more options on the page. You should see a "Service Accounts" section with a list of all of the service accounts that you have created. Find the one we just created, and click the "Grant Access" button in its row.

    Grant access
    Figure 435. Grant access
  4. This will open a dialog titled "Add New User". Leave everything default, except change the "Role" to "Administrator". This provides "ALL" permissions to this account, which probably isn’t a good idea for production. Later on, after everything is working, you can circle back and try to refine permissions. For the purpose of this tutorial, I just want to pull out all of the potential road blocks.

    New User
    Figure 436. New User
  5. Press the "Add User" button.

At this point, the service account should be active so we can try to validate receipts.

Testing Receipt Validation

The ReceiptsFacadeREST class includes a flag to enable/disable play store validation. By default it’s disabled. Let’s enable it:

public static final boolean DISABLE_PLAY_STORE_VALIDATION=true;

Change this to false.

Then build and run the server app. The validateSubscriptionsCron() method is set to run once per minute, so we just need to wait for the timer to come up and it should try to validate all of the play store receipts.

I’m assuming you’ve already added a receipt in the previous test that we did. If necessary, you should purchase the subscription again in your app.

After a minute or so, you should see "----------- VALIDATING RECEIPTS ---------" written in the Glassfish log, and it will validate your receipts. If it works, your receipt’s expiry date will get populated in the database, and you can press "Synchronize Receipts" in your app to see this reflected. If it fails, there will like be a big ugly stack trace and exception readout with some clues about what went wrong.

Realistically, your first attempt will fail for some reason. Use the error codes and stack traces to help lead you to the problem. And feel free to post questions here.

17.2.21. iTunes Connect Setup

The process for setting up and testing your app on iOS is much simpler than on Android (IMHO). It took me a couple hours to get the iTunes version working, vs a couple days on the Google Play side of things. One notable difference that makes things simpler is that you don’t need to actually upload your app to the store to test in-app purchase. You can just use your debug build on your device. It’s also much easier to roll a bunch of test accounts than on Google Play. You don’t need to set up an alpha program, you just create a few "test accounts" (and this is easy to do) in your iTunes connect account, and then make sure to use one of these accounts when making a purchase. You can easily switch accounts on your device from the "Settings" app, where you can just log out of the iTunes store - which will cause you to be prompted in your app the next time you make a purchase.

Setting up In-App Products

The process to add products in iTunes connect is outlined in this apple developer document. We’ll add our two SKUs:

  1. iapdemo.noads.month.auto - The 1 month subscription.

  2. iapdemo.noads.3month.auto - The 3 month subscription.

Just make sure you add them as auto-renewable subscriptions, and that you specify the appropriate renewal periods. Use the SKU as the product ID. Both of these products will be added to the same subscription group. Call the group whatever you like.

Creating Test Accounts

In order to test purchases, you need to create some test accounts. See this apple document for details on how to create these test accounts. Don’t worry, the process is much simpler than for Android. It should take you under 5 minutes.

Once you have the test accounts created, you should be set to test the app.

  1. Make sure your server is running.

  2. Log out from the app store. The process is described here.

  3. Open your app.

  4. Try to purchase a 1-month subscription

If all went well, you should see the receipt listed in the RECEIPTS table of your database. But the expiry date will be null. We need to set up receipt verification in order for this to work.

Setting up Receipt Verification

In order for receipt verification to work we simply need to generate a shared secret in iTunes connect. The process is described here.

Once you have a shared secret, update the ReceiptsFacadeREST class with the value:

public static final String APPLE_SECRET = "your-shared-secret-here";

And enable iTunes store validation:

public static final boolean DISABLE_ITUNES_STORE_VALIDATION=true;

Change this to false.

If you rebuild and run the server project, and wait for the validateSubscriptionsCron() method to run, it should validate the receipt. After about a minute (or less), you’ll see the text "----------- VALIDATING RECEIPTS ---------" written to the Glassfish log file, followed by some output from connecting to the iTunes validation service. If all went well, you should see your receipt expiration date updated in the database. If not, you’ll likely see some exception stack traces in the Glassfish log.

Sandbox receipts in the iTunes store are set to run on an accelerated schedule. A 1 month subscription is actually 5 minutes, 3 months is 15 minutes etc…​ Also sandbox subscriptions don’t seem to persist in perpetuity until the user has cancelled it. I have found that they usually renew only 4 or 5 times before they are allowed to lapse by Apple.

18. Advanced topics/under the hood

18.1. Sending arguments to the build server

When you send a build to the server, you can provide additional parameters. The server incorporates those parameters into the build process as build hints.

These hints are often called "build hints" or "build arguments". They behave like compiler flags that tune the build server’s behavior. That makes them useful for fast iteration on new functionality without rebuilding plugin UI for every change. They are also useful when you need to expose low-level behavior such as customizing the Android manifest XML or the iOS plist.

You can set these hints by right-clicking the project in the IDE and selecting Codename OneCodename One SettingsBuild Hints. The hints use the key=value style.

The build hints UI in Codename One Settings
Figure 437. The build hints UI in Codename One Settings

You can also set the build hints directly in the codenameone_settings.properties file. When you do that, each setting must start with the codename1.arg. prefix. For example, android.debug=true becomes codename1.arg.android.debug=true.

Here is the current list of supported arguments. Build hints change over time, so consult the discussion forum if you don’t find what you need here:

Table 10. Build hints
NameDescription

android.debug

true/false defaults to true - indicates whether to include the debug version in the build

android.release

true/false defaults to true - indicates whether to include the release version in the build

android.installLocation

Maps to android:installLocation manifest entry defaults to auto. Can also be set to internalOnly or preferExternal.

android.xapplication

defaults to an empty string. Allows developers of native Android code to add text within the application block to define things such as widgets, services etc.

android.permission.PERMISSION_NAME

true/false Whether to include a particular permission. Use of these build hints is preferred to android.xpermissions since they avoid possible conflicts with libraries. See Android’s Manifest.permission docs for a full list of permissions.

android.permission.PERMISSION_NAME.maxSdkVersion

Will be translated to the maxSdkVersion attribute of the <uses-permission> tag for the corresponding android.permission.PERMISSION_NAME build hint. (Optional)

android.permission.PERMISSION_NAME.required

true/false Will be translated to the required attribute of the <uses-permission> tag for the corresponding android.permission.PERMISSION_NAME build hint. (Optional)

android.xpermissions

additional permissions for the Android manifest

android.xintent_filter

Allows adding an intent filter to the main android activity

android.activity.launchMode

Allows explicitly setting the android:launchMode attribute of the main activity in android. Default is "singleTop", but for some applications you may need to change this behaviour. In particular, apps that are meant to open a file type will need to set this to "singleTask". See Android docs for the activity element for more information about the android:launchMode attribute.

android.licenseKey

The license key for the Android app, this is required if you use in-app-purchase on Android

android.signingV1

true/false Default true. See https://source.android.com/docs/security/features/apksigning

android.signingV2

true/false Default true. See https://source.android.com/docs/security/features/apksigning

android.signingV3

true/false Default true. See https://source.android.com/docs/security/features/apksigning

android.signingV4

true/false Default true. See https://source.android.com/docs/security/features/apksigning

android.stack_size

Size in bytes for the Android stack thread

android.statusbar_hidden

true/false defaults to false. When set to true hides the status bar on Android devices.

android.facebook_permissions

Permissions for Facebook used in the Android build target, applicable only if Facebook native integration is used.

android.googleAdUnitId

Allows integrating admob/google play ads, this is effectively identical to google.adUnitId but only applies to Android

android.googleAdUnitTestDevice

Device key used to mark a specific Android device as a test device for Google Play ads defaults to C6783E2486F0931D9D09FABC65094FDF

android.includeGPlayServices

Deprecated, please android.playService.*! Indicates whether Goolge Play Services should be included into the build, defaults to false but that might change based on the functionality of the application and other build hints. Adding Google Play Services support allows us to use a more refined location implementation and invoke some Google specific functionality from native code.

android.playService.plus, android.playService.auth, android.playService.base, android.playService.identity, android.playService.indexing, android.playService.appInvite, android.playService.analytics, android.playService.cast, android.playService.gcm, android.playService.drive, android.playService.fitness, android.playService.location, android.playService.maps, android.playService.ads, android.playService.vision, android.playService.nearby, android.playService.panorama, android.playService.games, android.playService.safetynet, android.playService.wallet, android.playService.wearable

Allows including only a specific play services library portion. Notice that this setting conflicts with the deprecated android.includeGPlayServices and only works with the Gradle-based Android build pipeline.

If none of the services are defined to true then plus, auth, base, analytics, gcm, location, maps & ads will be set to true. If one or more of the android.playService entries are defined to something then all entries will default to false.

android.playServicesVersion

The version number of play services to build against. Experimental. Use with caution as building against versions other than the server default may introduce incompatibilities with some Codename One APIs.

xxx.minPlayServicesVersion

This is a special case build hint. You can use any prefix to the build hint and the convention is to use your cn1lib name. it’s identical to android.minPlayServicesVersion with the exception that the "highest version wins". That way if your cn1lib requires play services 9+ and uses: myLib.minPlayServicesVersion=9.0.0 and another library has otherLib.minPlayServicesVersion=10.0.0 then play services will be 10.0.0

android.multidex

Boolean true/false defaults to false. Multidex allows Android binaries to reference more than 65536 methods. This slows builds a bit so you’ve it off by default but if you get a build error mentioning this limit you should turn this on.

android.headphoneCallback

Boolean true/false defaults to false. When set to true it assumes the main class has two methods: headphonesConnected & headphonesDisconnected which it invokes appropriately as needed

android.gpsPermission

Indicates whether the GPS permission should be requested, it’s auto-detected by default if you use the location API. However, some code might want to explicitly define it

android.asyncPaint

Boolean true/false defaults to true. Toggles the Android pipeline between the legacy pipeline (false) and new pipeline (true)

android.stringsXml

Allows injecting additional entries into the strings.xml file using a value that includes something like this <string name="key1">value1</string><string name="key2">value2</string>

android.supportV4

Boolean true/false defaults to false but that can change based on usage (e.g. push implicitly activates this). Indicates whether the android support v4 library should be included in the build

android.style

Allows injecting additional data into the styles.xml file right before the closing resources tag

android.enableAdaptiveIcons

Boolean true/false defaults to false. Enables Android adaptive icon generation in Android Gradle builds. When enabled, Codename One generates mipmap launcher resources (ic_launcher, ic_launcher_foreground, and adaptive XML in mipmap-anydpi-v26) and uses them in the application manifest (android:icon and android:roundIcon).

android.adaptiveIconBackground

Background color to use for adaptive icons when android.enableAdaptiveIcons=true and no background image is supplied. Defaults to #ffffff and is written as @color/ic_launcher_background.

android.adaptiveIconBackgroundImage

Optional path (relative to the root of the native Android project) to an image file to use as the adaptive icon background when android.enableAdaptiveIcons=true. If this property is set, it overrides android.adaptiveIconBackground.

android.cusom_layout1

Applies to any number of layouts as long as they are in sequence (e.g. android.cusom_layout2, android.cusom_layout3 etc.). Will write the content of the argument as a layout xml file and give it the name cusom_layout1.xml onwards. This can be used by native code to work with XML files

android.keyboardOpen

Boolean true/false defaults to true. Toggles the new async keyboard mode that leaves the keyboard open while we move between text components

android.versionCode

Allows overriding the auto generated version number with a custom internal version number specifically used for the xml attribute android:versionCode

android.captureRecord

Indicates whether the RECORD_AUDIO permission should be requested. Can be enabled or any other value to disable this option

android.nonconsumable

Comma delimited string of items that are non-consumable in the in-app-purchase API

android.removeBasePermissions

Boolean true/false defaults to false. Disables the built-in permissions specifically INTERNET permission (i.e. no networking…​)

android.blockExternalStoragePermission

Boolean true/false defaults to false. Disables the external storage (SD card) permission

android.min_sdk_version

The minimum SDK required to run this app, the default value changes based on functionality but can be as low as 7. This corresponds to the XML attribute android:minSdkVersion.

android.manifest.queries

Embeds XML content into the <queries> section of the Android manifest file. This is required in Android 11 for package visibility. See queries element Android documentation.

android.mockLocation

Boolean true/false defaults to true. Toggles the mock location permission which is on by default, this allows easier debugging of Android device location based services

android.smallScreens

Boolean true/false defaults to true. Corresponds to the android:smallScreens XML attribute and allows disabling the support for very small phones

android.xapplication_attr

Allows injecting additional attributes into the application` tag in the Android XML

android.xactivity

Allows injecting additional attributes into the activity tag in the Android XML

android.streamMode

The mode in which the volume key should behave, defaults to OS default. Allows setting it to music for music playback apps

android.pushVibratePattern

Comma delimited long values to describe the push pattern of vibrate used for the setVibrate native method

android.enableProguard

Boolean true/false defaults to true. Allows disabling the proguard obfuscation even on release builds, notice that this isn’t recommended

android.proguardKeep

Arguments for the keep option in proguard allowing us to keep a pattern of files e.g. -keep class com.mypackage.ProblemClass { *; }

android.shrinkResources

Boolean true/false defaults to false. Used only in conjunction with android.enableProguard. Strips out unused resources to reduce apk size. Since 7.0

android.sharedUserId

Allows adding a manifest attribute for the sharedUserId option

android.sharedUserLabel

Allows adding a manifest attribute for the sharedUserLabel option

android.targetSDKVersion

Indicates the Android SDK used to compile the Android build currently defaults to 21. Notice that not all targets will work since the source might have some limitations and not all SDK targets are installed on the build servers.

android.useAndroidX

Use Android X instead of support libraries. This will also run a find/replace on all source files to replace support libraries and artifacts with AndroidX equivalents.

android.rootCheck

Boolean true/false defaults to false. Indicates whether the app should check for root access on the device. If root access is detected, the app will exit.

android.fridaDetection

Boolean true/false defaults to false. Indicates whether the app should check for the presence of the Frida dynamic instrumentation toolkit on the device. If Frida is detected, the app will exit. This uses the [frida-blocker](https://github.com/shannah/frida-blocker) library to perform the frida detection.

android.fridaVersion

x.y.z The version of [frida-blocker](https://github.com/shannah/frida-blocker) to use to perform frida detection. This is only relevant if android.fridaDetection=true. If omitted, it will use the latest tested version in the build server.

android.fridaDebugLogging

Boolean true/false defaults to false. If true, it will add verbose debug logs during frida detection to show which check if fails on.

android.theme

Light or Dark defaults to Light. On Android 4+ the default Holo theme is used to render the native widgets in some cases and this indicates whether holo light or holo dark is used. Currently this doesn’t affect the Codename One theme but that might change in the future.

android.web_loading_hidden

true/false defaults to false - set to true to hide the progress indicator that appears when loading a web page on Android.

block_server_registration

true/false flag defaults to false. By default Codename One applications register with our server, setting this to true blocks them from sending information to our cloud. We keep this data for statistical purposes and intend to provide additional installation stats in the future.

facebook.appId

The application ID for an app that requires native Facebook login integration, this defaults to null which means native Facebook support shouldn’t be in the app

facebook.clientToken

The client token for an app that requires native Facebook login integration, this is required if the facebook.appId is set.

gcm.sender_id

The Android/chrome push identifier, see the push section for more details

android.background_push_handling

Deliver push messages on Android when the app is minimized by setting this to "true". Default behaviour is to deliver the message only if the app is in the foreground when received, or after the user taps on the notification to open the app, if the app was in the background when the message was received.

desktop.mac.plist.PLISTKEY

Set the key PLISTKEY in the Info.plist file for desktop mac build. E.g. desktop.mac.plist.LSApplicationCategoryType=public.app-category.business. See Apple Documentation of Info.plist keys and values for a full list of supported keys. + Currently only supported for App Store builds. See Mac OS Desktop Build Options for more information.

desktop.mac.plistInject

Injects raw XML into the Info.plist file for desktop builds. E.g. desktop.mac.plistInject=<key>LSApplicationCategoryType</key><string>public.app-category.business</string> + Currently only supported for App Store builds. See Mac OS Desktop Build Options for more information.

ios.associatedDomains

Comma-delimited list of domains associated with this app. Since 6.0. Note that each domain should be prefixed by a supported prefix. E.g. "applinks:" or "webcredentials:". See Apple’s documentation on Associated domains for more information.

ios.bitcode

true/false defaults to false. Enables bitcode support for the build.

ios.debug.archs

Can be set to "armv7" to force iOS debug builds to be 32 bit. By default, debug builds are 64 bit only.

ios.release.archs

Can be set to "arm64" to only build iOS release builds for 64 bit. By default, release builds are both 32 and 64 bit.

ios.distributionMethod

Specifies distribution type for debug iOS builds. This is generally used for enterprise or ad-hoc builds (using values "enterprise" and "ad-hoc" respectively).

ios.debug.distributionMethod

Specifies distribution type for debug iOS builds only. This is generally used for enterprise or ad-hoc builds (using values "enterprise" and "ad-hoc" respectively).

ios.release.distributionMethod

Specifies distribution type for release iOS builds only. This is generally used for enterprise or ad-hoc builds (using values "enterprise" and "ad-hoc" respectively).

ios.keyboardOpen

Flips between iOS keyboard open mode and auto-fold keyboard mode. Defaults to true which means the keyboard will remain open and not fold automatically when editing moves to another field.

ios.uiscene

true/false (defaults to true). Enables iOS UIScene lifecycle support. UIScene lets iOS manage one or more app UI sessions independently, improving lifecycle handling in modern iOS versions. Apple has indicated UIScene will be required starting with iOS 27, so this is now on by default; set the flag to false only if you need to temporarily fall back to the legacy UIApplicationDelegate lifecycle.

ios.urlScheme

Allows intercepting a URL call using the syntax <string>urlPrefix<string>

ios.useAVKit

Use AVKit for video components on iOS rather than MPMoviePlayerController on iOS versions 8 through 12. iOS 13 will always use AVKit, and iOS 7 and lower will always use MPMoviePlayerController. Default value false

ios.teamId

Specifies the team ID associated with the iOS provisioning profile and certificate. Use ios.debug.teamId and ios.release.teamId to specify different team IDs for debug and release builds respectively.

ios.debug.teamId

Specifies the team ID associated with the iOS debug provisioning profile and certificate.

ios.release.teamId

Specifies the team ID associated with the iOS release provisioning profile and certificate.

ios.project_type

one of ios, ipad, iphone (defaults to ios). Indicates whether the resulting binary is targeted to the iphone only or ipad only. Notice that the IDE plugin has a "Project Type" combo box you should use under the iOS section.

ios.rpmalloc

true/false Use rpmalloc instead of malloc/free for memory allocation in ParparVM. This will cause the deployment target to be changed to a minimum of iOS 8.0.

ios.statusbar_hidden

true/false defaults to false. Hides the iOS status bar if set to true.

ios.newStorageLocation

true/false defaults to false but defined on new projects as true by default. This changes the storage directory on iOS from using caches to using the documents directory which is more correct but might break compatibility. This is described in this issue

ios.prerendered_icon

true/false defaults to false. The iOS build process adapts the submitted icon for iOS conventions (adding an overlay) that might not be appropriate on some icons. Setting this to true leaves the icon unchanged (only scaled).

ios.app_groups

Space-delimited list of app groups that this app belongs to as described in Apple’s documentation. These are added to the entitlements file with key com.apple.security.application-groups.

ios.keychainAccessGroup

Space-delimited list of keychain access groups that this app has access to as described in Apple’s documentation. These are added to the entitlements file with the key keychain-access-groups.

ios.application_exits

true/false (defaults to false). Indicates whether the application should exit immediately on home button press. The default is to exit, leaving the application running is only partially tested at the moment.

ios.blockScreenshotsOnEnterBackground

true/false (defaults to false). Indicates that app should prevent iOS from taking screenshots when app enters background. Described here.

ios.detectJailbreak

true/false (defaults to false). When true, the iOS app will exit on launch if it detects that it’s running on a jailbroken device.

ios.applicationQueriesSchemes

Comma separated list of url schemes that canExecute will respect on iOS. If the url scheme isn’t mentioned here canExecute will return false starting with iOS 9. Notice that this collides with ios.plistInject when used with the <key>LSApplicationQueriesSchemes</key>…​ value so you should use one or the other. E.g. to enable canExecute for a url like myurl://xys you can use: myurl,myotherurl

ios.themeMode

auto (default), modern, ios7, legacy. auto (unset) keeps the existing iOS 7 flat theme so pre-refactor screenshot goldens and apps see no behavior change. modern / liquid opts in to the CSS-generated iOS Modern (liquid-glass) theme shipped from native-themes/ios-modern/theme.css. ios7 / flat is the same as auto - pre-liquid iOS 7 flat theme; legacy / iphone loads the pre-iOS 7 iPhone theme. The auto → modern flip is planned for a future release.

cn1.androidTheme

hololight (default), material, legacy. Default is hololight (Android Holo Light, what the framework shipped on API 14+ before this refactor). material / modern opts in to the CSS-generated Android Material 3 theme from native-themes/android-material/theme.css. legacy loads the pre-Holo Android theme. and.hololight=true is still accepted for back-compat and maps to hololight. The default stays on hololight until we flip in a future release.

cn1.nativeTheme

modern, legacy, custom (default unset). Cross-platform override that sets both ios.themeMode and cn1.androidTheme together when those are not set explicitly. modern = liquid glass + Material 3, legacy = iOS 7 flat + Holo Light, custom disables the framework native theme entirely.

ios.interface_orientation

UIInterfaceOrientationPortrait by default. Indicates the orientation, one or more of (separated by colon :): UIInterfaceOrientationPortrait, UIInterfaceOrientationPortraitUpsideDown, UIInterfaceOrientationLandscapeLeft, UIInterfaceOrientationLandscapeRight. Notice that the IDE plugin has an "Interface Orientation" combo box you should use under the iOS section.

ios.xcode_version

The version of Xcode used on the server. Defaults to 4.5; currently accepts 5.0 as an option and nothing else.

ios.multitasking

Set to true to enable iOS multitasking and split-screen support. This only works if ios.xcode_verson=9.2.

java.version

Valid values include 5 or 8. Indicates the JVM version that should be used for server compilation, this is defined by default for newly created apps based on the Java 8 mode selection

javascript.inject_proxy

true/false (defaults to true) By default, the build server will configure the .war version of your app to use the bundled proxy servlet for HTTP requests (to get around same-origin restrictions on network requests). Setting this to false prevents this, causing the application to make network requests without a proxy.

javascript.inject.beforeHead

Content to be injected into the index.html file at the beginning of the <head> tag.

javascript.inject.afterHead

Content to be injected into the index.html file at the end of the <head> tag.

javascript.minifying

true/false (defaults to true). By default the javascript code is minified to reduce file size. You may optionally disable minification by setting javascript.minifying to false.

javascript.proxy.url

The URL to the proxy servlet that should be used for making network requests. If this is omitted, the .war version of the app will be set to use the bundled proxy servlet, and the .zip version of the app will be set to use no proxy. If javascript.inject_proxy is false, this build-hint will be ignored.

javascript.sourceFilesCopied

true/false (defaults to false). Setting this flag to true will cause available java source files to be included in the resulting .zip and .war files. These may be used by Chrome during debugging.

javascript.stopOnErrors

true/false (defaults to true). Cause javascript build to fail if there are warnings during the build. In some cases build warnings won’t affect the running of the app. E.g. if the Javascript port is missing a method that the app depends on, but it isn’t used in most of the app. Or if there is multithreaded code detected in static initializers, but that code-path isn’t used by the app. Setting this to false may allow you to get past some build errors, but it might just result in runtime errors later on, which are much more difficult to debug. *This build hint is only available in Codename One 3.4 and later.

javascript.teavm.version

(Optional) The version of TeaVM to use for the build. Use caution, only use this property if you know what you’re doing!

google.adUnitId

Allows integrating Admob/Google Play ads into the application see this

ios.entitlementsInject

Content to inject into the iOS entitlements file. This should be in the Plist XML format. See Apple Entitlements Documentation.

ios.plistInject

entries to inject into the iOS plist file during build.

ios.includePush

true/false (defaults to false). Whether to include the push capabilities in the iOS build. Notice that the IDE plugin has an "Include Push" check box you should use under the iOS section.

ios.newPipeline

Boolean true/false defaults to true. Allows toggling the OpenGL ES 2.0 drawing pipeline off to the older OGL ES 1.0 pipeline.

ios.headphoneCallback

Boolean true/false defaults to false. When set to true it assumes the main class has two methods: headphonesConnected & headphonesDisconnected which it invokes appropriately as needed

ios.facebook_permissions

Permissions for Facebook used in the Android build target, applicable only if Facebook native integration is used.

ios.applicationDidEnterBackground

Objective-C code that can be injected into the iOS callback method (message) applicationDidEnterBackground.

ios.enableAutoplayVideo

Boolean true/false defaults to false. Makes videos "auto-play" when loaded on iOS

ios.googleAdUnitId

Allows integrating admob/google play ads, this is effectively identical to google.adUnitId but only applies to iOS

ios.viewDidLoad

Objective-C code that can be injected into the iOS callback method (message) viewDidLoad

ios.googleAdUnitIdPadding

Indicates the amount of padding to pass to the Google ads placed at the bottom of the screen with google.adUnitId

ios.enableBadgeClear

Boolean true/false defaults to true. Clears the badge value with every load of the app, this is useful if the app doesn’t manually keep track of number values for the badge

ios.glAppDelegateHeader

Objective-C code that can be injected into the iOS app delegate at the top of the file. E.g. if you need to include headers or make special imports for other injected code

ios.glAppDelegateBody

Objective-C code that can be injected into the iOS app delegate within the body of the file before the end. This only makes sence for methods that aren’t already declared in the class

ios.beforeFinishLaunching

Objective-C code that can be injected into the iOS app delegate at the top of the body of the didFinishLaunchingWithOptions callback method

ios.afterFinishLaunching

Objective-C code that can be injected into the iOS app delegate at the bottom of the body of the didFinishLaunchingWithOptions callback method

ios.locationUsageDescription

This flag is required for iOS 8 and newer if you’re using the location API. It needs to include a description of the reason for which you need access to the users location

ios.NSXXXUsageDescription

iOS privacy flags for using certain APIs. Starting with Xcode 8, you’re required to add usage description strings for certain APIs. Find a full list of the available keys in Apple’s docs. Some relevant ones include ios.NSCameraUsageDescription, ios.NSContactsUsageDescription, ios.NSLocationAlwaysUsageDescription, NSLocationUsageDescription, ios.NSMicrophoneUsageDescription, ios.NSPhotoLibraryAddUsageDescription, ios.NSSpeechRecognitionUsageDescription, ios.NSSiriUsageDescription

ios.add_libs

A semicolon separated list of libraries that should be linked to the app in order to build it

ios.pods

A comma separated list of Cocoa Pods that should be linked to the app in order to build it. E.g. AFNetworking ~> 2.6, ORStackView ~> 3.0, SwiftyJSON ~> 2.3

ios.pods.platform

Sets the Cocoapods 'platform' for the Cocoapods. Some Cocoapods require a minimum platform level. E.g. ios.pods.platform=7.0.

ios.deployment_target

Sets the deployment target for iOS builds. This is the minimum version of iOS required by a device to install the app. E.g. ios.deployment_target=8.0. Default is '6.0'. Note: This build hint interacts with the ios.rpmalloc build hint. If ios.deployment_target is 8.0 or higher, ParparVM will use rpmalloc by default. You can disable this default and revert back to using malloc/free by setting the ios.rpmalloc=false build hint.

ios.bundleVersion

Indicates the version number of the bundle, this is useful if you want to create a minor version number change for the beta testing support

ios.objC

Added the -ObjC compile flag to the project files which some native libraries require

ios.testFlight

Boolean true/false defaults to false and works only for pro accounts. Enables the testflight support in the release binaries for easy beta testing. Notice that the IDE plugin has a "Test Flight" check box you should use under the iOS section.

ios.generateSplashScreens

Boolean true/false defaults to false as of 5.0. Enable legacy generation of splash screen images for use when launching the app. These have been replaced now by the new launch storyboards.

desktop.width

Width in pixels for the form in desktop builds, will be doubled for retina grade displays. Defaults to 800.

desktop.height

Height in pixels for the form in desktop builds, will be doubled for retina grade displays. Defaults to 600.

desktop.adaptToRetina

Boolean true/false defaults to true. When set to true some values will ve implicitly doubled to deal with retina displays and icons etc. will use higher DPI’s

desktop.resizable

Boolean true/false defaults to true. Indicates whether the UI in the desktop build is resizable

desktop.fontSizes

Indicates the sizes in pixels for the system fonts as a comma delimited string containing 3 numbers for small,medium,large fonts.

desktop.theme

Name of the theme res file (without the ".res" extension) to use as the "native" theme. By default this is native indicating iOS theme on Mac and Windows Metro on Windows. If its something else then the app will try to load the file /themeName.res (placed in native/Java SE directory).

desktop.themeMac

Same as desktop.theme but specific to Mac OS

desktop.themeWin

Same as desktop.theme but specific to Windows

desktop.windowsOutput

Can be exe or msi depending on desired results

desktop.win.cef

Whether to use CEF for media and BrowserComponent instead of JavaFX in windows desktop builds. true/false. Currently default value is false (Jan 2021), but this will be changed to true in a future version.

desktop.mac.cef

Whetherto use CEF for media or BrowserComponent instead of JavaFX in Mac desktop builds. true/false. Currently default value is false (Jan 2021), but this will be changed to true in a future version.

mac.desktop-vm

The JVM the should be bundled with Mac desktop build. Mac desktop builds only. Supported values: zuluFx8, zulu11, zuluFx11

win.desktop-vm

The JVM that should be bundled in the Windows desktop build. Windows desktop builds only. Supported values: zulu8, zuluFx8, zulu8-32bit, zuluFx8-32bit, zulu11, zuluFx11, zulu11-32bit, zuluFx11-32bit

windows.extensions

Historical build hint for the discontinued UWP target. it’s retained here only for legacy reference and isn’t used by current supported build targets.

win.vm32bit

true/false (defaults to false). Forces windows desktop builds to use the Win32 JVM instead of the 64 bit VM making them compatible with older Windows Machines. This is off by default at the moment because of a bug in JDK 8 update 112 that might cause this to fail for some cases

noExtraResources

true/false (defaults to false). Blocks codename one from injecting its own resources when set to true, the only effect this has is in slightly reducing archive size. This might have adverse effects on some features of Codename One so it isn’t recommended.

18.2. Android Permissions

One of the annoying tasks when programming native Android applications is tuning all the required permissions to match your codes requirements, Codename One aims to simplify this. The build server automatically introspects the classes sent to it as part of the build and injects the right set of permissions required by the app.

For example, sometimes developers might find the permissions that come up a bit confusing and might not understand why a specific permission came up. This maps Android permissions to the methods/classes in Codename One that would trigger them. Notice that this list isn’t exhaustive as the API is rather large:

android.permission.WRITE_EXTERNAL_STORAGE - included by default (up to Android 13) so file APIs continue to work unless you block it with android.blockExternalStoragePermission=true.

android.permission.INTERNET - always requested because the networking stack depends on it even for offline features like local web views.

android.permission.CAMERA & android.permission.RECORD_AUDIO - required when capturing photos, video, or audio. The builder injects them automatically and the Android port prompts the user the first time the API is used.

android.permission.READ_PHONE_STATE - used by telephony-aware APIs like Display.getMsisdn() and by media integration so audio pauses correctly on calls.

android.permission.ACCESS_FINE_LOCATION & android.permission.ACCESS_COARSE_LOCATION - requested when using com.codename1.location or embedded maps so location fixes can be delivered.

android.permission.ACCESS_BACKGROUND_LOCATION - added when background geofencing or fetch tasks are enabled; the Android port verifies the permission separately on Android 10+.

android.permission.POST_NOTIFICATIONS - prompted on Android 13+ for both push registration and local notifications.

package.permission.C2D_MESSAGE, com.google.android.c2dm.permission.RECEIVE, and android.permission.RECEIVE_BOOT_COMPLETED - bundled with the push subsystem so Firebase Cloud Messaging can wake the app after device restarts.

android.permission.READ_CONTACTS - requested when accessing the device address book through Display.getAllContacts() and related APIs.

18.2.1. Permissions Under Marshmallow (Android 6+)

Starting with Marshmallow (Android 6+ API level 23) Android shifted to a permissions system that prompts users for permission the first time an API is used for example: when accessing contacts the user will receive a prompt whether to allow contacts access.

Permission can be denied and a user can later on revoke/grant a permission through external settings UI

This is great as it allows apps to be installed with a single click and no permission prompt during install which can increase conversion rates!

Enabling Permissions

Codename One’s Gradle 8 based Android builder detects the highest Android SDK you’ve installed and uses that value (with a minimum of API 33) for both the compile and target SDK versions, so the modern runtime permission flow is enabled by default. If you override the target version through the android.targetSDKVersion build hint the builder will honour it, but lowering the target may disable some compatibility libraries. Keeping the target current is strongly recommended for Play Store compliance.

Permission Prompts

To test this API see the following simple contacts app:

Form f = new Form("Contacts", BoxLayout.y());
f.add(new InfiniteProgress());
Display.getInstance().invokeAndBlock(() -> {
    Contact[] ct = Display.getInstance().getAllContacts(true, true, false, true, true, false);
    Display.getInstance().callSerially(() -> {
        f.removeAll();
        for (Contact c : ct) {
            MultiButton mb = new MultiButton(c.getDisplayName());
            mb.setTextLine2(c.getPrimaryPhoneNumber());
            f.add(mb);
        }
        f.revalidate();
    });
});

f.show();

If you explicitly lower the target SDK (for example: android.targetSDKVersion=21) and install this app on an Android 6 device you will still see the legacy install prompt with all permissions listed up front:

Install UI when using the old permissions system
Figure 438. Install UI when using the old permissions system

When you keep the default target (API 33+) the installer defers to the runtime permission flow and the install UI looks like this instead:

Install UI when using the new permissions system
Figure 439. Install UI when using the new permissions system

When you launch the UI under the old permissions system you see the contacts instantly. In the new system you’re presented with this UI:

Native permission prompt first time
Figure 440. Native permission prompt first time

If you accept and allow all is good and the app loads as usual but if you deny then Codename One provides the user another chance to request the permission. Notice that in this case you can customize the prompt string as explained below.

Codename One permission prompt
Figure 441. Codename One permission prompt

If you select don’t ask then you will get a blank screen since the contacts will return as a 0 length array. This makes sense as the user is aware he denied permission and the app will still function as expected on a device where no contacts are available. For example, if the user realizes his mistake he can double back and ask to re-prompt for permission in which case he will see this native prompt:

Native permission prompt second time
Figure 442. Native permission prompt second time

Notice that denying this second request won’t trigger another Codename One prompt.

Code Changes

There are no explicit code changes needed for this functionality to "work". The respective API’s will work like they always worked and will prompt the user seamlessly for permissions.

Some behaviors that never occurred on Android but were perfectly legal in the past might start occurring with the switch to the new API. For example: the location manager might be null and your app must always be ready to deal with such a situation

When permission is requested a user will be seamlessly prompted/warned. You can customize the permission text through Display properties. For example: to customize the rationale text of the contacts permission:

Display.getInstance().setProperty(
        "android.permission.READ_CONTACTS",
        "MyCoolChatApp needs access to your contacts so we can show you which of your friends already have MyCoolChatApp installed");

The Android port also checks UIManager.localize() for localized values before falling back to Display properties. You can provide localized strings for the permission body and dialog buttons/title using keys based on the permission name:

com.codename1.ui.plaf.UIManager.getInstance().setBundle(new java.util.Hashtable<String, String>() {{
    put("android.permission.READ_CONTACTS", "Localized rationale for contacts");
    put("android.permission.READ_CONTACTS.title", "Localized permission title");
    put("android.permission.READ_CONTACTS.askAgain", "Localized ask again");
    put("android.permission.READ_CONTACTS.dontAsk", "Localized don't ask");
}});

For example, if the permission key is android.permission.READ_CONTACTS, you can localize these keys:

  • android.permission.READ_CONTACTS (dialog body)

  • android.permission.READ_CONTACTS.title

  • android.permission.READ_CONTACTS.askAgain

  • android.permission.READ_CONTACTS.dontAsk

The same pattern applies to other permissions. android.permission.ACCESS_BACKGROUND_LOCATION also supports: android.permission.ACCESS_BACKGROUND_LOCATION.settings, android.permission.ACCESS_BACKGROUND_LOCATION.cancel, android.permission.ACCESS_BACKGROUND_LOCATION.explanation_title, android.permission.ACCESS_BACKGROUND_LOCATION.explanation_body, and android.permission.ACCESS_BACKGROUND_LOCATION.ok.

This is optional as there is a default value defined. You can define this once in the init(Object) method but for some extreme cases permission might be needed for different things for example: you might ask for this permission with one reason at one point in the app and with a different reason at another point in the app.

Simulating Prompts

You can simulate permission prompts by checking that option in the simulator menu.

Simulate permission prompts menu item in the simulator
Figure 443. Simulate permission prompts menu item in the simulator

This will produce a dialog to the user whenever this happens in Android and will try to act in a similar way to the device. Notice that you can test it in the iOS simulator too.

AndroidNativeUtil’s checkForPermission

If you write Android native code using native interfaces you’re probably familiar with the AndroidNativeUtil class from the com.codename1.impl.android package.

This class provides access to many low-level capabilities you would need as a developer writing native code. Since native code might need to request a permission you introduced the same underlying logic you used namely: checkForPermission.

To get a permission you can use this code as such:

if (!AndroidNativeUtil.checkForPermission(
        android.Manifest.permission.READ_PHONE_STATE,
        "This should be the description shown to the user...")) {
    // you didn't get the permission, you might want to return here
}
// you have the permission, do what you need

This will prompt the user with the native UI and later on with the fallback option as described above. Notice that the checkForPermission method is a blocking method and it will return when there is a final conclusion on the subject. It uses invokeAndBlock and can be safely invoked on the event dispatch thread without concern.

By default, fallback prompts are displayed using Codename One’s Dialog.show(…​). If you’re writing native Android code and need to use your own prompt implementation, you can install a custom callback:

AndroidNativeUtil.setPermissionPromptCallback(new PermissionPromptCallback() {
    @Override
    public boolean showPermissionPrompt(String permission, String title, String body, String positiveButtonText, String negativeButtonText) {
        return com.codename1.ui.Dialog.show(title, body, positiveButtonText, negativeButtonText);
    }

    @Override
    public void showPermissionMessage(String permission, String title, String body, String okButtonText) {
        com.codename1.ui.Dialog.show(title, body, okButtonText, null);
    }
});

Pass null to AndroidNativeUtil.setPermissionPromptCallback() to restore the default behavior.

18.3. On Device Debugging

Codename One supports debugging applications on devices by using the natively generated project. All paid subscription levels include the ability to check an Include Source flag in the settings that returns a native OS project. You can debug that project in the respective native IDE.

In iOS this is usually strait forward, open the project with Xcode and run it optionally disabling bitcode. Unzip the.bz2 file and open the .xcworkspace file if it’s available otherwise open the .xcodeproj file inside the dist directory.

The .xcworkspace is no longer exclusive to CocoaPods-based builds. Use it whenever it’s generated, whether the project uses CocoaPods, Swift Package Manager, or both.

With Android Studio this is sometimes as easy task as it’s possible to actually open the Gradle project in Android Studio and run it. For example, due to the fragile nature of the Gradle project this stopped working for some builds and has been "flaky".

18.3.1. Android Studio Debugging (Easy Way)

By default you should be able to open the Gradle project in Android Studio and run it. To get this to work open the Android Studio Setting and select Gradle 2.11.

Gradle settings UI in Android Studio
Figure 444. Gradle settings UI in Android Studio (notice you need Gradle 2.11 and not 2.8 as pictured here)

If this works for you then you can ignore the section below.

18.3.2. Android Studio Debugging the Hard Way

In some cases the Gradle project might not work or this might fail with a change from Google.

Here are steps that should work for everyone:

  1. Check the include source flag in the IDE and send a build

  2. Download the sources.zip result from the build server

  3. Launch Android Studio and create a new project

  4. Make sure to use the same package and app name as you did in the Codename One project, select to not create an activity

  5. Unzip the sources.zip file and copy the main directory from its src directory to the Android Studio projects src directory make sure to overwrite files/directories.

  6. Copy its libs directory on top of the existing libs

  7. Copy the source Gradle dependencies content to the destination Gradle file

  8. Connect your device and press the Debug button for the IDE

You might need to copy additional Gradle file meta-data such as multi-dexing etc.

You might not need to repeat the whole thing with every build. For example: it might be practical to copy the userSources.jar from the libs directory to get the latest version of your code. You can copy the src/main directory to get the latest up to date Android port.

18.4. Native Interfaces

Sometimes you may wish to use an API that’s unsupported by Codename One or integrate with a 3rd party library/framework that isn’t supported. These are achievable tasks when writing native code and Codename One lets you encapsulate such native code using native interfaces.

18.4.1. Introduction

Notice that when you say "native" you don’t mean C/C++ always but rather the platforms "native" environment. So in the case of Android, Java or Kotlin code can be invoked with full access to the Android API. In case of iOS, Objective-C or Swift code can be invoked and so forth.

You can still access C code under Android either by using JNI from the Android native code or by using a library

Native interfaces are designed to allow primitive types, Strings, arrays of primitive types (single dimension ) & PeerComponent values. Any other type of parameter/return type is prohibited. For example, once in the native layer the native code can act freely and query the Java layer for additional information.

The reason for the limits is the disparity between the platforms. Mapping a Java Object to an Objective-C NSObject is possible but leads to odd edge cases and complexity for example: GC vs. ARC in a disparate object graph

Furthermore, native methods should avoid features such as overloading, varargs (or any Java 5+ feature for that matter) to allow portability for languages that don’t support such features.

don’t rely on pass by reference/value behavior since they vary between platforms

Implementing a native layer effectively means:

  1. Creating an interface that extends NativeInterface and defines methods with the arguments/return values declared in the previous paragraph.

  2. Creating the proper native implementation hierarchy based on the call conventions for every platform within the native directory

For example: to create a simple hello world interface do something like:

public interface MyNative extends NativeInterface {
    String helloWorld(String hi);
}

You now need to right click the class in the IDE and select the Generate Native Access menu item:

Generating the native code
Figure 445. Generating the native code
Once generated you’re prompted that the native code is in the "native" directory
Figure 446. Once generated you’re prompted that the native code is in the "native" directory

You can now look int the native directory in the project root (in NetBeans you can see that in the Files tab) and you can see something that looks like this:

Native directory structure containing stubs for the various platforms
Figure 447. Native directory structure containing stubs for the various platforms

These are effectively stubs you can edit to implement the methods in native code.

If you re-run the Generate Native Access tool you will get this dialog, if you answer yes all the files will be overwritten, if you answer no files you deleted/renamed will be recreated
Running "Generate Native Access" when some/all of the native files exist already
Figure 448. Running "Generate Native Access" when some/all of the native files exist already

For now lets leave the stubs and come back to them soon. From the Codename One Java code you can call the implementation of this native interface using:

MyNative my = NativeLookup.create(MyNative.class);
if (my != null && my.isSupported()) {
    Log.p(my.helloWorld("Hi"));
}

Notice that for this to work you must implement the native code on all supported platforms.

You will start with Android which should be familiar and intuitive to many developers. The helper MyNativeImplStub class below mirrors the stub that the tooling generates under the native/android directory:

class MyNativeImplStub {
    public String helloWorld(String param) {
        return null;
    }

    public boolean isSupported() {
        return false;
    }
}

The stub implementation always returns false, null or 0 by default. The isSupported also defaults to false thus allowing you to implement a NativeInterface on some platforms and leave the rest out without knowing anything about these platforms.

You can implement the Android version in Java or Kotlin. Here is the Java version:

public class MyNativeImpl {  (2) (3)
    public String helloWorld(String param) {
        Log.d("MyApp", param); (1)
        return "Tada";
    }

    public boolean isSupported() {
        return true; (4)
    }
}
1Notice that you’re using the Android native android.util.Log class which isn’t accessible from standard Codename One code
2The impl class doesn’t physically implement the MyNative interface!
This is intentional and due to the PeerComponent functionality mentioned below. You don’t need to add an implements clause.
3Notice that there is no constructor and the class is public. it’s crucial that the system will be able to allocate the class without obstruction. You can use a constructor but it can’t have any arguments and you shouldn’t rely on semantics of construction.
4You implemented the native method and that you set isSupported to true.
The IDE won’t provide completion suggestions and will claim that there are errors in the code!
Codename One doesn’t include the native platforms in its bundle for example: the full Android SDK or the full Xcode Objective-C runtime. For example, since the native code is compiled on the servers (where these runteims are present) this shouldn’t be a problem
When implementing a non-trivial native interface, send a server build with the "Include Source" option checked. Implement the native interface in the native IDE then copy and paste the native code back into Codename One

The implementation of this interface is nearly identical for Android (Java/Kotlin) & Java SE.

Swift (iOS) and Kotlin (Android) options

For iOS native interfaces you can implement the generated …​Impl class in Objective-C or Swift.
For Android native interfaces you can implement the generated …​Impl class in Java or Kotlin.

PlatformTypical file locations for native interface implementations

Android (Java/Kotlin)

android/src/main/java/com/mycompany/myapp/MyNativeImpl.java
android/src/main/java/com/mycompany/myapp/MyNativeImpl.kt

iOS (Objective-C/Swift)

ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.h
ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.m
ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.swift

Use the Android Main Thread (Native EDT)

iOS, Android & pretty much any modern OS has an EDT like thread that handles events etc. The problem is that they differ in their nuanced behavior. For example: Android will usually respect calls off of the EDT and iOS will often crash. Some OS’s enforce EDT access rigidly and will throw an exception when you violate that…​

Normally you don’t need to know about these things, hidden functionality within your implementation bridges between your EDT and the native EDT to provide consistent cross platform behavior. But when you write native code you need awareness.

Why not Implicitly call Native Interfaces on the Native EDT?

Calling into the native EDT includes overhead and it might not be necessary for some features (e.g. IO, polling etc.). Furthermore, some calls might work well with asynchronous calls while others might need synchronous results and you can’t know in advance which ones you would need.

How do you Access the Native EDT?

Within your native code in Android do something like:

com.codename1.impl.android.AndroidNativeUtil.getActivity().runOnUiThread(new Runnable() {
    public void run() {
       // your native code here...
    }
});

This will execute the block within run() asynchronously on the native Android UI thread. If you need synchronous execution you’ve a special method for Codename One:

com.codename1.impl.android.AndroidImplementation.runOnUiThreadAndBlock(new Runnable() {
    public void run() {
       // your native code here...
    }
});

This blocks in a way that’s OK with the Codename One EDT which is unique to your Android port.

Gradle Dependencies

Integrating a native OS library isn’t hard but it sometimes requires some juggling. Most instructions target developers working with Xcode or Android Studio & you need to twist your head around them. In Android the steps for integration in most modern libraries include a Gradle dependency.

For example: you published a library that added support for Intercom. The native Android integration instructions for the library looked like this:

Add the following dependency to your app’s build.Gradle file:

dependencies {
    compile 'io.intercom.android:intercom-sdk:3.+'
}

Which instantly raises the question: "How in the world do I do that in Codename One"?

Well, it’s actually pretty simple. You can add the build hint:

android.gradleDep=compile 'io.intercom.android:intercom-sdk:3.+'

This would "work" but there is a catch…​

You might need to define the specific version of the Android SDK used and specific version of Google play services version used. Intercom is pretty sensitive about those and demanded that you also add:

android.playServices=9.8.0
android.sdkVersion=25

Once those were defined the native code for the Android implementation became trivial to write and the library was easy as there were no jars to include.

18.4.2. Objective-C and Swift (iOS)

When generating the Objective-C code the "Generate Native Sources" tool produces two files by default: com_mycompany_myapp_MyNativeImpl.h & com_mycompany_myapp_MyNativeImpl.m. If you enable Swift stub generation in the Maven goal, it can also produce com_mycompany_myapp_MyNativeImpl.swift.

The .m files are the Objective-C equivalent of .c files and .h files contain the header/include information. In this case the com_mycompany_myapp_MyNativeImpl.h contains:

#import <Foundation/Foundation.h>

@interface com_mycompany_myapp_MyNativeImpl : NSObject {
}

-(NSString*)helloWorld:(NSString*)param;
-(BOOL)isSupported;
@end

And com_mycompany_myapp_MyNativeImpl.m contains:

#import "com_mycompany_myapp_MyNativeImpl.h"

@implementation com_mycompany_myapp_MyNativeImpl

-(NSString*)helloWorld:(NSString*)param{
    return nil;
}

-(BOOL)isSupported{
    return NO;
}

@end
Objective-C relies on argument names as part of the message (method) signature. So -(NSString*)helloWorld:(NSString*)param isn’t the same as -(NSString*)helloWorld:(NSString*)iChangedThisName!
don’t change argument names in the Objective-C native interface!

Here is a simple implementation similar to above:

#import "com_mycompany_myapp_MyNativeImpl.h"

@implementation com_mycompany_myapp_MyNativeImpl

-(NSString*)helloWorld:(NSString*)param{
    NSLog(@"MyApp: %@", param);
    return @"Tada";
}

-(BOOL)isSupported{
    return YES;
}

@end

If you prefer Swift for iOS native interfaces, keep the same class naming convention (com_mycompany_myapp_MyNativeImpl) and annotate the class with @objc(…​) so the runtime can discover it.

Using the iOS Main Thread (Native EDT)

iOS has a native thread you should use for all calls like Android. Check out the Native EDT on Android section above for reference.

On iOS this is pretty similar to Android (if you consider objective-c to be similar). This is used for asynchronous invocation:

dispatch_async(dispatch_get_main_queue(), ^{
    // your native code here...
});

You can use this for synchronous invocation, notice the lack of the a in the dispatch call:

dispatch_sync(dispatch_get_main_queue(), ^{
    // your native code here...
});

The problem with the synchronous call is that it will block the caller thread, if the caller thread is the EDT this can cause performance issues and even a deadlock. it’s important to be cautious with this call!

Use Cocoapods For Dependencies

Cocoapods are the iOS equivalent of Gradle dependencies.

CocoaPods allow you to add a native library dependency to iOS far more easily than Gradle. By default you target iOS 7.0 or newer which is supported by Intercom for older versions of the library. Annoyingly CocoaPods might seem to work but some specific API’s won’t work since it fell back to an older version…​ To solve this you’ve to explicitly define the build hint ios.pods.platform=8.0 to force iOS 8 or newer. You might need to force it to even newer versions as some libraries force an iOS 9 minimum etc.

Including intercom itself required a single build hint: ios.pods=Intercom which you can obviously extend by using commas to include many libraries. You can search the cocoapods website for supported 3rd party libraries which includes everything you would expect. One important advantage when working with CocoaPods is the faster build time as the upload to the Codename One website is smaller and the bandwidth you’ve to CocoaPods is faster. Another advantage is the ability to keep up with the latest developments from the library providers.

18.4.3. Javascript

Native interfaces in Javascript look a little different than the other platforms since Javascript doesn’t natively support threads or classes. The native implementation should be placed in a file with name matching the name of the package and the class name combined where the "." elements are replaced by underscores.

The default generated stubs for the JavaScript build look like this com_mycompany_myapp_MyNative:

(function(exports){

var o = {};

    o.helloWorld__java_lang_String = function(param1, callback) {
        callback.error(new Error("Not implemented yet"));
    };

    o.isSupported_ = function(callback) {
        callback.complete(false);
    };

exports.com_mycompany_myapp_MyNative= o;

})(cn1_get_native_interfaces());

A simple implementation looks like this.

(function(exports){

var o = {};

    o.helloWorld__java_lang_String = function(param1, callback) {
        callback.complete("Hello World!!!");
    }

    o.isSupported_ = function(callback) {
        callback.complete(true);
    };

exports.com_my_code_MyNative = o;

})(cn1_get_native_interfaces());

Notice that you use the complete() method of the provided callback to pass the return value rather than using the return statement. This is to work around the fact that Javascript doesn’t natively support threads. The Java thread that’s calling your native interface will block until your method calls callback.complete(). This allows you to use asynchronous APIs inside your native method while still allowing Codename One to work use your native interface through a synchronous API.

Make sure you call either callback.complete() or callback.error() in your method at some point, or you will cause a deadlock in your app (code calling your native method will sit and "wait" forever for your method to return a value).

The naming conventions for the methods themselves are modeled after the naming conventions shown in the previous examples:

<method-name>__<param-1-type>_<param-2-type>_…​<param-n-type>

Where <method-name> is the name of the method in Java, and the `<param-X-type>`s are a string representing the parameter type. The general rule for these strings are:

  1. Primitive types are mapped to their type name. (For example: int to "int", double to "double", etc…​).

  2. Reference types are mapped to their fully-qualified class name with '.' replaced with underscores. For example: java.lang.String would be "java_lang_String".

  3. Array parameters are marked by their scalar type name followed by an underscore and "1ARRAY". For example: int[] would be "int_1ARRAY" and String[] would be "java_lang_String_1ARRAY".

JavaScript Examples

Java API:

public interface JavaScriptNativeApi {
    void print(String str);
}

becomes

o.print__java_lang_String = function(param1, callback) {
    console.log(param1);
    callback.complete();
}

Java API:

interface JavaScriptNativeApiAddTwoArgs {
    int add(int a, int b);
}

becomes

o.add__int_int = function(param1, param2, callback) {
    callback.complete(param1 + param2);
}
interface JavaScriptNativeApiAddArray {
    int add(int[] a);
}

becomes

o.add__int_1ARRAY = function(param1, callback) {
    var c = 0, len = param1.length;
    for (var i =0; i<len; i++) {
        c += param1[i];
    }
    callback.complete(c);
}

18.4.4. Native GUI Components

PeerComponent return values are automatically translated to the platform native peer as an expected return value. For example: for a NativeInterface method such as this:

interface NativePeerProvider {
    PeerComponent createPeer();
}

Android native implementation would use:

class AndroidPeerImplementation {
    public View createPeer() {
        return null;
    }
}

The iphone would need to return a pointer to a view for example:

- (UIView*)createPeer;
Not all platforms support native peers. Specifically Java SE doesn’t support them due to the way the Java SE native interfaces are mapped to their implementation.
Note that this won’t limit the code from running on an unsupported platform. Only that specific method won’t work.

Javascript would expect a DOM Element (for example: a <div> tag to be returned.). For example:

o.createHelloComponent_ = function(callback) {
    var c = jQuery('<div>Hello World</div>')
            .css({'background-color' : 'yellow', 'border' : '1px solid blue'});
    callback.complete(c.get(0));
};

Notice that if you want to use a native library (jar,.a file etc.) places it within the appropriate native directory and it will be packaged into the final executable. You would be able to reference it from the native code and not from the Codename One code, which means you will need to build native interfaces to access it.

This is discussed further below.

18.4.5. Type Mapping & Rules

Several rules govern the creation of NativeInterfaces and you briefly covered some of them.

  • The implementation class must have a default public constructor or no constructor at all

  • Native methods can’t throw exceptions, checked or otherwise

  • A native method can’t have the name init as this is a reserved method in Objective-C

  • Only the supported types listed below can be used

  • Native implementations can’t rely on pass by reference/value semantics as those might change between platforms

  • hashCode, equals & toString are reserved and won’t be mapped to native code

Table 11. NativeInterface Supported Types
JavaAndroidJava SEObj-CC#

byte

byte

byte

char

sbyte

boolean

boolean

boolean

BOOL

bool

char

char

char

int

char

short

short

short

short

short

int

int

int

int

int

long

long

long

long long

long

float

float

float

float

float

double

double

double

double

double

String

String

String

NSString*

String

byte[]

byte[]

byte[]

NSSData*

sbyte[]

boolean[]

boolean[]

boolean[]

NSData*

bool[]

char[]

char[]

char[]

NSData

char[]

short[]

short[]

short[]

NSData*

short[]

int[]

int[]

int[]

NSData*

int[]

long[]

long[]

long[]

NSData*

long[]

float[]

float[]

float[]

NSData*

float[]

double[]

double[]

double[]

NSData*

double[]

PeerComponent

android.view.View

PeerComponent

void*

FrameworkElement

JavaScript is excluded from the table above as it isn’t a type safe language and thus has no such type mapping
PeerComponent on iOS is void* but UIView is expected as a result

The examples below demonstrate the signatures for this method on all platforms:

Listing 27. NativeInterface definition
interface AllTypesNativeApi {
    void test(byte b, boolean boo, char c, short s,
              int i, long l, float f, double d, String ss,
              byte[] ba, boolean[] booa, char[] ca, short[] sa, int[] ia,
              long[] la, float[] fa, double[] da,
              PeerComponent cmp);
}
Listing 28. Android Version
class AndroidAllTypesImplementation {
    public void test(byte param, boolean param1, char param2,
                     short param3, int param4, long param5, float param6,
                     double param7, String param8, byte[] param9,
                     boolean[] param10, char[] param11, short[] param12,
                     int[] param13, long[] param14, float[] param15,
                     double[] param16, android.view.View param17) {
    }
}
Listing 29. iOS Version
-(void)test:(char)param param1:(BOOL)param1
    param2:(int)param2 param3:(short)param3 param4:(int)param4
    param5:(long long)param5 param6:(float)param6
    param7:(double)param7 param8:(NSString*)param8
    param9:(NSData*)param9 param10:(NSData*)param10
    param11:(NSData*)param11 param12:(NSData*)param12
    param13:(NSData*)param13 param14:(NSData*)param14
    param15:(NSData*)param15 param16:(NSData*)param16
    param17:(void*)param17;
You had to break lines for the print version, the JavaScript version is a long method name that literally broke the book!
Listing 30. JavaScript Version
o.test__byte_boolean_char_short_int_long_float_double
_java_lang_String_byte_1ARRAY_boolean_1ARRAY_char_1ARRAY
_short_1ARRAY_int_1ARRAY_long_1ARRAY_float_1ARRAY_double
_1ARRAY_com_codename1_ui_PeerComponent = function(param1, param2, param3, param4, param5, param6, param7, param8, param9, param10, param11, param12, param13, param14, param15, param16, param17, param18, callback) {
    callback.error(new Error("Not implemented yet"));
};
Listing 31. Java SE Version
class JavaScriptAllTypesImplementation {
    public void test(byte param, boolean param1, char param2, short param3, int param4,
                     long param5, float param6, double param7, String param8, byte[] param9,
                     boolean[] param10, char[] param11, short[] param12, int[] param13,
                     long[] param14, float[] param15, double[] param16,
                     PeerComponent param17) {
    }
}
Listing 32. C# Version
public void test(byte param, bool param1, char param2, short param3, int param4, long param5, float param6, double param7, String param8, byte[] param9, boolean[] param10, char[] param11, short[] param12, int[] param13, long[] param14, float[] param15, double[] param16, FrameworkElement param17) {
}

18.4.6. Android Native Permissions

Normally permissions in Codename One are seamless. Codename One traverses the bytecode and automatically assigns permissions to Android applications based on the API’s used by the developer.

For example, when accessing native functionality this won’t work since native code might require specialized permissions and you don’t/can’t run any serious analysis on it (it can be about anything).

So if you require additional permissions in your Android native code you need to define them in the build arguments using android.permission.<PERMISSION_NAME>=true for each permission you want to include. A full list of permissions are listed in Android’s Manifest.permission documentation.

For example:

android.permission.ADD_VOICEMAIL=true
android.permission.BATTERY_STATS=true
...

You can specify the maximum SDK version in which the permission is needed using the android.permission.<PERMISSION_NAME>.maxSdkVersion build hint. You can also specify whether the permission is required for the app to run using the android.permission.<PERMISSION_NAME>.required build hint.

For example:

android.permission.ADD_VOICEMAIL=true
android.permission.BATTERY_STATS=true
android.permission.ADD_VOICEMAIL.required=false
android.permission.ADD_VOICEMAIL.maxSdkVersion=18
...

You can alternatively use the android.xpermissions build hint to inject <uses-permission> tags into the manifest file. For example:

android.xpermissions=<uses-permission android:name="android.permission.READ_CALENDAR" />
You need to include the full XML snippet. You can unify many lines into a single line in the GUI as XML allows that.

18.4.7. Native AndroidNativeUtil

If you do any native interfaces programming in Android you should be familiar with the AndroidNativeUtil class which allows you to access native device functionality more easily from the native code. For example: many Android API’s need access to the Activity which you can get by calling AndroidNativeUtil.getActivity().

The native util class includes a few other features such as:

  • runOnUiThreadAndBlock(Runnable) - this is such a common pattern that it was generalized into a public static method. Its identical to Activity.runOnUiThread but blocks until the runnable finishes execution.

  • addLifecycleListener/removeLifecycleListener - These essentially provide you with a callback to lifecycle events: onCreate etc. which can be pretty useful for some cases.

  • registerViewRenderer - PeerComponent's are usually shown on top of the UI since they are rendered within their own thread outside of the EDT cycle. So when you need to show a Dialog on top of the peer you grab a screenshot of the peer, hide it and then show the dialog with the image as the background (the same applies for transitions). Unfortunately some components (specifically the MapView) might not render properly and require custom code to implement the transferal to a native Bitmap, this API allows you to do that.

You can work with AndroidNativeUtil using native code such as this:

class NativeCallsImpl {
     public void nativeMethod() {
        AndroidNativeUtil.getActivity().runOnUiThread(new Runnable() {
            public void run() {
               // ...
            }
        });
     }
    // ...
}

18.4.8. Broadcast Receiver

A common way to implement features in Android is the BroadcastReceiver API. This allows intercepting operating system events for common use cases.

A good example is intercepting incoming SMS which is specific to Android so you’d need a broardcast receiver to implement that. This is often confusing to developers who sometimes derive the impl class from broadcast receiver. that’s a mistake…​

The solution is to place any native Android class into the native/android directory. It will get compiled with the rest of the native code and " works". So you can place this class under native/android/com/codename1/sms/intercept:

public class SMSListener extends BroadcastReceiver {

    @Override
    public void onReceive(Context cntxt, Intent intent) {
        if (intent.getAction().equals("android.provider.Telephony.SMS_RECEIVED")) {
            Bundle bundle = intent.getExtras();
            SmsMessage[] msgs = null;
            if (bundle != null) {
                try {
                    Object[] pdus = (Object[]) bundle.get("pdus");
                    msgs = new SmsMessage[pdus.length];
                    for (int i = 0; i < msgs.length; i++) {
                        msgs[i] = SmsMessage.createFromPdu((byte[]) pdus[i]);
                        String msgBody = msgs[i].getMessageBody();
                        SMSCallback.smsReceived(msgBody);
                    }
                } catch (Exception e) {
                    Log.e(e);
                    SMSCallback.smsReceiveError(e);
                }
            }
        }
    }
}

The code above is pretty standard native Android code, it’s a callback in which most of the logic is similar to the native Android code mentioned in this stackoverflow question.

But there is still more you need to do. In order to implement this natively you need to register the permission and the receiver in the manifest.xml file as explained in that question. This is how their native manifest looked:

<?xml version="1.0" encoding="utf-8"?>
<manifest xmlns:android="http://schemas.android.com/apk/res/android"
    package="com.bulsy.smstalk1">
    <uses-permission android:name="android.permission.RECEIVE_SMS" />
    <uses-permission android:name="android.permission.READ_SMS" />
    <uses-permission android:name="android.permission.SEND_SMS"/>
    <uses-permission android:name="android.permission.READ_CONTACTS" />

    <application
        android:allowBackup="true"
        android:icon="@mipmap/ic_launcher"
        android:label="@string/app_name"
        android:supportsRtl="true"
        android:theme="@style/AppTheme">
        <activity android:name=".MainActivity">
            <intent-filter>
                <action android:name="android.intent.action.MAIN" />
                <category android:name="android.intent.category.LAUNCHER" />
            </intent-filter>
        </activity>
        <receiver android:name="com.bulsy.smstalk1.SmsListener"
               android:enabled="true"
               android:permission="android.permission.BROADCAST_SMS"
               android:exported="true">
            <intent-filter android:priority="2147483647">//this doesnt work
                <category android:name="android.intent.category.DEFAULT" />
                <action android:name="android.provider.Telephony.SMS_RECEIVED" />
            </intent-filter>
        </receiver>
    </application>
</manifest>

You need the broadcast permission XML and the permission XML. Both are doable through the build hints. The former is pretty easy:

android.xpermissions=<uses-permission android:name="android.permission.RECEIVE_SMS" />

The latter isn’t much harder, notice I took many lines and made them into a single line for convenience:

android.xapplication=<receiver android:name="com.codename1.sms.intercept.SMSListener"  android:enabled="true" android:permission="android.permission.BROADCAST_SMS"  android:exported="true">                    <intent-filter android:priority="2147483647"><category android:name="android.intent.category.DEFAULT" />        <action android:name="android.provider.Telephony.SMS_RECEIVED" />                 </intent-filter>             </receiver>

Here it’s formatted nicely:

<receiver android:name="com.codename1.sms.intercept.SMSListener"
              android:enabled="true"
              android:permission="android.permission.BROADCAST_SMS"
              android:exported="true">
                   <intent-filter android:priority="2147483647">
                          <category android:name="android.intent.category.DEFAULT" />
                          <action android:name="android.provider.Telephony.SMS_RECEIVED" />
                   </intent-filter>
</receiver>
Listening & Permissions

You will notice that these don’t include the actual binding or permission prompts you would expect for something like this. To do this you need a native interface.

The native sample in stack overflow bound the listener in the activity but here you want the app code to decide when you should bind the listening:

public interface NativeSMSInterceptor extends NativeInterface {
    void bindSMSListener();
    void unbindSMSListener();
}

that’s easy!

Notice that isSupported() returns false for all other OS’s so you won’t need to ask whether this is "Android" you can use isSupported().

The implementation is pretty easy too:

public class NativeSMSInterceptorImpl {
    private SMSListener smsListener;
    public void bindSMSListener() {
        if (AndroidNativeUtil.checkForPermission(Manifest.permission.RECEIVE_SMS, "We can automatically enter the SMS code for you")) { (1)
            smsListener = new SMSListener();
            IntentFilter filter = new IntentFilter();
            filter.addAction("android.provider.Telephony.SMS_RECEIVED");
            AndroidNativeUtil.getActivity().registerReceiver(smsListener, filter); (2)
        }
    }

    public void unbindSMSListener() {
        AndroidNativeUtil.getActivity().unregisterReceiver(smsListener);
    }

    public boolean isSupported() {
        return true;
    }
}
1This will trigger the permission prompt on Android 6 and newer. Even though the permission is declared in XML this isn’t enough for 6+. Notice that even when you run on Android 6 you still need to declare permissions in XML!
2Here you actually bind the listener, this allows you to grab one SMS and not listen in on every SMS coming thru

18.4.9. Native Code Callbacks

Native interfaces standardize the invocation of native code from Codename One, but it doesn’t standardize the reverse of callbacks into Codename One Java code. The reverse is naturally more complicated since its platform specific and more error prone.

A common "trick" for calling back is to define a static method and then trigger it from native code. This works nicely for Android & Java SE since those platforms use Java for their "native code". Mapping this to iOS requires some basic understanding of how the iOS VM works.

For the purpose of this explanation lets pretend you’ve a class called NativeCallback in the src hierarchy under the package com.mycompany that has the method: public static void callback().

public class NativeCallback {
    public static void callback() {
        // do stuff
    }

    public static void callback(int arg) {
        // do stuff
    }

    public static void callback(String arg) {
        // do stuff
    }

    public static int callbackR(int arg) {
        // do stuff
        return arg;
    }
}

So if I want to call it from Android or all of the Java based platforms I can write this in the "native" code:

public class NativeCallbackUsage {
    public void invokeCallbacks() {
        NativeCallback.callback();
        NativeCallback.callback("My Arg");
    }
}

I can also pass a argument as you do later on:

public class NativeCallbackUsage {
    public void invokeCallbacks() {
        NativeCallback.callback();
        NativeCallback.callback("My Arg");
    }
}
Accessing Callbacks from Objective-C

If you want to invoke that method from Objective-C you need to do the following.

Add an include statement as such:

#include "com_mycompany_NativeCallback.h"
#include "CodenameOne_GLViewController.h"

Notice that the CodenameOne_GLViewController.h include defines various macros such as CN1_THREAD_STATE_PASS_SINGLE_ARG.

Then when you want to trigger the method do:

com_mycompany_NativeCallback_callback__(CN1_THREAD_STATE_PASS_SINGLE_ARG);
For most callbacks you should use the macro CN1_THREAD_GET_STATE_PASS_SINGLE_ARG instead of CN1_THREAD_STATE_PASS_SINGLE_ARG also make sure to add `#include "cn1_globals.h" in the file

The VM passes the thread context along method calls to save on API calls (thread context is heavily used in Java for synchronization, gc and more).

You can easily pass arguments like:

public static void callback(int arg) {
    // do stuff
}

Which maps to native as (notice the extra _ before the int):

com_mycompany_NativeCallback_callback___int(CN1_THREAD_GET_STATE_PASS_ARG intValue);

Notice that there is no comma between the CN1_THREAD_GET_STATE_PASS_ARG and the value!

Why No Comma?

The comma is included as part of the macro which makes for code that isn’t as readable.

The reason for this dates to the migration from XMLVM [10] to the current ParparVM implementation. CN1_THREAD_GET_STATE_PASS_ARG is defined as nothing in XMLVM since it didn’t use that concept. Yet under ParparVM it will include the necessary comma.

A common use case is passing string values to the Java side, or NSString* which is iOS equivalent. Assuming a method like this:

public static void callback(String arg) {
    // do stuff
}

You would need to convert the NSString* value you already have to a java.lang.String which the callback expects.

The fromNSString function also needs this special argument so you will need to modify the method as such:

com_mycompany_NativeCallback_callback___java_lang_String(CN1_THREAD_GET_STATE_PASS_ARG fromNSString(CN1_THREAD_GET_STATE_PASS_ARG nsStringValue));

And finally you might want to return a value from callback as such:

public static int callbackR(int arg) {
    // do stuff
    return arg;
}

This is tricky since the method name changes to support covariant return types and so the signature would be:

com_mycompany_NativeCallback_callback___int_R_int(intValue);

The upper case R allows you to differentiate between void callback(int,int) and int callback(int).

Covariant return types are a little known Java 5 feature. For example: the method Object getX() can be overriden by MyObject getX(). For example, in the VM level they can both exist side by side.
Accessing Callbacks from Javascript

The mechanism for invoking static callback methods from Javascript (for the Javascript port ) is similar to Objective-C’s. The this object in your native interface method contains a property named $GLOBAL$ that provides access to static java methods. This object will contain Javascript mirror objects for each Java class (though the property name is mangled by replacing "." with underscores). Each mirror object contains a wrapper method for its underlying class’s static methods where the method name follows the same naming convention as is used for the Javascript native methods themselves (and similar to the naming conventions used in Objective-C).

For example, the Google Maps project includes the static callback method:

class MapContainerCallbacks {
    static void fireMapChangeEvent(int mapId, final int zoom, final double lat, final double lon) {
        // ...
    }
}

defined in the com.codename1.googlemaps.MapContainer class.

This method is called from Javascript inside a native interface using the following code:

var fireMapChangeEvent = this.$GLOBAL$.com_codename1_googlemaps_MapContainer.fireMapChangeEvent__int_int_double_double;
google.maps.event.addListener(this.map, 'bounds_changed', function() {
    fireMapChangeEvent(self.mapId, self.map.getZoom(), self.map.getCenter().lat(), self.map.getCenter().lng());
});

In this example you first obtain a reference to the fireMapChangeEvent method, and then call it later. For example, you could have called it directly also.

Your code MUST contain the full string path this.$GLOBAL$.your_class_name.your_method_name or the build server won’t be able to recognize that your code requires this method. The $GLOBAL$ object is populated by the build server with those classes and methods that are used inside your native methods. If the build server doesn’t recognize that the methods are being used (through this pattern) it won’t generate the necessary wrappers for your Javascript code to access the Java methods.
Callbacks of the SMS Receiver

The SMS Broadcast Receiver code from before also used callbacks such as this:

package com.codename1.sms.intercept; (1)

import com.codename1.util.FailureCallback;
import com.codename1.util.SuccessCallback;
import static com.codename1.ui.CN.*;

class SMSCallback {
    static SuccessCallback<String> onSuccess;
    static FailureCallback onFail;

    public static void smsReceived(String sms) {
        if (onSuccess != null) {
            SuccessCallback<String> s = onSuccess;
            onSuccess = null;
            onFail = null;
            SMSInterceptor.unbindListener();
            callSerially(() -> s.onSucess(sms)); (2)
        }
    }

    public static void smsReceiveError(Exception err) {
        if (onFail != null) {
            FailureCallback f = onFail;
            onFail = null;
            SMSInterceptor.unbindListener();
            onSuccess = null;
            callSerially(() -> f.onError(null, err, 1, err.toString()));
        } else {
            if (onSuccess != null) {
                SMSInterceptor.unbindListener();
                onSuccess = null;
            }
        }
    }
}
1Notice that the package is the same as the native code and the other classes. This allows the callback class to be package protected so it isn’t exposed through the API (the class doesn’t have the public modifier)
2You wrap the callback in call serially to match the Codename One convention of using the EDT by default. The call will probably arrive on the Android native thread so it makes sense to normalize it and not expose the Android native thread to the user code
Asynchronous Callbacks & Threading

One of the problematic aspects of calling back into Java from Javascript is that Javascript has no notion of multi-threading. Therefore, if the method you’re calling uses Java’s threads at all (for example: It includes a wait(), notify(), sleep(), callSerially(), etc…​) you need to call it asynchronously from Javascript. You can call a method asynchronously by appending $async to the method name. For example: With the Google Maps example above, you would change :

this.$GLOBAL$.com_codename1_googlemaps_MapContainer.fireMapChangeEvent__int_int_double_double;

to

this.$GLOBAL$.com_codename1_googlemaps_MapContainer.fireMapChangeEvent__int_int_double_double$async;

This will cause the call to be wrapped in the appropriate bootstrap code to work properly with threads - and it’s absolutely necessary in cases where the method may use threads of any kind. The side-effect of calling a method with the $async suffix is that you can’t use return values from the method.

In most cases you should use the async version of a method when calling it from your native method. Only use the synchronous (default) version if you’re absolutely sure that the method doesn’t use any threading primitives.

18.5. Libraries - cn1lib

Support for JAR files in Codename One has been a source of confusion so its probably a good idea to revisit this subject again and clarify all the details.

The first source of confusion is changing the classpath. You should NEVER change the classpath or add an external JAR through the IDE classpath UI. The reasoning here is simple, these IDE’s don’t package the JAR’s into the final executable and even if they did these JAR’s would probably use features unavailable or inappropriate for the device (for example: java.io.File etc.).

don’t change the classpath
Figure 449. don’t change the classpath, this is how it should look for a typical Java 8 Codename One application

Cn1libs are Codename One’s file format for 3rd party extensions. it’s physicially a zip file containing other zip files and some meta-data.

18.5.1. Why Not Use JAR?

A jar can be compiled with usage of any Java API that might not be supported, it can be compiled with a Java target version that isn’t tested.

Jars don’t include support for writing native code, you could use JNI in jars (awkwardly) but that doesn’t match Codename One’s needs for native support (see section above).

Jars don’t support "proper" code completion, a common developer trick is to stick source code into the jar but that prevents usage with proprietary code. Cn1libs provide full IDE code completion (with JavaDoc hints) without exposing the sources.

There are two use cases for wanting JAR’s and they both have different solutions:

  1. Modularity

  2. Working with an existing JARs

Cn1lib’s address the modularity aspect allowing you to break that down. Existing jars can sometimes be used native code settings but for the most part you would want to adapt the code to abide by Codename One restrictions.

18.5.2. How To Use cn1libs?

Codename One has a large repository of 3rd party cn1libs, you can install a cn1lib by placing it in the lib directory of your project then right clicking the project and selecting Codename OneRefresh cn1lib files.

Refresh cn1lib files menu option
Figure 450. Refresh cn1lib files menu option

Once refreshed the content of the cn1lib will be available to code completion and you could use it.

Notice that some cn1libs require additional configurations such as build hints etc. so make sure to read the developers instructions when integrating a 3rd party library.
Under the Hood of cn1lib Install

Refresh cn1lib files invokes the ant task refresh-libs. You could automatically trigger a refresh as part of your build process by invoking that ant task manually.

Technically that task invokes a custom task that unzips the content of the cn1lib into a set of directories accessible to the build process. Classes and stub sources are installed in lib/impl/cls & lib/impl/stubs respectively.

The native files are extracted to lib/impl/native. The classpath for the main project and the ant build process know about these directories and include them within their path.

18.5.3. Creating a Simple cn1lib

Creating a cn1lib is trivial, you will get into more elaborate uses soon enough but for a hello world cn1lib you can use this 2 step process:

Select the CodenameOne Library Option
Figure 451. Select the CodenameOne Library Option
Select the file name/destination. Notice that a Java 8 cn1lib requires Java 8 support in the parent project!
Figure 452. Select the file name/destination. Notice that a Java 8 cn1lib requires Java 8 support in the parent project!

Once you go thru these steps you can define any source file within the library and it will be accessible to the users of the library.

18.5.4. Build Hints in cn1libs

Some cn1libs are pretty simple to install, place them under the lib directory and refresh. For example, many of the more elaborate cn1libs need some pretty complex configurations. This is the case when native code is involved where you need to add permissions or plist entries for the various native platforms to get everything to work. This makes the cn1lib’s helpful but less than seamless which is where you want to go.

Codename One cn1libs include two files that can be placed into the root: codenameone_library_required.properties & codenameone_library_appended.properties.

In these files you can write a build hint as codename1.arg.ios.plistInject=…​ for the various hints.

Notice the usage of the properties syntax for the build hint with the codename1.arg prefix you would also need to escape reserved characters for properties files.
The best way to discover the right syntax for such build hints is to set them through the build hints GUI in a regular project and copy/paste them from codenameone_settings.properties into the cn1lib file.

The obvious question is why do you need two files?

There are two types of build hints: required and appended.

Required build hints can be something like ios.objC=true which you want to always work. For example: if a cn1lib defines ios.objC=true and another cn1lib defines ios.objC=false things won’t work since one cn1lib won’t get what it needs…​
In this case you’d want the build to fail so you can remove the faulty cn1lib.

If two cn1libs define ios.objC=true there will be no collision as the value would be identical

An appended property would be something like ios.plistInject=<key>UIBackgroundModes</key><array><string>audio</string> </array>

Notice that this can still collide for example: if a different cn1lib defines its own background mode. For example, there are many valid cases where ios.plistInject can be used for other things. In this case you will append the content of the ios.plistInject into the build hint if it isn’t already there.

There are a couple of things you need to keep in mind:

  • Properties are merged with every "refresh libs" call not dynamically on the server. This means it should be pretty simple for the developer to investigate issues in this process.

  • Changing flags is problematic - there is no "uninstall" process. Since the data is copied into the codenameone_settings.properties file. If you need to change a flag later on you might need to alert users to make changes to their properties essentially negating the value of this feature…​
    So be careful when adding properties here.

it’s your responsibility as a library developer to decide which build hint goes into which file!
Codename One can’t automate this process as the whole process of build hints is by definition an ad hoc process.

The rule of thumb is that a build hint with a numeric or boolean value is always a required property. If an entry has a string that you can append with another string then its probably an appended entry.

These build hints are probably of the "required" type:

android.debug
android.release
android.installLocation
android.licenseKey
android.stack_size
android.statusbar_hidden
android.googleAdUnitId
android.includeGPlayServices
android.headphoneCallback
android.gpsPermission
android.asyncPaint
android.supportV4
android.theme
android.cusom_layout1
android.versionCode
android.captureRecord
android.removeBasePermissions
android.blockExternalStoragePermission
android.min_sdk_version
android.smallScreens
android.streamMode
android.enableProguard
android.targetSDKVersion
android.web_loading_hidden
facebook.appId
facebook.clientToken
ios.keyboardOpen
ios.project_type
ios.newStorageLocation
ios.prerendered_icon
ios.application_exits
ios.themeMode
ios.xcode_version
javascript.inject_proxy
javascript.minifying
javascript.proxy.url
javascript.sourceFilesCopied
javascript.teavm.version
google.adUnitId
ios.includePush
ios.headphoneCallback
ios.enableAutoplayVideo
ios.googleAdUnitId
ios.googleAdUnitIdPadding
ios.enableBadgeClear
ios.locationUsageDescription
ios.bundleVersion
ios.objC
ios.testFlight
desktop.width
desktop.height
desktop.adaptToRetina
desktop.resizable
desktop.fontSizes
desktop.theme
desktop.themeMac
desktop.themeWin
desktop.windowsOutput
noExtraResources
android.permission.<PERMISSION_NAME>

These build hints should probably be appended:

android.xapplication
android.xpermissions
android.xintent_filter
android.facebook_permissions
android.stringsXml
android.style
android.nonconsumable
android.xapplication_attr
android.xactivity
android.pushVibratePattern
android.proguardKeep
android.sharedUserId
android.sharedUserLabel
ios.urlScheme
ios.interface_orientation
ios.plistInject
ios.facebook_permissions
ios.applicationDidEnterBackground
ios.viewDidLoad
ios.glAppDelegateHeader
ios.glAppDelegateBody
ios.beforeFinishLaunching
ios.afterFinishLaunching
ios.add_libs
cn1lib Structure/File Format

The cb1lib file format is quite simple, it’s a zip file containing zip files within it with fixed names to support the various features.

The table below covers the files that can/should be a part of a cn1lib file:

Table 12. cn1lib structure
File NameRequiredPurpose

main.zip

Contains the bytecode and the library binary data. This is effectively the portable portion of the jar

stubs.zip

Stub source files (auto-generated) containing javadocs to provide code completion

manifest.properties

×

General properties of the library, this isn’t used for much at the moment

codenameone_ library_ appended.properties

×

Discussed above

codenameone_ library_ required.properties

×

Discussed above

nativeios.zip

×

Native iOS sources if applicable

nativeand.zip

×

Native Android sources if applicable

nativejavascript.zip

×

Native JavaScript sources if applicable

nativese.zip

×

Native Java SE sources if applicable

nativewin.zip

×

Native Windows sources if applicable

nativeme.zip

×

Native Java ME sources if applicable

18.6. Integrating Android 3rd Party Libraries & JNI

While its pretty easy to use native interfaces to write Android native code some things aren’t necessarily as obvious. For example: if you want to integrate a 3rd party library, specifically one that includes native C JNI code this process isn’t as straightforward.

If you need to integrate such a library into your native calls you’ve the following options:

  1. The first option (and the easiest one) is to place a Jar file in the native/android directory. This will link your binary with the jar file. Just place the jar under the native/android and the build server will pick it up and will add it to the classpath.
    Notice that Android release apps are obfuscated by default which might cause issues with such libraries if they reference API’s that are unavailable on Android. You can workaround this by adding a build hint to the proguard obfuscation code that blocs the obfuscation of the problematic classes using the build hint:
    android.proguardKeep=-keep class com.mypackage.ProblemClass { *; }`

  2. Another option is the aar file is a binary format Google introduced to represent an Android Library project (similarly to the cn1lib format). One of the problem with the Android Library projects was the fact that it required the project sources which made it difficult for 3rd party vendors to publish libraries.
    As a result so android introduced the aar file which is a binary format that represents a Library project. To learn more about arr you can read this.

    You can link an aar file by placing it under the native/android and the build server will link it to the project.

  3. There is another obsolete approach that you’re mentioning for legacy purposes (for example: if you need to port code written with this legacy option). This predated the aar option from Google…​ Not all 3rd party tools can be packaged as a simple jar, some 3rd party tools need to declare activities add permissions, resources, assets, and/or even add native code (.so files).
    To link a Library project to your Codename One project open the Library project in Eclipse or Android Studio and make sure the project builds, after the project was built successfully remove the bin directory from the project and zip the whole project.

    Rename the extension from .zip to .andlib and place the andlib file under the native/android directory. The build server will pick it up and will link it to the project.

18.7. Drag & Drop

Unlike other platforms that tried to create overly generic catch all API’s Codename One tried to make things as simple as possible.

In Codename One components can be dragged and drop targets are always components. The logic of actually performing the operation indicated by the drop is the responsibility of the person implementing the drop.

Some platforms for example: AWT allow dragging abstract concepts such as mime type elements. This allows dragging things like a text file into the app, but that use case isn’t realistic in mobile

The code below allows you to rearrange the items based on a sensible order. Notice it relies on the default Container drop behavior.

Form hi = new Form("Rearrangeable Items", new BorderLayout());
String[] buttons = {"A Game of Thrones", "A Clash Of Kings",  "A Storm Of Swords",
    "A Feast For Crows", "A Dance With Dragons", "The Winds of Winter", "A Dream of Spring" };

Container box = new Container(BoxLayout.y());
box.setScrollableY(true);
box.setDropTarget(true);
java.util.List<String> got = Arrays.asList(buttons);
Collections.shuffle(got);
for(String current : got) {
    MultiButton mb = new MultiButton(current);
    box.add(mb);
    mb.setDraggable(true);
}

hi.add(BorderLayout.NORTH, "Arrange The Titles").add(BorderLayout.CENTER, box);
hi.show();
Drag and drop demo
Figure 453. Drag and drop demo

To enable dragging a component it must be flagged as draggable using setDraggable(true), to allow dropping the component onto another component you must first enable the drop target with setDropTarget(true) and override some methods (more on that later).

When dragging on top of a child component of a drop target the code recursively searches for a drop target parent. Dropping a component on the child will automatically find the right drop target, hence there is no need to make "everything" into a drop target.

You can override these methods in the draggable components:

  • getDragImage - this generates an image preview of the component that will be dragged. This automatically generates a sensible default so you don’t need to override it.

  • drawDraggedImage - this method will be invoked to draw the dragged image at a given location, it might be useful to override it if you want to display some drag related information such an additional icon based on location etc. (for example: a move/copy icon).

In the drop target you can override the following methods:

  • draggingOver - returns true if a drop operation at this point is permitted. Otherwise releasing the component will have no effect.

  • dragEnter/Exit - useful to track and cleanup state related to dragging over a specific component.

  • drop - the logic for dropping/moving the component must be implemented here!

18.8. Android Lollipop ActionBar Customization

When running on Android Lollipop (5.0 or newer) the native action bar will use the Lollipop design. This isn’t applicable if you use the Toolbar or SideMenuBar this will be used in the task switcher.

To customize the colors of the native ActionBar on Lollipop define a colors.xml file in the native/android directory of your project. It should look like this:

<resources>
   <color name="colorPrimary">#ff00ff00</color>
   <color name="colorPrimaryDark">#80ff0000</color>
   <color name="colorAccent">#800000ff</color>
</resources>

18.9. Intercepting URL’s On iOS & Android

A common trick in mobile application development, is communication between two unrelated applications.

In Android you can use intents which are pretty elaborate and can be used through Display.execute, however what if you would like to expose the functionality of your application to a different application running on the device. This would allow that application to launch your application.

This isn’t something you built-in to Codename One, however it does expose enough of the platform capabilities to enable that functionality rather easily on Android.

On Android you need to define an intent filter which you can do using the android.xintent_filter build hint, this accepts the XML to filter whether a request is relevant to your application:

android.xintent_filter=<intent-filter>   <action android:name="android.intent.action.VIEW" />    <category android:name="android.intent.category.DEFAULT" />    <category android:name="android.intent.category.BROWSABLE" />    <data android:scheme="myapp" />  </intent-filter>

You can read more about it in this stack overflow question.

To bind the myapp:// URL to your application. As a result typing myapp://x into the Android browser will launch the application.

18.9.1. Passing Launch Arguments To The App

You can access the value of the URL that launched the app using:

public class RearrangeableItemsDemo {
    public void show() {
        Form hi = new Form("Rearrangeable Items", new BorderLayout());
        String[] buttons = {"A Game of Thrones", "A Clash Of Kings",  "A Storm Of Swords",
            "A Feast For Crows", "A Dance With Dragons", "The Winds of Winter", "A Dream of Spring" };

        Container box = new Container(BoxLayout.y());
        box.setScrollableY(true);
        box.setDropTarget(true);
        java.util.List<String> got = Arrays.asList(buttons);
        Collections.shuffle(got);
        for (String current : got) {
            MultiButton mb = new MultiButton(current);
            box.add(mb);
            mb.setDraggable(true);
        }

        hi.add(BorderLayout.NORTH, "Arrange The Titles").add(BorderLayout.CENTER, box);
        hi.show();
    }
}

This value would be null if the app was launched through the icon.

18.9.2. Android App-to-App Contracts (Wallet/Issuer style flows)

Some integrations (wallet provisioning, issuer verification, secure step-up) need more than a URL launch. They usually require:

  • a custom Android intent action,

  • caller validation,

  • asynchronous app logic (login/backend verification),

  • a native setResult(…​) response back to the caller.

In Codename One, keep this flow in two layers:

  1. Android bridge activity for contract lifecycle and setResult(…​).

  2. Codename One app code for business logic in start().

Why this is not implicitly generated by AndroidGradleBuilder

A generic bridge can’t safely infer:

  • expected caller package(s),

  • required result extra names,

  • approval/decline mapping rules,

  • timeout/failure policy.

Those are contract-specific, so the bridge activity is intentionally app-defined.

Registering the bridge activity

Use android.xapplication to inject a dedicated bridge activity and bind the action it should receive:

codename1.arg.android.xapplication=<activity android:name="com.example.wallet.WalletBridgeActivity" android:exported="true" android:launchMode="singleTop" android:noHistory="true" android:excludeFromRecents="true" android:theme="@android:style/Theme.Translucent.NoTitleBar"><intent-filter><action android:name="com.example.wallet.ACTION_VERIFY"/><category android:name="android.intent.category.DEFAULT"/></intent-filter></activity>

Keep codename1.arg.android.activity.launchMode=singleTask on your main CN1 activity so app resume behavior is predictable.

Bridge activity responsibilities

A minimal bridge activity should:

  1. Receive and parse the incoming intent.

  2. Capture caller identity using getCallingPackage().

  3. Launch or resume the CN1 app activity.

  4. Hold contract state until CN1 completes verification.

  5. Return setResult(…​) and finish().

For payment/wallet trust decisions, treat only getCallingPackage() as verified identity. Do not rely on referrer extras for caller authentication because callers can spoof those values. This implies the contract should be launched with startActivityForResult(…​) so caller identity is available.
Wallet Contract Security Guidelines

Use this checklist when the integration can activate payment credentials or accounts:

  1. Fail closed on missing verified caller. If android.intent.caller is empty (or android.intent.caller.verified is not true), reject the request and return a failure/cancel result.
    Where: CN1 start() guard before any business logic.

  2. Use an allow-list of trusted caller package names and reject everything else.
    Where: CN1 start() (or native bridge) before network calls.

  3. Verify signing certificate fingerprints natively for each allowed package. Package name checks alone are not sufficient in high-trust wallet scenarios.
    Where: native Android code (bridge activity/native interface), because this requires Android PackageManager APIs.

  4. Validate payload freshness (nonce/timestamp/challenge) before approving.
    Where: backend/API service as the source of truth.

  5. Bind response to request (request id / correlation id) and reject mismatched or replayed responses.
    Where: backend first, then enforce in CN1/native completion flow.

  6. Time-box bridge activity state and fail closed on timeout, process death, or missing bridge instance.
    Where: native Android bridge + CN1 timeout handling.

  7. Audit log caller package, request id, decision, and failure reason (without storing full PAN/token data).
    Where: backend and security telemetry pipeline.

Optional native Android example for certificate fingerprint verification (called from bridge/native layer before trusting caller):

private static boolean isTrustedCallerSignature(Context ctx, String packageName, Set<String> allowedSha256) {
    if (packageName == null || packageName.isEmpty()) return false;
    try {
        PackageManager pm = ctx.getPackageManager();
        PackageInfo info;
        if (Build.VERSION.SDK_INT >= 28) {
            info = pm.getPackageInfo(packageName, PackageManager.GET_SIGNING_CERTIFICATES);
            Signature[] sigs = info.signingInfo != null
                    ? info.signingInfo.getApkContentsSigners()
                    : null;
            return hasAllowedFingerprint(sigs, allowedSha256);
        } else {
            info = pm.getPackageInfo(packageName, PackageManager.GET_SIGNATURES);
            return hasAllowedFingerprint(info.signatures, allowedSha256);
        }
    } catch (Exception ex) {
        return false;
    }
}

private static boolean hasAllowedFingerprint(Signature[] sigs, Set<String> allowedSha256) throws Exception {
    if (sigs == null) return false;
    MessageDigest md = MessageDigest.getInstance("SHA-256");
    for (Signature s : sigs) {
        String fp = toHex(md.digest(s.toByteArray()));
        if (allowedSha256.contains(fp)) return true;
    }
    return false;
}

private static String toHex(byte[] data) {
    StringBuilder out = new StringBuilder(data.length * 2);
    for (byte b : data) out.append(String.format("%02X", b));
    return out.toString();
}
public class WalletBridgeActivity extends Activity {
    private static WalletBridgeActivity active;

    @Override
    protected void onCreate(Bundle savedInstanceState) {
        super.onCreate(savedInstanceState);
        active = this;

        Intent in = getIntent();
        String caller = getCallingPackage();

        Intent launch = getPackageManager().getLaunchIntentForPackage(getPackageName());
        launch.addFlags(Intent.FLAG_ACTIVITY_NEW_TASK | Intent.FLAG_ACTIVITY_CLEAR_TOP | Intent.FLAG_ACTIVITY_SINGLE_TOP);
        launch.putExtra("wallet_payload", in.getStringExtra("payload"));
        launch.putExtra("wallet_caller", caller == null ? "" : caller);
        startActivity(launch);
        // Do not finish yet. CN1 will finish this activity via native callback once verification completes.
    }

    @Override
    protected void onDestroy() {
        if (active == this) {
            active = null;
        }
        super.onDestroy();
    }

    public static WalletBridgeActivity getActive() {
        return active;
    }
}
Reading contract data in start()

Codename One exposes launch metadata through AppArg and Display properties. Read these in start():

  • AppArg (primary launch payload)

  • android.intent.action

  • android.intent.data

  • android.intent.type

  • android.intent.caller

  • android.intent.caller.verified

  • android.intent.extra.<KEY>

@Override
public void start() {
    Display d = Display.getInstance();
    String action = d.getProperty("android.intent.action", null);
    if ("com.example.wallet.ACTION_VERIFY".equals(action)) {
        boolean callerVerified = "true".equals(d.getProperty("android.intent.caller.verified", "false"));
        String payload = d.getProperty("android.intent.extra.wallet_payload", d.getProperty("AppArg", null));
        String caller = d.getProperty("android.intent.caller", "");

        if (!callerVerified || !isAllowedCaller(caller)) {
            failClosed(); // return declined/canceled via bridge completion API
            return;
        }

        // Run authentication + backend verification, then call native bridge completion API.
        return;
    }
    showMainForm();
}
Returning results to the wallet API

Implement a small native interface method (Android implementation) that:

  1. gets WalletBridgeActivity.getActive(),

  2. verifies getActive() is non-null and fails closed if the bridge timed out/canceled,

  3. builds caller-specific result extras,

  4. calls setResult(Activity.RESULT_OK, resultIntent),

  5. calls finish() on the bridge activity.

This is where you bind to the wallet contract’s exact response schema. Keep these extra names in one place so upgrades are manageable.

Foreground behavior on Android 14/15

Foreground transitions are best-effort because Android may block background launches in some states. Build for:

  • immediate resume when allowed,

  • notification fallback when blocked.

iOS is practically identical to Android with some small caveats, iOS’s equivalent of the manifest is the plist.

You can inject more data into the plist by using the ios.plistInject build hint.

So the equivalent in the iOS side would be

ios.plistInject=<key>CFBundleURLTypes</key>     <array>         <dict>             <key>CFBundleURLName</key>             <string>com.yourcompany.myapp</string>         </dict>         <dict>             <key>CFBundleURLSchemes</key>             <array>                 <string>myapp</string>             </array>         </dict>     </array>

For example, that can conflict with the Facebook integration if you use FacebookConnect which needs access to the schemes. To workaround it you can use the build hint ios.urlScheme for example:

ios.urlScheme=<string>myapp</string>

18.10. Native Peer Components

Many Codename One developers don’t truly grasp the reason for the separation between peer (native) components and Codename One components. This is a crucial thing you need to understand especially if you plan on working with native widgets for example: Web Browser, native maps, text input, media and native interfaces (which can return a PeerComponent).

Codename One draws all of its widgets on its own, this is a concept which was modeled in part after Swing. This allows functionality that can’t be achieved in native widget platforms:

  1. The Codename One GUI builder & simulator are almost identical to the device - notice that this also enables the build cloud, otherwise device specific bugs would overwhelm development and make the build cloud redundant.

  2. Ability to override everything - paint, pointer, key events are all overridable and replaceable. Developers can also paint over everything for example: glasspane and layered pane.

  3. Consistency - provides identical functionality on all platforms for the most part.

This all contributes to your ease of working with Codename One and maintaining Codename One. More than 95% of Codename One’s code is in Java hence its portable and pretty easy to maintain!

18.10.1. Why does Codename One Need Native Widgets at all?

You need the native device to do input, html rendering etc. these are too big and too complex tasks for Codename One to do from scratch.

They are sometimes impossible to perform without the native platform. For example: the virtual keyboard input on the devices is tied directly to the native text input. it’s impractical to implement everything from scratch for all languages, dictionaries etc. The result would be sub-par.

A web browser can’t be implemented in this day and age without a JavaScript JIT and including a JIT within an iOS app is prohibited by Apple.

18.10.2. So what’s the problems with native widgets?

Codename One does pretty much everything on the EDT (Event Dispatch Thread), this provides a lot of cool features for example: modal dialogs, invokeAndBlock etc.

For example native widgets have to be drawn on the devices native UI thread.
This means that drawing looks something like this:

  1. Loop over all Codename One components and paint them.

  2. Loop over all native peer components and paint them.

This means that all peer components are drawn on top of the Codename One components.

This was also the case in AWT/Swing to one degree or another…​

18.10.3. So how do you show dialogs on top of Peer Components?

Codename One grabs a screenshot of the peer, hide it and then you can show the screenshot. Since the screenshot is static it can be rendered through the standard UI. Naturally you can’t do that always since grabbing a screenshot is an expensive process on all platforms and must be performed on the native device thread.

18.10.4. Why can’t you combine peer component scrolling and Codename One scrolling?

Since the form title/footer etc. are drawn by Codename One the peer component might paint itself on top of them. Clipping a peer component is often pretty difficult. Furthermore, if the user drags his finger within the peer component he might trigger the native scroll within the might collide with your scrolling?

18.10.5. Native Components In The First Form

There is also another problem that might be counter intuitive. iOS has screenshot images representing the first form. If your first page is an HTML or a native map (or other peer widget) the screenshot process on the build server will show fallback code instead of the real thing thus providing sub-par behavior.

Its impractical to support something like HTML for the screenshot process since it would also look completely different from the web component running on the device.

You can read more about the screenshot process here.

18.11. Integrating 3rd Party Native SDKs

The following is a description of the procedure that was used to create the Codename One FreshDesk library. This process can be easily adapted to wrap any native SDK on Android and iOS.

18.11.1. Step 1 : Review the FreshDesk SDKs

Before you begin, you will need to review the Android and iOS SDKs.

  1. FreshDesk Android SDK: Integration Guide | API Docs

  2. FreshDesk iOS SDK: Integration Guide | API Docs

In reviewing the SDKs, you’re looking for answers to two questions:

  1. What should my Codename One FreshDesk API look like?

  2. What will be involved in integrating the native SDK in my app or lib?

18.11.2. Step 2: Designing the Codename One Public API

When designing the Codename One API, you should begin by looking at the Javadocs for the native Android SDK. If the class hierarchy doesn’t look too elaborate, you may decide to model your Codename One public API fairly closely on the Android API. On the other hand, if you need a small part of the SDK’s functionality, you may choose to create my abstractions around the functionality that you need.

In the case of the FreshDesk SDK, it looks like most of the functionality is handled by one central class Mobihelp, with a few other POJO classes for passing data to and from the service. This is a good candidate for a comprehensive Codename One API.

Before proceeding, you also need to look at the iOS API to see if there are any features that aren’t included. While naming conventions in the iOS API are a little different than those in the Android API, it looks like they are functionally the same.

Therefore, I choose to create a class hierarchy and API that closely mirrors the Android SDK.

18.11.3. Step 3: The Architecture and Internal APIs

A Codename One library that wraps a native SDK, will generally consist of the following:

  1. Public Java API, consisting of pure Java classes that are intended to be used by the outside world.

  2. Native Interface(s). The Native Interface(s) act as a conduit for the public Java API to communicate to the native SDK. Parameters in native interface methods are limited to primitive types, arrays of primitive types, and Strings, as are return values.

  3. Native code. Each platform must include an implementation of the Native Interface(s). These implementations are written in the native language of the platform (for example: Java for Android, and Objective-C for iOS).

  4. Native dependencies. Any 3rd party libraries required for the native code to work, need to be included for each platform. On android, this may mean bundling.jar files,.aar files, or.andlib files. On iOS, this may mean bundling.h files,.a files,.framework, and.bundle files.

  5. Build hints. Some libraries will require you to add some extra build hints to your project. For example: On Android you may need to add permissions to the manifest, or define services in the <Application> section of the manifest. On iOS, this may mean specifying additional core frameworks for inclusion, or adding build flags for compilation.

The following diagram shows the dependencies in a native library:

Relationship between native and Codename One API UML Diagram
Figure 454. Relationship between native & Codename One API UML Diagram

In the specific case of your FreshDesk API, the public API and classes will look like:

Freshdesk API Integration
Figure 455. Freshdesk API Integration
Things to Notice
  1. The public API consists of the main class (Mobihelp), and a few supporting classes (FeedbackRequest, FeedbackType, MobihelpConfig, MobihelpCallbackStatus), which were copied almost directly from the Android SDK.

  2. The way for the public API to communicate with the native SDK is through the MobihelpNative interface.

  3. You introduced the MobihelpNativeCallback class to facilitate native code calling back into the public API. This was necessary for a few methods that used asynchronous callbacks.

18.11.4. Step 4: Implement the Public API and Native Interface

you’ve already looked at the final product of the public API in the previous step, but let’s back up and walk through the process step-by-step.

I wanted to model my API closely around the Android API, and the central class that includes all of the functionality of the SDK is the com.freshdesk.mobihelp.Mobihelp class, so you begin there.

You will start by creating your own package (com.codename1.freshdesk) and your own Mobihelp class inside it.

Adapting Method Signatures
The Context parameter

In a first glance at the com.freshdesk.mobihelp.Mobihelp API you see that many of the methods take a parameter of type android.content.Context. This class is part of the core Android SDK, and won’t be accessible to any pure Codename One APIs. Therefore, your public API can’t include any such references. Luckily, you will be able to access a suitable context in the native layer, so you will omit this parameter from your public API, and inject them in your native implementation.

Hence, the method signature public static final void setUserFullName (Context context, String name) will simply become public static final void setUserFullName (String name) in your public API.

Non-Primitive Parameters

Although your public API isn’t constrained by the same rules as your Native Interfaces with respect to parameter and return types, you need to be cognizant of the fact that parameters you pass to your public API will ultimately be funnelled through your native interface. Therefore, you should pay attention to any parameters or return types that can’t be passed directly to a native interface, and start forming a strategy for them. For example: consider the following method signature from the Android Mobihelp class:

public static final void showSolutions (Context activityContext, ArrayList<String> tags)

You’ve already decided to omit the Context parameter in your API, so that’s a non-issue. But what about the ArrayList<String> tags parameter? Passing this to your public API is no problem, but when you implement the public API, how will you pass this ArrayList to your native interface, since native interfaces don’t allow you to arrays of strings as parameters?

I generally use one of three strategies in such cases:

  1. Encode the parameter as either a single String (for example: using JSON or some other easily parseable format) or a byte[] array (in some known format that can easily be parsed in native code).

  2. Store the parameter on the Codename One side and pass some ID or token that can be used on the native side to retrieve the value.

  3. If the data structure can be expressed as a finite number of primitive values, then simply design the native interface method to take the individual values as parameters instead of a single object. For example: If there is a User class with properties name and phoneNumber, the native interface can have name and phoneNumber parameters rather than a single `user parameter.

In this case, because an array of strings is such a simple data structure, I decided to use a variation on strategy number 1: Merge the array into a single string with a delimiter.

In any case, you don’t have to come up with the specifics right now, as you’re still on the public API, but it will pay dividends later if you think this through ahead of time.

Callbacks

it’s often the case that native code needs to call back into Codename One code when an event occurs. This may be connected directly to an API method call (for example: as the result of an asynchronous method invocation), or due to something initiated by the operating system or the native SDK on its own (for example: a push notification, a location event, etc..).

Native code will have access to both the Codename One API and any native APIs in your app, but on some platforms, accessing the Codename One API may be a little tricky. For example: on iOS you’ll be calling from Objective-C back into Java which requires knowledge of Codename One’s java-to-objective C conversion process. In general, I have found that the easiest way to facilitate callbacks is to provide abstractions that involve static java methods (in Codename One space) that accept and return primitive types.

In the case of your Mobihelp class, the following method hints at the need to have a "callback plan":

public static final void getUnreadCountAsync (Context context, UnreadUpdatesCallback callback)

The interface definition for UnreadUpdatesCallback is:

class AppArgSnippet {
    public void readArgument() {
        String arg = Display.getInstance().getProperty("AppArg", null);
    }
}

that’s: If you were to implement this method (which I plan to do), you need to have a way for the native code to call the callback.onResult() method of the passed parameter.

So you’ve two issues that will need to be solved here:

  1. How to pass the callback object through the native interface.

  2. How to call the callback.onResult() method from native code at the right time.

For the first issue, you will use strategy #2 that you mentioned previously: (Store the parameter on the Codename One side and pass some ID or token that can be used on the native side to retrieve the value).

For the second issue, you will create a static method that can take the token generated to solve the first issue, and call the stored callback object’s onResult() method. You abstract both sides of this process using the MobihelpNativeCallback class.

public interface UnreadUpdatesCallback {
    //This method is called once the unread updates count is available.
    void onResult(MobihelpCallbackStatus status, Integer count);
}

Things to notice here:

  1. This class uses a static Map<Integer,UnreadUpdatesCallback> member to keep track of all callbacks, mapping a unique integer ID to each callback.

  2. The registerUnreadUpdatesCallback() method takes an UnreadUpdatesCallback object, places it in the callbacks map, and returns the integer token that can be used to fire the callback later. This method would be called by the public API inside the getUnreadCountAsync() method implementation to convert the callback into an integer, which can then be passed to the native API.

  3. The fireUnreadUpdatesCallback() method would be called later from native code. Its first parameter is the token for the callback to call.

  4. You wrap the onResult() call inside a Display.callSerially() invocation to ensure that the callback is called on the EDT. This is a general convention that’s used throughout Codename One, and you’d be well-advised to follow it. Event handlers should be run on the EDT unless there is a good reason not to - and in that case your documentation and naming conventions should make this clear to avoid accidentally stepping into multithreading hell!

Initialization

Most Native SDKs include some sort of initialization method where you pass your developer and application credentials to the API. When I filled in FreshDesk’s web-based form to create a new application, it generated an application ID, an app "secret", and a "domain". The SDK requires me to pass all three of these values to its init() method through the MobihelpConfig class.

Note, however, that FreshDesk (and most other service provides that have native SDKs) requires me to create different Apps for each platform. This means that my App ID and App secret will be different on iOS than they will be on Android.

Therefore your public API needs to enable you to provide many credentials in the same app, and your API needs to know to use the correct credentials depending on the device that the app is running on.

There are many solutions to this problem, but the one I chose was to provide two different init() methods:

public class MobihelpNativeCallback {
    private static int nextId = 0;
    private static Map<Integer, UnreadUpdatesCallback> callbacks = new HashMap<>();

    static int registerUnreadUpdatesCallback(UnreadUpdatesCallback callback) {
        callbacks.put(nextId, callback);
        return nextId++;
    }

    public static void fireUnreadUpdatesCallback(int callbackId, final int status, final int count) {
        final UnreadUpdatesCallback cb = callbacks.get(callbackId);
        if (cb != null) {
            callbacks.remove(callbackId);
            Display.getInstance().callSerially(new Runnable() {

                public void run() {
                    MobihelpCallbackStatus status2 = MobihelpCallbackStatus.values()[status];
                    cb.onResult(status2, count);
                }

            });
        }
    }
}

and

public final static void initIOS(MobihelpConfig config) {
    if ("ios".equals(Display.getInstance().getPlatformName())) {
        init(config);
    }
}

Then I can set up the API with code like:

public final static void initAndroid(MobihelpConfig config) {
    if ("and".equals(Display.getInstance().getPlatformName())) {
        init(config);
    }
}
The Resulting Public API
public class MobihelpUsage {
    public void configure() {
        MobihelpConfig config = new MobihelpConfig();
        config.setAppSecret("xxxxxxx");
        config.setAppId("freshdeskdemo-2-xxxxxx");
        config.setDomain("codenameonetest1.freshdesk.com");
        MobihelpInitMethods.initIOS(config);

        config = new MobihelpConfig();
        config.setAppSecret("yyyyyyyy");
        config.setAppId("freshdeskdemo-1-yyyyyyyy");
        config.setDomain("https://codenameonetest1.freshdesk.com");
        MobihelpInitMethods.initAndroid(config);
    }
}
The Native Interface

The final native interface is nearly identical to your public API, except in cases where the public API included non-primitive parameters.

public class Mobihelp {

    private static char[] separators = new char[]{',','|','/','@','#','%','!','^','&','*','=','+','*','<'};
    private static MobihelpNative peer;

    public static boolean isSupported() {
        return peer != null;
    }

    public static void setPeer(MobihelpNative peer) {
        Mobihelp.peer = peer;
    }

    //Attach the given custom data (key-value pair) to the conversations/tickets.
    public final static void addCustomData(String key, String value) {
        // ...
    }
    //Attach the given custom data (key-value pair) to the conversations/tickets with the ability to flag sensitive data.
    public final static void addCustomData(String key, String value, boolean isSensitive) {
        // ...
    }
    //Clear all breadcrumb data.
    public final static void clearBreadCrumbs() {
        // ...
    }
    //Clear all custom data.
    public final static void clearCustomData() {
        // ...
    }
    //Clears User information.
    public final static void clearUserData() {
        // ...
    }
    //Retrieve the number of unread items across all the conversations for the user synchronously i.e.
    public final static int getUnreadCount() {
        return 0;
    }

    //Retrieve the number of unread items across all the conversations for the user asynchronously
    public final static void getUnreadCountAsync(UnreadUpdatesCallback callback) {
        // ...
    }
    //Initialize the Mobihelp support section with necessary app configuration.
    public final static void initAndroid(MobihelpConfig config) {
        // ...
    }

    public final static void initIOS(MobihelpConfig config) {
        // ...
    }

    public void showSupport() {
        // ...
    }
}

Notice also, that the native interface includes a set of methods with names prefixed with config__. This is a naming conventions I used to identify methods that map to the MobihelpConfig class. I could have used a separate native interface for these, but decided to keep all the native stuff in one class for simplicity and maintainability.

Connecting the Public API to the Native Interface

So you’ve a public API, and you’ve a native interface. The idea is that the public API should be a thin wrapper around the native interface to smooth out rough edges that are likely to exist due to the strict set of rules involved in native interfaces. You will, therefore, use delegation inside the Mobihelp class to provide it a reference to an instance of MobihelpNative:

public interface MobihelpNative extends NativeInterface {
    void config_setAppId(String appId);
    void config_setAppSecret(String appSecret);
    void config_setAutoReplyEnabled(boolean enabled);
    void config_setDomain(String domain);
    void config_setEnhancedPrivacyModeEnabled(boolean enabled);
    void config_setFeedbackType(int type);
    void config_setLaunchCountForReviewPrompt(int count);
    void config_setPrefetchSolutions(boolean prefetch);
    void initNative();
    void setUserFullName(String name);
    void showSupportWithTags(String tags, String separator);
    void getUnreadCountAsync(int callbackId);
}

You will initialize this peer inside the init() method of the Mobihelp class. Notice, though that init() is private since you’ve provided abstractions for the Android and iOS apps separately:

public class Mobihelp {

    private static char[] separators = new char[]{',','|','/','@','#','%','!','^','&','*','=','+','*','<'};
    private static MobihelpNative peer;

    public static boolean isSupported() {
        return peer != null;
    }

    public static void setPeer(MobihelpNative peer) {
        Mobihelp.peer = peer;
    }

    //Attach the given custom data (key-value pair) to the conversations/tickets.
    public final static void addCustomData(String key, String value) {
        // ...
    }
    //Attach the given custom data (key-value pair) to the conversations/tickets with the ability to flag sensitive data.
    public final static void addCustomData(String key, String value, boolean isSensitive) {
        // ...
    }
    //Clear all breadcrumb data.
    public final static void clearBreadCrumbs() {
        // ...
    }
    //Clear all custom data.
    public final static void clearCustomData() {
        // ...
    }
    //Clears User information.
    public final static void clearUserData() {
        // ...
    }
    //Retrieve the number of unread items across all the conversations for the user synchronously i.e.
    public final static int getUnreadCount() {
        return 0;
    }

    //Retrieve the number of unread items across all the conversations for the user asynchronously
    public final static void getUnreadCountAsync(UnreadUpdatesCallback callback) {
        // ...
    }
    //Initialize the Mobihelp support section with necessary app configuration.
    public final static void initAndroid(MobihelpConfig config) {
        // ...
    }

    public final static void initIOS(MobihelpConfig config) {
        // ...
    }

    public void showSupport() {
        // ...
    }
}

Things to Notice:

  1. The initAndroid() and initIOS() methods include a check to see if they are running on the correct platform. Ultimately they both call init().

  2. The init() method, uses the NativeLookup class to instantiate your native interface.

Implementing the Glue Between Public API and Native Interface

For most of the methods in the Mobihelp class, you can see that the public API will be a thin wrapper around the native interface. For example: the public API implementation of setUserFullName(String) is:

class MobihelpInitMethods {
    //Initialize the Mobihelp support section with necessary app configuration.
    public final static void initAndroid(MobihelpConfig config) {
        if ("and".equals(Display.getInstance().getPlatformName())) {
            init(config);
        }
    }

    public final static void initIOS(MobihelpConfig config) {
        if ("ios".equals(Display.getInstance().getPlatformName())) {
            init(config);
        }
    }

    private static void init(MobihelpConfig config) {
        MobihelpNative peer = (MobihelpNative) NativeLookup.create(MobihelpNative.class);
        peer.config_setAppId(config.getAppId());
        peer.config_setAppSecret(config.getAppSecret());
        peer.config_setAutoReplyEnabled(config.isAutoReplyEnabled());
        peer.config_setDomain(config.getDomain());
        peer.config_setEnhancedPrivacyModeEnabled(config.isEnhancedPrivacyModeEnabled());
        if (config.getFeedbackType() != null) {
            peer.config_setFeedbackType(config.getFeedbackType().ordinal());
        }
        peer.config_setLaunchCountForReviewPrompt(config.getLaunchCountForReviewPrompt());
        peer.config_setPrefetchSolutions(config.isPrefetchSolutions());
        peer.initNative();
    }
}

For some other methods, the public API needs to break apart the parameters into a form that the native interface can accept. For example: the init() method, shown above, takes a MobihelpConfig object as a parameter, but it passed the properties of the config object individually into the native interface.

Another example, is the showSupport(ArrayList<String> tags) method. The corresponding native interface method that’s wraps is showSupport(String tags, `String separator)` - i.e it needs to merge all tags into a single delimited string, and pass then to the native interface along with the delimiter used. The implementation is:

public final static void setUserFullName(String name) {
    peer.setUserFullName(name);
}

The other non-trivial wrapper is the getUnreadCountAsync() method that you discussed before:

public final static void showSupport(ArrayList<String> tags) {
    String separator = findUnusedSeparator(tags);
    StringBuilder sb = new StringBuilder();
    for (String tag : tags) {
        sb.append(tag).append(separator);
    }
    peer.showSupportWithTags(sb.toString().substring(0, sb.length() - separator.length()), separator);
}

18.11.5. Step 5: Implementing the Native Interface in Android

Now that you’ve set up your public API and your native interface, it’s time to work on the native side of things. You can generate stubs for all platforms in your IDE (Netbeans in my case), by right clicking on the MobihelpNative class in the project explorer and selecting "Generate Native Access".

Generate Native Access Menu Item
Figure 456. Generate Native Access Menu Item

This will generate a separate directory for each platform inside your project’s native directory:

Native generated sources directory view
Figure 457. Native generated sources directory view

Inside the android directory, this generates a com/codename1/freshdesk/MobihelpNativeImpl class with stubs for each method.

Your implementation will be a thin wrapper around the native Android SDK. See the source here.

Some highlights:

  1. Context : The native API requires you to pass a context object as a parameter on many methods. This should be the context for the current activity. It will allow the FreshDesk API to know where to return to after it has done its thing. Codename One provides a class called AndroidNativeUtil that allows you to retrieve the app’s Activity (which includes the Context). You will wrap this with a convenience method in your class as follows:

    public final static void getUnreadCountAsync(UnreadUpdatesCallback callback) {
        int callbackId = MobihelpNativeCallback.registerUnreadUpdatesCallback(callback);
        peer.getUnreadCountAsync(callbackId);
    }

    This will enable you to easily wrap the freshdesk native API. For example:

    private static Context context() {
        return AndroidNativeUtil.getActivity().getApplicationContext();
    }
  2. runOnUiThread() - Many of the calls to the FreshDesk API may have been made from the Codename One EDT. For example, Android has its own event dispatch thread that should be used for interacting with native Android UI. Therefore, any API calls that look like they initiate some sort of native Android UI process should be wrapped inside Android’s runOnUiThread() method which is similar to Codename One’s Display.callSerially() method. For example: see the showSolutions() method:

    public void clearUserData() {
        com.freshdesk.mobihelp.Mobihelp.clearUserData(context());
    }

    (Note here that the activity() method is another convenience method to retrieve the app’s current Activity from the AndroidNativeUtil class).

  3. Callbacks. You discussed, in detail, the mechanisms you put in place to enable your native code to perform callbacks into Codename One. You can see the native side of this by viewing the getUnreadCountAsync() method implementation:

    public void showSolutions() {
        activity().runOnUiThread(new Runnable() {
            public void run() {
                com.freshdesk.mobihelp.Mobihelp.showSolutions(context());
            }
        });
    
    }

18.11.6. Step 6: Bundling the Native SDKs

The last step (at least on the Android side) is to bundle the FreshDesk SDK. For Android, there are a few different scenarios you’ll run into for embedding SDKs:

  1. The SDK includes Java classes - NO XML UI files, assets, or resources that aren’t included inside a simple.jar file. In this case, you can place the.jar file inside your project’s native/android directory.

  2. The SDK includes some XML UI files, resources, and assets. In this case, the SDK is generally distributed as an Android project folder that can be imported into an Eclipse or Android studio workspace. In general, in this case, you would need to zip the entire directory and change the extension of the resulting.zip file to ".andlib", and place this in your project’s native/android directory.

  3. The SDK is distributed as an .aar file - In this case you can copy the .aar file into your native/android directory.

The FreshDesk SDK

The FreshDesk (aka Mobihelp) SDK is distributed as a project folder (that’s: scenario 2 from the above list). Therefore, your procedure is to download the SDK (download link), and rename it from mobihelp_sdk_android.zip to mobihelp_sdk_android.andlib, and copy it into your native/android directory.

Dependencies

Unfortunately, in this case there is a catch. The Mobihelp SDK includes a dependency:

Mobihelp SDK depends on AppCompat-v7 (Revision 19.0+) Library. You will need to update project.properties to point to the Appcompat library.

If you look inside the project.properties file (inside the Mobihelp SDK directory--- that’s: you’d need to extract it from the zip to view its contents), you’ll see the dependency listed:

android.library.reference.1=../appcompat_v7

that’s: it’s expecting to find the appcompat_v7 library located in the same parent directory as the Mobihelp SDK project. After a little bit of research (if you’re not yet familiar with the Android AppCompat support library), you find that the AppCompat_v7 library is part of the Android Support library, which can can installed into your local Android SDK using Android SDK Manager. Installation processed specified here.

After installing the support library, you need to retrieve it from your Android SDK. You can find that.aar file inside the ANDROID_HOME/sdk/extras/android/m2repository/com/android/support/appcompat-v7/19.1.0/ directory (for version 19.1.0). The contents of that directory on my system are:

appcompat-v7-19.1.0.aar		appcompat-v7-19.1.0.pom
appcompat-v7-19.1.0.aar.md5	appcompat-v7-19.1.0.pom.md5
appcompat-v7-19.1.0.aar.sha1	appcompat-v7-19.1.0.pom.sha1

There are two files of interest here:

  1. appcompat-v7-19.1.0.aar - This is the actual library that you need to include in your project to satisfy the Mobisdk dependency.

  2. appcompat-v7-19.1.0.pom - This is the Maven XML file for the library. It will show you any dependencies that the appcompat library has. You will also need to include these dependencies:

      <dependencies>
        <dependency>
          <groupId>com.android.support</groupId>
          <artifactId>support-v4</artifactId>
          <version>19.1.0</version>
          <scope>compile</scope>
        </dependency>
      </dependencies>

    that’s: You need to include the support-v4 library version 19.1.0 in your project. This is also part of the Android Support library. If you back up a couple of directories to: ANDROID_HOME/sdk/extras/android/m2repository/com/android/support, you will see it listed there:

    appcompat-v7			palette-v7
    cardview-v7			recyclerview-v7
    gridlayout-v7			support-annotations
    leanback-v17			support-v13
    mediarouter-v7			support-v4
    multidex			test
    multidex-instrumentation

    + And if you look inside the appropriate version directory of support-v4 (in ANDROID_HOME/sdk/extras/android/m2repository/com/android/support/support-v4/19.1.0), you see:

    support-v4-19.1.0-javadoc.jar		support-v4-19.1.0.jar
    support-v4-19.1.0-javadoc.jar.md5	support-v4-19.1.0.jar.md5
    support-v4-19.1.0-javadoc.jar.sha1	support-v4-19.1.0.jar.sha1
    support-v4-19.1.0-sources.jar		support-v4-19.1.0.pom
    support-v4-19.1.0-sources.jar.md5	support-v4-19.1.0.pom.md5
    support-v4-19.1.0-sources.jar.sha1	support-v4-19.1.0.pom.sha1

    Looks like this library is pure Java classes, so you need to include the support-v4-19.1.0.jar file into your project. Checking the .pom file you see that there are no additional dependencies you need to add.

So, to summarize your findings, you need to include the following files in your native/android directory:

  1. appcompat-v7-19.1.0.aar

  2. support-v4-19.1.0.jar

And since your Mobihelp SDK lists the appcompat_v7 dependency path as "../appcompat_v7" in its project.properties file, you’re going to rename appcompat-v7-19.1.0.aar to appcompat_v7.aar.

When all is said and done, your native/android directory should contain the following:

appcompat_v7.aar	mobihelp.andlib
com			support-v4-19.1.0.jar

18.11.7. Step 7 : Injecting Android Manifest and Proguard Config

The final step on the Android side is to inject necessary permissions and services into the project’s AndroidManifest.xml file.

You can find the manifest file injections required by opening the AndroidManifest.xml file from the MobiHelp SDK project. Its contents are as follows:

<?xml version="1.0" encoding="utf-8"?>
<manifest xmlns:android="http://schemas.android.com/apk/res/android"
    package="com.freshdesk.mobihelp"
    android:versionCode="1"
    android:versionName="1.0" >

     <uses-sdk
        android:minSdkVersion="10" />

    <uses-permission android:name="android.permission.INTERNET" />
    <uses-permission android:name="android.permission.READ_LOGS" />
    <uses-permission android:name="android.permission.ACCESS_NETWORK_STATE" />
    <uses-permission android:name="android.permission.WRITE_EXTERNAL_STORAGE" />

    <application>
        <activity
            android:name="com.freshdesk.mobihelp.activity.SolutionArticleListActivity"
            android:configChanges="orientation|screenSize"
            android:theme="@style/Theme.Mobihelp"
            android:windowSoftInputMode="adjustPan" >
        </activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.FeedbackActivity"
            android:configChanges="keyboardHidden|orientation|screenSize"
            android:theme="@style/Theme.Mobihelp"
            android:windowSoftInputMode="adjustResize|stateVisible" >
        </activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.InterstitialActivity"
            android:configChanges="orientation|screenSize"
            android:theme="@style/Theme.AppCompat">
		</activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.TicketListActivity"
            android:parentActivityName="com.freshdesk.mobihelp.activity.SolutionArticleListActivity"
            android:theme="@style/Theme.Mobihelp" >

            <!-- Parent activity meta-data to support 4.0 and lower -->
            <meta-data
                android:name="android.support.PARENT_ACTIVITY"
                android:value="com.freshdesk.mobihelp.activity.SolutionArticleListActivity" />
        </activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.SolutionArticleActivity"
            android:parentActivityName="com.freshdesk.mobihelp.activity.SolutionArticleListActivity"
            android:theme="@style/Theme.Mobihelp"
            android:configChanges="orientation|screenSize|keyboard|keyboardHidden" >

            <!-- Parent activity meta-data to support 4.0 and lower -->
            <meta-data
                android:name="android.support.PARENT_ACTIVITY"
                android:value="com.freshdesk.mobihelp.activity.SolutionArticleListActivity" />
        </activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.ConversationActivity"
            android:parentActivityName="com.freshdesk.mobihelp.activity.SolutionArticleListActivity"
            android:theme="@style/Theme.Mobihelp"
            android:windowSoftInputMode="adjustResize|stateHidden" >

            <!-- Parent activity meta-data to support 4.0 and lower -->
            <meta-data
                android:name="android.support.PARENT_ACTIVITY"
                android:value="com.freshdesk.mobihelp.activity.SolutionArticleListActivity" />
        </activity>
        <activity
            android:name="com.freshdesk.mobihelp.activity.AttachmentHandlerActivity"
            android:configChanges="keyboardHidden|orientation|screenSize"
            android:parentActivityName="com.freshdesk.mobihelp.activity.SolutionArticleListActivity"
            android:theme="@style/Theme.Mobihelp" >

            <!-- Parent activity meta-data to support 4.0 and lower -->
            <meta-data
                android:name="android.support.PARENT_ACTIVITY"
                android:value="com.freshdesk.mobihelp.activity.SolutionArticleListActivity" />
        </activity>

        <service android:name="com.freshdesk.mobihelp.service.MobihelpService" />

        <receiver android:name="com.freshdesk.mobihelp.receiver.ConnectivityReceiver" >
            <intent-filter>
                <action android:name="android.net.conn.CONNECTIVITY_CHANGE" />
            </intent-filter>
        </receiver>
    </application>

</manifest>

You will need to add the <uses-permission> tags and all of the contents of the <application> tag to your manifest file. Codename One provides the following build hints for these:

  1. android.xpermissions - For your <uses-permission> directives. Add a build hint with name android.xpermissions, and for the value, paste the actual <uses-permission> XML tag.

  2. android.xapplication - For the contents of your <application> tag.

Proguard Config

For the release build, you will also need to inject some proguard configuration so that important classes don’t get stripped out at build time. The FreshDesk SDK instructions state:

If you use Proguard, please make sure you’ve the following included in your project’s proguard-project.txt

-keep class android.support.v4.** { *; }
-keep class android.support.v7.** { *; }

In addition, if you look at the proguard-project.txt file inside the Mobihelp SDK, you’ll see the rules:

-keep public class * extends android.app.Service
-keep public class * extends android.content.BroadcastReceiver
-keep public class * extends android.app.Activity
-keep public class * extends android.preference.Preference
-keep public class com.freshdesk.mobihelp.exception.MobihelpComponentNotFoundException

-keepclassmembers class * implements android.os.Parcelable {
  public static final android.os.Parcelable$Creator *;
}

You will want to merge this and then paste them into the build hint android.proguardKeep of your project.

Troubleshooting Android Stuff

If, after doing all this, your project fails to build, you can enable the "Include Source" option of the build server, then download the source project, open it in Eclipse or Android Studio, and debug from there.

18.12. Part 2: Implementing the iOS Native Code

Part 1 of this tutorial focused on the Android native integration. Now you will shift your focus to the iOS implementation.

After selecting "Generate Native Interfaces" for your "MobihelpNative" class, you’ll find a native/ios directory in your project with the following files:

These files contain stub implementations corresponding to your MobihelpNative class.

You make use of the API docs to see how the native SDK needs to be wrapped. The method names aren’t the same. For example: instead of a method showFeedback(), it has a message -presentFeedback:

You more-or-less follow the iOS integration guide for wrapping the API. Some key points include:

  1. Remember to import the Mobihelp.h file in your header file:

    #import "Mobihelp.h"
  2. Similar to your use of runOnUiThread() in Android, you will wrap all of your API calls in either dispatch_async() or dispatch_sync() calls to ensure that you’re interacting with the Mobihelp API on the app’s main thread rather than the Codename One EDT.

  3. Some methods/messages in the Mobihelp SDK require you to pass a UIViewController as a parameter. In Codename One, the entire application uses a single UIViewController: CodenameOne_GLViewController. You can obtain a reference to this using the [CodenameOne_GLViewController instance] message. You need to import its header file:

    #import "CodenameOne_GLViewController.h"

    As an example, let’s look at the showFeedback() method:

    -(void)showFeedback{
        dispatch_async(dispatch_get_main_queue(), ^{
            [[Mobihelp sharedInstance] presentFeedback:[CodenameOne_GLViewController instance]];
        });
    }

18.12.1. Using the MobihelpNativeCallback

You described earlier how you created a static method on the MobihelpNativeCallback class so that native code could easily fire a callback method. Now let’s take a look at how this looks from the iOS side of the fence. Here is the implementation of getUnreadCountAsync():

-(void)getUnreadCountAsync:(int)param{
    dispatch_async(dispatch_get_main_queue(), ^{
        [[Mobihelp sharedInstance]
            unreadCountWithCompletion:^(NSInteger count){
                com_codename1_freshdesk_MobihelpNativeCallback_fireUnreadUpdatesCallback___int_int_int(
                    CN1_THREAD_GET_STATE_PASS_ARG param, 3 /*SUCCESS*/, count);
            }];
    });
}

In your case the iOS SDK version of this method is +unreadCountWithCompletion: which takes a block (which is like an anonymous function) as a parameter.

The callback to your Codename One function occurs on this line:

com_codename1_freshdesk_MobihelpNativeCallback_fireUnreadUpdatesCallback___int_int_int(
    CN1_THREAD_GET_STATE_PASS_ARG param, 3 /*SUCCESS*/, count);

Some things worth mentioning here:

  1. The method name is the result of taking the FQN (MobihelpNativeCallback.fireUpdateUnreadUpdatesCallback(int, int, int) in the package com.codename1.freshdesk) and replacing all . characters with underscores, suffixing two underscores after the end of the method name, then appending _int once for each of the int arguments.

  2. You also need to import the header file for this class:

    #import "com_codename1_freshdesk_MobihelpNativeCallback.h"

18.12.2. Bundling Native iOS SDK

Now that you’ve implemented your iOS native interface, you need to bundle the Mobihelp iOS SDK into your project. There are a few different scenarios you may face when looking to include a native SDK:

  1. The SDK includes .bundle resource files. In this case, copy the .bundle file(s) into your native/ios directory.

  2. The SDK includes .h header files. In this case, copy the .h file(s) into your native/ios directory.

  3. The SDK includes .a files. In this case, copy the .a file(s) into your native/ios directory.

  4. The SDK includes .framework files. In this case, you’ll need to zip up the framework, and copy it into your native/ios directory. For example: If the framework is named, MyFramework.framework, then the zip file should be named MyFramework.framework.zip, and should be located at native/ios/MyFramework.framework.zip.

The FreshDesk SDK doesn’t include any .framework files, so you don’t need to worry about that last scenario. You simply download the iOS SDK, copy the libFDMobihelpSDK.a, Mobihelp.h. MHModel.bundle, MHResources.bundle, and MHLocalization/en.proj/MHLocalizable.strings into native/ios.

18.12.3. Troubleshooting iOS

If you run into problems with the build, you can select "Include Sources" in the build server to download the resulting Xcode Project. You can then debug the Xcode project locally, make changes to your iOS native implementation files, and copy them back into your project once it’s building properly.

18.12.4. Adding Required Core Libraries and Frameworks

The iOS integration guide for the FreshDesk SDK lists the following core frameworks as dependencies:

iOS link options
Figure 458. IOS link options

You can add these dependencies to your project using the ios.add_libs build hint. For example:

iOS’s "add libs" build hint
Figure 459. iOS’s "add libs" build hint

that’s: you list the framework names separated by semicolons. Notice that my list in the above image doesn’t include all of the frameworks that they list because many of the frameworks are already included by default (I obtained the default list by simply building the project with "include sources" checked, then looked at the frameworks that were included).

18.13. Part 3 : Packaging as a cn1lib

During the initial development, I generally find it easier to use a regular Codename One project so that I can run and test as I go. But once it’s stabilized, and I want to distribute the library to other developers, I will transfer it over to a Codename One library project. This general process involves:

  1. Create a Codename One Library project.

  2. Copy the.java files from my original project into the library project.

  3. Copy the native directory from the original project into the library project.

  4. Copy the relevant build hints from the original project’s codenameone_settings.properties file into the library project’s codenameone_library_appended.properties file.

In the case of the FreshDesk.cn1lib, I modified the original project’s build script to generate and build a library project automatically. But that’s beyond the scope of this tutorial.

18.14. Building Your Own Layout Manager

A Layout contains all the logic for positioning Codename One components. It essentially traverses a Codename One Container and positions components absolutely based on internal logic.

When you build the layout you need to take margin into consideration and make sure to add it into the position/size calculations. Building a layout manager involves two simple methods: layoutContainer & getPreferredSize.

layoutContainer is invoked whenever Codename One decides the container needs rearranging, Codename One tries to avoid calling this method and invokes it at the last possible moment. Since this method is generally expensive (imagine the recursion with nested layouts). Codename One marks a flag indicating layout is "dirty" when something important changes and tries to avoid "reflows".

getPreferredSize allows the layout to determine the size desired for the container. This might be a difficult call to make for some layout managers that try to provide both flexibility and simplicity.

Most of FlowLayout bugs stem from the fact that this method is impossible to implement correctly & efficiently for all the use cases of a deeply nested FlowLayout. The size of the final layout won’t necessarily match the requested size (it probably won’t) but the requested size is taken into consideration, especially when scrolling and also when sizing parent containers.

This is a layout manager that arranges components in a center column aligned to the middle. You then show the proper usage of margin to create a stair like effect with this layout manager:

public void getUnreadCountAsync(final int callbackId) {
    activity().runOnUiThread(new Runnable() {
        public void run() {
            com.freshdesk.mobihelp.Mobihelp.getUnreadCountAsync(context(), new com.freshdesk.mobihelp.UnreadUpdatesCallback() {
                public void onResult(com.freshdesk.mobihelp.MobihelpCallbackStatus status, Integer count) {
                    MobihelpNativeCallback.fireUnreadUpdatesCallback(callbackId, status.ordinal(), count);
                }
            });
        }
    });

}
Center layout staircase effect with margin
Figure 460. Center layout staircase effect with margin

18.14.1. Porting a Swing/AWT Layout Manager

The GridBagLayout was ported to Codename One relatively easily considering the complexity of that specific layout manager. Here are some tips you should take into account when porting a Swing/AWT layout manager:

  1. Codename One doesn’t have Insets, you added some support for them in order to port GridBag but components in Codename One have a margin they need to consider instead of the Insets (the padding is in the preferred size and is thus hidden from the layout manager).

  2. AWT layout managers also synchronize a lot on the AWT thread. This is no longer necessary since Codename One is single threaded, like Swing.

  3. AWT considers the top left position of the Container to be 0,0 whereas Codename One considers the position based on its parent Container. The top left position in Codename One is getX(), getY().

Other than those things it’s mostly fixing method and import statements, which are slightly different. Pretty trivial stuff.

18.15. Port a Language to Codename One

As you may have already read, you’ve added support for Kotlin in Codename One. This is something that you can achieve without the help of Codename One. You could port a 3rd party language like Scala, Ruby, Python etc. to Codename One.

18.15.1. What is a JVM Language?

A JVM Language is any programming language that can be compiled to byte-codes that will run on the JVM (Java Virtual Machine). Java was the original JVM language, but many others have sprung up over the years. Kotlin, Scala, Groovy, and JRuby come to mind as well-established and mature languages, but there are many others.

18.15.2. How Hard is it to Port a JVM Language to Codename One?

The difficulty of porting a particular language to Codename One will vary depending on such factors as:

  1. Does it require a runtime library?

    1. How complex is the runtime library? (For example: Does it require classes that aren’t currently offered in Codename One’s subset of the java standard libraries?)

  2. Does it need reflection?

    1. Codename One doesn’t support reflection because it would result in a large application size. If a JVM language requires reflection to get off the ground then adding it to Codename one would be tricky.

  3. Does it perform any runtime byte-code manipulation?

    1. Some dynamic languages may perform byte-code manipulation at runtime. This is problematic on iOS (and possibly other platforms) which prohibits such runtime behavior.

Step 1: Assess the Language

The more similar a language, and its build outputs are to Java, the easier it will be to port (probably). Most JVM languages have two parts:

  1. A compiler, which compiles source files to JVM byte-code (usually as.class files).

  2. A runtime library.

Currently I am aware of one language (other than Java) that doesn’t require a runtime library, and that’s Mirah.

Codename One also supports Mirah
Assessing the Byte-Code

The first thing I do is take a look at the byte-code that’s produced by the compiler. I use javap to print out a nice version.

Consider this sample Kotlin class:

package com.codename1.hellokotlin2

import com.codename1.ui.Button
import com.codename1.ui.Form
import com.codename1.ui.Label
import com.codename1.ui.layouts.BoxLayout

/**
 * Created by shannah on 2017-07-10.
 */
class KotlinForm : Form {

    constructor() : super("Hello Kotlin", BoxLayout.y()) {
        val label = Label("Hello Kotlin")
        val clickMe = Button("Click Me")
        clickMe.addActionListener {
            label.setText("You Clicked Me");
            revalidate();
        }

        add(label).add(clickMe);

    }


}

Let you take a look at the bytecode that Kotlin produced for this class:

$ javap -v com/codename1/hellokotlin2/KotlinForm.class
  Last modified 10-Jul-2017; size 1456 bytes
  MD5 checksum 1cb00f6e63b918bb5a9f146ca8b0b78e
  Compiled from "KotlinForm.kt"
public final class com.codename1.hellokotlin2.KotlinForm extends com.codename1.ui.Form
  SourceFile: "KotlinForm.kt"
  InnerClasses:
       static final #31; //class com/codename1/hellokotlin2/KotlinForm$1
  RuntimeVisibleAnnotations:
    0: #56(#57=[I#58,I#58,I#59],#60=[I#58,I#61,I#58],#62=I#58,#63=[s#64],#65=[s#55,s#66,s#6,s#67])
  minor version: 0
  major version: 50
  flags: ACC_PUBLIC, ACC_FINAL, ACC_SUPER
Constant pool:
   #1 = Utf8               com/codename1/hellokotlin2/KotlinForm
   #2 = Class              #1             //  com/codename1/hellokotlin2/KotlinForm
   #3 = Utf8               com/codename1/ui/Form
   #4 = Class              #3             //  com/codename1/ui/Form
   #5 = Utf8               <init>
   #6 = Utf8               ()V
   #7 = Utf8               Hello Kotlin
   #8 = String             #7             //  Hello Kotlin
   #9 = Utf8               com/codename1/ui/layouts/BoxLayout
  #10 = Class              #9             //  com/codename1/ui/layouts/BoxLayout
  #11 = Utf8               y
  #12 = Utf8               ()Lcom/codename1/ui/layouts/BoxLayout;
  #13 = NameAndType        #11:#12        //  y:()Lcom/codename1/ui/layouts/BoxLayout;
  #14 = Methodref          #10.#13        //  com/codename1/ui/layouts/BoxLayout.y:()Lcom/codename1/ui/layouts/BoxLayout;
  #15 = Utf8               com/codename1/ui/layouts/Layout
  #16 = Class              #15            //  com/codename1/ui/layouts/Layout
  #17 = Utf8               (Ljava/lang/String;Lcom/codename1/ui/layouts/Layout;)V
  #18 = NameAndType        #5:#17         //  "<init>":(Ljava/lang/String;Lcom/codename1/ui/layouts/Layout;)V
  #19 = Methodref          #4.#18         //  com/codename1/ui/Form."<init>":(Ljava/lang/String;Lcom/codename1/ui/layouts/Layout;)V
  #20 = Utf8               com/codename1/ui/Label
  #21 = Class              #20            //  com/codename1/ui/Label
  #22 = Utf8               (Ljava/lang/String;)V
  #23 = NameAndType        #5:#22         //  "<init>":(Ljava/lang/String;)V
  #24 = Methodref          #21.#23        //  com/codename1/ui/Label."<init>":(Ljava/lang/String;)V
  #25 = Utf8               com/codename1/ui/Button
  #26 = Class              #25            //  com/codename1/ui/Button
  #27 = Utf8               Click Me
  #28 = String             #27            //  Click Me
  #29 = Methodref          #26.#23        //  com/codename1/ui/Button."<init>":(Ljava/lang/String;)V
  #30 = Utf8               com/codename1/hellokotlin2/KotlinForm$1
  #31 = Class              #30            //  com/codename1/hellokotlin2/KotlinForm$1
  #32 = Utf8               (Lcom/codename1/hellokotlin2/KotlinForm;Lcom/codename1/ui/Label;)V
  #33 = NameAndType        #5:#32         //  "<init>":(Lcom/codename1/hellokotlin2/KotlinForm;Lcom/codename1/ui/Label;)V
  #34 = Methodref          #31.#33        //  com/codename1/hellokotlin2/KotlinForm$1."<init>":(Lcom/codename1/hellokotlin2/KotlinForm;Lcom/codename1/ui/Label;)V
  #35 = Utf8               com/codename1/ui/events/ActionListener
  #36 = Class              #35            //  com/codename1/ui/events/ActionListener
  #37 = Utf8               addActionListener
  #38 = Utf8               (Lcom/codename1/ui/events/ActionListener;)V
  #39 = NameAndType        #37:#38        //  addActionListener:(Lcom/codename1/ui/events/ActionListener;)V
  #40 = Methodref          #26.#39        //  com/codename1/ui/Button.addActionListener:(Lcom/codename1/ui/events/ActionListener;)V
  #41 = Utf8               com/codename1/ui/Component
  #42 = Class              #41            //  com/codename1/ui/Component
  #43 = Utf8               add
  #44 = Utf8               (Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
  #45 = NameAndType        #43:#44        //  add:(Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
  #46 = Methodref          #2.#45         //  com/codename1/hellokotlin2/KotlinForm.add:(Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
  #47 = Utf8               com/codename1/ui/Container
  #48 = Class              #47            //  com/codename1/ui/Container
  #49 = Methodref          #48.#45        //  com/codename1/ui/Container.add:(Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
  #50 = Utf8               clickMe
  #51 = Utf8               Lcom/codename1/ui/Button;
  #52 = Utf8               label
  #53 = Utf8               Lcom/codename1/ui/Label;
  #54 = Utf8               this
  #55 = Utf8               Lcom/codename1/hellokotlin2/KotlinForm;
  #56 = Utf8               Lkotlin/Metadata;
  #57 = Utf8               mv
  #58 = Integer            1
  #59 = Integer            6
  #60 = Utf8               bv
  #61 = Integer            0
  #62 = Utf8               k
  #63 = Utf8               d1
  #64 = Utf8
                           \n\n\20¢¨
  #65 = Utf8               d2
  #66 = Utf8               Lcom/codename1/ui/Form;
  #67 = Utf8               HelloKotlin2
  #68 = Utf8               KotlinForm.kt
  #69 = Utf8               Code
  #70 = Utf8               LocalVariableTable
  #71 = Utf8               LineNumberTable
  #72 = Utf8               SourceFile
  #73 = Utf8               InnerClasses
  #74 = Utf8               RuntimeVisibleAnnotations
{
  public com.codename1.hellokotlin2.KotlinForm();
    descriptor: ()V
    flags: ACC_PUBLIC
    Code:
      stack=5, locals=3, args_size=1
         0: aload_0
         1: ldc           #8                  // String Hello Kotlin
         3: invokestatic  #14                 // Method com/codename1/ui/layouts/BoxLayout.y:()Lcom/codename1/ui/layouts/BoxLayout;
         6: checkcast     #16                 // class com/codename1/ui/layouts/Layout
         9: invokespecial #19                 // Method com/codename1/ui/Form."<init>":(Ljava/lang/String;Lcom/codename1/ui/layouts/Layout;)V
        12: new           #21                 // class com/codename1/ui/Label
        15: dup
        16: ldc           #8                  // String Hello Kotlin
        18: invokespecial #24                 // Method com/codename1/ui/Label."<init>":(Ljava/lang/String;)V
        21: astore_1
        22: new           #26                 // class com/codename1/ui/Button
        25: dup
        26: ldc           #28                 // String Click Me
        28: invokespecial #29                 // Method com/codename1/ui/Button."<init>":(Ljava/lang/String;)V
        31: astore_2
        32: aload_2
        33: new           #31                 // class com/codename1/hellokotlin2/KotlinForm$1
        36: dup
        37: aload_0
        38: aload_1
        39: invokespecial #34                 // Method com/codename1/hellokotlin2/KotlinForm$1."<init>":(Lcom/codename1/hellokotlin2/KotlinForm;Lcom/codename1/ui/Label;)V
        42: checkcast     #36                 // class com/codename1/ui/events/ActionListener
        45: invokevirtual #40                 // Method com/codename1/ui/Button.addActionListener:(Lcom/codename1/ui/events/ActionListener;)V
        48: aload_0
        49: aload_1
        50: checkcast     #42                 // class com/codename1/ui/Component
        53: invokevirtual #46                 // Method add:(Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
        56: aload_2
        57: checkcast     #42                 // class com/codename1/ui/Component
        60: invokevirtual #49                 // Method com/codename1/ui/Container.add:(Lcom/codename1/ui/Component;)Lcom/codename1/ui/Container;
        63: pop
        64: return
      LocalVariableTable:
        Start  Length  Slot  Name   Signature
           32      32     2 clickMe   Lcom/codename1/ui/Button;
           22      42     1 label   Lcom/codename1/ui/Label;
            0      65     0  this   Lcom/codename1/hellokotlin2/KotlinForm;
      LineNumberTable:
        line 13: 0
        line 14: 12
        line 15: 22
        line 16: 32
        line 21: 48
}

that’s a big mess of stuff, but it’s pretty easy to pick through it when you know what you’re looking for. The layout of this output is pretty straight forward. The beginning shows that this is a class definition:

class CenterLayout extends Layout {
    public void layoutContainer(Container parent) {
        int components = parent.getComponentCount();
        Style parentStyle = parent.getStyle();
        int centerPos = parent.getLayoutWidth() / 2 + parentStyle.getMargin(Component.LEFT);
        int y = parentStyle.getMargin(Component.TOP);
        boolean rtl = parent.isRTL();
        for (int iter = 0; iter < components; iter++) {
            Component current = parent.getComponentAt(iter);
            Dimension d = current.getPreferredSize();
            Style currentStyle = current.getStyle();
            int marginRight = currentStyle.getMarginRight(rtl);
            int marginLeft = currentStyle.getMarginLeft(rtl);
            int marginTop = currentStyle.getMarginTop();
            int marginBottom = currentStyle.getMarginBottom();
            current.setSize(d);
            int actualWidth = d.getWidth() + marginLeft + marginRight;
            current.setX(centerPos - actualWidth / 2 + marginLeft);
            y += marginTop;
            current.setY(y);
            y += d.getHeight() + marginBottom;
        }
    }

    public Dimension getPreferredSize(Container parent) {
        int components = parent.getComponentCount();
        Style parentStyle = parent.getStyle();
        int height = parentStyle.getMargin(Component.TOP) + parentStyle.getMargin(Component.BOTTOM);
        int marginX = parentStyle.getMargin(Component.RIGHT) + parentStyle.getMargin(Component.LEFT);
        int width = marginX;
        for (int iter = 0; iter < components; iter++) {
            Component current = parent.getComponentAt(iter);
            Dimension d = current.getPreferredSize();
            Style currentStyle = current.getStyle();
            width = Math.max(d.getWidth() + marginX + currentStyle.getMargin(Component.RIGHT)
                    + currentStyle.getMargin(Component.LEFT), width);
            height += currentStyle.getMargin(Component.TOP) + d.getHeight()
                    + currentStyle.getMargin(Component.BOTTOM);
        }
        Dimension size = new Dimension(width, height);
        return size;
    }
}

public class CenterLayoutDemo {
    public void show() {
        Form hi = new Form("Center Layout", new CenterLayout());
        for (int iter = 1; iter < 10; iter++) {
            Label l = new Label("Label: " + iter);
            l.getUnselectedStyle().setMarginLeft(iter * 3);
            l.getUnselectedStyle().setMarginRight(0);
            hi.add(l);
        }
        hi.add(new Label("Really Wide Label Text!!!"));
        hi.show();
    }
}

Even comparing this line with the class definition from the source file you’ve learned something about the Kotlin compiler. It has made the class final by default. That observation shouldn’t affect your assessment here, but it’s kind of interesting.

After the class definition, it shows the internal classes:

InnerClasses:
     static final #31; //class com/codename1/hellokotlin2/KotlinForm$1

The Constant Pool

And the constants that are used in the class:

Constant pool:
   #1 = Utf8               com/codename1/hellokotlin2/KotlinForm
   #2 = Class              #1             //  com/codename1/hellokotlin2/KotlinForm
   #3 = Utf8               com/codename1/ui/Form
   #4 = Class              #3             //  com/codename1/ui/Form
   #5 = Utf8               <init>
   #6 = Utf8               ()V
   #7 = Utf8               Hello Kotlin
   #8 = String             #7             //  Hello Kotlin
   #9 = Utf8               com/codename1/ui/layouts/BoxLayout
   ... etc...

The constant pool will consist of class names, and strings mostly. You’ll want to peruse this list to see if the compiler has added any classes that aren’t in the source code. In the example above, it looks like Kotlin is pretty faithful to the original source’s dependencies. It didn’t inject any classes that aren’t in the original source.

Even if the compiler does inject other dependencies into the bytecode, it might not be a problem. it’s a problem if those classes aren’t supported by Codename One. Keep your eyes peeled for anything in the java.lang.reflect package or unsolicited use of java.net, java.nio, or any other package that aren’t part of the Codename One standard library. If you’re not sure if a class or package is available in the Codename One standard library, check the javadocs.

The ByteCode Instructions:

After the constant pool, you see each of the methods of the class written out as a list of bytecode instructions. For example:

public com.codename1.hellokotlin2.KotlinForm();
  descriptor: ()V
  flags: ACC_PUBLIC
  Code:
    stack=5, locals=3, args_size=1
       0: aload_0
       1: ldc           #8                  // String Hello Kotlin
       3: invokestatic  #14                 // Method com/codename1/ui/layouts/BoxLayout.y:()Lcom/codename1/ui/layouts/BoxLayout;
       6: checkcast     #16                 // class com/codename1/ui/layouts/Layout
       9: invokespecial #19                 // Method com/codename1/ui/Form."<init>":(Ljava/lang/String;Lcom/codename1/ui/layouts/Layout;)V
      12: new           #21                 // class com/codename1/ui/Label
      15: dup
      16: ldc           #8                  // String Hello Kotlin
      etc...

In the above snippet, the first instruction is aload_0 (which adds this to the stack). The 2nd instruction is ldc, (which loads constant #8 — the string "Hello Kotlin" to the stack). The 3rd instruction is invokestatic which calls the static method define by Constant #14 from the constant pool, with the two parameters that had been added to the stack.

You don’t need to understand what all of these instructions do. You need to look for instructions that may be problematic.

The instruction that I think might be problematic is "invokedynamic". All other instructions should work find in Codename One. (I don’t know for a fact that invokedynmic won’t work - I suspect it might not work on some platforms).

Summary of Byte-code Assessment

So to summarize, the byte-code assessment phase, you’re basically looking to make sure that the compiler doesn’t tend to add dependencies to parts of the JDK that Codename One doesn’t currently support. And you want to make sure that it doesn’t use invokedynamic.

If you find that the compiler does use invokedynamic or add references to classes that Codename One doesn’t support, don’t give up yet. You might be able to create your own "porting" runtime library that will provide these dependencies at runtime.

Assessing the Runtime Library

The process for assessing the runtime library is pretty similar to the process for the bytecodes. You’ll want to get your hands on the language’s runtime library, and use javap to inspect the.class files. You’re looking for the same things as you were looking for in the compiler’s output: "invokedynamic" and classes that aren’t supported in Codename One.

Step 2: Convert the Runtime Library into a CN1Lib

Once you’ve assessed the language and are optimistic that it’s a good candidate for porting, you can proceed to port the runtime library into Codename One. Usually that language’s runtime library will be distributed in.jar format. You need to convert this into a cn1lib so that it can be used in a Codename One project. If you can get your hands on the source code for the runtime library then the best approach is to paste the source files into a Codename One Library project, and try to build it. This has the advantage that it will validate the source during compile to ensure that it doesn’t depend on any classes that Codename One doesn’t support.

If you can’t find the sources of the runtime library or they don’t seem to be easily "buildable", then the next best thing is to get the binary distribution’s jar file and convert it to a cn1lib. This is what you did for the Kotlin runtime library.

This procedure exploits the fact that a cn1lib file is a zip file with a specific file structure inside it. The cross-platform Java.class files are all contained inside a file named "main.zip", inside the zip file. This is the mandatory file that must be inside a cn1lib.

To make the library easier to use the cn1lib file can also contain a file named "stubs.zip" which includes stubs of the Java sources. When you build a cn1lib using a Codename One Library project, it will automatically generate stubs of the source so that the IDE will have access to nice things like Javadoc when using the library. The kotlin distribution includes a separate jar file with the runtime sources, named "kotlin-runtime-sources.jar", so you used this as the "stubs". It contains full sources, which isn’t necessary, but it also doesn’t hurt.

So now that you had my two jar files: kotlin-runtime.jar and kotlin-runtime-sources.jar, I created a new empty directory, and copied them inside. I renamed the jars "main.zip" and "stubs.zip" respectively. Then I zipped up the directory and renamed the zip file "kotlin-runtime.cn1lib".

Building cn1libs manually in this way is a ** bad habit, as it bypasses the API verification step that normally occurs when building a library project. it’s possible, even likely, that the jar files that you convert depend on classes that aren’t in the Codename One library, so your library will fail at runtime in unexpected ways. The reason you could do this with kotlin’s runtime (with some confidence) is because I already analyzed the bytecodes to ensure that they didn’t include anything problematic.
Step 3: Hello World

For your "Hello World" test you will need to create a separate project in your JVM language and produce class files that you will manually copy into an appropriate location of your project. You will want to use the normal tools for the language and not worry about how it integrates with Codename One. For Kotlin, I followed the getting started tutorial on the Kotlin site to create a new Kotlin project in IntelliJ. When Steve ported Mirah, he used a text editor and the mirahc command-line compiler to create my Hello World class. The tools and process will depend on the language.

Here is the "hello world" you created in Kotlin:

package com.mycompany.myapp

class HelloKotlin {

    fun hello() {
        System.out.println("Hello from Kotlin");
    }
}

After building this, I have a directory that contains "com/mycompany/myapp/HelloKotlin.class".

It also produced a.jar file that contains this class.

The easiest way to integrate external code into a Codename One project, is to wrap it as a cn1lib file and place it into my Codename One project’s lib directory. That way you don’t have to mess with any of the build files. So, using roughly the same procedure as you used to create the kotlin-runtime.cn1lib, I wrap my hellokotlin.jar as a cn1lib to produce "hellokotlin.cn1lib" and copy it to the "lib" directory of a Codename One project.

Remember to select "Codename One" → "Refresh CN1Libs" after placing the cn1lib in your lib directory or it won’t get picked up.

Finally, I call my library from the start() method of my app:

public final class KotlinForm extends Form {
    //...
}

If you run this in the Simulator, it should print "Hello from Kotlin" in the output console. If you get an error, then you can dig in and try to figure out what went wrong using my standard debugging techniques. EXPECT an error on the first run. Hopefully it will be a missing import or something simple.

Step 4: A More Complex Hello World

In the case of Kotlin, the hello world example app would actually run without the runtime library because it was so simple. So it was necessary to add a more complex example to prove the need for the runtime library. It doesn’t matter what you do with your more complex example, as long as it doesn’t require classes that aren’t in Codename One.

If you want to use the Codename One inside your project, you should add the CodenameOne.jar (found inside any Codename One project) to your classpath so that it will compile.

Step 5: Automation and Integration

At this point you already have a manual process for incorporating files built with your alternate language into a Codename One project. The process looks like:

  1. Use standard tools for your JVM language to write your code.

  2. Use the JVM language’s standard build tools (for example: command-line compiler, etc..) to compile your code so that you’ve.class files (and optionally a.jar file).

  3. Wrap your.class files in a cn1lib.

  4. Add the cn1lib to the lib directory of a Codename One project.

  5. Use your library from the Codename One project.

When Steve first developed Mirah support he automated this process using an ANT script. He also automatically generated some bootstrap code so that he could develop the whole app in Mirah and he woudn’t have to write any Java. For example, this level of integration has limitations.

For example, with this approach alone, you couldn’t have two-way dependencies between Java source and Mirah source. Yes, Mirah code could use Java libraries (and it did depend on CodenameOne.jar), and my Java code could use my Mirah code. For example, Mirah source code could not depend on the Java source code in my project. This has to do with the order in which code is compiled. it’s a bit of a chicken and egg issue. If you’re building a project that has Java source code and Mirah source code, you’re using two different compilers: mirahc to compile the Mirah files, and javac to compile the Java files. If you’re starting from a clean build, and you run mirahc first, then the.java files haven’t yet been compiled to.class files - and thus mirahc can’t reference them - and any mirah code that depends on those uncompiled Java classes will fail. If you compile the.java files first, then you’ve the opposite problem.

Steve worked around this problem in Mirah by writing my own pseudo-compiler that produced stub class files for the java source that would be referenced by mirahc when compiling the Mirah files. In this way he was able to have two-way dependencies between Java and Mirah in the same project.

Kotlin also supports two-way dependencies, probably using a similar mechanism.

How Seamless Can You Make It?

For both the Kotlin and Mirah support, you wanted integration to be seamless. You didn’t want users to have to create a separate project for their Kotlin/Mirah code. You wanted them to simply add a Kotlin/Mirah file into their project and have it * work*. Achieving this level of integration in Kotlin was easy, since they provide an ANT plugin that essentially allowed me to add one tag inside my <javac/> tags:

<withKotlin/>

And it would automatically handle Kotlin and Java files together: Seamlessly. There are a few places in a Codename One’s build.xml file where you call "javac" so you needed to inject these tags in those places. This injection is performed automatically by the Codename One IntelliJ plugin.

For Mirah, Steve developed his own ANT plugins and Netbeans module that do something similar in Netbeans.

18.16. Update Framework

When you launched Codename One in 2012 you needed a way to ship updates and fixes faster than the plugin update system. So you built the client lib update system. Then you needed a way to update the designer tool (resource editor), the GUI builder & the skins…​ You also needed a system to update the built-in builder code (CodeNameOneBuildClient.jar so you built a tool for that too).

The Update Framework solves many problems in the old systems:

  • Download once - if you’ve many projects the library will download once to the .codenameone directory. All the projects will update from local storage

  • Skins update automatically - this is hugely important. When you change a theme you need to update it in the skins and if you don’t update the skin you might see a difference between the simulator and the device

  • Update of settings/designer without IDE plugin update - The IDE plugin update process is slow and tedious. This way you can push out a bug fix for the GUI builder without going through the process of releasing a new plugin version

For the most part this framework should be seamless. You should no longer see the "downloading" message whenever you push an update after your build client is updated. Your system would poll for a new version daily and update when new updates are available.

You can also use the usual method of Codename One SettingsBasicUpdate Client Libs which will force an update check. Notice that the UI will look a bit different after this update.

18.16.1. How does it Work?

You can see the full code here the gist of it’s simple. You create a jar called UpdateCodenameOne.jar under ~/.codenameone (~ represents the users home directory).

An update happens by running this tool with a path to a Codename One project for example:

java -jar ~/.codenameone/UpdateCodenameOne.jar path_to_my_codenameone_project

For example:

java -jar ~/.codenameone/UpdateCodenameOne.jar ~/dev/AccordionDemo
Checking: JavaSE.jar
Checking: CodeNameOneBuildClient.jar
Checking: CLDC11.jar
Checking: CodenameOne.jar
Checking: CodenameOne_SRC.jar
Checking: designer_1.jar
Checking: guibuilder_1.jar
Updating the file: /Users/shai/dev/AccordionDemo/JavaSE.jar
Updating the file: /Users/shai/dev/AccordionDemo/CodeNameOneBuildClient.jar
Updating the file: /Users/shai/dev/AccordionDemo/lib/CLDC11.jar
Updating the file: /Users/shai/dev/AccordionDemo/lib/CodenameOne.jar
Updated project files

Notice that no download happened since the files were up to date. You can also force a check against the server by adding the force argument as such:

java -jar ~/.codenameone/UpdateCodenameOne.jar path_to_my_codenameone_project

The way this works under the hood is thought a Versions.properties within your directory that lists the versions of local files. That way you know what should be updated.

Exclude Versions.properties from Git

Under the ~/.codenameone directory you’ve a more detailed UpdateStatus.properties file that includes versions of the locally downloaded files. Notice you can delete this file and it will be recreated as all the jars get downloaded over again.

18.16.2. What isn’t Covered

You will notice 3 big things that aren’t covered in this unified framework:

  • You don’t update cn1libs - I am not sure if this is something you would like to update automatically

  • Versioned builds - there is a lot of complexity in the versioned build system. This might be something you address in the future but for now I wanted to keep the framework simple.

19. Security

Security is a "big word". It implies many things and that’s also true for the mobile app development so before we get started lets try to define the scope of security.

You will deal with application security and its communication mechanisms while ignoring everything beyond that scope. Let us start with a simple fact:

Codename One applications are secure on the devices by the nature of the mobile OS security.

For most intents and purposes this will be enough, unless you’re specifically concerned about security this section isn’t for you. Mobile OS’s isolate applications from one another so it’s hard for an application to damage the OS or even damage/spy on a different app.

The restrictions laid on apps are here to make them extra secure and on top of that Codename One lays a few big advantages in terms of security:

  • Codename One code is compiled (unlike e.g. PhoneGap/Cordova)

  • We obfuscate by default which makes the binaries harder to reverse engineer

  • We compile the UI to native code too which means typical reverse engineering code will have a harder time following

  • We disable debug flags so a hacker won’t be able to debug your production app on the device

Despite that you still need to keep in mind that the binary could still be reverse engineered and so it’s important to avoid storing keys in the client side code. E.g. if you’ve an API key to access a service (e.g. Google Cloud key) it needs to be stored in your server and not as a constant in your app!

Each section below discusses some attack vectors against applications and how they can be stopped. Pretty much all of these attacks require a sophisticated attacker which will exist for high value targets (e.g. bank apps, government etc.).

19.1. Constant Obfuscation

One of the first things a hacker will do when compromising an app is look at it. E.g. if I want to exploit a bank’s login UI I would look at the label next to the login and then search for it in the decompiled code. So if the UI has the String "enter user name and password" I can search for that.

It won’t lead directly to a hack or exploit but it will show you the approximate area of the code where you should look and it makes the first step that much easier. Obfuscation helps as it removes descriptive method names but it can’t hide the Strings you use in constants. If an app has a secret key within obfuscating it can make a difference (albeit a slight difference).

Notice that this is a temporary roadblock as any savvy hacker would compile the app and connect a debugger eventually (although this is blocked in release builds) and would be able to inspect values of variables/flow. But the road to reverse engineering the app would be harder even with a simple xor obfuscation.

You aren’t calling this encoding or encryption since it’s neither. it’s a simple obfuscation of the data

There are two simple methods in the Util class:

public static String xorDecode(String s);
public static String xorEncode(String s);

They use a simple xor based obfuscation to make a String less readable. E.g. if you’ve code like this:

private static final String SECRET = "Don't let anyone see this....";

You might be concerned about the secret, then this would make it slightly harder to find out:

// Don't let anyone see this....
private static final String SECRET = Util.xorDecode("RW1tI3Ema219KmpidGFhdTFhdnE1Yn9xajQ1MjM=");

Notice that this is not secure, if you’ve a crucial value that must not be found you need to store it in the server. There is no alternative as everything that’s sent to the client can be compromised by a determined hacker

Use the comment to help you find the string in the code

Our built-in user specific constants are obfuscated with this method, e.g. normally an app built with Codename One carries some internal data such as the user who built the app etc. This is obfuscated now. We built this small app to encode strings easily so you can copy and paste them into our app easily:

Form hi = new Form("Encoder", BoxLayout.y());
TextField bla = new TextField("", "Type Text Here", 20, TextArea.ANY);
TextArea encoded = new TextArea();
SpanLabel decoded = new SpanLabel();
hi.addAll(bla, encoded, decoded);
bla.addDataChangedListener((a, b) -> {
    String s = bla.getText();
    String e = Util.xorEncode(s);
    encoded.setText(e);
    decoded.setText(Util.xorDecode(e));
    hi.getContentPane().animateLayout(100);
});

hi.show();

This allows you to type in the first text field and the second text area shows the encoded result. We used a text area so copy/paste would be easy.

For your convenience this app can be accessed here: https://www.codenameone.com/demos/StringEncoder/index.html

19.2. Storage Encryption

Codename One had support for bouncy castle encryption for quite a while but it isn’t as intuitive as we’d like it to be. This makes securing/encrypting your app more painful than it should.

Codename One supports full encryption of the Storage (notice the distinction, Storage isn’t FileSystemStorage). This is available by installing the bouncy castle cn1lib from the extensions menu then using one line of code

EncryptedStorage.install("your-pass-encryption-key");
Normally you would want that code within your init(Object) method

Notice that you can’t use storage or preferences to store this data as it would be encrypted (Preferences uses Storage internally). You can use a password for this key and it would make it way more secure but if a user changes his password you might have a problem. In that case you might need the old password to migrate to a new password.

This works thru a new mechanism in storage where you can replace the storage instance with another instance using:

Storage.setStorageInstance(new MyCustomStorageSubclass());

You can leverage that knowledge to change the encryption password on the encryption storage using pseudo code like this:

EncryptedStorage.install(oldKey);
InputStream is = Storage.getInstance().createInputStream(storageFileName);
byte[] data = Util.readInputStream(is);
EncryptedStorage.install(newKey);
OutputStream o = Storage.getInstance().createOutputStream("TestEncryption");
o.write(data);
o.close();
It isn’t a good idea to replace storage objects when an app is running so this is purely for this special case…​

If you use preferences it might be a good idea to set their built-in location to a different path using something like Preferences.setPreferencesLocation("EncryptedPreferences");.

This is useful as it prevents the encrypted preferences from colliding with the regular preferences.

19.3. Disabling Screenshots

One of the common security features some apps expect is the ability to block a screenshot. In the past apps like snapchat required that you touch the screen to view a photo to block the ability to grab a screenshot (on iOS). This no longer works…​

Blocking screenshots is implemented by classifying the app window as secure on Android. You can enable this via the build hint android.disableScreenshots=true. Once that’s added screenshots should no longer work for the app, this might impact other things as well such as the task view which will no longer show the screenshot either.

On iOS, you can’t prevent a user from taking a static screenshot, but you can block screen capture/recording while it’s active. This uses UIScreen.isCaptured and its change notification to hide the app contents while a capture session is active. Enable this behavior with the build hint ios.disableScreenshots=true.

19.4. Blocking Copy & Paste

Blocking copy & paste is useful for cases where a device might have spyware installed that monitors the clipboard. This also prevents a user from using a password manager (which usually rely on the clipboard), those managers could be compromised and thus if you’re building a secure app this might be necessary.

You can block copy & paste on Android & iOS. Blocking of copy & paste can be implemented globally or on a specific field.

To block copy & paste globally use:

Display.getInstance().setProperty("blockCopyPaste", "true");

To block copy & paste on a specific field do:

textCmp.putClientProperty("blockCopyPaste", Boolean.TRUE);
Notice that the inverse of using false might not work as expected

19.5. Blocking Jailbreak

iOS & Android are walled gardens which is both a blessing and a curse. Looking at the bright side the walled garden aspect of locked down devices means the devices are more secure by nature. E.g. on a PC that was compromised you can detect the banking details of a user logging into a bank. But on a phone it would be much harder due to the deep process isolation.

This isn’t true for jailbroken or rooted devices. In these devices security has been compromised often with good intentions (opening up the ecosystem) but it can also be used as a step in a serious attack on an application!

For obvious reasons it’s hard to accurately detect a jailbroken or rooted device but when possible if you’ve a high security app you might want to block the functionality or even raise a "silent alarm" in such a case. To detect this you can use the isJailbrokenDevice method as such:

if(Display.getInstance().isJailbrokenDevice()) {
    // probably jailbroken or rooted
} else {
   // probably not
}

Notice that this isn’t accurate, you can’t be 100% sure as there are no official ways to detect jailbreak. that’s why it’s crucial to encrypt everything and assume the device was compromised to begin with when dealing with sensitive data. Still it’s worthwhile to use these API’s to make the life of an attacker a little bit harder.

19.6. Strong Android Certificates

When Android launched RSA1024 with SHA1 was considered strong enough for the foreseeable future, this hasn’t changed completely but the recommendation today is to use stronger cyphers for signing & encrypting as those can be compromised.

APK’s are signed as part of the build process when we upload an app to the Google Play Store. This process seems redundant as we generate the signature/certificate ourselves (unlike Apple which generates it for us). However, this is a crucial step as it allows the device to verify upgrades and make sure a new update is from the same original author!

This means that if a hacker takes over your account on Google Play, he still won’t be able to ship fake updates to your apps without your certificate. that’s important since if a hacker would have access to your certificate he could create an app update that would send him all the users private information e.g. if you’re a bank this could be a disaster.

Android launched with RSA1024/SHA1 as the signing certificates. This was good enough at the time and is still pretty secure. However, these algorithms are slowly eroding and it’s conceivable that within the 10-15 year lifetime of an app they might be compromised using powerful hardware. that’s why Google introduced support for stronger cryptographic signing into newer versions of Android and you can use that.

19.6.1. The Bad News

There is a downside…​

Google introduced that capability in Android 4.3 so using these new keys will break compatibility with older devices. If you’re building a highly secure app this is probably a tradeoff you should accept. If not this might not be worth it for some theoretical benefit.

Furthermore, if your app is already shipping you’re out of luck. Due to the obvious security implications once you shipped an app the certificate is final. Google doesn’t provide a way to update the certificate of a shipping app. Thus this feature applies to apps that aren’t yet in the play store.

19.6.2. The Good

If you’re building a new app this is pretty easy to integrate and requires no changes on your part. Just a new certificate. You can generate the new secure key using instructions in articles like this one.

If you’re using Codename One Setting you can check the box to generate an SHA512 key which will harden the security for the APK.

19.7. Certificate Pinning

When we connect to HTTPS servers our networking code checks the certificate on the server. If the certificate was issued by a trusted certificate authority then the connection goes thru otherwise it fails. Let us imagine a case where I’m sitting in a coffee shop connected to the local wifi, I try to connect to gmail to check my email. Since I use HTTPS to Google I trust my connection is secure.

What if the coffee shop was hacked and the router is listening in on everything?

So HTTPS is encrypted and the way encryption works is thru the certificate. The server sends me a certificate and you can use that to send encrypted data to it.

What if the router grabs the servers certificate and communicates with Google in my name?

This won’t work since the data we send to the server is encrypted with the certificate from the server.

So what if the router sends its own "fake certificate"?

That won’t work either. All certificates are signed by a "certificate authority" indicating that a google.com certificate is valid.

What if I was able to get my fake certificate authorized by a real certificate authority?

that’s a problem!

it’s obviously hard to do but if someone was able to do this he could execute a "man in the middle" attack as described above. People were able to fool certificate authorities in the past and gain fake certificates using various methods so this is possible and probably doable for any government level attacker.

19.7.1. Certificate Pinning

This is the attack certificate pinning (or SSL pinning) aims to prevent. We code into our app the "fingerprint" of the certificate that’s "good" and thus prevent the app from working when the certificate is changed. This might break the app if we replace the certificate at some point but that might be reasonable in such a case.

To do this you’ve a cn1lib. that fetches the certificate fingerprint from the server, you can check this fingerprint against a list of "authorized" keys to decide whether it’s valid. You can install the SSLCertificateFingerprint from the extensions section in Codename One Settings and use something like this to verify your server:

if(CheckCert.isCertCheckingSupported()) {
    String f = CheckCert.getFingerprint(myHttpsURL);
    if(validKeysList.contains(f)) {
        // OK it's a good certificate proceed
    } else {
       if(Dialog.show("Security Warning", "WARNING: it is possible your commmunications are being tampered! We suggest quitting the app at once!", "Quit", "Continue")) {
          Display.getInstance().exitApplication();
       }
    }
} else {
    // certificate fingerprint checking isn't supported on this platform... It's your decision whether to proceed or not
}

Notice that once connection is established you don’t need to verify again for the current application run.

20. Signing, Certificates & Provisioning

In this section we attempt to explain how to acquire certificates for the various platforms and how to set them up.

The good news is that this is usually a "one time issue" and once it’s done the work becomes easier (except for the case of iOS where a provisioning profile should be maintained).

20.1. Common Terms In Signing & Distribution

This section uses some terms that you might not be familiar with if you haven’t used cryptography or built mobile apps before. Here is a quick "FAQ" covering some common terms/concepts in this section.

20.1.1. What Is A Certificate?

Certificates use cryptographic principals to "sign" data (e.g. an application). Think of them as you would think of a company stamp, you use them to sign an app so users know who it’s from.

20.1.2. What Is Provisioning?

Provisioning provides the hints/guidelines for the application install. E.g. if an application needs some service from the OS such as push it can usually request that with provisioning.

In iOS provisioning is separate from the app and you need to also define the devices supported by the app during development.

20.1.3. What’s a Signing Authority?

Normally certificates are issued by a signing authority which is a body that certifies that you’re who you say you’re. Apple issues certificates for iOS and is in effect a signing authority.

Android uses self signed certificates which don’t use a signing authority so anyone can ship an Android app.

The logic with the Android approach is that a signature indicates that you’re the same person who previously shipped the app. Hence an app will be updated with the exact same certificate.

20.1.4. What is UDID?

The UDID is the Universal Device Identifier. It identifies mobile devices uniquely, notice that some operating systems e.g. iOS block access to this value due to privacy concerns.

You need the iOS device UDID value during development to add the device into the list of allowed devices.

don’t use an app to get the UDID!
Most return the wrong value. Use the Finder device summary (macOS), Apple Configurator, or a trusted service such as http://get.udid.io/ which seems to work rather well

20.1.5. Should I Reuse the Same Certificate for All Apps?

For iOS yes. it’s designed to work in that way.

We would recommend it for all platforms for simplicity but some developers prefer creating per-application certificates for Android. The advantage here is that you can transfer ownership of the application later on without giving away what is effectively "you house keys".

20.2. iOS Signing Wizard

Codename One features a wizard to generate certificates/provisioning for iOS without requiring a Mac or deep understanding of the signing process for iOS. There is still support for manually generating the P12/provisioning files when necessary but for most intents and purposes using the wizard will simplify this error prone process significantly.

To generate your certificates and profiles, open project’s properties and click on "iOS" in the left menu. This will show the "iOS Signing" panel that includes fields to select your certificates and mobile provisioning profiles.

Netbeans iOS Signing properties panel
Figure 461. Netbeans iOS Signing properties panel

If you already have valid certificates and profiles, you can enter their locations here. If you don’t, then you can use the wizard by clicking the Generate button in the lower part of the form.

20.2.1. Logging into the Wizard

After clicking Generate you’ll be shown a login form. Log into this form using the App Store Connect Apple ID that’s registered on your Apple Developer Program team. NOT YOUR CODENAME ONE LOGIN.

Wizard login form
Figure 462. Wizard login form

20.2.2. Selecting Devices

Once you’re logged in you will be shown a list of all of the devices that you currently have registered on your Apple developer account.

Devices form
Figure 463. Devices form

Select the ones that you want to include in your provisioning profile and click next.

Apple currently allows up to 100 devices per device type (iPhone, iPad, Apple Watch, Apple TV, and Apple Vision) for testing purposes in each membership year. Make sure every device you intend to install builds on is registered here before you generate a new provisioning profile.
After selecting devices
Figure 464. After selecting devices

If you don’t have any devices registered yet, you can click the "Add New Device" button, which will prompt you to enter the UDID for your device.

20.2.3. Decisions & Edge Cases

If you already have iOS P12 development/distribution certificates you should reuse them for all your apps from that account and you shouldn’t regenerate them

After you click Next on the device form, the wizard checks to see if you already have a valid certificate. If your project already has a valid certificate and it matches the one that’s currently active in your apple developer account, then it will use the same certificate. If the certificate doesn’t match the currently-active one, or you haven’t provided a certificate, you will be prompted to overwrite the old certificate with a new one.

Prompt to overwrite existing certificate
Figure 465. Prompt to overwrite existing certificate
Prompt to overwrite other certificate
Figure 466. Prompt to overwrite other certificate

The same decision need to be made twice: Once for the development certificate, and once for the App Store distribution certificate.

Each Apple Developer account can have three active iOS Development certificates and three active iOS Distribution certificates at a time. Reuse existing certificates whenever possible to avoid hitting this limit.
You can revoke a certificate when you’ve an application in the store shipping with said certificate!
This won’t affect the shipping app see this.
Why Two Certificates?

A typical iOS app has at least two certificates:

  • Development - this is used during development and can’t be shipped to 3rd parties. An application signed with this certificate can only be installed on one of the up to 100 devices listed above.

  • Distribution - this is used when you’re ready to upload your app to App Store Connect whether for final shipping or beta testing. Notice that you can’t install a distribution build on your own device. You need to upload it to App Store Connect.

  • There are two push certificates, they are separate from the signing certificates. don’t confuse them!
    They are used to authenticate with Apple when sending push messages.

20.2.4. App IDs and Provisioning Profiles

The next form in the wizard asks for your app’s bundle ID. This should have been pre-filled, but you can change the app ID to a wildcard ID if you prefer.

Enter the app bundle ID
Figure 467. Enter the app bundle ID
Wildcard Card Provisioning

Wildcard ids such as com.mycompany.\* or even \* allow you to create one generic certificate to use with all applications. This is remarkably useful for the global settings dialog and allows you to create an app without launching the wizard. Notice that wildcards apps can’t use features such as push etc.

You can set the global defaults for the IDE by going to IDE settings/preferences and setting default values e.g.:

Setting the development certificate and a global \* provisioning profile allows you to create a new app and built it to device without running the certificate wizard. Notice that you will need to run it when going into production
Figure 468. Setting the development certificate and a global \* provisioning profile allows you to create a new app and built it to device without running the certificate wizard. Notice that you will need to run it when going into production

20.2.5. Installing Files Locally

Once the wizard is finished generating your provisioning profiles, you should click "Install Locally", which will open a file dialog for you to navigate to a folder in which to store the generated files.

Install files locally
Figure 469. Install files locally
Select directory to save files in
Figure 470. Select directory to save files in
Final Done Message
Figure 471. Final Done Message
You can see the password for the P12 files in the codenameone_settings.properties file. You can use the values defined there when creating a new application

20.2.6. Building Your App

After selecting your local install location, and closing the wizard, you should see the fields of the "iOS Signing" properties panel filled in correctly. You should now be able to send iOS debug or App Store builds without the usual hassles.

Filled in signing panel after wizard complete
Figure 472. Filled in signing panel after wizard complete

20.3. Advanced iOS Signing

You should use the certificate wizard, especially if you don’t have a Mac. This section is here mostly for reference and edge cases that don’t work with the certificate wizard

iOS signing has two distinct modes: App Store signing which is valid for distribution via App Store Connect (you won’t be able to run the resulting application without submitting it to Apple) and development mode signing.

you’ve two major files to keep track of:

  1. Certificate - your signature

  2. Provisioning Profile - details about the application and who is allowed to execute it

You need two versions of each file (4 total files) one pair is for development and the other pair is for uploading to App Store Connect.

You need to use a Mac in order to create a certificate file for iOS

The first step you need to accomplish is signing up as a developer to Apple’s iOS development program, even for testing on a device this is required!
This step requires that you pay Apple on an annual basis.

The Apple website will guide you through the process of applying for a certificate at the end of this process you should have a distribution and development certificate pair. After that point you can login to the iOS provisioning portal where there are plenty of videos and tutorials to guide you through the process. Within the iOS provisioning portal you need to create an application ID and register your development devices.

You can then create a provisioning profile which comes in two flavors:

  • Distribution - for building the release version of your application

  • Development - the development provisioning profile needs to contain the devices on which you want to test.

You can then configure the 4 files in the IDE and start sending builds to the Codename One cloud.

20.4. Provisioning Profile & Certificates Visual Guide

One of the hardest parts in developing for iOS is the certificate & provisioning process. In this step by step guide we walk over the manual certificate generation process. Notice that the UI for the Apple website changes occasionally but the basic process remains the same…​

Start by logging in to the iOS-provisioning portal

Log into IOS provisioning portal
Figure 473. Login for the iOS provisioning portal

In the certificates section you can download your development and distribution certificates.

Download development provisioning profile
Figure 474. Download development provisioning profile
Download distribution provisioning profile
Figure 475. Download distribution provisioning profile

In the devices section add device ids for the development devices you want to support. Notice no more than 100 devices are supported!

Add devices
Figure 476. Add devices

Create an application id; it should match the package identifier of your application perfectly!

Create application id
Figure 477. Create application id

Create a provisioning profile for development, make sure to select the right app and make sure to add the devices you want to use during debug.

Create provisioning profile step 1
Figure 478. Create provisioning profile step 1
Create provisioning profile step 2
Figure 479. Create provisioning profile step 2

Refresh the screen to see the profile you created and press the download button to download your development provisioning profile.

Create provisioning profile step 3
Figure 480. Create provisioning profile step 3

Create a distribution provisioning profile; it will be used when uploading to the App Store. There is no need to specify devices here.

Create distribution provisioning profile
Figure 481. Create distribution provisioning profile

Download the distribution provisioning profile.

Download distribution provisioning profile
Figure 482. Download distribution provisioning profile

You can now import the cer files into the key chain tool on a Mac by double clicking the file, on Windows the process is slightly more elaborate

Import cer files
Figure 483. Import cer files

You can export the p12 files for the distribution and development profiles through the keychain tool

Export p12 files
Figure 484. Export p12 files

In the IDE we enter the project settings, configure our provisioning profile, the password we typed when exporting and the p12 certificates. it’s now possible to send the build to the server.

IOS Project Settings
Figure 485. IOS Project Settings

20.4.1. Configuring codenameone_settings.properties for Manual Signing

The Codename One build servers read signing assets from codenameone_settings.properties. When you bypass the signing wizard, populate the following keys manually so the packaging process can locate your certificates, provisioning profiles, and keystores:

iOS

  • codename1.ios.debug.certificate / codename1.ios.debug.certificatePassword / codename1.ios.debug.provision – Development P12 and provisioning profile for device/debug builds.

  • codename1.ios.release.certificate / codename1.ios.release.certificatePassword / codename1.ios.release.provision – Distribution P12 and provisioning profile for App Store/TestFlight builds.

  • codename1.ios.certificate, codename1.ios.certificatePassword, and codename1.ios.provision – Legacy/global defaults. The IDE uses these as fallbacks when the debug/release-specific properties are blank, so keep them aligned with your preferred certificates.

Paths may be absolute or relative to the project directory. The passwords must match the values you used when exporting the P12 files from Keychain Access.

Android

  • codename1.android.keystore – Path to the Android keystore (.ks or .keystore).

  • codename1.android.keystorePassword – Password protecting the keystore and key entry.

  • codename1.android.keystoreAlias – Alias of the keypair used to sign the APK/AAB.

If the keystore fields are empty the Maven and Ant builders will create a default keystore, but production apps should commit the real paths and credentials so reproducible builds use your long-lived signing key.

20.4.2. iOS Code Signing Failure Checklist

Below is a list of common issues when singing and a set of suggestions for things to check. Notice that some of these signing failures will sometimes manifest themselves during build and sometimes will manifest during the install of the application.

Most of these issues aren’t applicable when using the wizard e.g. a Mac isn’t required for the certificate wizard as it uses the Codename One cloud
  • You must use a Mac to generate P12 certificates manually. The workaround we found is the certificate wizard!

    Notice that this is something you need to do once a year (generate P12), you will also need a Mac to upload your final app to the store at this time.

  • When exporting the P12 certificate make sure that you selected BOTH the public and the private keys as illustrated here. If you see one entry (no private key) then you created the CSR (singing request) on a different machine than the one where you imported the resulting CER file.

    P12 Export
    Figure 486. p12 export
  • Make sure the package matches between the main preferences screen in the IDE and the iOS settings screen.

    Package ID matching App ID
    Figure 487. Package ID matching App ID
  • Make sure the prefix for the app id in the iOS section of the preferences matches the one you’ve from Apple

    App prefix
    Figure 488. App prefix
  • Make sure your provisioning profile’s app id matches your package name or is a * provisioning profile. Both are sampled in the pictures below, notice that you would need an actual package name for push/in-app-purchase support as well as for app store distribution.

    The star (*) Provisioning Profile
    Figure 489. The star (*) Provisioning Profile
    Provisioning Profile with app id
    Figure 490. Provisioning Profile with app id
  • Make sure the certificate and provisioning profile are from the same source (if you work with multiple accounts), notice that provisioning profiles and certificates expire so you will need to regenerate provisioning when your certificate expires or is revoked.

  • If you declare push in the provisioning profile then ios.includePush (in the build arguments) MUST be set to true, otherwise it MUST be set to false (see pictures below). Notice that this should be configured via the UI in the iOS section. The build server automatically enables the notification entitlement when your project uses LocalNotification, even if ios.includePush is false, so don’t try to disable the entitlement manually to "fix" warning messages from App Store Connect.

    Include push build hint
    Figure 491. Include push build hint

20.5. Android

Signing Android applications is trivial when compared to the pain of iOS signing.

The NetBeans and Eclipse plugins have a simple wizard to generate the certificate that you can launch by pressing this button:

Android keystore generation wizard
Figure 492. Android keystore generation wizard

Then fill out your details and password in the form:

UI for Android certificate details
Figure 493. UI for Android certificate details

This will seamlessly generate a certificate for your project, you can reuse it for other projects as well.

20.5.1. Generating an Android Certificate Manually

You need the JDK’s keytool executable (it should be under the JDK’s bin directory) and execute the following command:

keytool -genkey -keystore Keystore.ks -alias [alias_name] -keyalg RSA -keysize 2048 -validity 15000 -dname "CN=[full name], OU=[ou], O=[comp], L=[City], S=[State], C=[Country Code]" -storepass [password] -keypass [password]

The elements in the brackets should be filled up based on this:

Alias: [alias_name] (just use your name/company name without spaces)
Full name: [full name]
Organizational Unit: [ou]
Company: [comp]
City: [City]
State: [State]
CountryCode: [Country Code]
Password: [password] (we expect both passwords to be identical)

Executing the command will produce a Keystore.ks file in that directory which you need to keep since if you lose it you will no longer be able to upgrade your applications! Fill in the appropriate details in the project properties or in the CodenameOne section in the Netbeans preferences dialog.

21. Working with iOS

21.1. Troubleshooting iOS debug build installs

If you’ve access to a Mac, connect the device, open Xcode, and use the device explorer console to inspect messages that may explain what went wrong. If not, check the following:

  • Make sure you built the debug version and not the App Store version. The App Store version won’t install on the device and can be distributed through Apple’s store or TestFlight.

  • Check that the UDID is correct. If you got the UDID from an app, it’s probably wrong because apps no longer have access to the device UDID. Get it from the iOS Settings app or iTunes.

  • Make sure the device isn’t locked for installing third-party apps. This can happen on devices configured with parental controls.

  • Check that you own the package name. For example, if you previously installed an app with the same package name but a different certificate, a new install will fail. This is true for Android too. If you installed the kitchen sink from the store and then built your own app with the same package name, the install will collide.

  • This can be a problem if you use a generic package name that someone else already claimed, so use your own domain.

  • Make sure the device has a recent enough version of iOS for the dependencies. As of 2024, Codename One builds target iOS 12.0 or newer by default. You can raise the requirement with the ios.deployment_target build hint if a library needs a newer version.

  • Verify that you’re using Safari when installing on the device. If you used a cable, that isn’t a problem. Some developers had issues with Firefox not launching the install process.

  • Check that the ios.includePush build hint matches your iOS provisioning. It must be false if your provisioning profile doesn’t include push.

21.2. Launch screen storyboard best practices

Launch screen storyboards are the default approach for Codename One iOS builds. Apple requires a storyboard-based launch experience for modern devices, so the legacy screenshot generator was removed in favour of a single adaptive layout. You can still opt back into the old behaviour by setting the ios.generateSplashScreens=true build hint, but it’s best to use a storyboard unless your use case can’t be expressed with Auto Layout.

21.2.1. Key Files

The build server provides a minimal launch storyboard automatically. Customize it by adding any of the following files under your project’s native/ios directory:

  1. Launch.Foreground.png - Shown in the center of the screen instead of your app icon.

  2. Launch.Background.png - Drawn behind the content to provide a color or illustration.

  3. LaunchScreen.storyboard - A custom storyboard created in Xcode that replaces the default layout entirely.

Make sure to add the ios.multitasking=true build hint or your launch storyboard won’t be used.

21.2.2. Designing a Flexible Layout

Keep the launch storyboard simple and static. The layout is rendered before your app code runs, so avoid views that depend on live data or animation. Follow these guidelines when editing LaunchScreen.storyboard in Xcode:

  • Use Auto Layout constraints and safe-area guides so the design scales to every device, including split view on iPad.

  • Prefer system colors or vector/PDF assets for logos so the result stays crisp on high-density screens and supports Dark Mode.

  • Reserve text for short taglines or status messages that don’t need localization at launch. Dynamic localization isn’t available.

  • Avoid referencing application delegate outlets or custom classes. Only design-time UIKit elements are supported.

21.2.3. Asset Reference

The default storyboard expects PNG assets with the following characteristics. All sizes are specified in points (pt). Supply @2x and @3x variants for Retina displays when possible.

Table 13. Launch Screen Asset Reference
AssetPurposeSuggested 1x dimensionsNotes

Launch.Foreground.png

Brand mark centered on screen

152×152

Provide optional Launch.Foreground@2x.png (304×304) and Launch.Foreground@3x.png (456×456) for sharper output. Use transparency to let the background show through.

Launch.Background.png

Full-screen backdrop

1024×1024

Supply complementary Launch.Background@2x.png (2048×2048) and Launch.Background@3x.png (3072×3072) if you rely on artwork instead of a flat color. Keep file sizes small (<2 MB) to avoid slowing startup.

LaunchScreen.storyboard

Complete custom layout

N/A

Target iOS 12.0 and later, enable Auto Layout, and include constraints for every view. Avoid timers or code connections.

21.2.4. Testing changes

Changes to the launch screen don’t take effect until the device has been restarted. If you install your app on a device, then change the launch screen and update the app, the launch screen won’t change until the device is restarted.

When iterating locally with a Mac, open the generated Xcode project and run it on a device or simulator to verify that the layout adapts correctly. On Windows or Linux, submit a TestFlight or Ad Hoc build and validate on hardware before shipping.

21.3. Local Notifications on iOS and Android

Local notifications are similar to push notifications, except that they are initiated locally by the app, rather than remotely. They are useful for communicating information to the user while the app is running in the background, since they manifest themselves as pop-up notifications on supported devices.

To set the notification icon on Android place a 24x24 icon named ic_stat_notify.png under the native/android folder of the app. The icon can be white with transparency areas

21.3.1. Sending Notifications

The process for sending a notification is:

  1. Create a LocalNotification object with the information you want to send in the notification.

  2. Pass the object to Display.scheduleLocalNotification().

Notifications can either be set up as one-time or as repeating.

Example Sending Notification
LocalNotification n = new LocalNotification();
n.setId("demo-notification");
n.setAlertBody("it's time to take a break and look at me");
n.setAlertTitle("Break Time!");
n.setAlertSound("beep-01a.mp3");

Display.getInstance().scheduleLocalNotification(
 n,
 System.currentTimeMillis() + 10 * 1000, // fire date/time
 LocalNotification.REPEAT_MINUTE // Whether to repeat and what frequency
);
On iOS, scheduling a local notification with an id that already exists now replaces the previously scheduled notification with that same id instead of keeping duplicates.

The resulting notification will look like

Resulting notification in iOS
Figure 494. Resulting notification in iOS

21.3.2. Receiving Notifications

The API for receiving/handling local notifications is also similar to push. Your application’s main lifecycle class needs to implement the com.codename1.notifications.LocalNotificationCallback interface which includes a single method:

public void localNotificationReceived(String notificationId)

The notificationId parameter will match the id value of the notification as set using LocalNotification.setId().

Example Receiving Notification
public class BackgroundLocationDemo implements LocalNotificationCallback {
 //...

 public void init(Object context) {
 //...
 }

 public void start() {
 //...

 }

 public void stop() {
 //...
 }

 public void destroy() {
 //...
 }

 public void localNotificationReceived(String notificationId) {
 System.out.println("Received local notification "+notificationId);
 }
}
localNotificationReceived() is called when the user responds to the notification by tapping on the alert. If the user doesn’t click on the notification, then this event handler will never be fired.

21.3.3. Canceling Notifications

Repeating notifications will continue until they are canceled by the app. You can cancel a single notification by calling:

Display.getInstance().cancelLocalNotification(notificationId);

Where notificationId is the string id that was set for the notification using LocalNotification.setId().

21.4. iOS Beta Testing (Testflight)

Apple provides the ability to distribute beta versions of your application to beta testers using testflight. This allows you to recruit up to 1000 beta testers without the typical UDID limits a typical Apple account has.

This is supported for pro users as part of the crash protection feature.

To take advantage of that capability use the build hint ios.testFlight=true and then submit the app to the store for beta testing. Make sure to use a release build target.

21.5. Accessing Insecure URL’s

Due to security exploits Apple blocked some access to insecure URL’s which means that http code that worked before could stop working for you on iOS 9+. This is generally a good move, you should use https and avoid http as much as possible but that’s sometimes impractical especially when working with an internal or debug environment.

You can disable the strict URL checks from Apple by using the venerable ios.plistInject build hint and setting it to:

<key>NSAppTransportSecurity</key><dict><key>NSAllowsArbitraryLoads</key><true/></dict>

For example, it seems that Apple will reject your app if you include that and don’t have a good reason.

21.6. Using Cocoapods

CocoaPods remains fully supported, but it’s no longer the only supported iOS dependency path. Swift Package Manager (SPM) is also supported. The current guidance is documented in this section.

CocoaPods is a dependency manager for Swift and Objective-C Cocoa projects. It has over eighteen thousand libraries and can help you scale your projects elegantly. Cocoapods can be used in your Codename One project to include native iOS libraries without having to go through the hassle of bundling the actual library into your project. Rather than bundling .h and .a files in your ios/native directory, you can specify which "pods" your app uses through the ios.pods build hint. (There are other build hints also if you need more advanced features).

Examples

Include the AFNetworking library in your app:

ios.pods=AFNetworking

Include the AFNetworking version 3.0.x library in your app:

ios.pods=AFNetworking ~> 3.0

For full versioning syntax specifying pods see the Podfile spec for the "pod" directive.

21.6.1. Including Multiple Pods

Multiple pods can be separated by either commas or semi-colons in the value of the ios.pods build hint. For example: To include GoogleMaps and AFNetworking, you could:

ios.pods=GoogleMaps,AFNetworking

Or specifying versions:

ios.pods=AFNetworking ~> 3.0,GoogleMaps

ios.pods.platform : The minimum platform to target. In some cases, Cocoapods require functionality that isn’t in older version of iOS. For example, the GoogleMaps pod requires iOS 7.0 or higher, so you would need to add the ios.pods.platform=7.0 build hint.

ios.pods.sources : Some pods require that you specify a URL for the source of the pod spec. This may be optional if the spec is hosted in the central CocoaPods source (https://github.com/CocoaPods/Specs.git).

21.6.3. Converting PodFile To Build Hints

Most documentation for Cocoapods "pods" provide instructions on what you need to add to your Xcode project’s PodFile. Here is an example from the GoogleMaps cocoapod to show you how a PodFile can be converted into equivalent build hints in a Codename One project.

The GoogleMaps cocoapod directs you to add the following to your PodFile:

source 'https://github.com/CocoaPods/Specs.git'
platform :ios, '7.0'
pod 'GoogleMaps'

This would translate to the following build hints in your Codename One project:

ios.pods.sources=https://github.com/CocoaPods/Specs.git
ios.pods.platform=7.0
ios.pods=GoogleMaps

(Note that the ios.pods.sources directive is optional).

21.7. Using Swift Package Manager

Swift Package Manager can be used as an alternative to CocoaPods for remote Swift package dependencies on iOS. Select the dependency path with ios.dependencyManager. Supported values are auto, cocoapods, spm, and both.

For an SPM-only configuration, declare the packages in ios.spm.packages using the format <identity>|<url>|<requirement> and then declare the products to link using ios.spm.products.<identity>.

ios.dependencyManager=spm
ios.spm.packages=swift-collections|https://github.com/apple/swift-collections.git|from:1.1.0
ios.spm.products.swift-collections=Collections

Supported requirement formats are from:, exact:, branch:, revision:, and range:.

ios.dependencyManager=auto preserves backward compatibility. Existing projects with ios.pods continue to use CocoaPods. Projects with ios.spm.* use SPM. If both hint families are present, both are applied.

21.8. Including Dynamic Frameworks

If you need to use a dynamic framework (for example: SomeThirdPartySDK.framework), and it isn’t available through cocoapods, then you can add it to your project by simply zipping up the framework and copying it to your native/ios directory.

for example: native/ios/SomeThirdPartySDK.framework.zip

There are no build hints necessary for this approach. The build server will automatically detect the framework and link it into your app.

22. Working with JavaScript

This section covers the Codename One Javascript port, which allows you to compile your app as native javascript and run it inside a browser. This is different from the BrowserComponent and other methods of displaying HTML/Javascript inside a Codename One app.

22.1. Limitations of the Javascript Port

22.1.1. No Multithreaded Code inside Static Initializers

This section pertains to Codename One 3.6 and older. Newer versions of Codename One support multithreaded code inside static initializers now.

Codename One’s Javascript port uses TeaVM to compile your application directly to Javascript so that it can run inside modern web browsers without the need for any plugins (i.e. NOT as an applet). One of the revolutionary features that TeaVM provides is the ability to run multi-threaded code (i.e. it has full support for Object.wait(), Object.notify(), Object.notifyAll(), and the synchronized keyword). The one caveat to be aware of is that you can’t use any threading primitives inside static initializers. This is due to technical limitations in the browser environment and the way that TeaVM compiles class definitions into Javascript. The workaround for this issue is to do lazy initialization in cases where you need to use multithreaded code.

Example

The following code will result in a build error when deploying a Javascript build:

Class1.java

import com.codename1.io.Log;
class Class1 {
    public static int getValue() {
        Log.p("Hello world");
        return 1;
    }
}

Class2.java

class Class2 {
    public static int value = Class1.getValue();

}

This fails because Class2 calls Class1.getValue() in its static initializer, and getValue() calls Log.p(), which, underneath the covers, writes to Storage - which involves some synchronous network access in the Javascript port (i.e. it uses wait() and notify() under the hood.

If we simply remove the call to Log.p() from getValue(), as follows:

    public static int getValue() {
        return 1;
    }

Then everything would be fine.

But How do we Know if A method includes wait()/notify somewhere along the line?

When you try to build your app as a Javascript app, it will fail (if code in your static initializers uses wait()/notify() somewhere along the line).

How to Work Around this Issue

Use lazy initialization wherever you can. You don’t need to worry about this for setting static variables to literal values. E.g.: static int someVal = 20; will always be fine. But static int someVal = OtherClass.calculateSomeVal(); may or may not be fine, because you don’t know whether calculateSomeVal() uses a wait/notify. So instead of initializing someVal in the static initializer, create a static accessor that lazily initializes it. Or initialize it inside your app’s init() method. Or initialize it inside the class constructor.

22.2. Troubleshooting Build Errors

If your Javascript build fails, you should download the error log and see what the problem is. The most common errors are:

  1. "[ERROR] Method XXX.<clinit>()V is claimed to be synchronous, but it’s has invocations of asynchronous methods"

    This error will occur if you’ve static initializers that use multithreaded code (e.g. wait/notify/sleep, etc…​). See Static Initializers for information about troubleshooting this error. In some cases TeaVM may give a false-positive here (i.e. it thinks you’re doing some multithreaded stuff, but you’re not), then you can force the build to "succeed" by adding the javascript.stopOnErrors=false build hint.

  2. "Method XXX was not found"

    TeaVM uses its own Java runtime library. it’s mostly complete, but you may occasionally run into methods that haven’t been implemented. If you run into errors saying that certain classes or methods were not found, please post them to the Codename One issue tracker. You can also work around these by changing your own code to not use such functions. If this missing method doesn’t fall on a critical path on your app, you can also force the app to still build despite this error by adding the javascript.stopOnErrors=false build hint.

22.3. ZIP, WAR, or Preview. What’s the difference?

The Javascript build target will result in up to three different bundles being generated:

  1. YourApp-1.0.war

  2. YourApp-1.0.zip

  3. YourApp-1.0-Preview.html

YourApp-1.0.war is a self contained application bundle that can be installed in any JavaEE servlet container. If you haven’t customized any proxy settings, then the application will be configured to use a proxy servlet that’s embedded into the.war file.

As an example, the PropertyCross.war file contains the following files:

$ jar tvf PropertyCross-1.0.war
     0 Thu Apr 30 15:57:38 PDT 2015 META-INF/
   132 Thu Apr 30 15:57:36 PDT 2015 META-INF/MANIFEST.MF
     0 Thu Apr 30 15:57:36 PDT 2015 assets/
     0 Thu Apr 30 15:57:36 PDT 2015 assets/META-INF/
     0 Thu Apr 30 15:57:36 PDT 2015 js/
     0 Thu Apr 30 15:57:36 PDT 2015 teavm/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/classes/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/classes/com/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/classes/com/codename1/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/classes/com/codename1/corsproxy/
     0 Thu Apr 30 15:57:36 PDT 2015 WEB-INF/lib/
 27568 Thu Apr 30 15:57:12 PDT 2015 assets/CN1Resource.res
306312 Thu Apr 30 15:57:12 PDT 2015 assets/iOS7Theme.res
427737 Thu Apr 30 15:57:12 PDT 2015 assets/iPhoneTheme.res
   350 Thu Apr 30 15:57:12 PDT 2015 assets/META-INF/MANIFEST.MF
 92671 Thu Apr 30 15:57:12 PDT 2015 assets/theme.res
 23549 Thu Apr 30 15:57:14 PDT 2015 icon.png
  2976 Thu Apr 30 15:57:14 PDT 2015 index.html
 30695 Thu Apr 30 15:57:12 PDT 2015 js/fontmetrics.js
 84319 Thu Apr 30 15:57:12 PDT 2015 js/jquery.min.js
 13261 Thu Apr 30 15:57:12 PDT 2015 progress.gif
  2816 Thu Apr 30 15:57:12 PDT 2015 style.css
1886163 Thu Apr 30 15:57:36 PDT 2015 teavm/classes.js
359150 Thu Apr 30 15:57:36 PDT 2015 teavm/classes.js.map
1147502 Thu Apr 30 15:57:36 PDT 2015 teavm/classes.js.teavmdbg
 30325 Thu Apr 30 15:57:36 PDT 2015 teavm/runtime.js
  1011 Thu Apr 30 15:57:18 PDT 2015 WEB-INF/classes/com/codename1/corsproxy/CORSProxy.class
232771 Wed Nov 05 17:35:12 PST 2014 WEB-INF/lib/commons-codec-1.6.jar
 62050 Wed Apr 15 14:35:56 PDT 2015 WEB-INF/lib/commons-logging-1.1.3.jar
590004 Wed Apr 15 14:35:58 PDT 2015 WEB-INF/lib/httpclient-4.3.4.jar
282269 Wed Apr 15 14:35:56 PDT 2015 WEB-INF/lib/httpcore-4.3.2.jar
 14527 Wed Apr 15 14:35:56 PDT 2015 WEB-INF/lib/smiley-http-proxy-servlet-1.6.jar
   903 Thu Apr 30 15:57:12 PDT 2015 WEB-INF/web.xml
  9458 Thu Apr 30 15:57:14 PDT 2015 META-INF/maven/com.propertycross/PropertyCross/pom.xml
   113 Thu Apr 30 15:57:36 PDT 2015 META-INF/maven/com.propertycross/PropertyCross/pom.properties

Some things to note in this file listing:

  1. The index.html file is the entry point to the application.

  2. CORSProxy.class is the proxy servlet for making network requests to other domains.

  3. The assets directory contains all of your application’s jar resources. All resource files in your app will end up in this directory.

  4. The teavm directory contains all of the generated javascript for your application. Notice that there are some debugging files generated (classes.js.map and classes.js.teavmdbg). These aren’t normally loaded by the browser when your app is run, but they can be used by Chrome when you’re doing debugging.

  5. The jar files in the WEB-INF/lib directory are dependencies of the proxy servlet. They aren’t required for your app to run - unless you’re using the proxy.

YourApp-1.0.zip is appropriate for deploying the application on any web server. It contains all of the same files as the.war file, excluding the WEB-INF directory (i.e. it doesn’t include any servlets, class files, or Java libraries - it contains purely client-side javascript files and HTML).

As an example, this is a listing of the files in the zip distribution of the PropertyCross demo:

$ unzip -vl PropertyCross-1.0.zip
Archive:  /path/to/PropertyCross-1.0.zip
 Length   Method    Size  Ratio   Date   Time   CRC-32    Name
--------  ------  ------- -----   ----   ----   ------    ----
   27568  Defl:N    26583   4%  04-30-15 15:57  9dc91739  assets/CN1Resource.res
  306312  Defl:N   125797  59%  04-30-15 15:57  0b5c1c3a  assets/iOS7Theme.res
  427737  Defl:N   218975  49%  04-30-15 15:57  3de499c8  assets/iPhoneTheme.res
     350  Defl:N      241  31%  04-30-15 15:57  7e7e3714  assets/META-INF/MANIFEST.MF
   92671  Defl:N    91829   1%  04-30-15 15:57  004ad9d7  assets/theme.res
   23549  Defl:N    23452   0%  04-30-15 15:57  acd79066  icon.png
    2903  Defl:N     1149  60%  04-30-15 15:57  e5341de1  index.html
   30695  Defl:N     7937  74%  04-30-15 15:57  2e008f6c  js/fontmetrics.js
   84319  Defl:N    29541  65%  04-30-15 15:57  15b91689  js/jquery.min.js
   13261  Defl:N    11944  10%  04-30-15 15:57  51b895c7  progress.gif
    2816  Defl:N      653  77%  04-30-15 15:57  a12159c7  style.css
 1886163  Defl:N   315437  83%  04-30-15 15:57  2b34c50f  teavm/classes.js
  359150  Defl:N    92874  74%  04-30-15 15:57  30abdf13  teavm/classes.js.map
 1147502  Defl:N   470472  59%  04-30-15 15:57  e5c456f7  teavm/classes.js.teavmdbg
   30325  Defl:N     5859  81%  04-30-15 15:57  46651f06  teavm/runtime.js
--------          -------  ---                            -------
 4435321          1422743  68%                            15 files

You’ll notice that it has many of the same files as the.war distribution. it’s missing the the proxy servlet and dependencies.

YourApp-1.0-Preview.html is a single-page HTML file with all of the application’s resources embedded into a single page. This is generated for convenience so that you can preview your application on the build server directly. While you could use this file in production, you’re probably better to use the ZIP or WAR distribution instead as some mobile devices have file size limitations that may cause problems for the "one large single file" approach. If you do decide to use this file for your production app (i.e. copy the file to your own web server), you will need to change the proxy settings, as it’s configured to use the proxy on the Codename One build server - which won’t be available when the app is hosted on a different server.

22.4. Setting up a Proxy for Network Requests

The Codename One API includes a network layer (the NetworkManager and ConnectionRequest classes) that allows you to make HTTP requests to arbitrary destinations. When an application is running inside a browser as a Javascript app, it’s constrained by the same origin policy. You can make network requests to the same host that served the app originally.

E.g. If your application is hosted at http://example.com/myapp/index.html, then your app will be able to perform network requests to retrieve other resources under the example.com domain, but it won’t be able to retrieve resources from example2.com, foo.net, etc..

The HTTP standard does support cross-origin requests in the browser via the Access-Control-Allow-Origin HTTP header. Some web services supply this header when serving resources, but not all. The way to be make network requests to arbitrary resources is to do it through a proxy.

Luckily there is a solution. The.war javascript distribution includes an embedded proxy servlet, and your application is configured, by default, to use this servlet. If you intend to use the.war distribution, then it should work. You shouldn’t need to do anything to configure the proxy.

If, however, you’re using the.zip distribution or the single-file preview, you will need to set up a Proxy servlet and configure your application to use it for its network requests.

22.4.1. Step 1: Setting up a Proxy

This section is relevant if you’re using the.zip or single-file distributions of your app. You shouldn’t need to set up a proxy for the.war distribution since it includes a proxy built-in.

The easiest way to set up a proxy is to use the Codename One cors-proxy project. This is the open-source project from which the proxy in the.war distribution is derived. Simply download and install the cors-proxy.war file in your JavaEE compatible servlet container.

If you don’t want to install the.war file, but would rather copy the proxy servlet into an existing web project, you can do that also. See the cors-proxy wiki for more information about this.

22.4.2. Step 2: Configuring your Application to use the Proxy

There are three ways to configure your application to use your proxy.

  1. Using the javascript.proxy.url build hint.

    E.g.:

    javascript.proxy.url=http://example.com/myapp/cn1-cors-proxy?_target=
  2. By modifying your app’s index.html file after the build.

    E.g.:

    <script type="text/javascript">
        window.cn1CORSProxyURL='http://example.com/myapp/cn1-cors-proxy?_target=';
    </script>
  3. By setting the javascript.proxy.url property in your Java source. Generally you would do this inside your init() method, but it has to be executed before you make a network request that requires the proxy.

    Display.getInstance().setProperty(
            "javascript.proxy.url",
            "http://example.com/myapp/cn1-cors-proxy?_target="
    );

The method you choose will depend on the workflow that you prefer. Options #1 and #3 will almost always result in fewer changes than #2 because you’ve to set them up once, and the builds will retain the settings each time you build your project.

22.5. Using the CORS Proxy for Same Origin Requests

By default, the CORS proxy is used for HTTP requests to URLS at a different domain than the one that the app is running in. There are some circumstances where you may want to even use the proxy for same domain requests. You can do this by setting the javascript.useProxyForSameDomain display property to true. E.g.

Display.getInstance().setProperty("javascript.useProxyForSameDomain", "true");

Why would you want to do this?

The browser shields some HTTP headers (e.g. "Set-Cookie") from Javascript so that your app can’t access them. Going through the proxy works around this limitation by copying and encoding such headers in a format that the browser will allow, and then decoding them client-side to make them available to your app seamlessly.

22.5.1. Using Apache as a Proxy

If you’re hosting your application on an Apache 2 web server with mod_proxy installed, and you need to make CORS requests to a single domain (or a limited set of domains), you can use Apache to serve as your proxy. One sample configuration (which you would place either in your VirtualHost definition or your.htaccess file is as follows:

SSLProxyEngine on
ProxyPass /app https://www.myexternaldomain.com
ProxyPassReverse /app https://www.myexternaldomain.com

This tells Apache to proxy all requests for '/app' to the domain https://www.myexternaldomain.com. You would then need to set your CORS proxy URL in your CN1 app to "/app/".

The syntax is the same if you’ve multiple domains, but keep attention to the order of the lines to make the proxy working correctly. For example:

SSLProxyEngine on
ProxyPass /app https://www.myexternaldomain1.com
ProxyPassReverse /app https://www.myexternaldomain1.com
ProxyPass /storage https://www.myexternaldomain2.com
ProxyPassReverse /storage https://www.myexternaldomain2.com

This tells Apache to proxy all requests for '/app' to the domain https://www.myexternaldomain1.com and all requests for '/storage' to the domain https://www.myexternaldomain2.com

22.6. Customizing the Splash Screen

Since your application may include many resource files, videos, etc.., the the build-server will generate a splash screen for your app to display while it’s loading. This basically shows a progress indicator with your app’s icon.

You can customize this splash screen by simply modifying the HTML source inside the cn1-splash div tag of your app’s index.html file:

<div id="cn1-splash">
    <img class="icon" src="icon.png"/>

    <img class="progress" src="progress.gif"/>
    <p>...Loading...</p>
</div>

22.7. Debugging

If you run into problems with your app that occur in the Javascript version, you may need to do a little bit of debugging. There are many debugging tools for Javascript, but the preferred tool for debugging Codename One apps is Chrome’s debugger.

If your application crashes and you don’t have a clue where to begin, follow these steps:

  1. Load your application in Chrome.

  2. Open the Chrome debugger.

  3. Enable the "Pause on Exceptions" feature, then click the "Refresh" button to reload your app.

  4. Step through each exception until you reach the one you’re interested in. Chrome will then show you a stack trace that includes the name of the Java source file and line numbers.

    Debugging using Chrome tools
    Figure 495. Debugging using Chrome tools

22.8. Including Third-Party Javascript Libraries

Codename One allows you to interact directly with Javascript using native interfaces. Native interfaces are placed inside your project’s native/javascript directory using a prescribed naming convention. If you want to, additionally, include third-party Javascript libraries in your application you should also place these libraries inside the native/javascript directory but you must specify which files should be treated as "libraries" and which files are treated as "resources". You can do this by adding a file with extension .cn1mf.json file either the root of your native/javascript directory or the root level of the project’s src directory.

22.8.1. Libraries vs Resources

A resource is a file whose contents can be loaded by your application at runtime using Display.getInstance().getResourceAsStream(). In a typical Java environment, resources would be stored on the application’s classpath (usually inside a Jar file). On iOS, resources are packaged inside the application bundle. In the Javascript port, resources are stored inside the APP_ROOT/assets directory. Historically, javascript files have always been treated as resources in Codename One, and many apps include HTML and Javascript files for use inside the BrowserComponent.

With the Javascript port, it isn’t quite so clear whether a Javascript file is meant to be a resource or a library that the application itself uses. Most of the time you probably want Javascript files to be used as libraries, but you might also have Javascript files in your app that are meant to be loaded at runtime and displayed inside a Web View - these would be considered resources.

22.8.2. The Javascript Manifest File

In order to differentiate libraries from resources, you should provide a cn1mf.json file inside your native/javascript directory that specifies any files or directories that should be treated as libraries. This file can be named anything you like, as long as its name ends with cn1mf.json. Any files or directories that you list in this manifest file will be packaged inside your app’s includes directory instead of the assets directory. Additionally it add appropriate <script> tags to include your libraries as part of the index.html page of your app.

If you include the cn1mf.json file in your project’s src directory it could potentially be used to add configuration parameters to platform’s other than Javascript (although currently no other platforms use this feature). If you place it inside your native/javascript directory, then the Javascript port will use the configuration contained therein.

A simple manifest file might contain the following JSON:

{
    "javascript" : {
        "libs" : [
            "mylib1.js"
        ]
    }
}

I.e. It contains a object with key libs whose value is a list of files that should be treated as libraries. In the above example, you’re declaring that the file native/javascript/mylib1.js should be treated as a library. This will result in the following <script> tag being added to the index.html file:

<script src="includes/mylib1.js"></script>
This also caused the mylib1.js file to be packaged inside the includes directory instead of the assets directory.
A project may contain more than one manifest file. This allows you to include manifest files with your cn1libs also. You need to make sure that each manifest file has a different name.
How to NOT generate the <script> tag

In some cases you may want a Javascript file to be treated as a library (i.e. packaged in the includes directory) but not automatically included in the index.html page. Rather than simply specifying the name of the file in the libs list, you can provide a structure with multiple options about the file. E.g.

{
    "javascript" : {
        "libs" : [
            "mylib1.js",
            {
                "file" : "mylib2.js",
                "include" : false
            }
        ]
    }
}

In the above example, the mylib2.js file will be packaged inside the includes directory, but the build server won’t insert its <script> tag in the index.html page.

Library Directories

You can also specify directories in the manifest file. In this case, the entire directory will be packaged inside the includes directory of your app.

If you’re including Javascript files in your app that are contained inside a directory hierarchy, you should specify the root directory of the hierarchy in your manifest file and use the sub "includes" property of the directory entry to specify which files should be included with <script> tags. Specifying the file directly inside the "libs" list will result in the file being packed directly in the your app’s includes directory. This may or may not be what you want.

E.g.

{
    "javascript" : {
        "libs" : [
            "mylib1.js",
            {
                "file" : "mylib2.js",
                "include" : false
            },
            {
                "file" : "mydir1",
                "includes" : ["subfile1.js", "subfile2.js"]
            }
        ]
    }
}

In this example the entire mydir1 directory would be packed inside the app’s includes directory, and the following script tags would be inserted into the index.html file:

<script src="includes/mydir1/subfile1.js"></script>
<script src="includes/mydir1/subfile2.js"></script>
Libraries included from a directory hierarchy may not work correctly with the single file preview that the build server generates. For that version, it will embed the contents of each included Javascript file inside the index.html file, but the rest of the directory contents will be omitted. If your the library depends on the directory hierarchy and supporting files and you require the single-file preview to work, then you may consider hosting the library on a separate server, and including the library directly from there, rather than embedding it inside your project’s "native/javascript" directory.
Including Remote Libraries

The examples so far have demonstrated the inclusion of libraries that are part of the app bundle. However, you can also include libraries over the network by specifying the URL to the library directly. This is handy for including common libraries that are hosted by a CDN.

E.g. The Google Maps library requires the Google maps API to be included. This is accomplished with the following manifest file contents:

{
    "javascript" : {
        "libs" : [
            "//maps.googleapis.com/maps/api/js?v=3.exp"
        ]
    }
}
This example uses the "//" prefix for the URL instead of specifying the protocol directly. This allow the library to work for both http and https hosting. You could however specify the protocol as well:

+

{
    "javascript" : {
        "libs" : [
            "https://maps.googleapis.com/maps/api/js?v=3.exp"
        ]
    }
}
Including CSS Files

CSS files can be included using the same mechanism as is used for Javascript files. If the file name ends with ".css", then it will be treated as a CSS file (and included with a <link> tag instead of a <script> tag. E.g.

{
    "javascript" : {
        "libs" : [
            "mystyles.css"
        ]
    }
}

or

{
    "javascript" : {
        "libs" : [
            "https://example.com/mystyles.css"
        ]
    }
}
Embedding Variables in URLs

In some cases the URL for a library may depend on the values of some build hints in the project. For example, in the Google Maps cn1lib, the API key must be appended to the URL for the API as a GET parameter. E.g. https://maps.googleapis.com/maps/api/js?v=3.exp&key=SOME_API_KEY, but the developer of the library doesn’t want to put his own API key in the manifest file for the library. It would be better for the API key to be supplied by the developer of the actual app that uses the library and not the library itself.

The solution for this is to add a variable into the URL as follows:

{
    "javascript" : {
        "libs" : [
            "//maps.googleapis.com/maps/api/js?v=3.exp&key={{javascript.googlemaps.key}}"
        ]
    }
}

The {{javascript.googlemaps.key}} variable will be replaced with the value of the javascript.googlemaps.key build hint by the build server, so the resulting include you see in the index.html page will be something like:

<script src="//maps.googleapis.com/maps/api/js?v=3.exp&key=XYZ"></script>

22.9. Browser Environment Variables

Native interfaces allow you to interact with the Javascript environment in unlimited ways, but Codename One provide’s a simpler method of obtaining some common environment information from the browser via the Display.getInstance().getProperty() method. The following environment variables are currently available:

Table 14. Property hints for the JavaScript port
NameDescription

browser.window.location.href

A String, representing the entire URL of the page, including the protocol (like http://)

browser.window.location.search

A String, representing the querystring part of a URL, including the question mark (?)

browser.window.location.host

A String, representing the domain name and port number, or the IP address of a URL

browser.window.location.hash

A String, representing the anchor part of the URL, including the hash sign (#)

browser.window.location.origin

A String, representing the protocol (including ://), the domain name (or IP address) and port number (including the colon sign (:) of the URL. For URL’s using the "file:" protocol, the return value differs between browsers

browser.window.location.pathname

A String, representing the pathname

browser.window.location.protocol

A String, representing the protocol of the current URL, including the colon (:)

browser.window.location.port

A String, representing the port number of a URL. + Note: If the port number isn’t specified or if it’s the scheme’s default port (like 80 or 443), an empty string is returned

browser.window.location.hostname

A String, representing the domain name, or the IP address of a URL

User-Agent

The User-agent string identifying the browser, version etc..

browser.language

The language code that the browser is currently set to. (e.g. en-US)

browser.name

the name of the browser as a string.

Platform

a string that must be an empty string or a string representing the platform on which the browser is executing. + For example: "MacIntel", "Win32", "FreeBSD i386", "WebTV OS"

browser.codeName

the internal name of the browser

browser.version

the version number of the browser

javascript.deployment.type

Specifies the deployment type of the app. This will be "file" for the single-file preview, "directory" for the zip distribution, and "war" for the war distribution.

22.10. Changing the Native Theme

Since a web application could potentially be run on any platform, it isn’t feasible to bundle all possible themes into the application (at least it wouldn’t be efficient for most use cases). By default you’ve bundled the iOS7 theme for javascript applications. This means that the app will look like iOS7 on all devices: desktop, iOS, Android, WinPhone, etc…​

You can override this behavior dynamically by setting the javascript.native.theme Display property to a theme that you’ve included in your app. All of the native themes are available on GitHub, so you can easily copy these into your application. The best place to add the theme is in your native/javascript directory - so that they won’t be included for other platforms.

22.10.1. Example: Using Android Theme on Android

As of Codename One 6.0, apps will automatically use the Android theme when run on an Android device, so this example isn’t necessary. However the technique of changing the native theme at runtime is still applicable.

First, download androidTheme.res from the Android port on GitHub, and copy it into your app’s native/javascript directory.

Then in your app’s init() method, add the following:

Display d = Display.getInstance();
if (d.getProperty("User-Agent", "Unknown").indexOf("Android") != -1) {
    d.setProperty("javascript.native.theme", "/androidTheme.res");
}

22.11. Disabling the 'OnBeforeUnload' Handler

By default, apps will display warning/confirm dialog when the user attempts to leave the page.

onbeforeunload prompt dialog

You can explicitly enable or disable this behaviour by setting the "platformHint.javascript.beforeUnloadMessage" display property. Setting the property to null will disable this behaviour, so that users won’t be harassed by this dialog when they navigate away from the app. Setting it to a string value, like "leaving so soon?", will re-enable this behaviour.

Some browsers don’t allow you to specify the message that’s displayed in this dialog. In those browsers, this property can be viewed as boolean: A null value will result in no prompt being shown, and a non-null value will result in a prompt being shown.

22.11.1. Example: Toggling the BeforeUnload Prompt On/Off

Form f = new Form("Test Before Unload", BoxLayout.y());
CheckBox enableBeforeUnload = new CheckBox("Enable Before Unload");
enableBeforeUnload.setSelected(true);
enableBeforeUnload.addActionListener(e->{
    if (enableBeforeUnload.isSelected()) {
        CN.setProperty("platformHint.javascript.beforeUnloadMessage", "Are you sure you want to leave this page?  It might be bad");
    } else {
        CN.setProperty("platformHint.javascript.beforeUnloadMessage", null);
    }
});
f.add(enableBeforeUnload);
f.show();

22.12. Deploying as a Progressive Web App

Out of the box, your app is ready to be deployed as a progressive web app (PWA). That means that users can access the app directly in their browser, but once the browser determines that the user is frequenting the app, it will "politely" prompt the user to install the app on their home screen. Once installed on the home screen, the app will behave like a native app. It will continue to work while offline, and if the user launches the app, it will open without the browser’s navigation bar. If you were to install the native and PWA versions of your app side by side, you would be hard pressed to find the difference - especially on newer devices.

Below is a screenshot from Chrome for Android where the browser is prompting the user to add the app to their home screen.

Add app to homescreen banner
Figure 496. Add app to homescreen banner

If the app is available as a native app, in the Play store, you can indicate this using the javascript.manifest.related_applications and javascript.manifest.prefer_related_applications build hints. Then, instead of prompting the user to add the web app to their home screen, they’ll be prompted to install the native app from the Play store, as shown below.

Add native app banner
Figure 497. Add native app banner
The PWA standard requires that you host your app on over HTTPS. For testing purposes, it will also work when accessed at a localhost address. You can use the Lighthoust PWA analysis tool to ensure compliance.

For more information about Progressive Web Apps see Google’s introduction to the subject.

22.12.1. Customizing the App Manifest File

At the heart of a progressive web app is the web app manifest. It specifies things like the app’s name, icons, description, preferred orientation, display mode (e.g. whether to display browser navigation or to open with the full screen like a native app), associated native apps, etc.. The Codename One build server will automatically generate a manifest file for your app but you can (and should) customize this file via build hints.

Build hints of the form javascript.manifest.XXX will be injected into the app manifest. E.g. To set the app’s description, you could add the build hint:

javascript.manifest.description=An app for doing cool stuff

You can find a full list of available manifest keys here. The build server will automatically generate all of the icons so you don’t need to worry about those. The "name" and "short_name" properties will default to the app’s display name, but they can be overridden via the javascript.manifest.name and javascript.manifest.short_name build hints respectively.

The javascript.manifest.related_applications build hint expects a JSON formatted list, like in the raw manifest file.

One nice feature (discussed above) of progressive web apps, is the ability to specify related applications in the app manifest. Browsers that support the PWA standard use some heuristics to "offer" the user to install the associated native app when it’s clear that the user is using the app on a regular basis. Use the javascript.manifest.related_applications build hint to specify the location of the native version of your app. E.g.

javascript.manifest.related_applications=[{"platform":"play", "id":"my.app.id"}]

You can declare that the native app is the preferred way to use the app by setting the javascript.manifest.prefer_related_applications build hint to "true".

According to the app manifest documentation, this should be used if the related native apps do offer something that the web application can’t do.

22.12.3. Device/Browser Support for PWAs

Chrome and Firefox both support PWAs on desktop and on Android. iOS doesn’t support the PWA standard, however, many aspects of it are supported. E.g. On iOS you can add the app to your home screen, after which time it will appear and behave like a native app - and it will continue to work while offline. However, many other nice features of PWA like "Install this app on your home screen" banners, push notifications, and invitations to install the native version of the app, aren’t supported. it’s unclear when, or even, whether Apple will ever add full support; but most experts predict that they will join the rest of the civilized world and add PWA support in the near future.

On the desktop, Chrome provides an analogous feature to "add to your homescreen": "Add to shelf". If it looks like the user is using the app on a regular basis, and it isn’t yet installed, it will show a banner at the top of the page asking the user if they want to add to their shelf.

Add to shelf banner
Figure 498. Add to shelf banner

Clicking the "Add button" prompts the user for the name they wish the app to appear as:

Add to shelf prompt
Figure 499. Add to shelf prompt

Upon submission, Chrome will generate a real application (on Mac, it will be a ".app", on Windows, an "exe", etc..) which the user can double click to open the app directly in the Chrome. And, importantly, the app will still work when the user is offline.

The app will also appear in their "Shelf" which you can always access at chrome://apps, or by opening the "Chrome App Launcher" app (on OS X this is located in "~/Applications/Chrome Apps/Application Launcher").

Chrome App Launcher
Figure 500. Chrome App Launcher
The Chrome App Launcher lists apps installed both via the Chrome Web Store and via the "Add to Shelf" feature that we discuss here. The features we describe in this article are orthogonal to the Chrome Web Store and won’t be affected by its closure.

People don’t like it when the browser automatically starts playing sounds, or opening links without their permission. For this reason, modern browsers generally restrict your ability to programmatically do these things, unless they are in response to a user action, like a mouse click.

If your app needs to play media (e.g. Media.play()), or open a link (e.g. Display.execute("…​")) without the user actually interacting physically (e.g. key press or pointer press), then it will display a popup dialog confirming that the user actually wants to perform this action.

In some cases this dialog may affect the utility of the app. For example, suppose you want to play a video in response to a voice command. Having to press an "OK" button after the command, may be annoying. For such cases, you can use the platformHint.javascript.backsideHooksInterval property to poll for media play requests on an authorized event.

For example:

CN.setProperty("platformHint.javascript.backsideHooksInterval", "1000");

// Now your app will process media.play() and Display.execute(...) calls
// once per second (1000ms).  If play() or execute() has been called anytime
// in that second (since the last poll), it will seamlessly process the
// request.


// To disable polling, just set it to an interval 0 or lower.
// e.g.
CN.setProperty("platformHint.javascript.backsideHooksInterval", "0");
don’t abuse this feature. You should enable this polling when necessary. E.g. If your app enables the user to listen for voice commands, enable polling for the period of time that it’s listening. When the user wants to stop listening, you should also stop the polling by setting the interval to "0".

22.14. BrowserComponent Lifecycle

On the JavaScript port, BrowserComponent uses an iframe that’s added to the DOM when the component is initialized. Understanding the lifecycle is important when showing Dialog`s over forms that contain `BrowserComponent instances.

22.14.1. Dialogs and BrowserComponent

When a Dialog is shown, the parent Form is deinitialized. This causes any BrowserComponent instances on that form to also be deinitialized, which removes their iframes from the DOM. When the Dialog is dismissed and the parent form is re-shown, the BrowserComponent is reinitialized with a new iframe, losing all JavaScript state.

This affects:

  • Editors (Monaco, CodeMirror) - content and cursor position lost

  • WebRTC connections - broken when removed from DOM

  • Interactive visualizations - charts, maps, diagrams with JavaScript state

  • Any JavaScript state - event listeners, variables, etc.

22.14.2. Preserving BrowserComponent State

To preserve the iframe and its JavaScript state across deinitialization cycles, set the HTML5Peer.removeOnDeinitialize client property to Boolean.FALSE:

BrowserComponent browser = new BrowserComponent();
browser.putClientProperty("HTML5Peer.removeOnDeinitialize", Boolean.FALSE);

This keeps the iframe in the DOM even when the component is deinitialized, preserving all JavaScript state.

22.14.3. Lifecycle Example

Without the property set:

  1. Dialog.show() is called

  2. Parent Form’s `deinitialize() is called

  3. BrowserComponent is deinitialized, iframe removed from DOM

  4. Dialog is dismissed

  5. Parent Form’s `initComponent() is called

  6. BrowserComponent creates a new iframe - JavaScript state is lost

With removeOnDeinitialize=false:

  1. Dialog.show() is called

  2. Parent Form’s `deinitialize() is called

  3. BrowserComponent is deinitialized, but iframe stays in DOM

  4. Dialog is dismissed

  5. Parent Form’s `initComponent() is called

  6. BrowserComponent reconnects to the existing iframe - JavaScript state preserved

23. Working with Mac OS X

23.1. Mac OS Desktop Build Options

You can configure Desktop Mac OS build settings, by opening Codename One Settings, and clicking the "Mac Desktop Settings" button:

Mac Desktop settings
Figure 501. Mac Desktop settings

This will bring you to the following form:

Mac Desktop settings form
Figure 502. Mac Desktop settings form

Here you can provide your certificate(s) as a .p12 file, and select a bundle type.

23.1.1. Bundle Types

There are three bundle types which dictate what the build server produces for you when you build your project as a Desktop Mac OS App.

  1. DMG - Produces a .DMG disk image with your app. This is the preferred format for distributing your app outside of the Mac App Store. If you provide a Developer ID Application certificate (see "Understanding Certificates" below), the app will be signed so that users won’t receive warnings about "Unidentified developer" when they install your app.

  2. Sandboxed DMG - Same as DMG bundle type except that your app is set up to use the app sandbox. Generally this would be used to test an app that’s being distributed via the App Store, since App Store apps must use the sandbox. If you select this bundle type, you’re required to provide a Mac App Distribution Certificate, and you should additionally specify entitlements required for your app to function properly. For more information about the app sandbox, see Apple’s documentation on the subject.

  3. Mac App Store Upload (PKG) - Produces a .PKG file that you can upload to the Mac App Store. This requires that you provide both a Mac App Distribution certificate, and a Mac App Installer certificate (see "Understanding Certificates" below). Both of these certificates should be embedded into a single .p12 file (See "Exporting Certificates as p12" below).

23.1.2. Understanding Mac Certificates

Currently (as of Jan. 5, 2020) the mac.desktop-vm build hint is ignored if you include a certificate with your app. This limitation should be fixed soon.

For the purposes of Mac application distribution, there are 3 types of certificates that you will be interested in. The type(s) of certificate required will depend on the type of bundle you generate. The certificate types are:

  1. Developer ID Application Certificate (Mac applications)

    This type of certificate is used to sign an app to be distributed outside of the Mac App Store as a DMG image. This corresponds to the "DMG" bundle type in Codename one settings. You can easily identity this kind of certificate because its identity will be of the form "Developer ID Application: YOUR COMPANY NAME (SOMECODE)". E.g. Developer ID Application: Acme Widgets Corp. (XYSD5YF).

  2. Mac App Distribution Certificate (Mac App Store)

    This type of certificate is used to sign the.app bundle for an app that’s to be distributed in the Mac App Store. This certificate is required for both the "Sandboxed DMG", and "Mac App Store Upload (PKG)" bundle types. You can easily identify this kind of certificate because its identity will be of the form "3rd Party Mac Developer Application: YOUR COMPANY NAME (SOMECODE)". E.g. 3rd Party Mac Developer Application: Acme Widgets Corp. (XYSD5YF).

  3. Mac App Installer Certificate (Mac App Store)

    This type of certificate is used to sign the.pkg installer for an app that’s being submitted to the Mac App Store. This certificate is required for the "Mac App Store Upload (PKG)" bundle type. You can easily identify this kind of certificate because its identity will be of the form "3rd Party Mac Developer Installer: YOUR COMPANY NAME (SOMECODE)". E.g. 3rd Party Mac Developer Installer: Acme Widgets Corp. (XYXD5YF).

23.1.3. Obtaining Certificates

Apple provides documentation on obtaining certificates on its website but the process described there involves Xcode. This section describes an alternate process that doesn’t require Xcode.

If you have an Apple developer account, you can manage your certificates here.

Mac Developer portal certificates
Figure 503. Mac Developer portal certificates

The screenshot above shows an account that already has the three kinds of certificates you will require:

  1. Developer ID Application - Used for the DMG bundle type.

  2. Mac App Distribution - Used for the Sandboxed DMG and Mac App Store Upload (PKG) bundle types.

  3. Mac App Installer - Used for the Mac App Store Upload (PKG) bundle type.

If your account doesn’t yet have a certificate of the required type, you should begin by pressing the "+" button in the upper right. This will bring you to a page asking "What type of Certificate do you need?". There are two options on this page that you will be interested in:

Creating a new certificate
Figure 504. Creating a new certificate
  1. Production > Mac App Store - For both the Mac App Distribution and Mac App Installer certificates.

  2. Production > Developer ID - For the Developer ID Application certificate.

Select the option corresponding to the certificate you wish to generate. In either case, you’ll be taken to a form to select whether you want an "Installer" certificate or an "Application" certificate. Select the appropriate type.

You will then be prompted to upload a Certificate Signing Request (CSR) file, and it will provide instructions on how to do this via the Keychain app.

You can reuse the same CSR file for generating all 3 certificates.

After generating the certificates, you should download them to your Mac, and import them into your keychain. You should be able to accomplish this by simply double-clicking the downloaded ".cer" file, and following the prompts.

23.1.4. Exporting Certificates as P12

The following section requires access to a Mac, and assumes that you’ve already generated your 3 certificates

Notice that Mac apps may require three different kinds of certificates, yet the settings page provides space for a single certificate (P12) file. This isn’t a mistake. P12 files may contain more than one certificate, and you’re expected to include all of the certificates that the build server may require inside a single P12. The build server will automatically extract the certificates it needs according to the bundle type.

When building the "DMG" bundle type, the build server will look for a "Developer ID Application Certificate" inside the P12. If one is found, it will be used to sign the app bundle.

The "Sandboxed DMG" target will look for a "Mac App Distribution Certificate" certificate in the P12.

The "Mac App Store Upload (PKG)" target will require both a "Mac App Distribution Certificate" and a "Mac App Installer Certificate" to be included in the P12.

The easiest way to produce a P12 that includes all 3 kinds of certificates is to export them from the Keychain Access app (Requires a Mac). Select all 3 certificates at once (using CMD-click), then right click and select "Export 3 Items…​"

Exporting certificates as P12

You will then be prompted to select a location to save the .p12 file, as well as selecting a password for the file.

23.1.5. Entitlements

When distributing apps in the Mac App Store, or when using the "Sandboxed DMG" bundle type, your app is run inside a sandboxed environment, meaning that it doesn’t have access to the outside world. It’s provided its own "sandboxed" container for file system access, and it doesn’t get any network access. If your app requires access to the "outside world", you need to request entitlements for that access. If you select a bundle type that uses the sandbox, you will be shown a list of all of the available entitlements from which you can "check" the ones that you wish to include.

App sandbox entitlements
Figure 505. App sandbox entitlements

For more information about the app sandbox, and a full list of entitlements, see Apple’s documentation on the subject.

You can specify entitlements using the build hint desktop.mac.entitlement.XXXX where XXX is the entitlement you wish to set. E.g. desktop.mac.entitlement.com.apple.security.network.client=true

23.1.6. Custom Info.plist Entries

You can add custom entries to the Info.plist file using the following build hints:

desktop.mac.plist.KEYNAME

Injects the entry with key KEYNAME into the Info.plist file. E.g. desktop.mac.plist.LSApplicationCategoryType=public.app-category.business

24. Working with Codename One Sources

The Codename One SDK is published as a Maven multi-module project. Building the aggregator in the /maven directory compiles every module, installs the artifacts into your local Maven repository, and lets you depend on the exact snapshot you cloned from GitHub.

24.1. Prerequisites

Codename One uses multiple JDKs and Maven profiles during the build. Make sure your development machine includes the following tooling (see BUILDING.md for platform-specific installation tips):

  • JDK 8 (required for the core build and Maven invocations)

  • JDK 17 (required when compiling the Android port)

  • Apache Maven 3.6 or newer

  • macOS with Xcode (if you plan to build or test the iOS port)

24.2. Preparing the Maven workspace

Clone the repository and run the Maven aggregator from inside the maven subdirectory. This installs the complete SDK (core runtime, simulator, and ports) into your local Maven cache:

$ git clone https://github.com/codenameone/CodenameOne
$ cd CodenameOne/maven
$ mvn install

The default build runs every module and its unit tests. Append -DskipTests if you want to skip the test phases to speed up local builds.

The version printed by Maven will usually end with -SNAPSHOT when you build from the master branch. Release builds from Maven Central omit the suffix.

24.3. Installing the Maven archetypes

Codename One ships its project archetypes in a companion repository. Install them once so that mvn archetype:generate (and the Codename One Initializr) can reference your locally built SDK artifacts:

$ git clone https://github.com/shannah/cn1-maven-archetypes
$ cd cn1-maven-archetypes
$ mvn install

24.4. Running tests selectively

The Maven aggregator exposes modules for the different automated test suites. Run any of these from the CodenameOne/maven directory:

  • Core unit tests:

    $ mvn -pl core-unittests test
  • Integration tests (simulator and build client):

    $ mvn -pl tests -am verify

Refer to the READMEs in maven/core-unittests and maven/tests for additional configuration flags, platform requirements, and environment variables.

24.5. Using your local build in application projects

After running the mvn install commands above, the Codename One artifacts are available in your local Maven repository. To consume that build in an application generated from the Codename One Initializr (or any other Maven project), adjust the pom.xml properties to reference your snapshot version:

<properties>
    <!-- Replace with the snapshot printed during mvn install -->
    <cn1.version>{cn1-snapshot-version}</cn1.version>
    <cn1.plugin.version>{cn1-snapshot-version}</cn1.plugin.version>
</properties>

Open the project in your IDE and build or run it. Maven will resolve the local snapshot instead of downloading the latest release from Maven Central.

24.6. Why build from source?

Building the SDK yourself gives you:

  • Immediate access to fixes and features before they reach Maven Central.

  • The ability to inspect, debug, and modify the framework when you need custom behavior.

  • A path to contribute improvements back to the Codename One core.

Once you’re comfortable with the baseline build, continue with the scripts in scripts/ or the BUILDING.md guide to compile specific ports (Android or iOS) or to automate CI workflows.

Appendix A: Project Archetypes

A.1. Codename One Application Project Archetype (cn1app-archetype)

The cn1app-archetype is the basis for all maven Codename One application projects. It provides a multimodule project with the following modules:

See Getting Started with the Bare-Bones Java App Template for details on using this archetype.

Also see Section 1.2.1.2.1, “Bare-bones Java Project” for an example using this archetype from the command-line to create a bare-bones Java project.

A.2. Codename One Library Project Archetype (cn1lib-archetype)

The cn1lib-archetype provides a project for building Codename One libraries. See Section 1.5, “Codename One Libraries” for details on using this archetype.

Appendix B: Maven Goals

B.1. Codename One Build (build)

The build goal is used to send builds to the Codename One build server. It also supports a few local build targets, such as ios-source, which generates an Xcode project, and android-source which generates an Android Gradle project.

This goal is bound to the package phase of the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)”, so you generally don’t need to run this directly.

B.1.1. Example

Listing 33. Submitting a Mac Desktop build directly using this goal.
mvn cn1:build -Dcodename1.platform=javase -Dcodename1.buildTarget=mac-os-x-desktop

B.1.2. Properties

codename1.platform

Specifies the platform to build for. Values include Java SE, android, ios, javascript, and win.

codename1.buildTarget

The build target. Different platforms support different build sets of build targets.

Build TargetPlatformDescription

mac-os-x-desktop

Java SE

Sends a Mac desktop build to the Codename One build server.

windows-desktop

Java SE

Sends a Windows desktop build to the Codename One build server.

android-device

android

Sends an Android build to the Codename One build server.

android-source

android

Generates an Android Gradle project locally that can be opened and built in Android Studio.

ios-device

ios

Sends an iOS build to the Codename One build server.

ios-source

ios

Generates an iOS Xcode project locally that can be opened and built in Xcode.

javascript

javascript

Sends a Javascript build to the Codename One build server.

automated

Set to true to submit build as an automated build. When using this flag, the goal will wait for the build server to complete the build, then download it and save it in the target directory (of the associated module) using standard maven artifact file naming conventions. This allows you to set up automated CI workflows more easily.

Default value is false.

Requires a Codename One enterprise subscription.

open

If set to true, this will automatically open the generated Gradle or Xcode project in Android studio or Xcode. Only applicable to the ios-source and android-source buildTargets.

Default is false

B.2. Generate Legacy cn1lib (cn1lib)

This goal generates a legacy.cn1lib file. it’s bound to the package phase of cn1lib-archetype projects so you generally will never need to run this goal directly.

B.2.1. Output Location

This will output the cn1lib file inside the common/target directory of the root multimodule maven project.

B.3. Compliance Check (compliance-check)

Checks API usage in the project’s "common" module to ensure that it doesn’t use any classes or methods that aren’t supported by Codename One.

This goal is bound to the process-classes phase of both Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” projects and Section A.2, “Codename One Library Project Archetype (cn1lib-archetype)” projects, so you generally shouldn’t ever need to run this goal directly.

B.4. Compile CSS (css)

Compiles the project’s CSS files, generating a theme.res file which is placed in the build/classes directory.

This goal is bound to the process-classes phase of Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” projects, so you generally shouldn’t need to run this goal directly.

B.5. Generate App Project (generate-app-project)

Generates a Maven project using the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” as a basis, and applying an optional project template. This goal can also be used to migrate legacy Codename One Ant-based Application projects into maven.

B.5.1. Usage Example

This goal should not be run inside an existing Maven project directory. It will output a project into a directory named after the artifactId parameter.

Because there is no existing project, you will need to provide the full maven path to the goal.

mvn com.codenameone:codenameone-maven-plugin:$CN1VERSION:generate-app-project \
  -DsourceProject=/path/to/my/ProjectTemplate \
  -DgroupId=com.example \
  -DartifactId=myapp \
  -Dcn1Version=$CN1VERSION
Substitute the latest Codename One plugin version for the $CN1VERSION in the above example.
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

In the above example, assuming all went well, it would output your project into a directory named myapp.

B.5.2. Parameters

cn1Version

The Codename One version that you want to use for the project. This will be manifested as the cn1.version and cn1.plugin.version properties in the common/pom.xml file of the generated project. If omitted it will default to the cn1Version that’s hard-coded in the cn1app-archetype artifact.

sourceProject

The path to an optional project template to use. This may be either a legacy Ant project, or a Maven project that follows the structure of Section A.1, “Codename One Application Project Archetype (cn1app-archetype)”.

artifactId

The artifactId to use for the new project.

groupId

The groupId to use for the new project.

version

The version to use for the new project. Optional.

Default value is "1.0-SNAPSHOT"

packageName

The package name to use for the new project.

This is necessary if the sourceProject property is a Maven project. If the sourceProject is a legacy Ant project, then this property is ignored.

mainName

The main class name to use for the new project.

This is necessary if the sourceProject property is a Maven project. If the sourceProject is a legacy Ant project, then this property is ignored.

B.5.3. Migrating Legacy Ant Projects into Maven

When providing an Ant-based Codename One application project as the sourceProject parameter, this goal will simply generate an equivalent Maven project to the Ant project, with the same settings and sources.

See Section 1.2.2, “Migrating an Existing Project” for examples using this goal to migrate an existing project into Maven.

B.5.4. Project Templates

When using a Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” maven project as the sourceProject parameter, the project will be treated project template template, and perform some basic processing of the source files as necessary convert the template into a real project. This includes replacing all occurrences of ${mainName} and ${packageName} in project sources with the value of the mainName and packageName parameters provided on the command-line.

Additionally any occurrences of mainName and packagePath in file or directory names will be swapped with the values of mainName and packagePath (which is automatically derived from packageName by substituting '.' with file separators).

The generate-app-project.rpf File

The (optional) secret sauce that differentiates a regular Maven project from a Maven project template is the existence of a generate-app-project.rpf file in the root project directory. This file is in rich property file format, and allows you to define a minimal amount of configuration details that the generate-app-project goal needs to convert the template into a real project.

This file may contain the following properties:

template.mainName

The name of the main class that’s currently used in this project. This property isn’t required if the project is already using the mainName placeholder in the file name that contains the main class, and the ${mainName} placeholder in any source code referring to the main class.

Often times it’s easier to specify this property here rather than injecting placeholders into the template source base, because that way the template itself can be used as a valid project.

template.packageName

The package name for the app. This property isn’t required if the project is already using the packagePath placeholder in directories containing your main package files, and the ${packageName} placeholder in any source code that refers to the main package.

Often times it’s easier to specify this property here rather than injecting placeholders into the template source base, because that way the template itself can be used as a valid project.

template.type

Either maven or ant, depending on the project type.

dependencies

An XML snippet containing any additional Maven dependencies that should be added to the project. This is handy of the project template relies on other cn1libs that are on Maven central.

Sample generate-app-project.rpf file
template.mainName=MyApp
template.packageName=com.example
template.type=maven

[dependencies]
====
<dependency>
  <groupId>com.codenameone</groupId>
  <artifactId>googlemaps-lib</artifactId>
  <version>1.0.1</version>
  <type>pom</type>
</dependency>
====

B.5.5. Sample: The Bare-bones Kotlin App Project

As a more complete example of a project template, see the generate-app-project.rpf file in the bare-bones kotlin app template.

This is the template that’s used in Codename One initializr for the Bare-bones Kotlin project.

B.6. Clone Project (clone)

Clones the current project as a new project with a different groupId, artifactId, packageName, and mainName. Resulting project will be made available in the common/target/generated-sources/cn1-cloned-projects directory.

B.6.1. Usage Example

mvn cn1:clone \
  -DgroupId=com.example.newgroup \
  -DartifactId=newapp \
This command is formatted for the bash prompt (e.g. Linux or Mac). It will work on Windows also if you use bash. If you’re on Windows and are using PowerShell or the regular command prompt, then you’ll need to modiy the command slightly. In particular, the entire command would need to be on a single line. (Remove the '\' at the end of each line, and merge lines together, with space between the command-line flags)

In the above example, assuming all went well, it would output your project into a directory named myapp.

B.6.2. Parameters

artifactId

The artifactId to use for the cloned project.

groupId

The groupId to use for the cloned project.

B.7. Create GUI Form (create-gui-form)

The create-gui-form goal will generate a GUI form that can be edited in the GUI builder.

Basic Usage Example

mvn cn1:create-gui-form -DclassName=com.example.MyForm

The above example will generate a GUIBuilder form with the provided class name. It effectively generates two files:

  1. common/src/main/guibuilder/com/example/MyForm.gui

  2. common/src/main/java/com/example/MyForm.java

The paths above assume that this goal was run from the root multimodule maven project. If it were run inside the "common" submodule, then the files would simply be generated in the "src/main/…​" directory of that module. (It would try to create yet another "common" submodule). See Project Structure.

You can then open the GUI builder to edit this form using the cn1:guibuilder goal.

mvn cn1:guibuilder -DclassName=com.example.MyForm

B.7.1. Parmeters

className

(Required) The class name of the form that you wish to generate. E.g com.example.MyForm.

guiType

The type of GUI component to generate. Supports "Form", "Dialog", and "Container". Default value is "Form"

autoLayout

Whether to use autolayout. This is boolean (true/false), and the default value is true.

B.8. Generate cn1lib Project (generate-cn1lib-project)

Generates a Maven cn1lib project (using the cn1lib-archetype) given an ANT cn1lib project as a template.

This is to assist in migrating Ant projects to Maven projects. This won’t make any changes to the source Ant project. It simply generates a new project using the Section A.2, “Codename One Library Project Archetype (cn1lib-archetype)” and copies all of files and configuration from the source project, into the new project.

B.8.1. Usage Example

This goal isn’t run in an existing maven project directory, therefore you need to include the absolute Maven coordinates for the goal.

Suppose you’ve a Ant Codename One library project at /path/to/MyLegacyAntLibraryProject and we want to convert it to a Maven project.

You can run the generate-cn1lib-project goal as follows:

Listing 34. Maven command to migrate an Ant project to Maven.
mvn com.codenameone:codenameone-maven-plugin:$CN1VERSION:generate-cn1lib-project \
  -DsourceProject=/path/to/MyLegacyAntLibraryProject \
  -DgroupId=com.example \
  -DartifactId=my-maven-lib \
  -Dversion=1.0-SNAPSHOT \
  -U
Make sure you substitute the latest codenameone-maven-plugin version for the $CN1VERSION in this command.

Some notes about this command as shown above:

  1. This command is formatted for Unix/Mac on multiple lines, using the \ character to escape the new-lines. On windows the command will need to be all one one line, and you should omit those \ escape characters.

  2. The -U flag tells Maven to update its catalogs to ensure that it can find the $CN1VERSION that you specify.

If all goes well, you should find a new maven project generated in the "my-maven-lib" directory (named after the artifactId that you specified).

To test that the project was generated successfully, try opening the resulting project in your IDE or simply run its "install" goal on the command-line.

E.g.

cd my-maven-lib
mvn install

After running the "install" command, you should be able to add your library as a dependency to a Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” project using the following dependency:

<dependency>
  <groupId>com.example</groupId>
  <artifactId>my-maven-lib-lib</artifactId>
  <version>1.0-SNAPSHOT</version>
  <type>pom</type>
</dependency>
Notice that the artifactId has an extra "-lib" appended. I.e. it’s <artifactId>my-maven-lib-lib</artifactId> and not <artifactId>my-maven-lib</artifactId>. This is because the artifactId that you specify in the generate-cn1lib-project goal is used for the "root" module of the multimodule maven project. The actual "lib" project that you can use as a Maven dependency is the "lib" submodule, which uses the specified artifactId with a "-lib" suffix.

See Section 1.5, “Codename One Libraries” for more information about the resulting maven library project.

B.8.2. Properties

sourceProject

The path to the legacy Ant project that you want to convert to a Maven project.

groupId

The maven groupId to use for the resulting project.

artifactId

The maven artifactId to use for the resulting project.

version

The maven version to use for the resulting project. Default "1.0-SNAPSHOT"

B.9. Generate Desktop App Wrapper (generate-desktop-app-wrapper)

Generates the bootstrapping wrapper class for the Java SE desktop app. This is used by the Java SE module of Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” projects.

Generally you shouldn’t need to call this goal directly.

B.10. Generate GUI Sources (generate-gui-sources)

Generates Java sources from the Codename One GUI builder files. This goal is bound to the process-sources phase of Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” projects, so you generally should never need to run this goal explicitly.

B.11. Generate Native Interfaces (generate-native-interfaces)

Generates stub implementations for all native interfaces defined in the project. This won’t overwrite any existing implemetations that may exist.

You should run this goal explicitly after you create a native interface in your class.

See the Codename One Developer guide section on native interfaces for more information on creating native interfaces.

B.11.1. Usage Example

Suppose you’ve created a native interface as the Java interface com.mycompany.myapp.MyNative, as described in the example in native interfaces.

After creating this (and possibly other) native interfaces in our project, run the generate-native-interfaces Maven goal as follows:

mvn cn1:generate-native-interfaces

By default this generates Java/Objective-C stubs. You can optionally include Swift and Kotlin stubs (both off by default):

mvn cn1:generate-native-interfaces \
  -Dcn1.generateNativeInterfaces.swift=true \
  -Dcn1.generateNativeInterfaces.kotlin=true

This will generate the following files (if they don’t exist yet).

Java SE

Java SE/src/main/java/com/mycompany/myapp/MyNativeImpl.java

ios
  1. ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.h

  2. ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.m

android

android/src/main/java/com/mycompany/myapp/MyNativeImpl.java

android (optional Kotlin)

android/src/main/java/com/mycompany/myapp/MyNativeImpl.kt

javascript

javascript/src/main/javascript/com_mycompany_myapp_MyNativeImpl.js

ios (optional Swift)

ios/src/main/objectivec/com_mycompany_myapp_MyNativeImpl.swift

Open and edit these files to implement your native interface methods as desired.

B.12. GUIBuilder Goal (guibuilder)

The guibuilder goal opens the Codename One GUI builder to edit a specified GUIBuilder form.

B.12.1. Usage

mvn cn1:guibuilder -DclassName=com.example.MyForm

This will open the gui builder to edit the form whose class is com.example.MyForm.

B.12.2. Parameters

className

The fully-qualified name to the form class that you wish to edit. This must have been previously generated using Section B.7, “Create GUI Form (create-gui-form)”.

B.13. Generate Archetype (generate-archetype)

This goal isn’t currently used. It was originally developed as a means of simplifying the maintenance of multiple application archetypes, but this approach was later abandoned in favor of application project templates.

The generate-archetype mojo will generate a new archetype maven project based on an existing archetype project. it’s designed to facilitate the maintenance of several similar archetypes which differe in some dependencies or default project source code. It takes as input a template file which references the base archetype project and specifies what to customize.

Example Usage

mvn cn1:generate-archetype -Dtemplate=/path/to/mytemplate.java

B.13.1. Parameters

template

Required. The path to a template file that should be used to generate the archetype project.

outputDir

Optional. The output directory where the archetype project should be written to. The project will be created at outputDir/artifactId, where the artifactId is as specified in the [archetype] section of the template. By default this will be the current working directory.

This goal doesn’t require a project in order to run. You can run it directly using the full goal coordinates:

mvn com.codenameone:codenameone-maven-plugin:7.0-SNAPSHOT:generate-archetype \
-Dtemplate=/path/to/mytemplate.java

B.13.2. Template Syntax

Here is a sample template file:

Listing 35. A sample template, which is a.java file.
#set( $symbol_pound = '#' )
#set( $symbol_dollar = '$' )
#set( $symbol_escape = '\' )
package ${package};
/*
[archetype] (1)
----
extends=../cn1app-archetype (2)
groupId=com.codenameone.archetypes
artifactId=helloworld2-archetype
version=7.0-SNAPSHOT
----

[dependencies] (3)
----
<dependency>
<groupId>com.codenameone.libs</groupId>
<artifactId>filechooser-lib</artifactId>
<version>1.0-SNAPSHOT</version>
<type>pom</type>
</dependency>
----
 */
import static com.codename1.ui.CN.*;
import com.codename1.ui.*;
import com.codename1.ui.layouts.*;
import com.codename1.io.*;
import com.codename1.ui.plaf.*;
import com.codename1.ui.util.Resources;

/**
 * This file was generated by <a href="https://www.codenameone.com/">Codename One</a> for the purpose
 * of building native mobile applications using Java.
 */
public class ${mainName} {

 private Form current;
 private Resources theme;

 public void init(Object context) {
 // use two network threads instead of one
 updateNetworkThreadCount(2);

 theme = UIManager.initFirstTheme("/theme");

 // Enable Toolbar on all Forms by default
 Toolbar.setGlobalToolbar(true);

 // Pro feature
 Log.bindCrashProtection(true);

 addNetworkErrorListener(err -> {
 // prevent the event from propagating
 err.consume();
 if(err.getError()!= null) {
 Log.e(err.getError());
 }
 Log.sendLogAsync();
 Dialog.show("Connection Error", "There was a networking error in the connection to " + err.getConnectionRequest().getUrl(), "OK", null);
 });
 }


 public void start() {
 if(current!= null){
 current.show();
 return;
 }
 //WebSocket sock;
 Form hi = new Form("Hi World", BoxLayout.y());
 hi.add(new Label("Hello World"));

 hi.show();
 }

 public void stop() {
 current = getCurrentForm();
 if(current instanceof Dialog) {
 ((Dialog)current).dispose();
 current = getCurrentForm();
 }
 }

 public void destroy() {
 }

}
1The [archetype] section specifies details about the archetype project to be generated. E.g. the groupId, artifactId, etc…​
2The extends property in the [archetype] section is required, and points to the location of the archetype project that this template is based on. Path is relative to the location of the template file.
3The [dependencies] section includes content that should be injected into the <dependencies> section of the pom.xml file. Note that this isn’t the pom file for the archetype project itself. it’s the pom.xml file for the project that the archetype project is to generate.

Notice that the above template is velocity template for a java file. It will be used as the source code for the main class in the resulting project. it’s a velocity template because maven’s archetype:generate goal will process it to replace properties such as package and the main class name.

Template Sections
archetype

This is a required section and specifies both the location of the base archetype project from which this project is to be derived, and the the coordinates of the output archetype project, such as groupId, archetypeId, and version.

Example

[archetype]
----
extends=../cn1app-archetype
groupId=com.codenameone.archetypes
artifactId=helloworld2-archetype
version=7.0-SNAPSHOT
----

Properties

extends

Required. The path to the archetype project that this is based on. This should usually be the cn1app-archetype project as it includes the placeholders that this generator relies on for injecting content into the pom.xml file and its project structure was used as a basis for developing this mojo.

groupId

The groupID of the resulting archetype project. You can alternatively use the id property to specify groupId, artifactId and version in a single string.

artifactId

The artifactId of the resulting archetype project. You can alternatively use the id property to specify groupId, artifactId and version in a single string.

version

The version of the resulting archetype project. You can alternatively use the id property to specify groupId, artifactId and version in a single string.

id

A colon-separated string in the format groupId:artifactId:version that can be used as an alternative to groupId, artifactId, and version.

parentGroupId

If the output archetype project should be part of a multi-module project, then this will specify the parent groupId for the <parent> tag in the pom.xml file.

parentArtifactId

If the output archetype project should be part of a multi-module project, then this will specify the parent archetypeId for the <parent> tag in the pom.xml file.

parentVersion

If the output archetype project should be part of a multi-module project, then this will specify the parent archetypeId for the <parent> tag in the pom.xml file.

parent

A colon-delimited string in the format parentGroupId:parentArtifactId:parentVersion that can be used as an alternative to the parentGroupId, parentArtifactId, and parentVersion properties separately.

dependencies

Specify additional dependencies that should be injected into the <dependencies> section of the pom.xml file for the common module of the maven project that the archetype will generate. The content of this section will be injected into the src/main/resources/archetype-resources/common/pom.xml of the archetype project.

Example

[dependencies]
---
<dependency>
    <groupId>com.codenameone.libs</groupId>
    <artifactId>filechooser-lib</artifactId>
    <version>1.0-SNAPSHOT</version>
    <type>pom</type>
</dependency>
---
css

CSS content that should be injected into the theme.css file of the project. This CSS will be injected into the src/main/resources/archetype-resources/common/src/main/css/theme.css file of the archetype project.

Example

[css]
---
#Constants {
    includeNativeBool: true;
}
Button {
    color:green;
    border:1px solid green;
    border-radius: 2mm;
    margin: 5mm;
}
---
properties

Properties that should be appended to the codenameone_settings.properties file. These will be added to the src/main/resources/archetype_resources/common/codenameone_settings.properties file of the archetype project.

Example

[properties]
---
codename1.arg.win.desktop-vm=zuluFx8-32bit
codename1.arg.win.desktopExtractDll=true
codename1.arg.win.launchOnStart=true
codename1.arg.win.runAfterInstall=true
---
files

Files contains a list of files that should be created in the archetype project. All file paths are relative to the "common" project root directory. Each path should have a corresponding section with the heading [file:path/to/file].

Example

[files]
----
src/main/guibuilder/__mainName__MainForm.gui
src/main/java/__mainName__MainForm.java
----

[file:src/main/guibuilder/__mainName__MainForm.gui]
----
<?xml version="1.0" encoding="UTF-8"?>

<component type="Form" layout="LayeredLayout" layeredLayoutPreferredWidthMM="0.0" layeredLayoutPreferredHeightMM="0.0"  autolayout="true" title="${mainName}MainForm" scrollableY="true" name="${mainName}MainForm">
<component type="Button" text="Click Me" name="Button">
<layoutConstraint insets="auto auto auto auto" referenceComponents="-1 -1 -1 -1" referencePositions="0.0 0.0 0.0 0.0" />
</component>
</component>
----

[file:src/main/java/__mainName__MainForm.java]
----
package ${package};
public class ${mainName}MainForm extends com.codename1.ui.Form {
public ${mainName}MainForm() {
this(com.codename1.ui.util.Resources.getGlobalResources());
}

    public ${mainName}MainForm(com.codename1.ui.util.Resources resourceObjectInstance) {
        initGuiBuilderComponents(resourceObjectInstance);
    }

//-- DON'T EDIT BELOW THIS LINE!!!
    protected com.codename1.ui.Button gui_Button = new com.codename1.ui.Button();


// <editor-fold defaultstate="collapsed" desc="Generated Code">
    private void initGuiBuilderComponents(com.codename1.ui.util.Resources resourceObjectInstance) {
        setLayout(new com.codename1.ui.layouts.LayeredLayout());
        setInlineStylesTheme(resourceObjectInstance);
        setScrollableY(true);
                setInlineStylesTheme(resourceObjectInstance);
        setTitle("MyForm");
        setName("MyForm");
        gui_Button.setText("Click Me");
                gui_Button.setInlineStylesTheme(resourceObjectInstance);
        gui_Button.setName("Button");
        addComponent(gui_Button);
        ((com.codename1.ui.layouts.LayeredLayout)gui_Button.getParent().getLayout()).setInsets(gui_Button, "auto auto auto auto").setReferenceComponents(gui_Button, "-1 -1 -1 -1").setReferencePositions(gui_Button, "0.0 0.0 0.0 0.0");
    }// </editor-fold>

//-- DON'T EDIT ABOVE THIS LINE!!!
}
----

B.14. Install Codename One (install-codenameone)

Installs/Updates Codename One into the user’s home directory. This goal is automtically run if a Maven build is attempted and it detects that Codename One isn’t yet installed (in the $HOME/.codenameone) directory.

B.15. Install Legacy Cn1lib (install-cn1lib)

Installs a legacy cn1lib file as a dependency in this application project.

See Section 1.2.3, “Adding Project Dependencies” for more complete coverage of project dependencies.

Generally using this goal explicitly is a last resort. The best solution for installing add-ons into your project is Section 1.2.3.5, “Managing Add-Ons in Control Center”.

B.15.1. Usage Example

mvn cn1:install-cn1lib -Dfile=/path/to/MyLegacyLib.cn1lib

This will generate a Maven pom project for this lib inside the "cn1libs" directory, and it will add a dependency inside the common/pom.xml file.

The generated project isn’t a cn1lib-archetype project, and it isn’t meant to modify. it’s merely a Maven wrapper around the cn1lib file that provides compatibility with Maven’s dependency mechanism.

B.15.2. Removing the Cn1lib Later

If you need to remove the cn1lib later (i.e. revert an installation), you can simply remove the <dependency> tag that was added to the common/pom.xml file for the cn1lib.

You can also remove the directory that was created inside the cn1libs folder for this cn1lib - but this step isn’t strictly necessary.

B.15.3. Parameters

file

Path to the cn1lib file you want to install.

groupId

The groupId to use for the generated pom project. Optional. If not specified, it will use the same groupId as the root project.

artifactId

The artifactId to use for the generated pom project. Optional. If not provided, it will generate an artifactId derived from the project’s artifactId.

version

The version to use for the generated pom project. Optional. If not provided, it will use the project version.

updatePom

A boolean flag indicating whether it should automatically update the pom.xml file with the dependency.

Default is true

overwrite

A boolean flag indicating whether it should overwrite an existing project of the same name. Default false.

Default is false

B.16. Open Designer (designer)

Opens the legacy Codename One designer app to edit the project "theme.res" file.

If your project is using CSS it may not have a theme.res file, thus this goal will fail in this case.

B.16.1. Usage Example

mvn cn1:designer

This will open the Codename One designer.

B.17. Prepare Simulator Classpath (prepare-simulator-classpath)

Sets up some properties and environment variables required for the Codename One simulator to run propertly.

This goal is bound to the initialize phase of the Java SE module of the Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” and should not be executed directly.

B.18. Open Settings (settings)

Opens the Control Center (aka Codename One Settings; aka Codename One Preferences).

B.19. Run Tests (test)

Runs Codename One unit tests.

This goal is bound to the test phase of Section A.1, “Codename One Application Project Archetype (cn1app-archetype)” projects, so that running it directly isn’t necessary. If you build a cn1app-archetype project using:

mvn install

or

mvn package

Then this goal will be executed automatically.

Prevent tests from running using the skipTests flag. E.g. mvn install -DskipTests

B.20. Update Codename One (update)

Updates Codename One. This will update the Codename One tools that reside inside $HOME/.codenameone such as the GUI builder and Control Center. This will also attempt to update the cn1.version and cn1.plugin.version properties in your project’s pom.xml file.

B.20.1. Usage Example

mvn cn1:update

Parameters

newVersion

(Optional) The version to update to. This should be a version number available on Maven central. Will accept a value of "LATEST" to cause it to resolve to the latest version available on Maven central.

If this parameter is omitted, then it will be implicitly set to "LATEST", but it won’t update the cn1.version or cn1.plugin.version properties if they are currently set to a SNAPSHOT version.

See Section 1.3, “Updating Codename One” for more information about updating Codename One.

Appendix C: API

This section isn’t a comprehensive treatment of the Codename One API. For a more in-depth discussion of Codename One and it’s supported APIs, refer to the Developer Guide.

Codename One apps support a subset of the Java SE 8 API as well as its own light-weight runtime and UI component library that includes support for everything that would expect in a mobile application platform.

See the JavaDocs for a full list of supported classes, and check out the source in the git repository.

The Codename One source is open source. Released under GPLv2 with Classpath Exception.

Codename One is much more than an API library. It provides a full tool-chain and eco-system for developing beautiful, performant native mobile apps with a single codebase in Java and Kotlin. Please see the introduction in the Developer guide for a proper overview of Codename One.

C.1. Limitations

No reflection

Codename One apps don’t support reflection because reflection makes it impossible to keep app-size down.

C.2. Kotlin API Support

Codename One apps support the Kotlin Standard Library. Kotlin support is still relatively new, so are still discovering which libraries are compatible. APIs that rely on reflection won’t be supported, but most other libraries should work.

C.3. Add-on Libraries

Add-on libraries can be added to your library in the common/pom.xml file, however, if you use APIs that aren’t supported by Codename One (e.g. which use reflection), then your app will fail to build.

Codename One supports its own library format (cn1lib) which sort of "certifies" that it’s compatible with Codename One. You can browse the growing catalog of available cn1libs inside Codename One Settings.

For more information about cn1libs, see the cn1libs section of the developer guide.

Appendix D: Codename One Settings

The Codename One Settings app (aka Codename One Preferences, aka Control Center) allows you to configure many aspects of your application. This is where you can generate certificates, browse/install add-ons, monitor the status of your cloud builds, configure build hints, and more.

D.1. Opening Codename One Settings

D.1.1. Opening Codename One Settings from Command-line

Use the run.sh (or run.bat, if on Windows) to open Codename One settings:

./run.sh settings

D.1.2. Opening Codename One Settings from IntelliJ

Click on the "Configuration" menu in the upper right of the toolbar, and select "Tools" > "Codename One Settings" as shown below.

intellij open settings

D.1.3. Opening Codename One Settings from NetBeans

Right-click on the project in the project inspector, and select "Maven" > "Open Control Center" as shown below:

netbeans open control center

D.1.4. Opening Codename One Settings from Eclipse

Press the eclipse run as button button, and select the "My Project Settings" option. (Where My Project is the name of your project). E.g.

eclipse open settings

D.2. The Dashboard

Once inside Codename One Settings, you’ll see a dashboard like the following:

control center dashboard

Appendix E: Rich Properties File (rpf) Format

The rich properties file (rpf) format is used to store configuration for the generate-app-project goal. The format is the same as a regular properties file except that it can more easily accommodate properties whose values are "rich" and lengthy.

"Rich" properties use the following syntax.

[keyname] (1)
=== (2)
Key value (3)
=== (4)
1The property key appears on a new line wrapped in square brackets.
2A separator consisting of 3 or more equals signs on the next line.
3The property value, which can be one or more lines of content.
4The separator with the same number of equals signs on a line of its own.

E.1. Example Rich Properties File

firstName=Bob
lastName=Smith
[bio]
====
Bob is a hard worker.
He attended Harvard and is looking for opportunities in the fast food industry.
====
age=23

# A comment that it is ignored
[xmldata]
========
<person>
    <name>Bob Smith</name>
    <age>23</age>
</person>
========

favoriteColor=Brown

Many of the properties of this file are regular properties. There are two rich properties: bio and xmldata.

Historical Reference

25. Working with UWP

The Codename One UWP (Universal Windows Platform) target was discontinued in release 7.0.229. This chapter is retained to document historical context for legacy projects and older blog posts. New projects should target the currently supported Codename One platforms instead.

If you’re maintaining an older codebase or reading archived material that mentions UWP, treat those instructions as historical. The current Maven build templates, initializr output, and IDE shortcuts no longer include a UWP target.


1. Languages that are written from right to left such as Hebrew, Arabic etc.
2. String width is the real expensive part here, the complexity of font kerning and the recursion required to reflow text is a big performance hurdle
3. Image by RegisFrey - Own work, Public Domain, https://commons.wikimedia.org/w/index.php?curid=10298177
4. Fisheye is an effect where the selection stays in place as the list moves around it
6. The text below is from A Wiki of Ice & Fire: http://awoiaf.westeros.org/index.php/A_Game_of_Thrones
7. Event Dispatch Thread
8. Right to left/bidi language such as Hebrew or Arabic
9. Event Dispatch Thread
10. The old Codename One VM